Qtr:3 NON-DPWH Project Performance

Filter by:
Project ID Project Name Agency Ouput Indicator Physical Performance Slippage(%)
30271288 Improving Production Efficiency of Denden's Furniture and Handicraft through Upgrading
Benguet
Department of Science and Technology - CAR No. of firms assisted
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
32875009 Improvement of Barangay Hall, Twin Peaks, Tuba
Benguet
Provincial Local Government of Benguet percent
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
52045756 Science, Technology, Innovation for Berry Benj Wines and jams
Benguet
Department of Science and Technology - CAR Number of firms assisted
(default)
Target: 0
Actual: 0 Expenditure:0 Release:0 Obligation:0
0
58426821 Construction of Gymnasium at Ebbes Elementary School, Banengbeng, Sablan
Benguet
Provincial Local Government of Benguet percent completed
(Cumulative)
Target: 100
Actual: 0 Expenditure: Release:0 Obligation:0
-33.444816053512
66410164 Improvement Of the Road Cut Section along the Dalicno Barangay Road, Ampucao, Itogon
Benguet
Provincial Local Government of Benguet percent completed
(Cumulative)
Target: 79.8
Actual: 0 Expenditure: Release:0 Obligation:0
-16.457811194653
97284484 Managed Internet Service - VSAT Network Services for Quarantine Centers and Medical Facilities - Buguias Man-Atong Evacuation Center Brgy. Baculongan Sur
Benguet
Department of Information and Communications Technology - CAR Percent Completed
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
118817842 Continuing the Productivity Enhancement of Reinzi Natania Farm (Phase 2)
Benguet
Department of Science and Technology - CAR Number of firms assisted
(default)
Target: 1
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
144261243 a) Construction of a (Covid-19) Isolation Building Facility; b) Construction of an Isolation facility of Northern Benguet District Hospital, Abatan, Buguias, Benguet (additional - Phase II); c) Construction of an Isolation Facility of Northern Benguet District Hospital, Abatan, Buguias (Phase II - Additional)
Benguet
Provincial Local Government of Benguet percent
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
158609092 DIGITAL WORKFORCE - RESEARCH AND EVALUATION: Implement the Apprenticeship Program
Benguet
Department of Information and Communications Technology - CAR # of students accepted in the program
(default)
Target: 10
Actual: 6 Expenditure: Release:0 Obligation:0
-40
162442138 Impvt. Of Cotcot Brgy. Rd, Poblacion, Kabayan
Benguet
Provincial Local Government of Benguet percent completed
(Cumulative)
Target: 100
Actual: 0 Expenditure: Release:0 Obligation:0
-25.581395348837
182956711 Tufil PIP
Benguet
National Irrigation Administration - CAR percent completed
(Cumulative)
Target: 100
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
209513945 Baugan - Cayapas CIP (Phase II)
Benguet
National Irrigation Administration - CAR percent completed
(Cumulative)
Target: 100
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
220443117 Galayap CIP
Benguet
National Irrigation Administration - CAR 100% Completed 2,500.00
(default)
Target: 30
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
223514565 Betwag PIP
Benguet
National Irrigation Administration - CAR percent completed
(Cumulative)
Target: 100
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
230314315 Sitio Sookan SIP
Benguet
National Irrigation Administration - CAR 100% Completed
(default)
Target: 89
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
232672657 Baculongan Norte PIS
Benguet
National Irrigation Administration - CAR 100% Completed
(default)
Target: 47
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
232935035 TABA-AO BHS
Benguet
Department of Health - CAR PERCENT COMPLETED
(default)
Target: 0
Actual: 96 Expenditure: Release:0 Obligation:0
0
245077796 Posposok Tilay SIP
Benguet
National Irrigation Administration - CAR 100 % Completed, 8 ha area generated
(Cumulative)
Target: 48
Actual: 100 Expenditure:2943260.53 Release:1667570 Obligation:3263947.06
84
246806562 Betwag PIP
Benguet
National Irrigation Administration - CAR 100 % Completed, 3 ha area generated
(Cumulative)
Target: 50
Actual: 100 Expenditure:253595.97 Release:297573 Obligation:1403310.73
191.66666666667
253097338 Bayabas CIS
Benguet
National Irrigation Administration - CAR 100 % Completed, 9 units Canal Structures, 3.22 km HDPE pipe
(Cumulative)
Target: 38
Actual: 100 Expenditure:435597.55 Release:1357871 Obligation:2297194.42
75
267310518 Extension of Maintenance of DICT fiber optic cable (FOC) in Baguio City and Benguet
Benguet
Department of Information and Communications Technology - CAR number of agencies connected to the Government Network
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
268919292 Construction of Ampusongan Flood Control, Ampusongan, Bakun
Benguet
Provincial Local Government of Benguet percent
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
273235904 REPAIR OF ELEMENTARY LABORATORY SCHOOL MAIN BUILDING, HOME ECONOMICS & SCIENCE AND HEALTH BUILDING
Benguet
Benguet State University PERCENTAGE COMPLETION
(Cumulative)
Target: 100
Actual: 0 Expenditure: Release:0 Obligation:0
-43.015
280245717 Bultot (Pulak) PIS
Benguet
National Irrigation Administration - CAR 100% Completion, Repair of Groundwater Pump irrigation System for 10 Farmer Beneficiaries
(Cumulative)
Target: 0
Actual: 0 Expenditure:0 Release:0 Obligation:0
0
284441000 Improvement along Longboy-Tacal FMR, Labueg, Kapangan
Benguet
Provincial Local Government of Benguet percent
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
288971196 Renovation of Annex A Building for Dialysis Expansion at Benguet General Hospital, La Trinidad
Benguet
Provincial Local Government of Benguet percent
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
294235266 Las-igan Creek - Mankayan Las-igan SIP (Phase II)
Benguet
National Irrigation Administration - CAR 100 % Completed, 11 ha area generated
(Cumulative)
Target: 50
Actual: 100 Expenditure:341019.81 Release:730952 Obligation:1820326.65
78.260869565217
296895227 Const. of New Kapangan District Hospital (KDH) Building (Phase I)
Benguet
Provincial Local Government of Benguet percent completed
(Cumulative)
Target: 100
Actual: 0 Expenditure: Release:0 Obligation:0
-30.202177293935
297958294 Construction of Multi-Purpose Gym for Topdac Elementary School, Topdac, Atok
Benguet
Provincial Local Government of Benguet percent completed
(Cumulative)
Target: 100
Actual: 30 Expenditure: Release:0 Obligation:0
-78.269565217391
301195685 a. Impvt of FMR, EKIp(1M) b. Improvement of Proper Ekip FMR, Ekip, Bokod(4.4M)
Benguet
Provincial Local Government of Benguet percent completed
(Cumulative)
Target: 84.19
Actual: 84.19 Expenditure: Release:0 Obligation:0
200
304185114 Kiweng Labey SIP
Benguet
National Irrigation Administration - CAR 100 % Completed, 12 ha area generated
(Cumulative)
Target: 48
Actual: 100 Expenditure:600524.59 Release:1629923 Obligation:3264822.23
53
334154257 BATUAN SIP PH II
Benguet
National Irrigation Administration - CAR 100% Completed, 88 ha Area Generated
(Cumulative)
Target: 65
Actual: 65 Expenditure:2278308.85 Release:3369551 Obligation:13865137.59
-4.3956043956044
338708364 Construction of Isolation Facility of Northern Benguet District Hospital (NBDH) at Abatan, Buguias
Benguet
Provincial Local Government of Benguet percent completed
(default)
Target: 0
Actual: 0 Expenditure:0 Release:0 Obligation:0
0
347014769 Kidpoan SIP
Benguet
National Irrigation Administration - CAR percent completed
(Cumulative)
Target: 100
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
358278773 Impvt. Along National Rd. Junction-Diboong-Bangao provincial Road
Benguet
Provincial Local Government of Benguet percent completed
(Cumulative)
Target: 100
Actual: 0 Expenditure: Release:0 Obligation:0
-28.95709008241
360570288 Balluay CIS
Benguet
National Irrigation Administration - CAR 100 % Completed, 6 units Canal Structures,5.27 km HDPE pipe
(Cumulative)
Target: 49
Actual: 100 Expenditure:87780.92 Release:1149734 Obligation:2342162.04
61
363560492 Lapalap River Dagdag SIS
Benguet
National Irrigation Administration - CAR 100% Completed
(default)
Target: 13
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
378535180 Equipment Upgrading of Ocataco Construction through S&T Intervention
Benguet
Department of Science and Technology - CAR Number of firms assisted
(default)
Target: 0
Actual: 0 Expenditure:0 Release:0 Obligation:0
0
378802241 Opening and Improvement along Colong to Takayan-Nagawa-Nabuo FMR, Gambang Bakun From: Opening of Colong - Panakiyan - Bagtangan FMR, Gambang
Benguet
Provincial Local Government of Benguet percent completed
(Cumulative)
Target: 100
Actual: 0 Expenditure: Release:0 Obligation:0
-70.3
380665909 Construction of School Building for Saguitlang Elementary School in Saguitlang, Tuba
Benguet
Provincial Local Government of Benguet percent completed
(default)
Target: 30
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
385509558 Demolition and reconstruction of Alternative Learning School(ALS)
Benguet
Provincial Local Government of Benguet percent completed
(Cumulative)
Target: 100
Actual: 0 Expenditure: Release:0 Obligation:0
-36.911265318175
391296564 Repair/Improvement/Upgrading of Bakun RHU
Benguet
Department of Health - CAR Percent completed
(Cumulative)
Target: 100
Actual: 100 Expenditure: Release:1000000 Obligation:781396.19
0
396855938 Construction of Gymnasium at Nalseb Elementary School, Ambassador, Tublay
Benguet
Provincial Local Government of Benguet percent completed
(Cumulative)
Target: 100
Actual: 0 Expenditure: Release:0 Obligation:0
-42.247570764681
405378059 Managed Internet Subscription for BENGUET
Benguet
Department of Information and Communications Technology - CAR Percent completed
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
406145943 Construction of 3 Storey Provincial Health Services Multi-purpose Building, La Trinidad
Benguet
Provincial Local Government of Benguet percent completed
(default)
Target: 80
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
406885069 Construction of a 4 Storey Hospital Building, Phase 2 (3rd floor ICU, surgical ward, 4th floor prayer room, conference room and private room/suites
Benguet
Provincial Local Government of Benguet percent completed
(Cumulative)
Target: 100
Actual: 95.23 Expenditure: Release:0 Obligation:0
-16.728260869565
417403706 B)Improvement of Aguyad-Lebbeng Barangay Road, Tadiangan, Tuba A)20% PDF 2021 (PN-21011)
Benguet
Provincial Local Government of Benguet percent completed
(Cumulative)
Target: 100
Actual: 0 Expenditure: Release:0 Obligation:0
-19.512195121951
424841376 CONSTRUCTION AND SITE IMPROVEMENT OF THE BENGUET AGRI-PINOY TRADING CENTER (BAPTC) MINIMAL PROCESSING AND PACKAGING FACILITY THROUGH DESIGN AND BUILD
Benguet
Benguet State University PERCENTAGE COMPLETION OF BUILDING FOR FOOD PROCESSING
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
427189593 NAKIDOL CREEK POBLACION SIP PH. IV
Benguet
National Irrigation Administration - CAR percent completed
(Cumulative)
Target: 45
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
429612651 TSHI Acop PIP
Benguet
National Irrigation Administration - CAR percent completed
(Cumulative)
Target: 100
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
441790080 Social Pension Program
Benguet
Department of Social Welfare and Development - CAR Percentage of beneficiaries using social pension to augment daily living subsistence and medical needs
(default)
Target: 23687
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
443390737 Coruz-Bajating SIP
Benguet
National Irrigation Administration - CAR 100 % Completed, 11 ha area generated
(Cumulative)
Target: 50
Actual: 86 Expenditure:436527.87 Release:1452479 Obligation:4632273.19
32.926829268293
447105900 Rehab of Alapang-Alno - Tuel Provincial Road, La Trinidad
Benguet
Provincial Local Government of Benguet Percent Completed
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
467702501 Improvement of Multi-purpose Hall, Camp 4, Tuba
Benguet
Provincial Local Government of Benguet percent
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
497981679 Improvement of Multi-Purpose Gym at Alno Kadorie Elementary School (E/S), Alno, La Trinidad
Benguet
Provincial Local Government of Benguet percent completed
(Cumulative)
Target: 100
Actual: 0 Expenditure: Release:0 Obligation:0
-34.019607843137
504412997 Repair/Improvement of Bayabas BHS
Benguet
Department of Health - CAR Percent completed
(Cumulative)
Target: 40
Actual: 40 Expenditure: Release:850000 Obligation:690632.91
250
507991421 Improvement of Multi-Purpose Gym, Colalo, Mankayan
Benguet
Provincial Local Government of Benguet percent completed
(Cumulative)
Target: 100
Actual: 90 Expenditure: Release:0 Obligation:0
20
508143923 Belong Pinanday SIP
Benguet
National Irrigation Administration - CAR 100% Completed
(default)
Target: 80
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
509053532 Improvement of Sookan-Gambang FMR, Bakun
Benguet
Provincial Local Government of Benguet percent
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
518594484 CONSTRUCTION OF COLLEGE OF NURSING BUILDING
Benguet
Benguet State University PERCENTAGE COMPLETION
(Cumulative)
Target: 100
Actual: 91.34 Expenditure: Release:22832782.4 Obligation:22832782.4
-2.3707317073171
523394817 Pudong SIP (Phase II)
Benguet
National Irrigation Administration - CAR 100 % Completed, 2 ha area generated
(Cumulative)
Target: 39
Actual: 100 Expenditure:10079.25 Release:807902 Obligation:1377263.76
80
523800648 ESA and Cash for Work
Benguet
Department of Social Welfare and Development - CAR number of beneficiaries served
(default)
Target: 0
Actual: 279 Expenditure:3142750 Release:3142750 Obligation:3166250
0
525407463 construction of open Canal at Bolo-Tocdo, Poblacion, Buguias
Benguet
Provincial Local Government of Benguet percent completed
(Cumulative)
Target: 100
Actual: 0 Expenditure: Release:0 Obligation:0
-34.461368805569
526097993 Construction of Multi-Purpose Building Phase 2, Catlubong, Buguias, Benguet
Benguet
Provincial Local Government of Benguet percent
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
527050874 Completion of Waterworks System Marlboro, Beckel, La Trinidad
Benguet
Provincial Local Government of Benguet percent completed
(default)
Target: 45
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
545516197 Improvement of Alapang-Alno - Tuel Provincial Road, La Trinidad
Benguet
Provincial Local Government of Benguet percent completed
(default)
Target: 4
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
547739114 Akiki CIS
Benguet
National Irrigation Administration - CAR percent completed
(Cumulative)
Target: 100
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
551892133 Dontog SIP
Benguet
National Irrigation Administration - CAR 100% Completed
(default)
Target: 97
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
552432651 Boosting Agribusiness and Capability of the IP Women of Naguey on Rice Wine Production in Naguey, Atok
Benguet
National Commission on Indigenous Peoples - CAR no of projects implemented
(default)
Target: 1
Actual: 1 Expenditure: Release:125000 Obligation:99210
0
556194380 Paswek Kalipkip CIS
Benguet
National Irrigation Administration - CAR percent completed
(Cumulative)
Target: 100
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
558188628 Esbo PIP
Benguet
National Irrigation Administration - CAR percent completed
(Cumulative)
Target: 0
Actual: 0 Expenditure:0 Release:0 Obligation:0
0
558512138 Rehabilitation of Bucao-Abucot-Taltalpok FMR, Eddet, Kabayan, Benguet
Benguet
Provincial Local Government of Benguet percent
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
566493933 Construciton of Tublay School of Home Industries (Annex) Ground, Tublay Central
Benguet
Provincial Local Government of Benguet percent completed
(Cumulative)
Target: 100
Actual: 0 Expenditure: Release:0 Obligation:0
-31.172138481657
569399445 REPAIR AND IMPROVEMENT OF THE BSU BOKOD ROAD NETWORK
Benguet
Benguet State University LINEAR METER
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
570019006 Improvement of Gadang Copias FMR, Gadang, Kapangan
Benguet
Provincial Local Government of Benguet percent
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
576514507 Balluay CIS
Benguet
National Irrigation Administration - CAR 100 % Completed, 6 units Canal Structures,5.27 km HDPE pipe
(Cumulative)
Target: 48
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
589166572 Pangablan CIS
Benguet
National Irrigation Administration - CAR 100 % Completed, 4 units Canal Structures,1 km HDPE pipe
(Cumulative)
Target: 0
Actual: 100 Expenditure:257784.98 Release:1306611 Obligation:1368404.05
0
605900414 Balingew SIP
Benguet
National Irrigation Administration - CAR percent completed
(Cumulative)
Target: 100
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
607113462 PROJECT FABULOUS
Benguet
Commission on Higher Education - CAR 0
(Maintained)
Target: 100
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
616300369 Tawangan CIS (Upper and Lower)
Benguet
National Irrigation Administration - CAR 100% Completed
(default)
Target: 20
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
624024832 Chackong CIS
Benguet
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
629185564 Completion of Lualhati Fire Sub- Station
Benguet
City Local Government of Baguio City commulative percentage
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
644261325 Improvement along Sayangan-Bacayao FMR, Taloy Norte, Tuba
Benguet
Provincial Local Government of Benguet percent
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
647301466 Improvement of Km. 49-Ambakian FMR (repackaged)
Benguet
Provincial Local Government of Benguet percent completed
(default)
Target: 5
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
657416162 Construction /Improvement of Barangay Hall, Paco, Mankayan
Benguet
Provincial Local Government of Benguet percent
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
670938183 Repair/Improvement/Upgrading of Amgaleyguey BHS
Benguet
Department of Health - CAR Percent completed
(Cumulative)
Target: 80
Actual: 98 Expenditure: Release:1000000 Obligation:787149.22
147.5
675701774 Product Improvement and Efficiency of Mother Sheperd Food Products (Phase 2)
Benguet
Department of Science and Technology - CAR Number of firms assisted
(default)
Target: 1
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
681385197 Yabyabuan PIP
Benguet
National Irrigation Administration - CAR 100 % Completed, 5 ha area generated
(Cumulative)
Target: 38
Actual: 16 Expenditure:44628.46 Release:1113847 Obligation:1874655.28
-78
681868832 Pangablan CIS
Benguet
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
706199263 Sustainable Livelihood Program-PAMANA
Benguet
Department of Social Welfare and Development - CAR Total number of households who received seed capital fund and total number of households trained (Seed Capital Funds, Skills Training, and CBLA)
(Maintained)
Target: 300
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
707145607 Scholarship Program
Benguet
Technical Education and Skills Development Authority - CAR number of enrolled, number of graduates
(default)
Target: 275
Actual: 228 Expenditure: Release:0 Obligation:6654358.801
-17.090909090909
715538131 (const. of mp shade at…) Construction of Gym at Karao Elementary School, Karao, Bokod
Benguet
Provincial Local Government of Benguet percent completed
(Cumulative)
Target: 100
Actual: 97.75 Expenditure: Release:0 Obligation:0
-3.2131011608624
717901835 Completion of Tawang Elementary School, Tawang, La Trinidad
Benguet
Provincial Local Government of Benguet percent
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
742305907 Repair/Improvement/Upgrading of Loo BHS
Benguet
Department of Health - CAR Percent completed
(Cumulative)
Target: 100
Actual: 25 Expenditure: Release:500000 Obligation:500000
-52.758620689655
755882712 Pudong SIP (Phase II)
Benguet
National Irrigation Administration - CAR percent completed
(Cumulative)
Target: 100
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
766226826 Construction of School Building in Midas Elementary School, Midas, Ucab, Itogon, Benguet
Benguet
Provincial Local Government of Benguet percent
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
769939446 Cabaritan SIP
Benguet
National Irrigation Administration - CAR 100% Completed
(default)
Target: 38
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
775401108 Palasaan Bulalacao PIS
Benguet
National Irrigation Administration - CAR 100% Completion, Repair of Groundwater Pump irrigation System for 15 Farmer Beneficiaries
(Cumulative)
Target: 0
Actual: 0 Expenditure:0 Release:0 Obligation:0
0
776171720 Basil CIS
Benguet
National Irrigation Administration - CAR 100% Completed
(default)
Target: 50
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
792510048 CONSTRUCTION OF INFORMATION TECHNOLOGY BUILDING
Benguet
Benguet State University PERCENTAGE COMPLETION OF BUILDING
(Cumulative)
Target: 100
Actual: 100 Expenditure: Release:49999997.14 Obligation:49999997.14
1.528
803907642 Posposok Tilay SIP
Benguet
National Irrigation Administration - CAR percent completed
(Cumulative)
Target: 100
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
807201119 Improving the Production Efficiency of Gaewen Vegetable Farm towards SMART Agriculture
Benguet
Department of Science and Technology - CAR No. of firms assisted
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
807437913 Beleng PIS
Benguet
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0 Expenditure:0 Release:0 Obligation:0
0
810199927 Managed Internet Service - VSAT Network Services for Quarantine Centers and Medical Facilities - Naguey, Atok Barangay Hall
Benguet
Department of Information and Communications Technology - CAR Percent Completed
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
815166838 Tuba CIS
Benguet
National Irrigation Administration - CAR 100 % Completed, 1 units Canal Structures, 1.9 km HDPE pipe
(Cumulative)
Target: 39
Actual: 100 Expenditure:191277.46 Release:777862 Obligation:1275183.09
61
821146883 Balluay CIS
Benguet
National Irrigation Administration - CAR percent completed
(Cumulative)
Target: 100
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
841824603 A. Const. of Naubunan to Brgy. Daklan WW, Daklan; B. Const. of Naubunan to Daklan WW(p-2), Daklan, Bokod
Benguet
Provincial Local Government of Benguet percent completed
(Cumulative)
Target: 100
Actual: 95.5 Expenditure: Release:0 Obligation:0
6.625
852060378 TSHI Acop PIP
Benguet
National Irrigation Administration - CAR 100 % Completed, 4 ha area generated
(Cumulative)
Target: 48
Actual: 100 Expenditure:237420.39 Release:791401 Obligation:1582802.61
53
865567061 IEC and Consultation of the CADT Owners/Holders of the 11 ADs in Benguet prior to Segregation of Titled Properties
Benguet
National Commission on Indigenous Peoples - CAR no of projects implemented in support to delineation function
(default)
Target: 1
Actual: 0 Expenditure: Release:107550 Obligation:3000
-100
873244248 PARTNERSHIP ON KAIBIGAN (DTI)
Benguet
Department of Social Welfare and Development - CAR No. of Households provided with livelihood modalities
(Cumulative)
Target: 0
Actual: 0 Expenditure:0 Release:0 Obligation:0
0
879596924 Completion of Loo National High School Gym, Loo Buguias
Benguet
Provincial Local Government of Benguet percent
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
881647455 Beleng PIS
Benguet
National Irrigation Administration - CAR 100% Completion, Repair of Groundwater Pump irrigation System for 15 Farmer Beneficiaries
(Cumulative)
Target: 0
Actual: 0 Expenditure:0 Release:0 Obligation:0
0
899169622 Sitio Kapongan PIP
Benguet
National Irrigation Administration - CAR 100 % Completed, 4 ha area generated
(Cumulative)
Target: 48
Actual: 100 Expenditure:252847.22 Release:683857 Obligation:1370690.69
103
910603158 Baugan - Cayapas CIP (Phase II)
Benguet
National Irrigation Administration - CAR 100 % Completed, 10 ha area generated
(Cumulative)
Target: 50
Actual: 77 Expenditure:51418.84 Release:570678 Obligation:1834787.19
45.121951219512
938725348 Ligenan SIP
Benguet
National Irrigation Administration - CAR 100 % Completed, 4 ha area generated
(Cumulative)
Target: 38
Actual: 100 Expenditure:309752.72 Release:805163 Obligation:1413605.8
102
945573195 Construction of Isolation Facility at Mulam, Ahin
Benguet
Department of Social Welfare and Development - CAR 100% completion
(default)
Target: 0
Actual: 100 Expenditure:0 Release:107581 Obligation:107788
0
951782823 Conig Pinipin Salat Getena Creek- Kapangan SIP (Phase II)
Benguet
National Irrigation Administration - CAR 100 % Completed, 8 ha area generated
(Cumulative)
Target: 38
Actual: 100 Expenditure:436527.87 Release:1499975 Obligation:2492945.27
73
952929150 Provision of Cash Grants including the amount of Rice Subsidy
Benguet
Department of Social Welfare and Development - CAR Number of Household beneficiaries provided with Conditional Cash Grants
(Maintained)
Target: 11814
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
954146673 Improvement along Daclan-Camangaan-Tickey-Bonagan Provincial Road, Bokod
Benguet
Provincial Local Government of Benguet percent completed
(default)
Target: 30
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
956026813 Repair/Improvement/Upgrading of Baayan BHS
Benguet
Department of Health - CAR Percent completed
(Cumulative)
Target: 40
Actual: 40 Expenditure: Release:1000000 Obligation:865142.33
250
969376306 Road Upgrading and Improvement of Mankayan- Balili Provincial Road
Benguet
Provincial Local Government of Benguet percent completed
(default)
Target: 65
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
972405059 Construction of Two-Storey Multi-purpose Buidling/ Women's Center, Madaymen, Kibungan
Benguet
Provincial Local Government of Benguet percent completed
(Cumulative)
Target: 100
Actual: 0 Expenditure: Release:0 Obligation:0
-21.026653504442
975646615 Opening of Bayeng to Almasi Farm to Market Road, Palina, Kibungan
Benguet
Provincial Local Government of Benguet percent completed
(default)
Target: 5
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
986991720 Completion of Municipal Building with Stage at Ampusongan, Bakun
Benguet
Provincial Local Government of Benguet percent completed
(Cumulative)
Target: 100
Actual: 0 Expenditure: Release:0 Obligation:0
-48.440366972477
991971200 Improvement /Completion of DRRM Building
Benguet
Provincial Local Government of Benguet percent
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
992107631 Bayabas CIS
Benguet
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1013311061 Ulman Tabeyo PIP
Benguet
National Irrigation Administration - CAR 100 % Completed, 5 ha area generated
(Cumulative)
Target: 38
Actual: 100 Expenditure:1662103.09 Release:4670972 Obligation:1841755.85
110
1019334492 Continuing the Production efficiency and Enhancement of N.P. Milo Machine Shop
Benguet
Department of Science and Technology - CAR No. of firms assisted
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
1026880825 Managed Internet Service - VSAT Network Services for Quarantine Centers and Medical Facilities - Natubleng, Buguias Barangay Hall
Benguet
Department of Information and Communications Technology - CAR Percent Completed
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
1034905881 Improvement of Multi-Purpose Hall, Cayapes, Kapangan
Benguet
Provincial Local Government of Benguet percent completed
(Cumulative)
Target: 100
Actual: 81.3 Expenditure: Release:0 Obligation:0
-14.36338921613
1036817773 Bayuga SIP
Benguet
National Irrigation Administration - CAR percent completed
(Cumulative)
Target: 100
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1038382988 Shelpi Creek Sablan Peday - Patad SIP
Benguet
National Irrigation Administration - CAR 100% Completed
(default)
Target: 45
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1051626351 Completion of the Buguias Public Market, Abatan, Buguias
Benguet
Provincial Local Government of Benguet percent completed
(Cumulative)
Target: 100
Actual: 98 Expenditure: Release:0 Obligation:0
3.359756097561
1053229546 Construction of Two Classroom School Building with Comfort Room at Nabalicong Saltin Elementary School, Natubleng, Buguias
Benguet
Provincial Local Government of Benguet percent
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
1054753085 Rehabilitation/ Improvement along Jose Mencio Provincial Road (Sowe-Naguey Section), Atok
Benguet
Provincial Local Government of Benguet percent completed
(Cumulative)
Target: 100
Actual: 0 Expenditure: Release:0 Obligation:0
-30.850306224185
1063255504 Social Pension Program
Benguet
Department of Social Welfare and Development - CAR Number of indigent senior citizens provided with Social Pension
(Maintained)
Target: 25140
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1068378815 Construction of Temporary Treatment and Monitoring Facility (TTMF)
Benguet
Provincial Local Government of Benguet percent completed
(default)
Target: 60
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1073949224 Construction of Child Development Center, Abiang, Atok:Realligned to Const. of School bldg. at Aduyonan ES, Aduyonan, Abiang,
Benguet
Provincial Local Government of Benguet percent completed
(Cumulative)
Target: 100
Actual: 0 Expenditure: Release:0 Obligation:0
-39.927597955707
1075151116 Construction of Sewage Treatment Plant, Capitol, La Trinidad, Bengeut
Benguet
Provincial Local Government of Benguet percent completed
(Cumulative)
Target: 5
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1082832046 Tuba CIS
Benguet
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1089431813 Supplemental Feeding Program
Benguet
Department of Social Welfare and Development - CAR Number of beneficiaries served
(Maintained)
Target: 8905
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1103723135 Regular and Frontloaded Livelihood Projects
Benguet
Department of Social Welfare and Development - CAR No. of Households provided with livelihood modalities
(Cumulative)
Target: 35
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1104973092 Conig Pinipin Salat Getena Creek- Kapangan SIP (Phase II)
Benguet
National Irrigation Administration - CAR percent completed
(Cumulative)
Target: 100
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1133929623 Baculongan Norte PIS
Benguet
National Irrigation Administration - CAR 100% Completed, Repair of Groundwater Pump irrigation System for 10 Farmer Beneficiaries
(Cumulative)
Target: 25
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1143670754 EXPANSION OF THE COLLEGE OF FORESTRY BUILDING
Benguet
Benguet State University PERCENTAGE COMPLETION OF BUILDING
(default)
Target: 10
Actual: 0 Expenditure: Release:0 Obligation:0
-100
1169280983 Scholarship Programs-UAQTEA
Benguet
Technical Education and Skills Development Authority - CAR number of enrolled, number of graduates
(default)
Target: 913
Actual: 539 Expenditure: Release:0 Obligation:63524058
-40.963855421687
1178523713 Kabayan Central CIS
Benguet
National Irrigation Administration - CAR 100% Completed
(default)
Target: 35
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1188797733 Managed Internet Service - VSAT Network Services for Quarantine Centers and Medical Facilities - Sablan Bagong Barangay Hall
Benguet
Department of Information and Communications Technology - CAR Percent Completed
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
1194815798 Construction of Fire Station, Buguias, Benguet
Benguet
Provincial Local Government of Benguet percent
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
1213591224 CONSTRUCTION OF SPOT TRADING BAY ANNEX BUILDING
Benguet
Benguet State University PERCENTAGE COMPLETION
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
1220176830 Upgrading MSMEs thru Science, Technology and Innovation: The Arca's Yard Café
Benguet
Department of Science and Technology - CAR No. of firms assisted
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
1225153967 Supplemental Feeding Program
Benguet
Department of Social Welfare and Development - CAR Number of Children Served
(Maintained)
Target: 9846
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1225341003 Linusod CIS
Benguet
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0 Expenditure:0 Release:0 Obligation:0
0
1232080232 Dalumpi-it SIP
Benguet
National Irrigation Administration - CAR 100% Completed
(default)
Target: 33
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1240698054 Construction of Cabuguiasan Elementary School Building, Natubleng, Buguias
Benguet
Provincial Local Government of Benguet percent
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
1249312359 Managed Internet Service - VSAT Network Services for Quarantine Centers and Medical Facilities - Kabayan Barangay Tawangan
Benguet
Department of Information and Communications Technology - CAR Percent Completed
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
1256898585 CONSTRUCTION OF BIODIVERSITY RESEARCH CENTER - BOKOD CAMPUS
Benguet
Benguet State University PERCENTAGE COMPLETION OF BUILDING
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
1265462309 Managed Internet Service - VSAT Network Services for Quarantine Centers and Medical Facilities - Sinacbat, Bakun Barangay Hall
Benguet
Department of Information and Communications Technology - CAR Percent Completed
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
1267357639 Opening of Bayeng to Almasi Farm to Market Road, Palina, Kibungan
Benguet
Provincial Local Government of Benguet percent completed
(default)
Target: 60
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1279120730 Construction of concrete retaining wall at 1300 level, Poblacion, Itogon
Benguet
Provincial Local Government of Benguet percent completed
(Cumulative)
Target: 100
Actual: 0 Expenditure: Release:0 Obligation:0
-20.8
1282681485 Science, Technology, Innovation for Funcakes Bakeshop
Benguet
Department of Science and Technology - CAR Number of firms assisted
(default)
Target: 0
Actual: 0 Expenditure:0 Release:0 Obligation:0
0
1292192612 Belong-Sayatan SIP
Benguet
National Irrigation Administration - CAR 100% Completed
(default)
Target: 55
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1326360912 Improvement and COmpletion of Barangay Health Station , Banangan, Sablan
Benguet
Provincial Local Government of Benguet percent
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
1332115469 Ulman Tabeyo PIP
Benguet
National Irrigation Administration - CAR percent completed
(Cumulative)
Target: 100
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1344413736 Upgrading of the Production Capacity and Capability of Wow Digital through S&T Intervention
Benguet
Department of Science and Technology - CAR No. of firms assisted
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
1352152650 Kingking CIS
Benguet
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1367093144 Chackong CIS
Benguet
National Irrigation Administration - CAR 100% completed, 0.07 Lined Canal, 2 units canal structures, .04 km HDPE Pipe
(Cumulative)
Target: 25
Actual: 100 Expenditure:365735.37 Release:1636340 Obligation:2220253.91
67
1375682719 Bectey Poblacion CIS
Benguet
National Irrigation Administration - CAR 100% Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1412396736 Opening of Batan-Bolok-Adaoay FMR, Kabayan
Benguet
Provincial Local Government of Benguet percent
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
1415431915 Science, Technology, Innovation for Johecs Cakes and Cupcakes
Benguet
Department of Science and Technology - CAR Number of firms assisted
(default)
Target: 0
Actual: 0 Expenditure:0 Release:0 Obligation:0
0
1423117462 Improvement of Talabis Elementary School, Bangao, Buguias
Benguet
Provincial Local Government of Benguet percent
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
1433891042 Construction of Flood Control and Drainage Canal, Naba, Poblacion, Bakun
Benguet
Provincial Local Government of Benguet percent
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
1453137175 Innovations for Filipinos Working Distantly from the Philippines (iFWD): Support to Uptown Iron Works, a Start-up Enterprise
Benguet
Department of Science and Technology - CAR No. of firms assisted
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
1462076754 Improvement of Pasbol Mankaet FMR, Taaw Section, Buguias
Benguet
Provincial Local Government of Benguet percent
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
1463977472 Provision of Cash Grant to 4Ps beneficiaries including the amount of Rice Subsidy
Benguet
Department of Social Welfare and Development - CAR Number of Household beneficiaries provided with Conditional Cash Grants
(Maintained)
Target: 11015
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1487730797 REPAIR OF THE WATER TANK AT THE TABANGAOEN, BALILI
Benguet
Benguet State University PERCENTAGE COMPLETION
(Cumulative)
Target: 100
Actual: 93 Expenditure: Release:0 Obligation:0
-7
1498013143 Improvement of Kamanbeey Bawing Pokingan FMR, Balili, Mankayan
Benguet
Provincial Local Government of Benguet percent
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
1499316185 Improvement of Mankil-et Lebeng FMR, Catlubong, Buguias
Benguet
Provincial Local Government of Benguet percent completed
(Cumulative)
Target: 100
Actual: 0 Expenditure: Release:0 Obligation:0
-29.518619436876
1507068650 Kingking CIS
Benguet
National Irrigation Administration - CAR 100 % Completed, 4.85 Km HDPE pipe
(Cumulative)
Target: 49
Actual: 27 Expenditure:609182.06 Release:1732395 Obligation:3396853.07
-62
1508678495 Upgrading the Peanut Butter Processing of Tereeque Food Products
Benguet
Department of Science and Technology - CAR No. of firms assisted
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
1515872669 Batanes CIS
Benguet
National Irrigation Administration - CAR 100% Completed
(default)
Target: 20
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1522206102 Construction of 3-storey Provincial Health Services Multi-purpose Building
Benguet
Provincial Local Government of Benguet percent
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
1523687896 Improvement along Camp 1-Indaoac-Twin Peaks Provincial Road, Tuba
Benguet
Provincial Local Government of Benguet percent completed
(default)
Target: 25
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1529972233 Construction of Open Gymnasium at Kayapa Elementary School, Bakun
Benguet
Provincial Local Government of Benguet percent completed
(default)
Target: 20
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1530615243 a. Const. of Annex Bldg( Capitol) Phase IV-40m b. Construction of Annex Building, (Capitol) Phase III -57m
Benguet
Provincial Local Government of Benguet percent completed
(default)
Target: 40
Actual: 50.1 Expenditure: Release:0 Obligation:0
25.25
1537508141 Social Pension Program
Benguet
Department of Social Welfare and Development - CAR Number of beneficiaries served
(Maintained)
Target: 23687
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1546752955 Akiki CIS
Benguet
National Irrigation Administration - CAR 100 % Completed, 6 units Canal Structures,3.57 km HDPE pipe
(Cumulative)
Target: 48
Actual: 100 Expenditure:423630.92 Release:1139862 Obligation:2286866.05
74
1548748689 Managed Internet Service - VSAT Network Services for Quarantine Centers and Medical Facilities - Kayapa, Bakun Barangay Hall
Benguet
Department of Information and Communications Technology - CAR Percent Completed
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
1566904513 Balluay CIS
Benguet
National Irrigation Administration - CAR percent completed
(Cumulative)
Target: 100
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1567422221 Egval Togoy CIS
Benguet
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1571389767 Yabyabuan PIP
Benguet
National Irrigation Administration - CAR percent completed
(Cumulative)
Target: 45
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1579558313 Baayan CIS
Benguet
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1587017212 Ligenan SIP
Benguet
National Irrigation Administration - CAR percent completed
(Cumulative)
Target: 100
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1587382123 Construction of Flood Control with Pathway and Railings beside Tebteb Creek from Tebteb Guard House 1 towards Gibson James Pinas Area at Tebteb, Balili, La Trinidad
Benguet
Provincial Local Government of Benguet percent
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
1591492570 IP Transport Domestic Managed Service (BAGUIO CITY & BENGUET)
Benguet
Department of Information and Communications Technology - CAR Percent completed
(default)
Target: 100
Actual: 0 Expenditure: Release:0 Obligation:0
-100
1594518088 Badiwan-Bongis-Maligsa SIP
Benguet
National Irrigation Administration - CAR 100% Completed
(default)
Target: 40
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1599410218 CONSTRUCTION OF BSU AGRI PROCESSING CENTER - PHASE 1
Benguet
Benguet State University PERCENTAGE COMPLETION OF BUILDING
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
1599949765 Batawil PIP
Benguet
National Irrigation Administration - CAR 100% Completed
(Cumulative)
Target: 0
Actual: 100 Expenditure:108577.66 Release:1036826 Obligation:1145403.51
0
1605823797 Construction of Multi-purpose Gym, Datakan, Kapangan
Benguet
Provincial Local Government of Benguet percent
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
1607056399 Rehabilitation along Besocol-Ballay FMR, Ballay, Kabayan
Benguet
Provincial Local Government of Benguet percent completed
(default)
Target: 50
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1608897584 Paswek Kalipkip CIS
Benguet
National Irrigation Administration - CAR 100 % Completed, 4 units Canal Structures,2.46 km HDPE pipe
(Cumulative)
Target: 50
Actual: 79 Expenditure:351871.61 Release:896306 Obligation:1875591.61
53.658536585366
1630838654 Improvement along Badiwan-City Limit Provincial Road, Tuba
Benguet
Provincial Local Government of Benguet percent completed
(default)
Target: 60
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1659333279 Improvement of Multi-purpose Building (Phase III) Panad West, Poblacion, Mankayan
Benguet
Provincial Local Government of Benguet percent
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
1675308371 Kiweng Labey SIP
Benguet
National Irrigation Administration - CAR percent completed
(Cumulative)
Target: 100
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1691745703 Oring PIP
Benguet
National Irrigation Administration - CAR 100% Completed, 8ha area Generated
(Cumulative)
Target: 100
Actual: 100 Expenditure:166643.4 Release:1307849 Obligation:2762337.39
22.727272727273
1703511232 Managed Internet Service - VSAT Network Services for Quarantine Centers and Medical Facilities - Itogon Quarantine Facility, Malasin, Brgy. Ucab
Benguet
Department of Information and Communications Technology - CAR Percent Completed
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
1713350982 Tufil PIP
Benguet
National Irrigation Administration - CAR 100% Completed, 3 ha area Generated
(Cumulative)
Target: 100
Actual: 100 Expenditure:447369.27 Release:908159 Obligation:1931860.2
31.168831168831
1723799123 Improvement of Alapang-Alno - Tuel Provincial Road, La Trinidad
Benguet
Provincial Local Government of Benguet percent completed
(default)
Target: 10
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1728106177 Linusod CIS
Benguet
National Irrigation Administration - CAR 100% Completion, Repair of Groundwater Pump irrigation System for 6 Farmer Beneficiaries
(Cumulative)
Target: 0
Actual: 0 Expenditure:0 Release:0 Obligation:0
0
1738760542 Esbo PIP
Benguet
National Irrigation Administration - CAR 100 % Completed, 12 ha area generated
(Cumulative)
Target: 50
Actual: 71 Expenditure:98566.5 Release:697126 Obligation:3311947.78
34.722222222222
1759185355 Las-igan Creek - Mankayan Las-igan SIP (Phase II)
Benguet
National Irrigation Administration - CAR percent completed
(Cumulative)
Target: 100
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1762268692 NAKIDOL CREEK POBLACION SIP PH. IV
Benguet
National Irrigation Administration - CAR 100% Completed
(Cumulative)
Target: 62
Actual: 26 Expenditure:2910926.77 Release:4028408 Obligation:18475231.78
-48.837209302326
1783281162 Oring PIP
Benguet
National Irrigation Administration - CAR percent completed
(Cumulative)
Target: 100
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1799456514 Improvement along Yagyagan-Ampusa Provincial Road, Tuba
Benguet
Provincial Local Government of Benguet percent completed
(Cumulative)
Target: 100
Actual: 0 Expenditure: Release:0 Obligation:0
-34.435261707989
1809575855 Baayan CIS
Benguet
National Irrigation Administration - CAR 100 % Completed, 11 units Canal Structures, 1.45 km HDPE pipe
(Cumulative)
Target: 48
Actual: 100 Expenditure:435757.65 Release:999675 Obligation:2069841.78
66
1818201927 Hiring of Job Order Personnel for Technical Support and Operations
Benguet
Department of Information and Communications Technology - CAR Hired Job Order Personnel for Technical Support and Operations
(Cumulative)
Target: 1
Actual: 2 Expenditure: Release:381938.4 Obligation:381938.4
200
1818237394 Langew CIS
Benguet
National Irrigation Administration - CAR 100% Completed
(default)
Target: 12
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1825857731 Road Opening/ Improvement of Dumanegdeg - Sayangan - Guinabayan Farm- to- Market Road, Poblacion, Bakun, Benguet
Benguet
Provincial Local Government of Benguet percent completed
(Cumulative)
Target: 100
Actual: 0 Expenditure: Release:0 Obligation:0
-25.373134328358
1826412866 Improvement of Domestic Water Works Tinekey to Lower Poblacion,Sablan
Benguet
Provincial Local Government of Benguet percent completed
(Cumulative)
Target: 100
Actual: 0 Expenditure: Release:0 Obligation:0
-41.272727272727
1832024689 Product and Productivity Enhancement Agreach Products Corporation
Benguet
Department of Science and Technology - CAR No. of firms assisted
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
1832557278 Baculongan Namatoc CIS
Benguet
National Irrigation Administration - CAR 100% Completed
(default)
Target: 80
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1840389010 Managed Internet Service - VSAT Network Services for Quarantine Centers and Medical Facilities - Ekip, Bokod Barangay Hall
Benguet
Department of Information and Communications Technology - CAR Percent Completed
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
1845393346 Sustainable Livelihood Program
Benguet
Department of Social Welfare and Development - CAR Total number of households who received seed capital fund and total number of households trained (Seed Capital Funds, Skills Training, Employment,and CBLA)
(Maintained)
Target: 567
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1849131585 Banengbeng CIS
Benguet
National Irrigation Administration - CAR 100% Completed
(default)
Target: 80
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1863705021 Batawil PIP
Benguet
National Irrigation Administration - CAR percent completed
(Cumulative)
Target: 100
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1881240566 IADDA: Indigenous Peoples Building (Phase 2) with Maintenance of the Previous Nursery
Benguet
National Commission on Indigenous Peoples - CAR no of projects implemented
(default)
Target: 1
Actual: 1 Expenditure: Release:102680 Obligation:470890
0
1890635483 Construction of National Educators Academy Building Extension
Benguet
Department of Education - CAR Percent Completed
(default)
Target: 25
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1911346631 Rehabilitation of Busan Barangay Road, Colalo, Mankayan
Benguet
Provincial Local Government of Benguet percent completed
(Cumulative)
Target: 100
Actual: 0 Expenditure: Release:0 Obligation:0
-31.034482758621
1912796421 a.Construction of Parking Area and Driveway with Slope Protection at the back of the Legislative (Phase I)-5m B. Impvt. Of Prov'l capitol cmpd.-1M
Benguet
Provincial Local Government of Benguet percent completed
(Cumulative)
Target: 100
Actual: 0 Expenditure: Release:0 Obligation:0
-31.506849315068
1919663999 Construction of Domestic Water Reservoir at All Sitios, Kabayan Barrio, Kabayan
Benguet
Provincial Local Government of Benguet percent
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
1923435130 Shekdan SIP
Benguet
National Irrigation Administration - CAR 100% Completed
(default)
Target: 45
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1944954219 Improvement of Km.49-Ambakian Farm to Market Road
Benguet
Department of Agriculture - CAR number of km constructed
(Cumulative)
Target: 10.79
Actual: 10.6 Expenditure: Release:223862808.22 Obligation:223862808.22
-5.1625239005736
1951934965 Improvement of Ampusongan to Dacugan FMR, Ampusongan, Bakun
Benguet
Provincial Local Government of Benguet percent
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
1955303092 Construction of three-storey Multi-purpose building (Phase 4) Lubas, La Trinidad
Benguet
Provincial Local Government of Benguet percent
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
1957447544 Coruz-Bajating SIP
Benguet
National Irrigation Administration - CAR percent completed
(Cumulative)
Target: 100
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1959241723 Enclosure of Multi-purpose Gym, Poblacion, Sablan
Benguet
Provincial Local Government of Benguet percent completed
(Cumulative)
Target: 100
Actual: 0 Expenditure: Release:0 Obligation:0
-26.963746223565
1961316501 Sitio Kapongan PIP
Benguet
National Irrigation Administration - CAR percent completed
(Cumulative)
Target: 100
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1968333096 Improvement along La Trinidad-Capitol-Bineng Provincial Road, La Trinidad, Benguet
Benguet
Provincial Local Government of Benguet percent completed
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
1972373846 Babatan CIS
Benguet
National Irrigation Administration - CAR 100% Completed
(default)
Target: 60
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1975089485 Opening and Improvement of Kayapa-Bulisay to Beyeng FMR, Kayapa, Bakun
Benguet
Provincial Local Government of Benguet percent completed
(Cumulative)
Target: 100
Actual: 0 Expenditure: Release:0 Obligation:0
-23.076923076923
1994575698 Managed Internet Service - VSAT Network Services for Quarantine Centers and Medical Facilities - Kabayan Public Market
Benguet
Department of Information and Communications Technology - CAR Percent Completed
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
2003094421 Improvement of Access Road to Barangay Hall of Naguey, Atok
Benguet
Provincial Local Government of Benguet percent completed
(Cumulative)
Target: 100
Actual: 0 Expenditure: Release:0 Obligation:0
-41.176470588235
2014727733 Repair/Improvement/Upgrading of Lam-ayan BHS
Benguet
Department of Health - CAR Percent completed
(Cumulative)
Target: 100
Actual: 100 Expenditure: Release:500000 Obligation:470657.32
-1.6666666666667
2017578020 REPAIR OF RIPRAP ALONG THE BSU COLLEGE OF FORESTRY NURSERY
Benguet
Benguet State University PERCENTAGE COMPLETED
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
2038560065 Improvement along National Road Junction-Diboong-Bangao Provincial Road, Kabayan
Benguet
Provincial Local Government of Benguet percent completed
(default)
Target: 90
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
2038731754 Sabdang Creek Sablan Poblacion SIS
Benguet
National Irrigation Administration - CAR 100% Completed
(default)
Target: 70
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
2048957888 Improvement along Bolagabog-Mogao FMR, Ballay, Kabayan, Benguet
Benguet
Provincial Local Government of Benguet percent
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
2053735481 Construction of Gym, Ampaguey Elementary School, Balluay, Sablan
Benguet
Provincial Local Government of Benguet percent completed
(default)
Target: 0
Actual: 0 Expenditure:0 Release:0 Obligation:0
0
2054335333 Bayuga SIP
Benguet
National Irrigation Administration - CAR 100 % Completed, 12 ha area generated
(Cumulative)
Target: 48
Actual: 100 Expenditure:605685.07 Release:1919078 Obligation:4500000
72
2054795105 Construciton of Open Gym at Tapsan Elementary School, Loacan, Itogon
Benguet
Provincial Local Government of Benguet percent completed
(Cumulative)
Target: 0
Actual: 0 Expenditure:0 Release:0 Obligation:0
0
2062378265 Impvt of FMR, EKIp(1M) b. Improvement of Proper Ekip FMR, Ekip, Bokod(5.4M)
Benguet
Provincial Local Government of Benguet Percent Completed
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
2062809512 Managed Internet Service - VSAT Network Services for Quarantine Centers and Medical Facilities - La Trinidad Benguet State University Gladiola Building
Benguet
Department of Information and Communications Technology - CAR Percent Completed
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
2064871417 Improvement of Besocol-Ballay FMR at Barangay Ballay, Kabayan, Benguet
Benguet
Provincial Local Government of Benguet percent
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
2075534493 Balingew SIP
Benguet
National Irrigation Administration - CAR 100 % Completed, 6 ha area generated
(Cumulative)
Target: 38
Actual: 100 Expenditure:298806.86 Release:997630 Obligation:1666524.75
70
2083922730 Improvement of Ta-aw FMR, Ballay, Kabayan, Benguet
Benguet
Provincial Local Government of Benguet percent
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
2084795664 Egval Togoy CIS
Benguet
National Irrigation Administration - CAR 100 % Completed, 12 units Canal Structures, 4.75 km HDPE pipe
(Cumulative)
Target: 50
Actual: 100 Expenditure:449324.72 Release:791585 Obligation:2473704.13
103.65853658537
2088687118 BATUAN SIP PH II
Benguet
National Irrigation Administration - CAR percent completed
(Cumulative)
Target: 100
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
2100105551 Construction of Oil Depot for the Province, La Trinidad
Benguet
Provincial Local Government of Benguet percent completed
(default)
Target: 0
Actual: 0 Expenditure:0 Release:0 Obligation:0
0
2106230025 Palasaan Bulalacao PIS
Benguet
National Irrigation Administration - CAR 100% Completed
(default)
Target: 86
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
2114047393 Pongew Creek Sablan Alog SIP
Benguet
National Irrigation Administration - CAR 100% Completed
(default)
Target: 34
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
2114136551 Kidpoan SIP
Benguet
National Irrigation Administration - CAR 100 % Completed, 6 ha area generated
(Cumulative)
Target: 38
Actual: 100 Expenditure:327817.7 Release:801832 Obligation:1427103.36
105
2139607196 Improvement of Legislative Building
Benguet
Provincial Local Government of Benguet percent completed
(Cumulative)
Target: 100
Actual: 0 Expenditure: Release:0 Obligation:0
-32.569615791329
140527835 S&T Intervention in Upgrading the Processing Center of Emma’s Special Food Manufacturing
Baguio City
Department of Science and Technology - CAR No. of firms assisted
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
149005368 Sidewalk recovery and improvement and rehabilitation of Drainage at Dominican Hill road, Lourdes Proper, san Roque
Baguio City
City Local Government of Baguio City percent completed
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
188276418 Program Management
Baguio City
National Economic and Development Authority - CAR percent completed
(default)
Target: 25
Actual: 0 Expenditure: Release:0 Obligation:0
-100
218073996 Continuation of Sidewalk recovery and improvement from Jose Felipe St. to Legarda Road
Baguio City
City Local Government of Baguio City percent completed
(Cumulative)
Target: 20
Actual: 22.35 Expenditure: Release:3702052.5 Obligation:3702052.5
11.75
242703949 Proposed Tennis Court at Athletic Bowl
Baguio City
City Local Government of Baguio City PERCENTAGE OF ACCOMPLISHMENT
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
337805217 Provision of Cash Grant to 4Ps beneficiaries including the amount of Rice Subsidy
Baguio City
Department of Social Welfare and Development - CAR Number of Household beneficiaries provided with Conditional Cash Grants
(Maintained)
Target: 2934
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
343929547 Social Pension Program
Baguio City
Department of Social Welfare and Development - CAR Number of indigent senior citizens provided with Social Pension
(Maintained)
Target: 5930
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
346977104 Social Pension Program
Baguio City
Department of Social Welfare and Development - CAR Percentage of beneficiaries using social pension to augment daily living subsistence and medical needs
(default)
Target: 3519
Actual: 146418000 Expenditure:0 Release:0 Obligation:150072000
4160684.3137255
351077052 Sidewalk recovery and improvement at Upper P.Burgos road going to Sto.Nino Hospital to Junction Magsaysay
Baguio City
City Local Government of Baguio City percent completed
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
388236982 Supplemental Feeding Program
Baguio City
Department of Social Welfare and Development - CAR Number of Children Served
(Maintained)
Target: 5000
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
409921618 REHABILITATION OF ERODED RIPRAP BELOW LINDAOAN RESIDENCE AT PUROK 2 ALONG LUCNAB ROAD
Baguio City
City Local Government of Baguio City percentage completed
(Cumulative)
Target: 100
Actual: 100 Expenditure: Release:790381.38 Obligation:790381.38
-16.666666666667
453543197 Construction of Perimeter Fence at CBAO and Improvement of CBAO building
Baguio City
City Local Government of Baguio City percent completed
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
481535825 Proposed Tennis Court at Athletic Bowl
Baguio City
City Local Government of Baguio City Percentage of Accomplishment
(Cumulative)
Target: 75
Actual: 51.8 Expenditure: Release:57014888.66 Obligation:0
-6.8933333333333
622260767 Continuation of the construction of sewerline along the creek, Imelda Village barangay, Baguio city
Baguio City
City Local Government of Baguio City percent completed
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
677443938 Sidewalk Recovery and improvement at Hillside road towards Baguio city National High School, Hillside Annex
Baguio City
City Local Government of Baguio City percent completed
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
831308024 Demolition and Reconstruction of Pacdal Day Care center
Baguio City
City Local Government of Baguio City percent completed
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
848069806 Repair/Improvement/Upgrading/Completion of Baguio City Health Services Office Annex Building
Baguio City
Department of Health - CAR Percent completed
(Cumulative)
Target: 14.22
Actual: 17.8 Expenditure: Release:2000000 Obligation:1734288.14
700.28129395218
850528740 Construction of sewerline at Holyghost Extension
Baguio City
City Local Government of Baguio City percent completed
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
852652260 Redevelopment of Bayan Park,Phase II
Baguio City
City Local Government of Baguio City percent completed
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
884029755 Supplemental Feeding Program
Baguio City
Department of Social Welfare and Development - CAR Number of beneficiaries served
(default)
Target: 4960
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
887195046 NEW CONSTRUCTION OF ATAB SUPER HEALTH CENTER
Baguio City
Department of Health - CAR PERCENT COMPLETED
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
910953730 Road recovery from Military Cut-off Road to Loakan Road via Sta. Escolastica Barangay Street
Baguio City
City Local Government of Baguio City percentage of accomplishment
(Cumulative)
Target: 10
Actual: 11 Expenditure: Release:2500000 Obligation:0
10
919319394 Continuation of Sidewalk recovery and improvement From Jose Felipe St. to Legarda Rd.
Baguio City
City Local Government of Baguio City Percentage of Accomplishment
(Cumulative)
Target: 100
Actual: 0 Expenditure: Release:0 Obligation:0
-38.691428571429
939242779 Repair/Improvement/Upgrading of Campo Filipino DHC
Baguio City
Department of Health - CAR Percent completed
(Cumulative)
Target: 100
Actual: 95 Expenditure: Release:500000 Obligation:474898.18
-3.3333333333333
1004023233 CONSTRUCTION OF ATHLETES QUARTERS/ISOLATION FACILITY
Baguio City
City Local Government of Baguio City PERCENT OF ACCOMPLISHMENT
(Cumulative)
Target: 75
Actual: 39 Expenditure: Release:8535732.38 Obligation:0
-48
1086368148 Installation of Pumps at CBAO/Plumbing Works
Baguio City
City Local Government of Baguio City percent completed
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
1119737916 Rehabilitation of the Swimming Pool, Old Bleachers and Old Office Building
Baguio City
City Local Government of Baguio City percent completed
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
1170787968 Social Pension Program
Baguio City
Department of Social Welfare and Development - CAR Number of beneficiaries served
(Maintained)
Target: 3519
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1248046618 Construction of Rain Harvesting and Treatment Facility (Phase II), Busol Watershed, Ambiong, Baguio City
Baguio City
Department of Public Works and Highways - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1250459306 Rehabilitation of Urban Waterway at Botanical Garden
Baguio City
City Local Government of Baguio City percent completed
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
1263863762 REHABILITATION OF MAIN DRAINAGE SYSTEM ALONG HAPPY HOMES LOOP
Baguio City
City Local Government of Baguio City PERCENTAGE COMPLETED
(Cumulative)
Target: 10
Actual: 42 Expenditure: Release:2391149.92 Obligation:2391149.92
320
1311770695 Enhancing the Production Capability of Veckamps Printing Press through S&T Intervention
Baguio City
Department of Science and Technology - CAR No. of firms assisted
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
1419443871 ICT Industry Development Bureau.
Baguio City
Department of Information and Communications Technology - CAR # of preparatory activities conducted for the establishment of ICT Councils
(default)
Target: 0
Actual: 1 Expenditure: Release:0 Obligation:0
0
1430712712 Construction of Athletes Quarters/Isolation Facility
Baguio City
City Local Government of Baguio City percent completed
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
1449135383 Construction of sewerline at Gen. De Jesus Street, north Central Aurora Hill, Baguio City
Baguio City
City Local Government of Baguio City percent completed
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
1475962234 ICT Industry Development Bureau
Baguio City
Department of Information and Communications Technology - CAR # of ICT Councils created, InDev 101
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
1499058033 Repair/Improvement of Pacdal District Health Center
Baguio City
Department of Health - CAR Percent completed
(Cumulative)
Target: 40.12
Actual: 40.19 Expenditure: Release:1000000 Obligation:793589.28
249.42671984048
1523845897 ICT Industry Development Bureau
Baguio City
Department of Information and Communications Technology - CAR # of Strategic Planning Workshop conducted, InDev 102
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
1572327401 ICT Industry Development Bureau
Baguio City
Department of Information and Communications Technology - CAR # of startup related activities conducted/attended
(default)
Target: 0
Actual: 5 Expenditure: Release:0 Obligation:0
0
1588855313 Continuation of construction of sewerline along Balili river, Brookside barangay, Baguio City
Baguio City
City Local Government of Baguio City percent completed
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
1608611475 City Camp DHC
Baguio City
Department of Health - CAR percent completed
(default)
Target: 60
Actual: 57 Expenditure: Release:0 Obligation:0
-5
1676633383 Sidewalk Recovery and improvement along Central Business District
Baguio City
City Local Government of Baguio City percent completed
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
1694997004 Construction of Outdoor Facilities for OCR and Wall Climbing Facility/ Skate park
Baguio City
City Local Government of Baguio City percent completed
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
1833975346 Provision of Cash Grants including the amount of Rice Subsidy
Baguio City
Department of Social Welfare and Development - CAR Number of Household beneficiaries provided with Conditional Cash Grants
(Maintained)
Target: 3214
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1880202899 Perimeter Fence and Rehabilitation of Athletic Bowl Access Road and Gates
Baguio City
City Local Government of Baguio City percent completed
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
1904301527 Repair/Improvement/Upgrading of Pinsao DHC
Baguio City
Department of Health - CAR Percent completed
(Cumulative)
Target: 100
Actual: 100 Expenditure: Release:500000 Obligation:478486.05
0
1950336458 Perimeter Fence and Rehabilitation of Athletic Bowl Access Road and Gates (3)
Baguio City
City Local Government of Baguio City Percentage of Accomplishment
(Cumulative)
Target: 75
Actual: 32 Expenditure: Release:4417500 Obligation:0
-46.130434782609
1954880151 Rehabilitation of Outdoor Archery Range
Baguio City
City Local Government of Baguio City percent completed
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
1989721449 Rehabilitation of Urban Waterway at Botanical Garden
Baguio City
City Local Government of Baguio City Percentage of Accomplishment
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
2027765167 Kayapa SIP
Baguio City
National Irrigation Administration - CAR 100% Completed
(default)
Target: 10
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
2035882727 Construction of Sewerline along the creek from St.Joseph going up to Pacdal and Gibraltar Barangay
Baguio City
City Local Government of Baguio City percent completed
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
2048690365 Construction of sewerline at Gen. De Jesus Street, North Central Aurora Hill, Baguio City
Baguio City
City Local Government of Baguio City Percentage of Accomplishment
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
2070202719 Procurement and Installation of Disinfection Wash Facility, Baguio City
Baguio City
Department of Social Welfare and Development - CAR 100% completion (60 hand washing facilities in 12 barangays of Baguio City)
(default)
Target: 0
Actual: 100 Expenditure:194909.5 Release:194909.5 Obligation:200000
0
2073288811 Sidewalk recovery and improvement at Hillside Rd towards Baguio City National High School, Hillside Annex
Baguio City
City Local Government of Baguio City Percentage of Accomplishment
(Cumulative)
Target: 100
Actual: 39.12 Expenditure: Release:146576.38 Obligation:0
-55.92
2114225975 Greenmuffler/Living Greenscreen Project and Landscape of Island at Magsaysay Flyover, abanao Extension, Happy Homes, Bokawkan
Baguio City
City Local Government of Baguio City percent completed
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
48684397 Construction of Grouted Riprap at Purok 3, Banban, Banban, Conner
Apayao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
53081989 Upgrading of Facilities of Ferdinand Plameras for the production of UPVC
Apayao
Department of Science and Technology - CAR No. of firms assisted
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
53401051 Cabaggaoan SIS
Apayao
National Irrigation Administration - CAR 100% Completed
(default)
Target: 52
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
57322595 Pangkabuhayang Paghahabi Para sa Mga IP - Provision of Loom Weaving Equipment and Supplies for Sipa IP Tribal Mutual Association, Inc of Sta. Marcela
Apayao
National Commission on Indigenous Peoples - CAR no of projects implemented
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:267295
0
63274345 Tabbug CIS
Apayao
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0 Expenditure:0 Release:0 Obligation:0
0
67007669 West Apayao Abulug Irrigation System (WAAIS)-04
Apayao
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
73652149 PARTNERSHIP ON SUSTAINABLE LIVING PROJECT
Apayao
Department of Social Welfare and Development - CAR No. of Households provided with livelihood modalities
(Cumulative)
Target: 0
Actual: 0 Expenditure:0 Release:0 Obligation:0
0
77052015 Upgrading of Facilities and Improvement of Packaging Material of Rosita Food Stand
Apayao
Department of Science and Technology - CAR No. of firms assisted
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
112192395 West Apayao Abulug IS
Apayao
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0 Expenditure:0 Release:0 Obligation:0
0
163670670 West Apayao Abulug Irrigation System (WAAIS)-06
Apayao
National Irrigation Administration - CAR 100% completed, 1 unit of concrete structures
(Cumulative)
Target: 45.31
Actual: 100 Expenditure:51013898.6 Release:44075854 Obligation:80853983.15
76
165982379 WAAIS POW CY 2023-006
Apayao
National Irrigation Administration - CAR 100% Completed
(default)
Target: 46
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
197624954 Construction of Balay Pagpaniyan Daya yApayao
Apayao
Provincial Local Government of Apayao 1 unit building constructed
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:10000000 Obligation:9988275.41
0
201609011 Construction of Multi-purpose Drying Pavement at Sitio Bangko, Guinamgamman, Guinamgaman, Conner
Apayao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
228123898 Construction of Child development center
Apayao
Provincial Local Government of Apayao 1 unit CDC constructed
(Cumulative)
Target: 100
Actual: 0 Expenditure: Release:3000000 Obligation:2990344.1
-49.206896551724
240181955 Construction of PCCP at Purok 2, Malama, Malama, Conner
Apayao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
244484521 Upgrading of Facilities for Concrete Hollowblock Production
Apayao
Department of Science and Technology - CAR Number of firms assisted
(default)
Target: 0
Actual: 0 Expenditure:0 Release:0 Obligation:0
0
245882604 Construction of CDC, Panay, Sta. Marcela, Apayao
Apayao
Provincial Local Government of Apayao 1 unit of CDC facility constructed
(Cumulative)
Target: 100
Actual: 100 Expenditure: Release:3000000 Obligation:2990344.1
4.0542168674699
246320393 Installation of Solar Powered Street Lights, Talifugo, Talifugo, Conner
Apayao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
298555999 Repair and Maintenance (Building & Other Structures-Apayao Justice Hall
Apayao
Provincial Local Government of Apayao 1 unit building repaired and maintained
(Cumulative)
Target: 0
Actual: 99.1 Expenditure: Release:3000000 Obligation:2978040.65
0
299919386 CW-APAYAO-08-2022 / WAAIS
Apayao
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 45
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
326132457 West Apayao Abulug IS
Apayao
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0 Expenditure:0 Release:0 Obligation:0
0
337736791 Improvement of Tanglagan E/S Access Road
Apayao
Provincial Local Government of Apayao access road improved
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:3000000 Obligation:2984821.8
0
363586152 Upgrading of Facilities of Villanueva Restaurant
Apayao
Department of Science and Technology - CAR Number of firms assisted
(default)
Target: 0
Actual: 0 Expenditure:0 Release:0 Obligation:0
0
367849241 RIS TECH4ED Center Launching
Apayao
Department of Information and Communications Technology - CAR number of activities
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
428818883 SITIO PANAWAGAN SIP
Apayao
National Irrigation Administration - CAR 100% completed
(Cumulative)
Target: 47.16
Actual: 86 Expenditure:0 Release:3246373 Obligation:9340819
69.270833333333
430494179 Upgrading of the Facilities and Improvement of the Packaging Material of Real Delicacies for the Production of Fruit and Veggie-Enriched Cakes and other Bakery Products
Apayao
Department of Science and Technology - CAR No. of firms assisted
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
435527383 Provision of Processing Equipment for Peanut Butter and Coco Jam. Nagbabalayan, Kabugao
Apayao
National Commission on Indigenous Peoples - CAR no of projects implemented
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:218749
0
435921655 PARTNERSHIP ON SAAD (DA)
Apayao
Department of Social Welfare and Development - CAR No. of Households provided with livelihood modalities
(Cumulative)
Target: 50
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
453007339 REPAIR/IMPROVEMENT/UPGRADING OF SAN ISIDRO NORTE BHS
Apayao
Department of Health - CAR Percent completed
(Cumulative)
Target: 100
Actual: 100 Expenditure: Release:500000 Obligation:500000
0
460465008 Social Pension Program
Apayao
Department of Social Welfare and Development - CAR Number of indigent senior citizens provided with Social Pension
(Maintained)
Target: 11578
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
538885891 Upgrading of Facilities of Aela's Digital Printing and Online Shop for the Production of Printed Products
Apayao
Department of Science and Technology - CAR No. of firms assisted
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
563627606 Continuing Improvement of the Production of Furniture Products, Building Components and Other Wood Products thru Science & Technology (Phase II)
Apayao
Department of Science and Technology - CAR Number of firms assisted
(default)
Target: 0
Actual: 0 Expenditure:0 Release:0 Obligation:0
0
567729643 NABUANGAN RIVER CUPIZMANGIANGAT PIGOC PH 3
Apayao
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 45
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
573333370 Concreting of Drainage Canal at Purok 2, Guinaang, Guinaang, Conner
Apayao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
580751374 Upgrading of Facilities of GM’s Food Haus for the Production of Baked Products
Apayao
Department of Science and Technology - CAR No. of firms assisted
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
594541306 Upgrading of Facilities of Martina for the Production of Fruit Wine
Apayao
Department of Science and Technology - CAR No. of firms assisted
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
601603284 REPAIR/IMPROVEMENT/UPGRADING OF SAN JOSE BHS
Apayao
Department of Health - CAR Percent completed
(Cumulative)
Target: 100
Actual: 100 Expenditure: Release:500000 Obligation:497946.12
0
611316299 Science & Technology Intervention for the Production of Furniture Products, Building Components and Novelty Items
Apayao
Department of Science and Technology - CAR No. of firms assisted
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
615864351 RIS Tech4Ed Launching (PLGU)
Apayao
Department of Information and Communications Technology - CAR number of activities
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
616239634 Sustainable Livelihood Program
Apayao
Department of Social Welfare and Development - CAR Total number of households who received seed capital fund and total number of households trained (Seed Capital Funds, Skills Training, and CBLA)
(Maintained)
Target: 324
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
624377204 West Apayao Abulug IS
Apayao
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0 Expenditure:0 Release:0 Obligation:0
0
627984804 Construction of Four - Storey College of Teacher Education Building (Reprogrammed)
Apayao
Apayao State College 25% Completion of the Whole CTE Building
(Cumulative)
Target: 26
Actual: 98.54 Expenditure: Release:0 Obligation:14540977.49
109.77
680725727 REPAIR/IMPROVEMENT/UPGRADING OF LUCAB BHS
Apayao
Department of Health - CAR Percent completed
(Cumulative)
Target: 100
Actual: 100 Expenditure: Release:500000 Obligation:489258.21
0
691041931 Science & Technology Intervention for the Production of Furniture Products, Building Components and Novelty Items
Apayao
Department of Science and Technology - CAR Number of firms assisted
(default)
Target: 1
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
699388678 Upgrading the facilities of JH Auto Parts and Accessories trading for the repair and maintenance services of vehicles
Apayao
Department of Science and Technology - CAR No. of firms assisted
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
702363755 Completion of ASC Multipurpose Building (Gym)
Apayao
Apayao State College Percent Completed
(default)
Target: 10
Actual: 94.7 Expenditure: Release:0 Obligation:12561923.74
847
746680382 NABUANGAN RIVER CUPIZMANGIANGAT PIGOC PH 3
Apayao
National Irrigation Administration - CAR 100% completed
(Cumulative)
Target: 33.05
Actual: 74 Expenditure:8102090.96 Release:9354651 Obligation:14796519
41
754304033 Family Transitory Support Package
Apayao
Department of Social Welfare and Development - CAR 100% payment of beneficiaries
(default)
Target: 0
Actual: 0 Expenditure:0 Release:0 Obligation:0
0
772545151 Construction of Four - Storey College of Business and Hospitality Managment Building (Reprogrammed)
Apayao
Apayao State College 25% of the whole structure of the CBHM Building
(default)
Target: 40
Actual: 70.2 Expenditure: Release:0 Obligation:14559974.91
75.5
774781871 REPAIR/IMPROVEMENT/UPGRADING OF BULUAN BIRTHING CENTER
Apayao
Department of Health - CAR Percent completed
(Cumulative)
Target: 100
Actual: 100 Expenditure: Release:500000 Obligation:499954.24
0
778775089 Livelihood for Enhanced Livestock related activities
Apayao
Department of Agriculture - CAR Number of Projects Completed, Number of Beneficiaries Serve, Number of Community Based Enterprise
(default)
Target: 9
Actual: 0 Expenditure: Release:0 Obligation:0
-100
813801320 Construction/Improvement of Upper Atok-Malibang farm to Market Road
Apayao
Provincial Local Government of Apayao 1,143.58 meters of farm to market road improved
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:3000000 Obligation:2994454.52
0
854825549 Dangin CIS
Apayao
National Irrigation Administration - CAR 100% Completed
(default)
Target: 38
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
855224127 New Construction of Calanasan RHU
Apayao
Department of Health - CAR Percent Completed
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
862130567 Construction of MPB (Guinamgamman, Conner)
Apayao
Provincial Local Government of Apayao 1 unit of multi-purpose building constructed.
(Cumulative)
Target: 100
Actual: 100 Expenditure: Release:5000000 Obligation:4977615.4
3.8468346215116
867607551 Upgrading of Facilities of Dumapayao Farms Corporation for the Production of Coconut Flour
Apayao
Department of Science and Technology - CAR Number of firms assisted
(default)
Target: 0
Actual: 0 Expenditure:0 Release:0 Obligation:0
0
867717011 Social Pension Program
Apayao
Department of Social Welfare and Development - CAR Percentage of beneficiaries using social pension to augment daily living subsistence and medical needs
(default)
Target: 11921
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
887515764 Macalino Valley CIS (Sinigpit CIS)
Apayao
National Irrigation Administration - CAR 100% Completed
(default)
Target: 90
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
900466395 Construction of Multi-purpose Drying Pavement at Purok 5, Ili, Ili, Conner
Apayao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
928150308 SITIO PANAWAGAN SIP
Apayao
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
936806065 Improvement of Malekkeg-Panay-Consuelo-Baluyan Provincial Road
Apayao
Provincial Local Government of Apayao 100 meter of provincial road improved with 70 meters of pccp constructed.
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:5000000 Obligation:4992153.77
0
948806626 Repair and Maintenance of the Finance Building
Apayao
Provincial Local Government of Apayao 1 unit building repaired and maintained
(Cumulative)
Target: 100
Actual: 96.45 Expenditure: Release:3000000 Obligation:2980088.91
-0.85156778705165
965865017 West Apayao Abulug Irrigation System (WAAIS)-04
Apayao
National Irrigation Administration - CAR 100% completed, 1 unit of concrete structures
(Cumulative)
Target: 27.63
Actual: 100 Expenditure:35149023.47 Release:68747286 Obligation:49469465.14
92.6
984605598 West Apayao Abulug Irrigation System (WAAIS)-06
Apayao
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
996342824 Malayugan SIP
Apayao
National Irrigation Administration - CAR 100% Completed
(default)
Target: 50
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1012230335 Continuation of Four Storey Academic Building (Phase III)
Apayao
Apayao State College Percent Completed
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
1021564517 Improvement of Barangay Health Station, Allangigan, Allangigan, Conner
Apayao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1053521635 Construction of Banurbur Bridge (Phase II)
Apayao
Provincial Local Government of Apayao 24 linear meter of RCDG Bridge Constructed
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:19600000 Obligation:19384920.47
0
1071527645 West Apayao Abulug Irrigation System (WAAIS)-07 (MOOE)
Apayao
National Irrigation Administration - CAR 100% completed, 12.744 km of service road
(Cumulative)
Target: 0
Actual: 100 Expenditure:0 Release:46603975 Obligation:0
0
1119943979 Construction/Improvement of Swan-Dona Loreta Road
Apayao
Provincial Local Government of Apayao 495 meters of road improved with 213 meters of portland cement concrete pavement
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:3000000 Obligation:2984844.27
0
1124156054 Construction/Improvement of Malubibit Sur FMR
Apayao
Provincial Local Government of Apayao farm to market road improved.
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:3000000 Obligation:2971573.71
0
1130931346 Construction of Multi Purpose Center Phase II
Apayao
Provincial Local Government of Apayao 1-unit multi-Purpose center Constructed.
(Cumulative)
Target: 0
Actual: 100 Expenditure: Release:3000000 Obligation:2970536.82
0
1138089775 Supplemental Feeding Program
Apayao
Department of Social Welfare and Development - CAR Number of beneficiaries served
(Maintained)
Target: 3385
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1159923864 West Apayao Abulug Irrigation System (WAAIS)-001
Apayao
National Irrigation Administration - CAR 100% completed, 1.2 km of gravel road
(Cumulative)
Target: 0
Actual: 100 Expenditure:86564341.96 Release:1376406 Obligation:99224036.75
0
1189027732 Anninipan Payanan SIP
Apayao
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0 Expenditure:0 Release:0 Obligation:0
0
1191267433 Construction of Access Road to PPO New Site
Apayao
Provincial Local Government of Apayao 1.58 kilometers of access road constructed
(Cumulative)
Target: 100
Actual: 88.46 Expenditure: Release:10000000 Obligation:9805218.48
22.275890298813
1191751695 Purag CIS
Apayao
National Irrigation Administration - CAR 100% Completed
(default)
Target: 90
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1211440936 Delineation of Zumigui Ancestral Domain
Apayao
National Commission on Indigenous Peoples - CAR number of stages of CADT application completed
(default)
Target: 0
Actual: 1 Expenditure: Release:0 Obligation:20550
0
1221363488 Smart Packaging of Rice for R.P. Manuel Rice Mill
Apayao
Department of Science and Technology - CAR Number of firms assisted
(default)
Target: 1
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1224497163 Improvement of Karikitan-Allangigan FMR
Apayao
Provincial Local Government of Apayao .317 kilometer of farm to market roads improved
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:5000000 Obligation:4970380.98
0
1254655499 Continuation of Four Storey Academic Building (Phase III)
Apayao
Apayao State College Percent Completed
(Cumulative)
Target: 80
Actual: 95.49 Expenditure: Release:0 Obligation:0
50.370588235294
1268499738 Improvement of Anninipan-Allig-Allacapan Provincial Road
Apayao
Provincial Local Government of Apayao 0.286 kilometers of provincial road improved
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:5000000 Obligation:4991319.17
0
1290948638 Construction of Provincial Agriculture Office
Apayao
Provincial Local Government of Apayao 1 unit office constructed
(Cumulative)
Target: 0
Actual: 49.82 Expenditure: Release:15000000 Obligation:14761387.81
0
1339123118 West Apayao Abulug Irrigation System (WAAIS)-03
Apayao
National Irrigation Administration - CAR 100% completed, 1.09 km of concrete lined canal, 3 units of concrete structures
(Cumulative)
Target: 24.26
Actual: 100 Expenditure:92820668.41 Release:35617063 Obligation:98887747.76
99.31
1361118500 Sustainable Livelihood Program
Apayao
Department of Social Welfare and Development - CAR Total number of households who received seed capital fund and total number of households trained (Seed Capital Funds, Skills Training, and CBLA)
(Maintained)
Target: 68
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1370278063 Concreting of Barangay road at Purok 5, Daga, Daga, Conner
Apayao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1371055491 Upgrading of Facilities of Arlydz Catering Services for the Production of Native Delicacies and other bakery products
Apayao
Department of Science and Technology - CAR Number of firms assisted
(default)
Target: 0
Actual: 0 Expenditure:0 Release:0 Obligation:0
0
1382823409 DAGA SIP
Apayao
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1400838408 Managed Internet Subscription for APAYAO
Apayao
Department of Information and Communications Technology - CAR Percent completed
(Cumulative)
Target: 100
Actual: 0 Expenditure: Release:0 Obligation:0
-55.24861878453
1424904841 Construction/Improvement of OAS-ENR Access Road
Apayao
Provincial Local Government of Apayao 0.135 kilometers of access road improved
(Cumulative)
Target: 100
Actual: 100 Expenditure: Release:3000000 Obligation:2609897.26
0.072310314549861
1427144974 Continuation of BSHRM Building, Phase III
Apayao
Apayao State College Percent Completed
(Cumulative)
Target: 70
Actual: 19.49 Expenditure: Release:0 Obligation:0
-69.85
1440738522 Construction/Improvement of Hugo-Lupi-Kadikitan (Kabugao) FMR
Apayao
Provincial Local Government of Apayao 7.70 kms. FMR improved.
(Cumulative)
Target: 100
Actual: 100 Expenditure: Release:15000000 Obligation:14775024.57
-13.976917057903
1460448449 West Apayao Abulug Irrigation System (WAAIS)-03
Apayao
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1472347188 Construction of PCCP at Sitio Pugo, Paddaoan, Paddaoan, Conner
Apayao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1502501436 Marimay Small Reservoir Irrigation Project
Apayao
National Irrigation Administration - CAR 100% completed, 450 ha generated
(Cumulative)
Target: 24.26
Actual: 9 Expenditure:0 Release:6606070 Obligation:0
-62.901896125309
1538155167 West Apayao Abulug IS
Apayao
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0 Expenditure:0 Release:0 Obligation:0
0
1570463490 Improvement of Sta.Maria - Mallig - Upper Atok Farm to Market Road
Apayao
Department of Agriculture - CAR number of kilometer constructed
(Cumulative)
Target: 11.8
Actual: 11.8 Expenditure: Release:195952888 Obligation:195952888
1.1764705882353
1578866898 Construction of CDC, Tumog, Luna, Apayao
Apayao
Provincial Local Government of Apayao 1 unit of CDC facility constructed
(Cumulative)
Target: 100
Actual: 100 Expenditure: Release:3000000 Obligation:2990344.1
4.0542168674699
1596731382 Regular and Frontloaded Livelihood Projects
Apayao
Department of Social Welfare and Development - CAR No. of Households provided with livelihood modalities
(Cumulative)
Target: 34
Actual: 0 Expenditure:0 Release:0 Obligation:0
-89.473684210526
1616236939 Improvement of Poblacion-Laco-Kumao-Baliwanan-Lagnao-Ferdinand Provincial Road
Apayao
Provincial Local Government of Apayao 26.25 kilometers of provincial road improved
(Cumulative)
Target: 100
Actual: 100 Expenditure: Release:25000000 Obligation:24775359.85
7.7201704545455
1660357042 Livelihood for Enhancement High Value Crops Related activities
Apayao
Department of Agriculture - CAR Number of Projects Completed, Number of Beneficiaries Serve, Number of Community Based Enterprise
(default)
Target: 1
Actual: 0 Expenditure: Release:0 Obligation:0
-100
1683799021 New Construction of Kabugao Super Health Center
Apayao
Department of Health - CAR Percent Completed
(default)
Target: 50
Actual: 7.8 Expenditure: Release:0 Obligation:0
-84.4
1700565214 West Apayao Abulug Irrigation System (WAAIS)-07 (MOOE)
Apayao
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1718499418 Construction of PCCP at Sitio Paddig, Cagalayan, Caglayan (New Pob.), Conner
Apayao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 74
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1722303925 Concreting of Pathway at Sitio Simud-Nanawatan-Bugbog, Nabuangan, Nabuangan, Conner
Apayao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1743352466 Improvement of Barangay Health Station, Ripang, Ripang (Old Pob.), Conner
Apayao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1797295274 Science and Technology Intervention to Increase the Productivity of H.N.D. Motor Vehicle Parts and Accessories Shop
Apayao
Department of Science and Technology - CAR No. of firms assisted
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
1818628478 Improvement of Marag-Cadaclan-Eva Provincial Road (Cagandungan-Cadaclan Sec.)
Apayao
Provincial Local Government of Apayao 0.32 kilometers of Rrovincial Road
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:15000000 Obligation:14556680.65
0
1838597150 REPAIR/IMPROVEMENT/UPGRADING OF ALEM BHS
Apayao
Department of Health - CAR Percent completed
(Cumulative)
Target: 100
Actual: 100 Expenditure: Release:500000 Obligation:497642.77
0
1860931527 Completion of Karikitan Multi Purpose Building
Apayao
Provincial Local Government of Apayao 1 unit multi purpose building constructed
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:3500000 Obligation:3476630.86
0
1886502560 Construction of Eleazar-Ferdinand Farm to Market Road
Apayao
Provincial Local Government of Apayao 5.160 kilometer of farm to market road constructed..
(Cumulative)
Target: 0
Actual: 95.76 Expenditure: Release:25000000 Obligation:24539352.55
0
1897050673 REPAIR/IMPROVEMENT/UPGRADING OF STA. MARCELA RHU
Apayao
Department of Health - CAR Percent completed
(Cumulative)
Target: 95
Actual: 97 Expenditure: Release:1000000 Obligation:990428.78
107.36842105263
1923196075 DAGA SIP
Apayao
National Irrigation Administration - CAR 100% completed, 5 HA Generated
(Cumulative)
Target: 21
Actual: 100 Expenditure:1700000 Release:2926811 Obligation:3944312
77
1933199067 Installation of Solar Powered Street Lights, Sacpil, Sacpil, Conner
Apayao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1937520782 West Apayao Abulug IS (07)
Apayao
National Irrigation Administration - CAR 100% Completed
(default)
Target: 72
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1947317627 Construction of Multi- Purposed Drying Pavement at Sitio Mehacan, Katablangan and Sitio Cuhoban, Manag, Katablangan, Conner
Apayao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1959318231 Installation of Solar Powered Street Lights, Karikitan, Karikitan, Conner
Apayao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1964516362 Continuing Iprovement of the Production of Furniture Products, Building Components and Other Wood Products thru Science & Technology (Phase II)
Apayao
Department of Science and Technology - CAR No. of firms assisted
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
1965047060 Upgrading/Improvement of Guina ang-Buguit Road
Apayao
Provincial Local Government of Apayao 3.205 kms. Road improved
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:3000000 Obligation:2937916.1
0
1981299995 West Apayao Abulug IS
Apayao
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0 Expenditure:0 Release:0 Obligation:0
0
1987198982 West Apayao Abulug Irrigation System (WAAIS)-001
Apayao
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
2023394933 Improvement of Barangay Health Station, Mawigue, Mawegui, Conner
Apayao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
2030581469 Pega Len-ey CIS
Apayao
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
2039076790 Ground Improvement of PNP Payanan
Apayao
Provincial Local Government of Apayao PNP ground improved
(Cumulative)
Target: 100
Actual: 90.17 Expenditure: Release:20000000 Obligation:19844407.75
8.3560193587417
2047332861 Construction/Improvement of Lagac-Pinsal FMR
Apayao
Provincial Local Government of Apayao 1.7 kilometer of farm to market road improved
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:5000000 Obligation:4979662.14
0
2058738664 Value-Adding of Rice thru Rice Milling
Apayao
Department of Science and Technology - CAR Number of firms assisted
(default)
Target: 0
Actual: 0 Expenditure:0 Release:0 Obligation:0
0
2075604917 Continuation of BSHRM Building, Phase III
Apayao
Apayao State College Percent Completed
(Maintained)
Target: 0
Actual: 41.98 Expenditure: Release:0 Obligation:9656748.4
0
2087460606 Social Pension Program
Apayao
Department of Social Welfare and Development - CAR Number of beneficiaries served
(Maintained)
Target: 11921
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
2087776981 Provision of Cash Grants including the amount of Rice Subsidy
Apayao
Department of Social Welfare and Development - CAR Number of Household beneficiaries provided with Conditional Cash Grants
(Maintained)
Target: 7855
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
2091033243 Provision of Cash Grant to 4Ps beneficiaries including the amount of Rice Subsidy
Apayao
Department of Social Welfare and Development - CAR Number of Household beneficiaries provided with Conditional Cash Grants
(Maintained)
Target: 7019
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
2095577688 Continuation of Three Storey Livelihood and Food Technology Building, Phase II, Malama, Conner, Apayao
Apayao
Apayao State College 50% of the whole structure of the LFT Building
(default)
Target: 30
Actual: 54.5 Expenditure: Release:0 Obligation:14577586.51
81.666666666667
2099679972 Supplemental Feeding Program
Apayao
Department of Social Welfare and Development - CAR Number of Children Served
(Maintained)
Target: 3714
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
2101129901 Training on Mushroom Production in Calaoan and Barren AD
Apayao
National Commission on Indigenous Peoples - CAR no of projects implemented
(default)
Target: 1
Actual: 1 Expenditure: Release:200000 Obligation:71634
0
2110423604 Upgrading of Facilities of Megabyte Printing Services for the Production of Printed Products
Apayao
Department of Science and Technology - CAR No. of firms assisted
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
2128943334 Completion of ASC Multipurpose Building (Gym)
Apayao
Apayao State College Percent Completed
(Cumulative)
Target: 70
Actual: 50.01 Expenditure: Release:0 Obligation:0
-26.56
2130301496 Construction of Concrete Footpath at Purok 4. Puguin, Puguin, Conner
Apayao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
2134715288 CW-APAYAO-08-2022 / WAAIS
Apayao
National Irrigation Administration - CAR 100% completed
(Cumulative)
Target: 16.18
Actual: 43 Expenditure:0 Release:8015070 Obligation:390480
165.76019777503
562530 Wangwang Kakangas SIP Phase III
Mountain Province
National Irrigation Administration - CAR 100% Completed, 9 ha.
(Cumulative)
Target: 35
Actual: 100 Expenditure:37787.18 Release:1180842 Obligation:3430041.73
142.85714285714
2110303 IMPROVEMENT/CONSTRUCTION OF BARANGAY ACCESS ROAD AT BARANGAY MAINIT, Bontoc
Mountain Province
Department of the Interior and Local Government - CAR percent completed
(Cumulative)
Target: 0
Actual: 100 Expenditure: Release:0 Obligation:0
0
2921098 Iwang Kareo SIP
Mountain Province
National Irrigation Administration - CAR 100% Completed, 18 hectares area generated
(Cumulative)
Target: 55
Actual: 100 Expenditure:19971.46 Release:1037080 Obligation:2325067.21
74
10282962 Bauyan CIS
Mountain Province
National Irrigation Administration - CAR 100% Completed
(default)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
18368045 Improvement of Various Community Pathways, Sumadel, Tadian
Mountain Province
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
18556729 Charupang Chapinay SIP
Mountain Province
National Irrigation Administration - CAR 100% Completed
(default)
Target: 30
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
27268247 Patpatayan CIS
Mountain Province
National Irrigation Administration - CAR 100% completed, 0.23 Lined Canal, 2 units canal structures
(Cumulative)
Target: 15
Actual: 69 Expenditure:0 Release:1304338 Obligation:1534515.03
22
37651918 PARTNERSHIP ON SUSTAINABLE LIVING PROJECT
Mountain Province
Department of Social Welfare and Development - CAR No. of Households provided with livelihood modalities
(Cumulative)
Target: 0
Actual: 0 Expenditure:0 Release:0 Obligation:0
0
38728664 MAJOR REPAIR AND IMPROVEMENT OF MEMA LOCAL ACCESS FOOTBRIDGE
Mountain Province
Provincial Local Government of Mountain Province Percent Completed
(Cumulative)
Target: 85
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
38731365 Kanligan CIS
Mountain Province
National Irrigation Administration - CAR 100% Completed
(default)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
46684034 Rehabilitation of Water Supply System, Poblacion
Mountain Province
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
53812078 CONSTRUCTION/UPGRADING OF ANKILENG-BALUGAN FARM-TO-MARKET ROAD at Barangay Ankileng, Sagada
Mountain Province
Department of the Interior and Local Government - CAR percent completed
(Cumulative)
Target: 0
Actual: 100 Expenditure: Release:0 Obligation:0
0
75919814 Lebdan Banguitan CIS
Mountain Province
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
80558814 Sustainable Livelihood Program
Mountain Province
Department of Social Welfare and Development - CAR Total number of households who received seed capital fund and total number of households trained (Seed Capital Funds, Skills Training, and CBLA)
(Maintained)
Target: 270
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
88400020 Maracab CIS (Sadanga CIS, Ampawileng CIS)
Mountain Province
National Irrigation Administration - CAR 100% Completed
(Cumulative)
Target: 90
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
88504596 Nacawang Paskok SIP
Mountain Province
National Irrigation Administration - CAR 100% Completed, 3 hectares area generated
(Cumulative)
Target: 10
Actual: 100 Expenditure:0 Release:776643 Obligation:862937.22
100
90253342 dulao SIP Ph. II
Mountain Province
National Irrigation Administration - CAR 100% completed, 4 ha area generated
(Cumulative)
Target: 77
Actual: 25 Expenditure:42623.33 Release:569181 Obligation:2532544.66
-70
117498712 Sebang Anga-ang SIP
Mountain Province
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0 Expenditure:0 Release:0 Obligation:0
0
128514756 Construction of Duagan Proper Daycare Center Slope Protection with Railings, Duagan, Tadian
Mountain Province
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
130279472 OPENING WITH CONCRETING OF CHUMAYAW-ABYOS FARM TO MARKET ROAD IN BARANGAY DALICAN, Bontoc
Mountain Province
Department of the Interior and Local Government - CAR percent completed
(Cumulative)
Target: 0
Actual: 100 Expenditure: Release:0 Obligation:0
0
133598539 Panabongen CIS
Mountain Province
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
137881796 PARTNERSHIP ON SAAD (DA)
Mountain Province
Department of Social Welfare and Development - CAR No. of Households provided with livelihood modalities
(Cumulative)
Target: 50
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
146446428 Purchase and Installation of Solar Lights
Mountain Province
Department of the Interior and Local Government - CAR Percent Completed
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
146575231 Construction of Abaan - Pungas Drainage and Abatan - Pua Drainage, Masla, Tadian
Mountain Province
Department of Social Welfare and Development - CAR Percent Completed
(default)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
148010035 CONSTRUCTION OF PIKONG SLOPE PROTECTION WITH DRAINAGE CANAL, Balaoa, Tadian
Mountain Province
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
152696225 Tampog Kao-ag SIP
Mountain Province
National Irrigation Administration - CAR 100% Completed, 10 hectares area generated
(Cumulative)
Target: 55
Actual: 74 Expenditure:44082.86 Release:683969 Obligation:1523941.35
7
157196643 Gueday SIP
Mountain Province
National Irrigation Administration - CAR 100% Completed, 12 hectares area generated
(Cumulative)
Target: 35
Actual: 50 Expenditure:733796.9 Release:1529146 Obligation:4538951.36
15.714285714286
164503389 Construction of Sidewalk with Railings Along Libo, Napua
Mountain Province
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
164517360 Mog-ao CIS (Kontowor CIS)
Mountain Province
National Irrigation Administration - CAR 100% completed, 0.44 Lined Canal
(Cumulative)
Target: 15
Actual: 100 Expenditure:369492.71 Release:2023639 Obligation:2393131.53
32
170837476 Adcharan Porag CIS (Porag CIS)
Mountain Province
National Irrigation Administration - CAR 100% Completed
(default)
Target: 35
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
175911068 Construction of Drainage at Bulala, Lumnek, Eengan, Buag, Kayan East, Tadian
Mountain Province
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
189268438 Rehabilitation of Water Supply System, Losad
Mountain Province
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
200285858 Improvement of Amkabigat Spring with Access and Drainage System, Sacasacan
Mountain Province
Department of Social Welfare and Development - CAR 100% completion
(default)
Target: 0
Actual: 100 Expenditure:48341.29 Release:463242.39 Obligation:514714
0
209948131 Data Guilom CIS
Mountain Province
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
212968075 Lamagan Koob SIP
Mountain Province
National Irrigation Administration - CAR 100% Completed, 20 hectares area generated
(Cumulative)
Target: 50
Actual: 100 Expenditure:17000.28 Release:1159463 Obligation:3330434.09
44.705882352941
241165290 Kelos CIS
Mountain Province
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
254649334 Bekes SIP
Mountain Province
National Irrigation Administration - CAR 100% Completed, 5 hectares area generated
(Cumulative)
Target: 10
Actual: 100 Expenditure:15897.92 Release:1312476 Obligation:1478212.52
10
269902996 Beswag SIP
Mountain Province
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
272392664 Fiangtin BHS
Mountain Province
Department of Health - CAR percent completed
(Cumulative)
Target: 10
Actual: 2 Expenditure: Release:0 Obligation:0
-80
277915095 Patonggan SIP
Mountain Province
National Irrigation Administration - CAR 100% Completed
(default)
Target: 30
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
280568324 Bongiyet Kangaw SIP
Mountain Province
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
298980982 CONSTRUCTION/IMPROVEMENT OF SACLIT FARM-TO-MARKET ROAD OF BARANGAY SACLIT, Sadanga
Mountain Province
Department of the Interior and Local Government - CAR percent completed
(Cumulative)
Target: 0
Actual: 100 Expenditure: Release:2524793 Obligation:599998.5
0
303109416 Improvement of Cagubatan Batangan System (Riprapping and Fencing) Phase 1
Mountain Province
National Commission on Indigenous Peoples - CAR no of projects implemented
(default)
Target: 1
Actual: 0 Expenditure: Release:300000 Obligation:273201
-100
313272007 2-STOREY KITCHEN AND MESSHALL
Mountain Province
Department of Health - CAR Percent Completed
(default)
Target: 50
Actual: 100 Expenditure: Release:0 Obligation:0
100
314983951 soysoyok creek watten laeg sip ph II
Mountain Province
National Irrigation Administration - CAR 100% completed, 22 ha area generated
(Cumulative)
Target: 20
Actual: 100 Expenditure:380358.32 Release:1600020 Obligation:2094912.21
61
340205157 Kagkey SIP
Mountain Province
National Irrigation Administration - CAR 100% Completed, 16 hectares area generated
(Cumulative)
Target: 0
Actual: 8 Expenditure:33217.5 Release:914800 Obligation:924511.56
0
365931697 Wangwang Kakangas SIP Phase III
Mountain Province
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
368546701 Construction/Improvement of Dandanac-Madagem Access Road in Barangay Tamboan
Mountain Province
Department of the Interior and Local Government - CAR percent completed
(Cumulative)
Target: 0
Actual: 100 Expenditure: Release:8000000 Obligation:7998914
0
373047412 Refurbishment of Multi-Purpose Building as Temporary Isolation Facility, Supang
Mountain Province
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
379195424 Okook SIP
Mountain Province
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
380876926 Dandanac SIP
Mountain Province
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
390689572 Improvement of Besao-Nacawang and Tadian-Mabalite Farm to Market Road (Repackaged Segment 2-Sta 413+180- 417+334)
Mountain Province
Department of Agriculture - CAR number of km constructed
(Cumulative)
Target: 4.1
Actual: 2.65 Expenditure: Release:88136349.51 Obligation:88136349.51
-33.368421052632
394418164 Livelihood for Enhanced Livestock related activities
Mountain Province
Department of Agriculture - CAR Number of Projects Completed, Number of Beneficiaries Serve, Number of Community Based Enterprise
(default)
Target: 6
Actual: 0 Expenditure: Release:0 Obligation:0
-100
402529068 Kimbongtit Payag-eo SIP
Mountain Province
National Irrigation Administration - CAR 100% Completed
(default)
Target: 50
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
410893987 Likyo Dawwan CIS
Mountain Province
National Irrigation Administration - CAR 100% Completed
(default)
Target: 40
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
424128458 Fiagtoy CIS
Mountain Province
National Irrigation Administration - CAR 100% completed, 0.30 Lined Canal
(Cumulative)
Target: 0
Actual: 100 Expenditure:862287.41 Release:887951 Obligation:909312.13
0
444105392 IMPROVEMENT/REHABILITATION/UPGRADING OF BAGNEN ORIENTE-BAGNEN PROPER ROAD at Barangay Bagnen Oriente, Bauko
Mountain Province
Department of the Interior and Local Government - CAR percent completed
(Cumulative)
Target: 0
Actual: 100 Expenditure: Release:0 Obligation:0
0
450837595 Kanga SIP
Mountain Province
National Irrigation Administration - CAR 100% Completed
(default)
Target: 28
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
452592538 Cadad-anan Pandayan CIS
Mountain Province
National Irrigation Administration - CAR 100% Completed
(default)
Target: 45
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
458270591 Dektan SIP
Mountain Province
National Irrigation Administration - CAR 100% Completed
(default)
Target: 60
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
472546675 wangwang kakangas sip ph III
Mountain Province
National Irrigation Administration - CAR 100% completed, 9 ha area generated
(Cumulative)
Target: 50
Actual: 100 Expenditure:37787.18 Release:1012150 Obligation:3430041.73
125.30120481928
473701423 Fiagtoy CIS
Mountain Province
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
475011417 REHABILITATION/IMPROVEMENT OF LEVEL III WATER SYSTEM AT BARANGAY PIDE, Sagada
Mountain Province
Department of the Interior and Local Government - CAR percent completed
(Cumulative)
Target: 0
Actual: 100 Expenditure: Release:0 Obligation:0
0
484039283 Machining Process Enhancement of KC Shop
Mountain Province
Department of Science and Technology - CAR No. of firms assisted
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
490016029 Bangyadan SIP
Mountain Province
National Irrigation Administration - CAR 100% Completed
(default)
Target: 56
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
500577527 Improvement of Ambagiw Access Road (Sawangan-Soybo Section)
Mountain Province
Department of Social Welfare and Development - CAR 100% completion (35 ln.m. PCCP, 118.05 cu.m. grouted riprap)
(default)
Target: 0
Actual: 100 Expenditure:0 Release:150000 Obligation:150000
0
504383712 Supplemental Feeding Program
Mountain Province
Department of Social Welfare and Development - CAR Number of Children Served
(Maintained)
Target: 4949
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
513546871 REPAIR/IMPROVEMENT/UPGRADING OF TALUBIN BHS
Mountain Province
Department of Health - CAR Percent completed
(Cumulative)
Target: 100
Actual: 100 Expenditure: Release:500000 Obligation:500000
0
520856835 Nagka SIP
Mountain Province
National Irrigation Administration - CAR 100% Completed
(default)
Target: 26
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
537420452 Construction of PCCP with Curb and Gutter on one side along Sitio Batnong FMR
Mountain Province
Department of Social Welfare and Development - CAR 100% completion
(default)
Target: 0
Actual: 100 Expenditure:0 Release:0 Obligation:151591
0
551167503 Upgrading the Production Equipment and Capability of Engan Bread and Pastries through Science and Technology Intervention
Mountain Province
Department of Science and Technology - CAR Number of firms assisted
(default)
Target: 1
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
568724542 REPAIR AND MAINTENANCE OF ADMINISTRATIVE BUILDING (ROOF DECK)
Mountain Province
Department of Health - CAR Percent Completed
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
574377038 Pengeo SIP
Mountain Province
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
582775662 Agyo SIS
Mountain Province
National Irrigation Administration - CAR 100% Completed
(default)
Target: 45
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
591447594 Tayoktok Badona SIP
Mountain Province
National Irrigation Administration - CAR 100% Completed
(default)
Target: 86
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
598973784 NEW CONSTRUCTION OF BARLIG SUPER HEALTH CENTER
Mountain Province
Department of Health - CAR Percent completed
(Cumulative)
Target: 6.5
Actual: 6 Expenditure: Release:10000000 Obligation:10000000
829.41176470588
602193770 wangwang kakangas sip ph III
Mountain Province
National Irrigation Administration - CAR percent completed
(Cumulative)
Target: 100
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
604124723 Iyahan CIS
Mountain Province
National Irrigation Administration - CAR 100% Completed
(default)
Target: 70
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
618601837 CONSTRUCTION OF GROUTED RIPRAP AT SAYSAYAGAN TO KAMALIG FMR, Banguitan
Mountain Province
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
624348711 Supang Lintoco SIP
Mountain Province
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
628547726 EO70 CVAs Livelihood Project
Mountain Province
Department of Social Welfare and Development - CAR No. of Households provided with livelihood modalities
(Cumulative)
Target: 0
Actual: 0 Expenditure:0 Release:0 Obligation:0
0
629406552 REPAIR/IMPROVEMENT/UPGRADING OF BONTOC GENERAL HOSPITAL
Mountain Province
Department of Health - CAR Percent completed
(Cumulative)
Target: 7.8
Actual: 7 Expenditure: Release:50000000 Obligation:50000000
887.17948717949
633032688 Cabacongan CIS
Mountain Province
National Irrigation Administration - CAR percent completed
(Cumulative)
Target: 100
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
638051886 Talubin CIS (Demang Padgik CIS, Lukkat, Ganenggeng Pagang)
Mountain Province
National Irrigation Administration - CAR 100% Completed
(default)
Target: 41
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
672835492 Regular and Frontloaded Livelihood Projects
Mountain Province
Department of Social Welfare and Development - CAR No. of Households provided with livelihood modalities
(Cumulative)
Target: 38
Actual: 0 Expenditure:0 Release:0 Obligation:0
-77.551020408163
688793144 REHABILITATION OF AGAWA NHS GROUTED RIPRAP, Agawa
Mountain Province
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
702549765 Akiakong Naanam-am SIP
Mountain Province
National Irrigation Administration - CAR 100% Completed
(default)
Target: 35
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
707791206 Pingat Taliwaga CIS
Mountain Province
National Irrigation Administration - CAR 100% completed, 0.37 Lined Canal
(Cumulative)
Target: 12
Actual: 100 Expenditure:42555.81 Release:1400925 Obligation:1634516.23
42
711465555 Ongao CIS
Mountain Province
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0 Expenditure:0 Release:0 Obligation:0
0
721057622 Improvement and Site Development of Multi-Purpose Building as Temporary Isolation Facility, Capinitan
Mountain Province
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
732577992 Upgrading the Production process of Sagada Tropical Fruit Farm
Mountain Province
Department of Science and Technology - CAR No. of firms assisted
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
732690136 Pataim SIP
Mountain Province
National Irrigation Administration - CAR 100% Completed
(default)
Target: 38
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
735404798 REHABILITATION/IMPROVEMENT OF LEVEL III POTABLE WATER SYSTEM IN BARANGAY MADONGO, Sagada
Mountain Province
Department of the Interior and Local Government - CAR percent completed
(Cumulative)
Target: 0
Actual: 100 Expenditure: Release:0 Obligation:0
0
749379753 Iwang Kareo SIP
Mountain Province
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
750963586 Improvement of Drainage Canal, Busa
Mountain Province
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
752637109 Kadegwayan SIP
Mountain Province
National Irrigation Administration - CAR 100% Completed, 4 hectares area generated
(Cumulative)
Target: 15
Actual: 100 Expenditure:15849.2 Release:986227 Obligation:1185077.97
3
758181391 Maubo Lasangan SIP
Mountain Province
National Irrigation Administration - CAR 100% Completed
(default)
Target: 40
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
762179309 Enhancing the Production Capacity of Junction Food Corner thru S&T Interventions (2nd Assistance)
Mountain Province
Department of Science and Technology - CAR No. of firms assisted
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
764932912 Kaleo CIS
Mountain Province
National Irrigation Administration - CAR 100% Completed
(default)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
777570326 Chanchaneg Foyfoy Mamokchang SIP
Mountain Province
National Irrigation Administration - CAR 100% Completed, 22 hectares area generated
(Cumulative)
Target: 25
Actual: 100 Expenditure:1287684.31 Release:2430000 Obligation:8123402.67
138.18181818182
782568140 Balugan SIP
Mountain Province
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
814670572 Improvement of Multi-Purpose Hall as Temporary Isolation Facility, Bun-ayan
Mountain Province
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
826044410 Naweywey SIP
Mountain Province
National Irrigation Administration - CAR 100% Completed
(default)
Target: 35
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
831699233 Upgrading of JF Backyard Chicken Farm
Mountain Province
Department of Science and Technology - CAR No. of firms assisted
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
832495899 Construction of Am-am Sub-Barangay Health Station, Cadad-Anan, Tadian
Mountain Province
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
834442489 Social Pension Program
Mountain Province
Department of Social Welfare and Development - CAR Number of beneficiaries served
(Maintained)
Target: 11465
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
839772170 Improvement of Teb-Tefar to Takib Farm to Market Road, Saclit
Mountain Province
Department of Social Welfare and Development - CAR 100% completion
(default)
Target: 0
Actual: 100 Expenditure:88859.43 Release:799734.83 Obligation:888594
0
839996355 Improvement of Production Process of Pangaton's Bakeshop through Science and Technology Intervention
Mountain Province
Department of Science and Technology - CAR No. of firms assisted
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
851939656 Bauko PIS
Mountain Province
National Irrigation Administration - CAR 100% Completed
(default)
Target: 73
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
855872338 Kayayeo SIP
Mountain Province
National Irrigation Administration - CAR 100% Completed, 9 hectares area generated
(Cumulative)
Target: 40
Actual: 19 Expenditure:23481.5 Release:1341908 Obligation:3386651.62
-72.5
871822847 Baccong Talikud CIS
Mountain Province
National Irrigation Administration - CAR 100% Completed
(default)
Target: 50
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
871837530 Pakang Chakiwatey CIS
Mountain Province
National Irrigation Administration - CAR 100% completed, 1.48 Lined Canal
(Cumulative)
Target: 46
Actual: 22 Expenditure:0 Release:2203696 Obligation:5246894.45
-69.318181818182
872695137 Buasao Tanulong CIS
Mountain Province
National Irrigation Administration - CAR 100% Completed
(default)
Target: 45
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
886166734 Sukeb SIP
Mountain Province
National Irrigation Administration - CAR 100% Completed, 5 hectares area generated
(Cumulative)
Target: 20
Actual: 100 Expenditure:290301.94 Release:1351941 Obligation:1760514.43
71
897013298 Dulao SIP Phase II
Mountain Province
National Irrigation Administration - CAR 100% Completed, 4 hectares area generated
(Cumulative)
Target: 40
Actual: 25 Expenditure:42623.33 Release:1484821 Obligation:2532544.66
-74
905852961 Construction of Kamangyawan - Roadside Drainage, Batayan, Tadian
Mountain Province
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
912992068 Bekes SIP
Mountain Province
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
915376727 Amba SIP
Mountain Province
National Irrigation Administration - CAR 100% Completed
(default)
Target: 88
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
919318496 Provision of Cash Grant to 4Ps beneficiaries including the amount of Rice Subsidy
Mountain Province
Department of Social Welfare and Development - CAR Number of Household beneficiaries provided with Conditional Cash Grants
(Maintained)
Target: 6153
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
923698585 Enhancing the Production Process of Mountain Welds and Designs Metal Fabworks (2nd Assistance)
Mountain Province
Department of Science and Technology - CAR No. of firms assisted
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
925207023 Construction of 1-Unit Quarantine Facility, Laylaya
Mountain Province
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
930850143 Tap-ew SIP PH.II
Mountain Province
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
935238535 Rehabilitation of Water Supply System, Lagan
Mountain Province
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
935520861 soysoyok creek watten laeg sip ph II
Mountain Province
National Irrigation Administration - CAR percent completed
(Cumulative)
Target: 100
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
946217358 Mog-ao CIS (Kontowor CIS)
Mountain Province
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
946265050 CONSTRUCTION OF BARANGAY HEALTH CENTER IN BARANGAY PIDE, Sagada
Mountain Province
Department of the Interior and Local Government - CAR percent completed
(Cumulative)
Target: 0
Actual: 100 Expenditure: Release:0 Obligation:0
0
949287641 IMPROVEMENT/REHABILITATION/UPGRADING OF BAGNEN ORIENTE-BAGNEN PROPER-BALINTAUGAN-MARKET-AN ROAD at Barangay Balintaugan, Bauko
Mountain Province
Department of the Interior and Local Government - CAR percent completed
(Cumulative)
Target: 0
Actual: 100 Expenditure: Release:0 Obligation:0
0
951734351 Mapakawet Sapid SIP
Mountain Province
National Irrigation Administration - CAR 100% Completed, 7 hectares area generated
(Cumulative)
Target: 50
Actual: 8 Expenditure:46213.44 Release:1224684 Obligation:2471953.76
-84
957947655 Data Guilom CIS
Mountain Province
National Irrigation Administration - CAR 100% completed, 0.56 Lined Canal, 3 units canal structures, .03 km HDPE Pipe
(Cumulative)
Target: 45
Actual: 45 Expenditure:50313.24 Release:1120957 Obligation:2541329.24
-42.222222222222
961862404 CONSTRUCTION OF MATERIALS RECOVERY FACILITY FOR BAUKO DATRC FACILITIES PHASE II
Mountain Province
Department of Health - CAR Percent Completed
(default)
Target: 50
Actual: 100 Expenditure: Release:0 Obligation:0
100
968644277 Provision of Cash Grants including the amount of Rice Subsidy
Mountain Province
Department of Social Welfare and Development - CAR Number of Household beneficiaries provided with Conditional Cash Grants
(Maintained)
Target: 6372
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
984152321 Construction of Purok Kalimban Drainage, Bantey, Tadian
Mountain Province
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
986698857 Pakang Chakiwatey CIS
Mountain Province
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
986761745 dulao SIP Ph. II
Mountain Province
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
987048806 Gued-ey Adlem SIP
Mountain Province
National Irrigation Administration - CAR 100% Completed
(default)
Target: 50
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
991772740 Macoling CIS
Mountain Province
National Irrigation Administration - CAR 100% Completed
(default)
Target: 50
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
994762839 Social Pension Program
Mountain Province
Department of Social Welfare and Development - CAR Number of indigent senior citizens provided with Social Pension
(Maintained)
Target: 11271
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
998244375 Mapakawet Sapid SIP
Mountain Province
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1010217302 Improvement of Dacudac - Tokod Barangay Road, Dacudac, Tadian
Mountain Province
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1025898766 Pengeo SIP
Mountain Province
National Irrigation Administration - CAR 100% Completed, 4 hectares area generated
(Cumulative)
Target: 60
Actual: 100 Expenditure:22641.01 Release:427514 Obligation:1091426.93
100
1029230126 Improvement of Dap-ay in Dandanac. Tamboan, Besao
Mountain Province
National Commission on Indigenous Peoples - CAR no of projects implemented
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:273385
0
1030253013 Provision of Sugarcane Wine and Muscovado Production for Balangao
Mountain Province
National Commission on Indigenous Peoples - CAR no of projects implemented
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:156047
0
1035445456 Amtagkid CIS
Mountain Province
National Irrigation Administration - CAR 100% Completed
(default)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1045088015 Sukeb SIP
Mountain Province
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1053759446 Beswag SIP
Mountain Province
National Irrigation Administration - CAR 100% Completed, 9 hectares area generated
(Cumulative)
Target: 35
Actual: 82 Expenditure:135714.63 Release:8735364 Obligation:2505699.07
98.571428571429
1056339006 Panabongen CIS
Mountain Province
National Irrigation Administration - CAR 100% completed, 0.56 Lined Canal, 2 units canal structures
(Cumulative)
Target: 25
Actual: 65 Expenditure:0 Release:1465002 Obligation:2722398.09
50
1058064760 Fukung SIP
Mountain Province
National Irrigation Administration - CAR 100% Completed
(default)
Target: 82
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1058476422 Nadatngan Lasangan SIP
Mountain Province
National Irrigation Administration - CAR Percent Completed
(default)
Target: 100
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1064172740 Cabacongan CIS
Mountain Province
National Irrigation Administration - CAR 100% completed, 3 units canal structures, 1.10 km HDPE Pipe
(Cumulative)
Target: 0
Actual: 100 Expenditure:384329.2 Release:2027358 Obligation:2107583.45
0
1088379750 Upgrading of Sichut Products
Mountain Province
Department of Science and Technology - CAR Number of firms assisted
(default)
Target: 1
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1089349916 Kortan SIP
Mountain Province
National Irrigation Administration - CAR 100% Completed, 7 hectares area generated
(Cumulative)
Target: 20
Actual: 22 Expenditure:17049.18 Release:836084 Obligation:1062563.6
-54
1090547246 Improvement of Health Center, Tambingan
Mountain Province
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1099560292 Rehabilitation of Data Various Footpath, Data
Mountain Province
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1120783776 Enhancement of Iglina's Farm Production Process
Mountain Province
Department of Science and Technology - CAR No. of firms assisted
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
1138323263 Kayayeo SIP
Mountain Province
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1161174025 REPAIR/ IMPROVEMENT/ UPGRADING OF BONTOC GEN. HOSPITAL
Mountain Province
Department of Health - CAR PERCENT COMPLETED
(default)
Target: 25
Actual: 95 Expenditure: Release:0 Obligation:0
280
1167990454 Kadegwayan SIP
Mountain Province
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1168887303 Patpatayan CIS
Mountain Province
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1171068686 Upgrading of H&S Restaurant
Mountain Province
Department of Science and Technology - CAR Number of firms assisted
(default)
Target: 0
Actual: 0 Expenditure:0 Release:0 Obligation:0
0
1181490922 Antadao SIP
Mountain Province
National Irrigation Administration - CAR 100% Completed
(default)
Target: 40
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1184155935 Kelos CIS
Mountain Province
National Irrigation Administration - CAR 100% completed, 0.26 Lined Canal, 1 unit canal structures
(Cumulative)
Target: 0
Actual: 11 Expenditure:0 Release:883035 Obligation:883034.99
0
1188135116 sachar SIP
Mountain Province
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1193316820 Construction of Toktok Diversion Dam, Belwang
Mountain Province
Department of Social Welfare and Development - CAR 100% completion
(default)
Target: 0
Actual: 28.99 Expenditure:85596 Release:770363 Obligation:855959
0
1215338731 Tabbak SIP
Mountain Province
National Irrigation Administration - CAR 100% Completed
(default)
Target: 45
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1222838012 Macalana BHS
Mountain Province
Department of Health - CAR percent completed
(Cumulative)
Target: 10
Actual: 25 Expenditure: Release:0 Obligation:0
150
1239766066 U-od Gusadan
Mountain Province
National Irrigation Administration - CAR 100% Completed
(default)
Target: 40
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1240716213 Magayang Sibayan SIP
Mountain Province
National Irrigation Administration - CAR 100% Completed
(default)
Target: 35
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1242858046 Soysoyok Creek Watten Laeg SIP Phase II
Mountain Province
National Irrigation Administration - CAR 100% Completed, 22 hectares area generated
(Cumulative)
Target: 50
Actual: 100 Expenditure:380358.32 Release:1000013 Obligation:2094912.21
45
1249156254 Construction of Nangannib Footbridge with Footpath, Betwagan
Mountain Province
Department of Social Welfare and Development - CAR 100% completion
(default)
Target: 0
Actual: 88.69 Expenditure:149333.92 Release:1897100.28 Obligation:2107889
0
1256722335 Ayosep SIP
Mountain Province
National Irrigation Administration - CAR 100% Completed
(default)
Target: 90
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1257295026 Pega Len-ey CIS
Mountain Province
National Irrigation Administration - CAR 100% completed, Restored
(Cumulative)
Target: 45
Actual: 75 Expenditure:62641.92 Release:924387 Obligation:2121806.14
40
1259297406 REHABILITATION/IMPROVEMENT OF LEVEL III POTABLE WATER SYSTEM IN BARANGAY AGUID, Sagada
Mountain Province
Department of the Interior and Local Government - CAR percent completed
(Cumulative)
Target: 0
Actual: 100 Expenditure: Release:0 Obligation:0
0
1263579150 Ominyo CIS
Mountain Province
National Irrigation Administration - CAR 100% Completed
(default)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1280776733 Agadangan Maniniting SIP
Mountain Province
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1281941800 Upgrading the Production Capability of Makhway's Peanut Butter
Mountain Province
Department of Science and Technology - CAR No. of firms assisted
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
1296007960 Miyangaw Fetak SIP
Mountain Province
National Irrigation Administration - CAR 100% Completed
(default)
Target: 95
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1303965010 Balugan SIP
Mountain Province
National Irrigation Administration - CAR 100% Completed, 6 hectares area generated
(Cumulative)
Target: 0
Actual: 100 Expenditure:15782.94 Release:1590401 Obligation:1618703.43
0
1323553195 Naubeng Suyo CIS
Mountain Province
National Irrigation Administration - CAR 100% Completed
(default)
Target: 100
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1342767495 Aliwanang SIP
Mountain Province
National Irrigation Administration - CAR 100% Completed
(default)
Target: 54
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1344117144 EXPANSION OF LEVEL II MAINIT POTABLE WATER SUPPLY AT BARANGAY MAINIT, Bontoc
Mountain Province
Department of the Interior and Local Government - CAR percent completed
(Cumulative)
Target: 0
Actual: 100 Expenditure: Release:0 Obligation:0
0
1348699804 Enhancement of Madararo Village Water System, Poblacion, Sadanga
Mountain Province
Department of Social Welfare and Development - CAR 100% completion
(default)
Target: 0
Actual: 80.84 Expenditure:121941.45 Release:1097473.03 Obligation:1219414
0
1350219829 awilan fiato sip ph 2
Mountain Province
National Irrigation Administration - CAR 100% completed, 25 ha area generated
(Cumulative)
Target: 60
Actual: 5 Expenditure:487018.68 Release:1053307 Obligation:4779315.62
-93.975903614458
1352774124 CONCRETING OF BESAO WEST DRAINAGE CANAL, Besao West
Mountain Province
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1360904741 Dandanac SIP
Mountain Province
National Irrigation Administration - CAR 100% Completed, 12 hectares area generated
(Cumulative)
Target: 35
Actual: 84 Expenditure:79130.64 Release:1521292 Obligation:4443568.26
48.571428571429
1366292921 Construction of 1 Unit Concrete Footbridge, Lacmaan
Mountain Province
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1369490697 Managed Internet Service - VSAT Network Services for Quarantine Centers and Medical Facilities - Paracelis RHU
Mountain Province
Department of Information and Communications Technology - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0 Expenditure: Release:0 Obligation:0
-42.054852320675
1382647535 Masoan SIP
Mountain Province
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1383640836 Bongiyet Kangaw SIP
Mountain Province
National Irrigation Administration - CAR 100% Completed, 7 hectares area generated
(Cumulative)
Target: 35
Actual: 92 Expenditure:43985.42 Release:894793 Obligation:2600535.82
124.28571428571
1386669765 CONSTRUCTION OF ELEMENTARY SCHOOL BUILDING IN BARANGAY FIDELISAN, SAGADA, MOUNTAIN PROVINCE
Mountain Province
Department of the Interior and Local Government - CAR percent completed
(Cumulative)
Target: 0
Actual: 100 Expenditure: Release:0 Obligation:0
0
1394100675 Improvement of Community Pathways, Kin-iway
Mountain Province
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1406425318 Design and Build of Sewage Treatment Plant (STP) using Advance Oxidation System for Bauko DATRC Phase II
Mountain Province
Department of Health - CAR Percent Completed
(default)
Target: 0
Actual: 100 Expenditure: Release:0 Obligation:0
0
1409250952 Completion of Banaao Barangay Quarantine Facility, Banaao, Tadian
Mountain Province
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1414780048 Construction of Camutagtag SWIP
Mountain Province
Department of Agriculture - CAR number of Small Scale Irrigation Projects (SSIP) constructed, service area (ha) generated, number of groups
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
1419267647 Construction of Grouted Riprap Along Ambagiw Access Road, Ambagiw
Mountain Province
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1422723537 Soysoyok Creek Watten Laeg SIP Phase II
Mountain Province
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1422803167 Construction of Various Drainage, Poblacion, Tadian
Mountain Province
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1427869893 Supang Lintoco SIP
Mountain Province
National Irrigation Administration - CAR 100% Completed, 6 hectares area generated
(Cumulative)
Target: 35
Actual: 100 Expenditure:781656.11 Release:903309 Obligation:1406902.69
63
1457256551 Malibo Catengan SIP
Mountain Province
National Irrigation Administration - CAR 100% Completed
(default)
Target: 25
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1460039218 Data CIS
Mountain Province
National Irrigation Administration - CAR 100% Completed
(default)
Target: 80
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1470043556 REPAIR/IMPROVEMENT/UPGRADING OF NATONIN RHU
Mountain Province
Department of Health - CAR Percent completed
(Cumulative)
Target: 4
Actual: 3 Expenditure: Release:1000000 Obligation:1000000
2475
1473559463 Installation of Solar Street Lights, Bunga, Tadian
Mountain Province
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1475959746 Awilan Fiato SIP Phase II
Mountain Province
National Irrigation Administration - CAR 100% Completed, 25 hectares area generated
(Cumulative)
Target: 35
Actual: 5 Expenditure:487018.68 Release:1602859 Obligation:4779315.62
-87.142857142857
1486694693 Tampog Kao-ag SIP
Mountain Province
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1496889869 Rehabilitation of Drainage Canal, Namatec
Mountain Province
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1505976267 Arapang SIP
Mountain Province
National Irrigation Administration - CAR 100% Completed
(default)
Target: 85
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1517011806 Construction of Barangay Disaster Operations Center, Lenga, Tadian
Mountain Province
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1519014535 Refurbishing of BDRRMC Building into a Quarantine Facility, Besao East
Mountain Province
Department of Social Welfare and Development - CAR 100% completion
(Cumulative)
Target: 0
Actual: 100 Expenditure:0 Release:200478.1 Obligation:200478
0
1520188746 Construction of 1-Unit Box Culvert, Gueday
Mountain Province
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1520854911 Owikan Bakan SIP
Mountain Province
National Irrigation Administration - CAR 100% Completed, 7 hectares area generated
(Cumulative)
Target: 25
Actual: 100 Expenditure:60728.64 Release:943712 Obligation:1323374.88
90
1523139352 Latang CIS
Mountain Province
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1523161796 Improvement of Kreativ Ink Printing Services
Mountain Province
Department of Science and Technology - CAR No. of firms assisted
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
1534012499 Pakil Labaan CIS
Mountain Province
National Irrigation Administration - CAR 100% completed, 0.37 Lined Canal
(Cumulative)
Target: 25
Actual: 50 Expenditure:0 Release:1005076 Obligation:5246894.45
-44
1541001616 RECONSTRUCTION OF PUBLIC BUILDING
Mountain Province
Provincial Local Government of Mountain Province Percent Completed
(Cumulative)
Target: 87.37
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1575023618 Okook SIP
Mountain Province
National Irrigation Administration - CAR 100% Completed, 5 hectares area generated
(Cumulative)
Target: 35
Actual: 96 Expenditure:36252.78 Release:1084715 Obligation:1852200.59
85.263157894737
1597754773 DIGITAL WORKFORCE - TRAINING ADMINISTRATION: ICT Executive Briefing for Digital Leaders Seminar
Mountain Province
Department of Information and Communications Technology - CAR # of Conducted ICT Executive Briefing for Digital Leaders Seminar
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
1608422415 Maliten SIP
Mountain Province
National Irrigation Administration - CAR 100% Completed
(default)
Target: 25
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1610056442 Finew Pawik CIS
Mountain Province
National Irrigation Administration - CAR 100% Completed
(default)
Target: 65
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1610914712 Namogsor CIS
Mountain Province
National Irrigation Administration - CAR 100% Completed
(default)
Target: 45
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1617251311 Cagubatan CIS
Mountain Province
National Irrigation Administration - CAR 100% Completed
(default)
Target: 65
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1628823273 Construction of Slope Protection at Agadangan, Kayan West, Tadian
Mountain Province
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1633325134 Completion of Multi-Purpose Hall Building as Temporary Isolation Facility, Camatagan
Mountain Province
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1636905861 Dulao SIP Phase II
Mountain Province
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1639868770 Chagchag SIP
Mountain Province
National Irrigation Administration - CAR 100% Completed
(default)
Target: 85
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1642583026 Mapway CIS
Mountain Province
National Irrigation Administration - CAR 100% completed, 2 units canal structures, .91 km HDPE Pipe
(Cumulative)
Target: 21
Actual: 100 Expenditure:31094.27 Release:640710 Obligation:842120.2
103
1642957707 Bananao PIS
Mountain Province
National Irrigation Administration - CAR 100% Completed
(default)
Target: 88
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1645623851 Tap-ew SIP PH.II
Mountain Province
National Irrigation Administration - CAR 100% Completed, 7 hectares area generated
(Cumulative)
Target: 40
Actual: 90 Expenditure:774200.68 Release:9700650 Obligation:1635537.93
71
1648172107 Namsong Mobo CIS
Mountain Province
National Irrigation Administration - CAR 100% completed, 0.04 Lined Canal, 0.70 km HDPE Pipe
(Cumulative)
Target: 0
Actual: 100 Expenditure:0 Release:1097298 Obligation:1097297.92
0
1658918357 Kabaayan SIP
Mountain Province
National Irrigation Administration - CAR 100% Completed
(default)
Target: 92
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1662875687 Rehabilitation of Subagan Drainage Canal, Bao-angan
Mountain Province
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1670808041 Masoan SIP
Mountain Province
National Irrigation Administration - CAR 100% Completed, 5 hectares area generated
(Cumulative)
Target: 0
Actual: 100 Expenditure:49662.42 Release:976366 Obligation:1029411.68
0
1674706973 Tekan SIP
Mountain Province
National Irrigation Administration - CAR 100% Completed
(default)
Target: 90
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1681141027 Construction of Suquib-Banao FMR (Kinggasa Section), Suquib
Mountain Province
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1698026326 Nacawang Paskok SIP
Mountain Province
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1700809389 Construction of Mogao to Katungao River Pathway Drainage, Cagubatan, Tadian
Mountain Province
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1710024465 Construction of Isolation Facility Phase II, Tue, Tadian
Mountain Province
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1712601461 Completion of Multi-Purpose Building as Temporary Isolation Facility, Pingad
Mountain Province
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1721939333 Lebdan Banguitan CIS
Mountain Province
National Irrigation Administration - CAR 100% completed, Restored
(Cumulative)
Target: 10
Actual: 100 Expenditure:52551.62 Release:1344986 Obligation:1546980.02
27
1723437637 Upper Tokok SIP
Mountain Province
National Irrigation Administration - CAR 100% Completed
(default)
Target: 40
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1726069720 Upgrading the Production Equipment and Capability of Log Cabin Restaurant and Homestay through Science and Technology Intervention
Mountain Province
Department of Science and Technology - CAR Number of firms assisted
(default)
Target: 1
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1739591012 Togtog-Maaliwen SIP
Mountain Province
National Irrigation Administration - CAR 100% Completed
(default)
Target: 84
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1739829825 Equipment Upgrading of Ambango Furniture Shop
Mountain Province
Department of Science and Technology - CAR Number of firms assisted
(default)
Target: 0
Actual: 0 Expenditure:0 Release:0 Obligation:0
0
1777613949 Agadangan Maniniting SIP
Mountain Province
National Irrigation Administration - CAR 100% Completed, 16 hectares area generated
(Cumulative)
Target: 35
Actual: 86 Expenditure:2860033.83 Release:2096298 Obligation:6050987.31
87.142857142857
1781069122 Aliwen Baang SIP
Mountain Province
National Irrigation Administration - CAR 100% Completed
(default)
Target: 65
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1792696443 REHABILITATION OF MADONGO-NADATNGAN FARM-TO-MARKET ROAD AT BARANGAY MADONGO, Sagada
Mountain Province
Department of the Interior and Local Government - CAR percent completed
(Cumulative)
Target: 0
Actual: 100 Expenditure: Release:0 Obligation:0
0
1792699419 Lower Tamboan SIP
Mountain Province
National Irrigation Administration - CAR 100% Completed
(default)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1794259992 Construction of Epasan - Angkiap Pathway with Drainage, Pandayan, Tadian
Mountain Province
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1808066223 Refurbishment of Multi-Purpose Building as Temporary Isolation Facility, Supang
Mountain Province
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1818482242 Construction of Cam-or Drainage Canal, Anabel
Mountain Province
Department of Social Welfare and Development - CAR 100% completion
(default)
Target: 0
Actual: 100 Expenditure:53144.32 Release:647417.84 Obligation:719353
0
1819676752 Kagkey SIP
Mountain Province
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1822570741 Ambagiw SIP
Mountain Province
National Irrigation Administration - CAR 100% Completed
(default)
Target: 50
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1833409625 Agawa SIP
Mountain Province
National Irrigation Administration - CAR 100% Completed
(default)
Target: 83
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1840733599 Sustainable Livelihood Program
Mountain Province
Department of Social Welfare and Development - CAR Total number of households who received seed capital fund and total number of households trained (Seed Capital Funds, Skills Training, and CBLA)
(Maintained)
Target: 330
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1855366153 Dogo SIP
Mountain Province
National Irrigation Administration - CAR 100% Completed, 5 hectares area generated
(Cumulative)
Target: 0
Actual: 100 Expenditure:44977.99 Release:890000 Obligation:934977.99
0
1855761933 Concreting of Catengan Drainage Systems. Catengan
Mountain Province
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1862702917 Construction and Improvement of Various Drainage, Lubon, Tadian
Mountain Province
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1888152827 Upgrading of Rofline Wines Food Processing
Mountain Province
Department of Science and Technology - CAR No. of firms assisted
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
1897693878 Equipment & Market Process Upgrading of Little Auto Shop
Mountain Province
Department of Science and Technology - CAR Number of firms assisted
(default)
Target: 0
Actual: 0 Expenditure:0 Release:0 Obligation:0
0
1915084543 Livelihood for Enhanced High Value Crops related activities
Mountain Province
Department of Agriculture - CAR Number of Projects Completed, Number of Beneficiaries Serve, Number of Community Based Enterprise
(default)
Target: 8
Actual: 0 Expenditure: Release:0 Obligation:0
-100
1922453140 Nadatngan Lasangan SIP
Mountain Province
National Irrigation Administration - CAR 100% Completed, 7 hectares area generated
(Cumulative)
Target: 55
Actual: 100 Expenditure:75122.12 Release:975976 Obligation:2264015.29
101
1931013230 Improvement of Barangay Demang Various Footpath, Demang
Mountain Province
Department of Social Welfare and Development - CAR 100% completion
(default)
Target: 0
Actual: 100 Expenditure:49724.24 Release:645032.24 Obligation:716702
0
1934150812 Kortan SIP
Mountain Province
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1936032009 Chanchaneg Foyfoy Mamokchang SIP
Mountain Province
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1943285446 IMPROVEMENT/REHABILITATION/UPGRADING OF BAGNEN ORIENTE-BAGNEN PROPER-BALINTAUGAN ROAD at Barangay Bagnen Proper, Bauko
Mountain Province
Department of the Interior and Local Government - CAR percent completed
(Cumulative)
Target: 0
Actual: 100 Expenditure: Release:0 Obligation:0
0
1944269013 awilan fiato sip ph 2
Mountain Province
National Irrigation Administration - CAR percent completed
(Cumulative)
Target: 100
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1947543259 Mapway CIS
Mountain Province
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1956865685 Depe CIS
Mountain Province
National Irrigation Administration - CAR 100% Completed
(default)
Target: 65
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1959204430 NEW CONSTRUCTION OF BARLIG SUPER HEALTH CENTER
Mountain Province
Department of Health - CAR PERCENT COMPLETED
(default)
Target: 25
Actual: 100 Expenditure: Release:0 Obligation:0
300
1971903286 Pingat Taliwaga CIS
Mountain Province
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1972217365 Gueday SIP
Mountain Province
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1994916497 Dogo SIP
Mountain Province
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1998965246 Payew Tocucan SIP
Mountain Province
National Irrigation Administration - CAR 100% Completed
(default)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
2004932938 Improvement of Community Drainage Canal, Payeo
Mountain Province
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
2015397652 Improvement of Footpath with Railings, Gayang
Mountain Province
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
2018016356 sachar SIP
Mountain Province
National Irrigation Administration - CAR 100% completed, 7 ha area generated
(Cumulative)
Target: 30
Actual: 100 Expenditure:350845.13 Release:1532374 Obligation:2241341.13
0
2021881536 Karanag SIP
Mountain Province
National Irrigation Administration - CAR 100% Completed
(default)
Target: 63
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
2027195044 Sinmodata PIS
Mountain Province
National Irrigation Administration - CAR 100% Completed
(default)
Target: 38
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
2030169686 CONSTRUCTION OF POWER HOUSE FOR BAUKO DARTC FACILITIES PHASE II
Mountain Province
Department of Health - CAR Percent Completed
(default)
Target: 0
Actual: 100 Expenditure: Release:0 Obligation:0
0
2034414300 Latang CIS
Mountain Province
National Irrigation Administration - CAR 100% completed, 0.44 Lined Canal
(Cumulative)
Target: 15
Actual: 100 Expenditure:0 Release:1145038 Obligation:1347103.66
104
2041710307 Pakil Labaan CIS
Mountain Province
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
2056371352 Biyogan Payas Natundo SIP
Mountain Province
National Irrigation Administration - CAR 100% Completed
(default)
Target: 69
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
2058910846 Sustainable Livelihood Program
Mountain Province
Department of Social Welfare and Development - CAR Total number of households who received seed capital fund and total number of households trained (Seed Capital Funds, Skills Training, and CBLA)
(Maintained)
Target: 0
Actual: 0 Expenditure:0 Release:0 Obligation:0
0
2070810190 Social Pension Program
Mountain Province
Department of Social Welfare and Development - CAR Percentage of beneficiaries using social pension to augment daily living subsistence and medical needs
(default)
Target: 11465
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
2072646345 Lamagan Koob SIP
Mountain Province
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
2088551574 Improvement of Padangaan Drainage System, Padangaan
Mountain Province
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
2092433940 Upgrading of Patty's Food Products
Mountain Province
Department of Science and Technology - CAR No. of firms assisted
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
2099099072 Supplemental Feeding Program
Mountain Province
Department of Social Welfare and Development - CAR Number of beneficiaries served
(Maintained)
Target: 4820
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
2112814942 Owikan Bakan SIP
Mountain Province
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
2122505667 Namsong Mobo CIS
Mountain Province
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
2125534986 Rehabilitation of Lipitan - Tabbaan Access Road, Mabalite, Tadian
Mountain Province
Department of Social Welfare and Development - CAR Percent Completed
(default)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
2147322062 Cadogen CIS
Mountain Province
National Irrigation Administration - CAR 100% Completed
(default)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1405432 Procure and implement Internet Connectivity Service in State Universities and Colleges (SUCs)
Regionwide
Department of Information and Communications Technology - CAR # of Free Wi-Fi AP sites in SUCs established/activated
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
2206058 DIGITAL WORKFORCE - COMPETENCY STANDARDS: Conduct of ICT for User Assessment Exam
Regionwide
Department of Information and Communications Technology - CAR # of ICT for User Assessment takers
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
14896761 SETUP Program Mobilization Budget
Regionwide
Department of Science and Technology - CAR N/A
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
19620353 Adjudication Services
Regionwide
National Commission on Indigenous Peoples - CAR no of cases acted upon
(default)
Target: 10
Actual: 8 Expenditure: Release:242000 Obligation:720656
-20
71032792 DIGITAL WORKFORCE - TRAINING ADMINISTRATION: Provide Digital Governance and Management trainings
Regionwide
Department of Information and Communications Technology - CAR Participants for the training on Digital Governance and Management (in %)
(default)
Target: 80
Actual: 100 Expenditure: Release:0 Obligation:0
25
78175287 DIGITAL WORKFORCE - TRAINING ADMINISTRATION: Provide Training of Trainers for Subject Matter Experts on ICT specialized training programs
Regionwide
Department of Information and Communications Technology - CAR # of Participants for the ToT for Subject Matter Experts on ICT specialized training program
(default)
Target: 40
Actual: 0 Expenditure: Release:0 Obligation:0
-100
99403301 DIGITAL WORKFORCE - RESEARCH AND EVALUATION: Conduct of Competency Needs Assessment (CNA)
Regionwide
Department of Information and Communications Technology - CAR # Training Needs Assessment Participants
(default)
Target: 30
Actual: 109 Expenditure: Release:0 Obligation:0
263.33333333333
104926320 System Implementation and Maintenance Cloud Provisioning and System Implementation for LGUs Implementing the Integrated Processing of Barangay Clearance in Business Permit Module
Regionwide
Department of Information and Communications Technology - CAR Percent Completed
(Cumulative)
Target: 10
Actual: 0 Expenditure: Release:0 Obligation:0
-100
105564478 Technical Consultancy Services
Regionwide
Department of Science and Technology - CAR No. of beneficiaries served
(default)
Target: 6
Actual: 0 Expenditure: Release:0 Obligation:0
-100
112556696 DIGITAL WORKFORCE - COMPETENCY STANDARDS: Formulation of Curriculum Recognition Guidelines
Regionwide
Department of Information and Communications Technology - CAR Participation of regions in the FGDs conducted (%)
(default)
Target: 0
Actual: 100 Expenditure: Release:0 Obligation:0
0
122505306 Maintenance and Protection
Regionwide
Department of Environment and Natural Resources - CAR Area Maintained and Protected in Hectares
(Cumulative)
Target: 8287
Actual: 8287 Expenditure: Release:28154000 Obligation:28154000
-66.666666666667
142924094 Conduct of DJPH interviews in preparation for the technical trainings
Regionwide
Department of Information and Communications Technology - CAR # of interviewed applicants
(default)
Target: 100
Actual: 99 Expenditure: Release:0 Obligation:0
-1
143017646 Construction of Diversion Dam
Regionwide
Department of Agriculture - CAR number of diversion dam constructed, service area generated
(Cumulative)
Target: 6
Actual: 4 Expenditure: Release:33386590 Obligation:31306595.93
16.666666666667
144570130 Conduct of Planning and Monitoring and Evaluation Activities
Regionwide
Department of Information and Communications Technology - CAR # Advocacy Activities Conducted
(default)
Target: 0
Actual: 3 Expenditure: Release:0 Obligation:0
0
187054533 Provision of Cash Grants including the amount of Rice Subsidy
Regionwide
Department of Social Welfare and Development - CAR Number of Household beneficiaries provided with Conditional Cash Grants
(Maintained)
Target: 0
Actual: 52404 Expenditure:0 Release:216249600 Obligation:240055200
0
198112739 DIGITAL WORKFORCE - TRAINING ADMINISTRATION: Conduct of external engagements with stakeholders for the implementation of target or or other related activities
Regionwide
Department of Information and Communications Technology - CAR # of external engagements conducted for the implementation of a target or other related activities
(default)
Target: 0
Actual: 9 Expenditure: Release:0 Obligation:0
0
214260805 Regional Government Network (GovNet)
Regionwide
Department of Information and Communications Technology - CAR # of agencies connected to the Government Network
(Cumulative)
Target: 72
Actual: 73 Expenditure: Release:274680 Obligation:274680
1.3888888888889
215610900 DIGITAL WORKFORCE - RESEARCH AND EVALUATION: Conduct of external engagement with stakeholders for the implementation of target or or other related activities
Regionwide
Department of Information and Communications Technology - CAR # of external engagements conducted for the implementation of a target or other related activities
(default)
Target: 0
Actual: 20 Expenditure: Release:0 Obligation:0
0
219795590 DIGITAL WORKFORCE - TRAINING ADMINISTRATION: ICT Executive Briefing for Digital Leaders Seminar
Regionwide
Department of Information and Communications Technology - CAR # of Participants for the ICT Executive Briefing for Digital Leaders Seminar
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
226734077 DIGITAL WORKFORCE - TRAINING ADMINISTRATION: Provide training on Cybersecurity
Regionwide
Department of Information and Communications Technology - CAR # of Participants for the training on Cybersecurity
(default)
Target: 80
Actual: 123 Expenditure: Release:0 Obligation:0
53.75
253798018 DRRM events/meetings attended/participated
Regionwide
Department of Information and Communications Technology - CAR Number of DRRM events/meetings attended/participated
(default)
Target: 1
Actual: 7 Expenditure: Release:250000 Obligation:71381.38
600
258861195 Operational Requirements and Internal Activities Conduct of Periodic Planning and Assessment
Regionwide
Department of Information and Communications Technology - CAR Percent Completed
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
271511461 Seedling Production
Regionwide
Department of Environment and Natural Resources - CAR Number of Seedlings/Propagules Produced
(default)
Target: 0
Actual: 0 Expenditure: Release:1667000 Obligation:0
0
281827686 Construction of Diversion Dam
Regionwide
Department of Agriculture - CAR number of Small Scale Irrigation Projects (SSIP) constructed, service area (ha) generated, number of groups
(Cumulative)
Target: 8
Actual: 0 Expenditure: Release:0 Obligation:0
-78.571428571429
297680009 (Central Office) Procurement for the Provision of Mobile Solution for Internet Liberty (PMSIL)
Regionwide
Department of Information and Communications Technology - CAR # of Free Wi-Fi AP sites established/activated and accepted by Central Office
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
371489553 Innovations for Filipinos Working Distantly from the Philippines (iFWD) and Industry Level Intervention
Regionwide
Department of Science and Technology - CAR N/A
(default)
Target: 0
Actual: 0 Expenditure: Release:21000 Obligation:210000
0
374969703 DIGITAL WORKFORCE - RESEARCH AND EVALUATION: Conduct of Competency Needs Assessment (CNA)
Regionwide
Department of Information and Communications Technology - CAR # of Competency Needs Assessment Participants
(default)
Target: 30
Actual: 149 Expenditure: Release:0 Obligation:0
396.66666666667
379852985 System Implementation and Maintenance Cloud Provisioning and System Implementation for LGUs Implementing the Certificate of Occupancy Module
Regionwide
Department of Information and Communications Technology - CAR Percent Completed
(Cumulative)
Target: 4
Actual: 0 Expenditure: Release:0 Obligation:0
-100
393518527 Plantation Establishment
Regionwide
Department of Environment and Natural Resources - CAR Area Planted in Hectares
(Cumulative)
Target: 4427
Actual: 4427 Expenditure: Release:28775000 Obligation:28775000
-66.666666666667
454502142 Conduct of Site Inspection and Testing
Regionwide
Department of Information and Communications Technology - CAR # of inspected and tested WiFi sites
(default)
Target: 0
Actual: 23 Expenditure: Release:0 Obligation:0
0
492040758 Operations management of DTCs
Regionwide
Department of Information and Communications Technology - CAR # of Center Managed
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
507611252 DIGITAL WORKFORCE - RESEARCH AND EVALUATION: Collaboration with other educational institutions both local and international, and other institutions
Regionwide
Department of Information and Communications Technology - CAR # of Activities conducted in collaboration with the educational institutions
(default)
Target: 0
Actual: 15 Expenditure: Release:0 Obligation:0
0
521824942 Scholarship Program-TWSP
Regionwide
Technical Education and Skills Development Authority - CAR number of enrolled, number of graduates
(default)
Target: 37
Actual: 807 Expenditure: Release:14369983.58 Obligation:26747629.26
2081.0810810811
540526726 JobStart Philippines
Regionwide
Department of Labor and Employment - CAR No. of JobStart Life Skills Training Enrollees
(default)
Target: 50
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
575036136 Conduct of Digital Literacy (DL) Training to Program stakeholders
Regionwide
Department of Information and Communications Technology - CAR # of Digital Literacy Training(s) Conducted
(Cumulative)
Target: 0
Actual: 1 Expenditure: Release:0 Obligation:0
0
586173211 Construction and Installation of SPIS
Regionwide
Department of Agriculture - CAR number of SPIS constructed/installed, service area (hectare) generated
(Cumulative)
Target: 4
Actual: 4 Expenditure: Release:5000000 Obligation:4982572.8
0
587285372 Rehabilitation of Irrigation Canal
Regionwide
Department of Agriculture - CAR linear meter, service area restored
(Cumulative)
Target: 1274
Actual: 0 Expenditure: Release:0 Obligation:0
-24.859075535513
591944112 Regional implementation of startup awareness activities (Mapping, Awareness/ Advocacy, Mentorship etc)
Regionwide
Department of Information and Communications Technology - CAR Number of DSDAP Activities Conducted
(default)
Target: 1
Actual: 15 Expenditure: Release:94799.2 Obligation:0
1400
598783319 Cordillera Month
Regionwide
National Economic and Development Authority - CAR Percentage completed
(default)
Target: 100
Actual: 100 Expenditure: Release:0 Obligation:0
0
639902016 DIGITAL WORKFORCE - TRAINING ADMINISTRATION: Review of Training Courses
Regionwide
Department of Information and Communications Technology - CAR # of conducted Review of Training Courses
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
648895451 Regional Autonomy: What's in it for you and me?
Regionwide
National Economic and Development Authority - CAR Percentage completed
(default)
Target: 100
Actual: 0 Expenditure: Release:0 Obligation:0
-100
659506423 Conduct of activities for Creative Upskilling Program for Development
Regionwide
Department of Information and Communications Technology - CAR Number of trained individuals for the Creative Upskilling Program for Development
(default)
Target: 0
Actual: 21 Expenditure: Release:1080700 Obligation:0
0
662511845 Scholarship Programs-PESFA
Regionwide
Technical Education and Skills Development Authority - CAR number of enrolled, number of graduates
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
700348085 Scholarship Program
Regionwide
Technical Education and Skills Development Authority - CAR number of enrolled, number of graduates
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:37149
0
707474834 DIGITAL WORKFORCE - RESEARCH AND EVALUATION: Stakeholder's Summit
Regionwide
Department of Information and Communications Technology - CAR # of Partner Summit conducted
(default)
Target: 1
Actual: 0 Expenditure: Release:0 Obligation:0
-100
783600884 DIGITAL WORKFORCE - TRAINING ADMINISTRATION: Provide Digital Governance and Management trainings
Regionwide
Department of Information and Communications Technology - CAR # of Conducted training on Digital Governance and Management
(default)
Target: 2
Actual: 1 Expenditure: Release:0 Obligation:0
-50
807946876 Technology Trainings and Fora for MSMEs
Regionwide
Department of Science and Technology - CAR No. of trainings and fora conducted
(default)
Target: 8
Actual: 0 Expenditure: Release:0 Obligation:0
-100
816859282 Operations management of DTCs
Regionwide
Department of Information and Communications Technology - CAR # of Center users provided with training and non-training services
(default)
Target: 600
Actual: 2253 Expenditure: Release:0 Obligation:0
275.5
822097161 Scholarship Program
Regionwide
Technical Education and Skills Development Authority - CAR number of enrolled, number of graduates
(default)
Target: 1017
Actual: 919 Expenditure: Release:0 Obligation:15605727
-9.6361848574238
828704689 IP Month Celebration: Restoring and Fostering Cultural Growth in the Cordillera Regio
Regionwide
National Commission on Indigenous Peoples - CAR no of projects implemented
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
842529138 (Central Office) Procurement of Universal Internet Subscription for Geographically Isolated and Disadvantaged Areas (UISG) - Phase 1
Regionwide
Department of Information and Communications Technology - CAR # of Free Wi-Fi AP sites in GIDAs established/activated and accepted by Central Office
(Cumulative)
Target: 75
Actual: 0 Expenditure: Release:0 Obligation:0
-100
849268943 Conduct of Internet Media and Information Literacy (IMIL) Training to Program beneficiary users
Regionwide
Department of Information and Communications Technology - CAR # of IMIL Training(s) conducted
(Cumulative)
Target: 0
Actual: 7 Expenditure: Release:0 Obligation:0
0
880035390 DIGITAL WORKFORCE - COMPETENCY STANDARDS: Conduct of ICT for User Assessment Exam
Regionwide
Department of Information and Communications Technology - CAR # of ICT for User Assessment Exam Conducted
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
902263507 DIGITAL WORKFORCE - TRAINING ADMINISTRATION: Review of Training Courses
Regionwide
Department of Information and Communications Technology - CAR # of Participants for the Review of Training Courses
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
908501059 Digital Jobs PH
Regionwide
Department of Information and Communications Technology - CAR numbers of trained individuals, number of trainings conducted, numbers of employed graduates
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
929868222 (Central office) Provision of Internet Connectivity Services (PICS) in Public Places (PICS-PP)
Regionwide
Department of Information and Communications Technology - CAR # of Free Wi-Fi AP sites in public places established/activated and accepted by Central Office
(Cumulative)
Target: 27
Actual: 0 Expenditure: Release:0 Obligation:0
-100
937229953 DIGITAL WORKFORCE - TRAINING ADMINISTRATION: Provide trainings on Transformative Technologies
Regionwide
Department of Information and Communications Technology - CAR # of Conducted training on Transformative Technologies
(default)
Target: 3
Actual: 0 Expenditure: Release:0 Obligation:0
-100
949698156 DIGITAL WORKFORCE - COMPETENCY STANDARDS: Conduct of ICT Specialist Proficiency Certification Exam (Hands-on)
Regionwide
Department of Information and Communications Technology - CAR # of certification exams conducted
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
974363261 DIGITAL WORKFORCE - TRAINING ADMINISTRATION: Provide trainings on Transformative Technologies
Regionwide
Department of Information and Communications Technology - CAR # of Participants for the training on Transformative Technologies
(default)
Target: 120
Actual: 0 Expenditure: Release:0 Obligation:0
-100
984495512 Rehabilitation of Diversion Dam
Regionwide
Department of Agriculture - CAR number of diversion dam rehabilitated, service area restored
(Cumulative)
Target: 4
Actual: 0 Expenditure: Release:0 Obligation:0
-71.428571428571
986897312 Scholarship Program
Regionwide
Technical Education and Skills Development Authority - CAR number of enrolled, number of graduates
(default)
Target: 475
Actual: 1009 Expenditure: Release:0 Obligation:14410121
112.42105263158
996385006 Workshops on Messaging on Peace and Autonomy
Regionwide
National Economic and Development Authority - CAR number of activities
(Cumulative)
Target: 0
Actual: 0 Expenditure:0 Release:0 Obligation:0
0
998050986 Scholarship Program-TWSP
Regionwide
Technical Education and Skills Development Authority - CAR Number of enrolled, Number of graduates
(default)
Target: 282
Actual: 1578 Expenditure: Release:0 Obligation:31441070.49
459.57446808511
1000896108 Regional Government Network (GovNet) - Operations and Maintenance
Regionwide
Department of Information and Communications Technology - CAR Percentage of Connections Operated and Maintained
(Maintained)
Target: 100
Actual: 100 Expenditure: Release:4000000 Obligation:3912043.44
0
1015302348 DIGITAL WORKFORCE - TRAINING ADMINISTRATION: Provide Training of Trainers for Subject Matter Experts on ICT specialized training programs
Regionwide
Department of Information and Communications Technology - CAR Participants for the ToT for Subject Matter Experts on ICT specialized training program (in %)
(default)
Target: 80
Actual: 0 Expenditure: Release:0 Obligation:0
-100
1015995932 Innovations for Filipinos Working Distantly from the Philippines (iFWD) and Industry Level Intervention
Regionwide
Department of Science and Technology - CAR Percent Completed
(default)
Target: 38.31
Actual: 0 Expenditure: Release:113331 Obligation:113331
-100
1061503954 DIGITAL WORKFORCE - RESEARCH AND EVALUATION: Implement the Apprenticeship Program
Regionwide
Department of Information and Communications Technology - CAR # of students completed the program
(default)
Target: 10
Actual: 14 Expenditure: Release:0 Obligation:0
40
1062382713 DIGITAL WORKFORCE - COMPETENCY STANDARDS: Conduct of ICT Specialist Proficiency Examination (Diagnostic)
Regionwide
Department of Information and Communications Technology - CAR # of diagnostic exam takers
(default)
Target: 45
Actual: 12 Expenditure: Release:0 Obligation:0
-73.333333333333
1064853965 DIGITAL WORKFORCE - TRAINING ADMINISTRATION: Conduct of regional-initiated activities not included in the list of regular courses of TMD
Regionwide
Department of Information and Communications Technology - CAR # of regional-initiated activities
(default)
Target: 0
Actual: 6 Expenditure: Release:0 Obligation:0
0
1082414607 Digital Literacy and Education
Regionwide
Department of Information and Communications Technology - CAR number of trainings conducted
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
1098140150 DIGITAL WORKFORCE - TRAINING ADMINISTRATION: Provide Training of Trainers for Subject Matter Experts on ICT specialized training programs
Regionwide
Department of Information and Communications Technology - CAR # of Conducted ToT for Subject Matter Experts on ICT specialized training program
(default)
Target: 1
Actual: 0 Expenditure: Release:0 Obligation:0
-100
1103927030 Family Transitory Support Package
Regionwide
Department of Social Welfare and Development - CAR 100% payment of beneficiaries
(Cumulative)
Target: 100
Actual: 0 Expenditure:0 Release:0 Obligation:0
-3
1104492352 DIGITAL WORKFORCE - TRAINING ADMINISTRATION: Provide training on Cybersecurity
Regionwide
Department of Information and Communications Technology - CAR # of Conducted training on Cybersecurity
(default)
Target: 2
Actual: 2 Expenditure: Release:0 Obligation:0
0
1148444451 Educational Assistance Program
Regionwide
National Commission on Indigenous Peoples - CAR no of beneficiaries
(default)
Target: 0
Actual: 559 Expenditure: Release:4354000 Obligation:16505659
0
1174836240 System Implementation and Maintenance Cloud Provisioning and System Implementation for LGUs Implementing the Building Permit Module
Regionwide
Department of Information and Communications Technology - CAR Percent Completed
(Cumulative)
Target: 4
Actual: 0 Expenditure: Release:0 Obligation:0
-100
1186446125 Conduct of training activities
Regionwide
Department of Information and Communications Technology - CAR # of conducted training activities
(default)
Target: 4
Actual: 1 Expenditure: Release:0 Obligation:0
-75
1192396821 System Implementation and Maintenance Cloud Provisioning and System Implementation for LGUs Implementing the Business Permit Module
Regionwide
Department of Information and Communications Technology - CAR Percent Completed
(Cumulative)
Target: 10
Actual: 0 Expenditure: Release:0 Obligation:0
-100
1207023476 Conduct of DJPH interviews in preparation for the technical trainings
Regionwide
Department of Information and Communications Technology - CAR # of interviews conducted
(default)
Target: 2
Actual: 32 Expenditure: Release:0 Obligation:0
1500
1215685736 Technical Consultancy Services
Regionwide
Department of Science and Technology - CAR N/A
(default)
Target: 0
Actual: 0 Expenditure: Release:28556.2 Obligation:28556.2
0
1218424302 Philippine National Public Key Infrastructure (PNPKI)
Regionwide
Department of Information and Communications Technology - CAR # of orientation conducted
(Cumulative)
Target: 1
Actual: 6 Expenditure: Release:996623.8 Obligation:0
433.33333333333
1218609994 DIGITAL WORKFORCE - TRAINING ADMINISTRATION: Review of Training Courses
Regionwide
Department of Information and Communications Technology - CAR # of Reports submitted
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
1226801759 (Central Office Procurement for) Provision of Internet Access via Low Earth Orbit Satellites (PIALEOS)
Regionwide
Department of Information and Communications Technology - CAR # of Free Wi-Fi AP sites established/activated and accepted by Central Office
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
1228818977 DIGITAL WORKFORCE - TRAINING ADMINISTRATION: Provide Digital Governance and Management trainings
Regionwide
Department of Information and Communications Technology - CAR # of Participants for the training on Digital Governance and Management
(default)
Target: 80
Actual: 48 Expenditure: Release:0 Obligation:0
-40
1246752693 MANAGED INTERNET SERVICE OF VERY SMALL APERTURE TERMINAL (VSAT) FOR THE PROVISION OF EMERGENCY TELECOMMUNICATIONS SERVICE
Regionwide
Department of Information and Communications Technology - CAR number of sites
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
1248243394 System Implementation and Maintenance (ONLINE) Provision of technical assistance to LGUs during (1) data build-up, (2) pilot testing, (3) dry-run, and (4) operations, and (5) during data migration (if necessary)
Regionwide
Department of Information and Communications Technology - CAR # of technical assistance provided
(default)
Target: 30
Actual: 0 Expenditure: Release:0 Obligation:0
-100
1256345737 Conduct of Paralegal Trainings for IP Elders/Leaders/IPMRs
Regionwide
National Commission on Indigenous Peoples - CAR no of projects implemented
(default)
Target: 2
Actual: 3 Expenditure: Release:90000 Obligation:221381
50
1289578183 Training and Retooling of Autonomy IEC speakers
Regionwide
National Economic and Development Authority - CAR Number of participants trained
(default)
Target: 100
Actual: 0 Expenditure: Release:0 Obligation:0
-100
1294680013 Technical Consultancy Services (TCS), Trainings and Fora for MSMEs
Regionwide
Department of Science and Technology - CAR Number of firms assisted
(default)
Target: 1
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1308557719 Rehabilitation of Irrigation Canal
Regionwide
Department of Agriculture - CAR linear meter, service area restored
(Cumulative)
Target: 4365
Actual: 2309 Expenditure: Release:20580000 Obligation:19160930.69
-47.899511514306
1372821335 Conduct of training activities
Regionwide
Department of Information and Communications Technology - CAR Percentage of graduates (%)
(Cumulative)
Target: 80
Actual: 0 Expenditure: Release:0 Obligation:0
-100
1379689913 Barangay-wide IECs on Cordillera Autonomy
Regionwide
National Economic and Development Authority - CAR Number of IECs conducted
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
1385247598 Integrated Local Government Unit (iLGU)/ e- Local Government Unit (eLGU)
Regionwide
Department of Information and Communications Technology - CAR Regional Operations Cost and Project Team Regional Activities including technical support activities (site visits, validation, refresher training, internal planning and performance review and monitoring)
(default)
Target: 22
Actual: 65 Expenditure: Release:0 Obligation:0
195.45454545455
1391755222 DIGITAL WORKFORCE - COMPETENCY STANDARDS: Conduct of ICT Specialist Proficiency Certification Exam (Hands-on)
Regionwide
Department of Information and Communications Technology - CAR #of certification exam takers
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
1409563262 Multi-media IECs
Regionwide
National Economic and Development Authority - CAR Percent completed
(default)
Target: 33.33
Actual: 10 Expenditure: Release:0 Obligation:0
-69.99699969997
1428221584 Social Pension Program
Regionwide
Department of Social Welfare and Development - CAR number of beneficiaries served
(Maintained)
Target: 111239
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1433173645 DIGITAL WORKFORCE - RESEARCH AND EVALUATION: Conduct of Evaluation of training programs
Regionwide
Department of Information and Communications Technology - CAR # of Trainings programs evaluated
(default)
Target: 1
Actual: 5 Expenditure: Release:0 Obligation:0
400
1439232084 Seedling Production
Regionwide
Department of Environment and Natural Resources - CAR Number of Seedling Produced
(Cumulative)
Target: 4659180
Actual: 5257387 Expenditure: Release:54395000 Obligation:54395000
-90.596723386232
1446649115 Scholarship Programs-TTSP
Regionwide
Technical Education and Skills Development Authority - CAR number of enrolled, number of graduates
(default)
Target: 1350
Actual: 1148 Expenditure: Release:4007201.46 Obligation:29587900.76
-14.962962962963
1448952595 Establishment and Monitoring of Free WiFi Sites
Regionwide
Department of Information and Communications Technology - CAR # of Public Places with FWPPP presence
(Maintained)
Target: 516
Actual: 516 Expenditure: Release:0 Obligation:0
0
1476518259 DIGITAL WORKFORCE - COMPETENCY STANDARDS: Conduct of ICT Specialist Proficiency Examination (Diagnostic)
Regionwide
Department of Information and Communications Technology - CAR # of diagnostic exam conducted
(default)
Target: 3
Actual: 3 Expenditure: Release:0 Obligation:0
0
1486461173 SETUP Program Mobilization Budget
Regionwide
Department of Science and Technology - CAR Percent Completed
(default)
Target: 23.75
Actual: 0 Expenditure: Release:837552 Obligation:837552
-100
1496300468 Conduct of external engagements with stakeholders for the implementation of target or or other related activities
Regionwide
Department of Information and Communications Technology - CAR # of external engagements conducted for the implementation of a target or other related activities
(default)
Target: 1
Actual: 10 Expenditure: Release:0 Obligation:0
900
1534671586 Scholarship Program
Regionwide
Technical Education and Skills Development Authority - CAR number of enrolled, number of graduates
(default)
Target: 38
Actual: 214 Expenditure: Release:0 Obligation:5185037
463.15789473684
1547081419 TECH4ED Center Census and Monitoring for CAR
Regionwide
Department of Information and Communications Technology - CAR number of centers
(default)
Target: 110
Actual: 0 Expenditure: Release:0 Obligation:0
-100
1553550386 Public Awareness and Engagement Conduct of Orientation
Regionwide
Department of Information and Communications Technology - CAR Percent Completed
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
1562295461 Local candidates' forum
Regionwide
National Economic and Development Authority - CAR Number of participants
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
1567592248 Industry-level Interventions Towards Industry 4.0
Regionwide
Department of Science and Technology - CAR Number of firms assisted
(default)
Target: 0
Actual: 0 Expenditure:0 Release:0 Obligation:0
0
1580364115 Public Awareness and Engagement Conduct of Roadshows
Regionwide
Department of Information and Communications Technology - CAR Percent Completed
(default)
Target: 1
Actual: 1 Expenditure: Release:0 Obligation:0
0
1582894684 Philippine National Public Key Infrastructure (PNPKI)
Regionwide
Department of Information and Communications Technology - CAR # of processed Digital Certificate Application
(default)
Target: 0
Actual: 104 Expenditure: Release:0 Obligation:0
0
1583016212 DIGITAL WORKFORCE - COMPETENCY STANDARDS: Conduct of external engagements with stakeholders for the implementation of target or or other related activities
Regionwide
Department of Information and Communications Technology - CAR # of external engagements conducted for the implementation of a target or other related activities
(default)
Target: 3
Actual: 22 Expenditure: Release:0 Obligation:0
633.33333333333
1597496921 Social Pension Program
Regionwide
Department of Social Welfare and Development - CAR Percentage of beneficiaries using social pension to augment daily living subsistence and medical needs
(default)
Target: 111239
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1614861421 Technical Training to LGUs Conduct of users training to (1) key system users and (2) endorsing offices; per iBPLS modules
Regionwide
Department of Information and Communications Technology - CAR Percent Completed
(Cumulative)
Target: 2
Actual: 0 Expenditure: Release:0 Obligation:0
-100
1619559132 System Implementation and Maintenance Provision of technical assistance to LGUs during (1) data build-up, (2) pilot testing, (3) dry-run, and (4) operations, and (5) during data migration (if necessary)
Regionwide
Department of Information and Communications Technology - CAR Percent Completed
(Cumulative)
Target: 10
Actual: 10 Expenditure: Release:0 Obligation:0
0
1642495523 Operational Requirements and Internal Activities Maintenance of RCO-service vehicles; for use during official travels
Regionwide
Department of Information and Communications Technology - CAR Percent Completed
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
1649348568 DIGITAL WORKFORCE - COMPETENCY STANDARDS: Conduct of Local Digital Challenge
Regionwide
Department of Information and Communications Technology - CAR # of Local Digital Challenges Conducted
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
1650039482 Procure and Implement internet Connectivity Service in Municipalities (PICS-MUN)
Regionwide
Department of Information and Communications Technology - CAR # of Free Wi-Fi AP sites established/activated in Municipalites of CAR
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
1651965302 Rehabilitation of Diversion Dam
Regionwide
Department of Agriculture - CAR number of diversion dam rehabilitated, service area restored
(Cumulative)
Target: 5
Actual: 4 Expenditure: Release:15962410 Obligation:14604826.02
1225
1666818973 Supplementary Feeding Program
Regionwide
Department of Social Welfare and Development - CAR 45055 Target Beneficiaries
(Maintained)
Target: 0
Actual: 44271 Expenditure:0 Release:0 Obligation:0
0
1690348108 Scholarship-CACW
Regionwide
Technical Education and Skills Development Authority - CAR Number of Assessed
(default)
Target: 373
Actual: 0 Expenditure: Release:0 Obligation:0
-100
1693523977 Meeting/Briefing with Upstream partners for Autonomy
Regionwide
National Economic and Development Authority - CAR Percent completed
(default)
Target: 50
Actual: 25 Expenditure: Release:0 Obligation:0
-50
1701274456 Program Mobilization Budget
Regionwide
Department of Science and Technology - CAR Number of firms assisted
(default)
Target: 0
Actual: 0 Expenditure:0 Release:0 Obligation:0
0
1707361226 Public Awareness and Engagement Conduct of Official System Launchings of LGUs with Operational System Modules
Regionwide
Department of Information and Communications Technology - CAR Percent Completed
(Cumulative)
Target: 10
Actual: 0 Expenditure: Release:0 Obligation:0
-100
1713757110 Technology Trainings and Fora for MSMEs
Regionwide
Department of Science and Technology - CAR N/A
(default)
Target: 0
Actual: 0 Expenditure: Release:62668 Obligation:22738
0
1745118166 Center Managers' Trainings
Regionwide
Department of Information and Communications Technology - CAR # of Center Managers trained
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
1764587018 Digital Workforce
Regionwide
Department of Information and Communications Technology - CAR number of ICT Courses Conducted; Number of ICT Diagnostic/assessment Exam conducted
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
1791419973 Scholarship Programs
Regionwide
Technical Education and Skills Development Authority - CAR number of enrolled, number of graduates
(default)
Target: 2007
Actual: 1261 Expenditure: Release:0 Obligation:30150339
-37.16990533134
1805531875 Conduct of Cybersecurity Advocacy and Awareness Campaigns
Regionwide
Department of Information and Communications Technology - CAR Number of conducted Cybersecurity Advocacy and Awareness Campaigns
(default)
Target: 3
Actual: 7 Expenditure: Release:0 Obligation:0
133.33333333333
1809230083 Other IECs in partnership with other agencies
Regionwide
National Economic and Development Authority - CAR Percentage completed
(default)
Target: 50
Actual: 0 Expenditure: Release:0 Obligation:0
-100
1811833844 (Central Office) Procurement for the Subscription of Wi-Fi Internet Access in Tourist Spots (WITS)
Regionwide
Department of Information and Communications Technology - CAR # of new Free Wi-Fi AP sites established/activated and accepted by Central Office
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
1834880776 (Central Office) Procurement of Subscription of Very Small Aperture Terminal Internet Services for Geographically Isolated and Disadvantaged Areas
Regionwide
Department of Information and Communications Technology - CAR # of Free Wi-Fi AP sites in GIDAs established/activated and accepted by Central Office
(Cumulative)
Target: 480
Actual: 480 Expenditure: Release:0 Obligation:0
0
1847502201 IEC Collaterals
Regionwide
National Economic and Development Authority - CAR Percentage completed
(Maintained)
Target: 100
Actual: 90 Expenditure: Release:0 Obligation:0
-10
1865854056 Construction of Irrigation Canal
Regionwide
Department of Agriculture - CAR linear meter, service area restored
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
1893075248 DIGITAL WORKFORCE - TRAINING ADMINISTRATION: Provide trainings on Transformative Technologies
Regionwide
Department of Information and Communications Technology - CAR Percentage of training completers for the Transformative Technologies training conducted (in %)
(default)
Target: 80
Actual: 0 Expenditure: Release:0 Obligation:0
-100
1934394273 Scholarship Programs-STEP
Regionwide
Technical Education and Skills Development Authority - CAR number of enrolled, number of graduates
(default)
Target: 675
Actual: 1542 Expenditure: Release:9944606.25 Obligation:24683849.45
128.44444444444
1936466901 Operational Requirements and Internal Activities Execution of Memorandum of Agreement with Data Sharing Agreement
Regionwide
Department of Information and Communications Technology - CAR Percent Completed
(Cumulative)
Target: 35
Actual: 0 Expenditure: Release:0 Obligation:0
-100
1940509422 Plantation Establishment
Regionwide
Department of Environment and Natural Resources - CAR Area Planted in Hectares
(default)
Target: 231
Actual: 231 Expenditure: Release:1503000 Obligation:0
0
1962159324 Philippine National Public Key Infrastructure (PNPKI)
Regionwide
Department of Information and Communications Technology - CAR # of issued digital certificates
(default)
Target: 0
Actual: 200 Expenditure: Release:0 Obligation:0
0
1971366431 Scholarship Program
Regionwide
Technical Education and Skills Development Authority - CAR number of assessed, number of certified
(default)
Target: 0
Actual: 868 Expenditure: Release:0 Obligation:728170
0
1973772513 Maintenance and Protection
Regionwide
Department of Environment and Natural Resources - CAR Area Maintained and Protected in Hectares
(Cumulative)
Target: 7937
Actual: 7937 Expenditure: Release:48315000 Obligation:41713000
0
1999067631 DRRM Emergency Telecommunications Cluster advocacy activities conducted/participated
Regionwide
Department of Information and Communications Technology - CAR # of advocacy activities conducted/participated
(default)
Target: 1
Actual: 7 Expenditure: Release:0 Obligation:0
600
1999492944 Legal Assistance to the ICCs/IPs
Regionwide
National Commission on Indigenous Peoples - CAR no of beneficiaries
(default)
Target: 0
Actual: 350 Expenditure: Release:0 Obligation:71618
0
2007021146 (Central Office) Procurement for the Subscription of Wi-Fi Internet Access in Tourist Spots (WITS)
Regionwide
Department of Information and Communications Technology - CAR # of new Free Wi-Fi AP sites in tourism areas established/activated and accepted by Central Office
(Cumulative)
Target: 50
Actual: 0 Expenditure: Release:0 Obligation:0
-100
2032300285 Procure and implement Internet Connectivity Service in State Universities and Colleges (SUCs)
Regionwide
Department of Information and Communications Technology - CAR # of Free Wi-Fi live AP sites established in SUCs
(Cumulative)
Target: 6
Actual: 0 Expenditure: Release:0 Obligation:0
-100
2039160599 Engagement of COS Program personnel
Regionwide
Department of Information and Communications Technology - CAR Number of men and women engaged for Program operations
(Maintained)
Target: 9
Actual: 8 Expenditure: Release:1899680.92 Obligation:0
-11.111111111111
2046263667 Support to the RDC-CAR's development and autonomy agenda
Regionwide
National Economic and Development Authority - CAR Number of meetings conducted
(default)
Target: 1
Actual: 0 Expenditure: Release:0 Obligation:0
-100
2061573464 Sustainable Livelihood Program
Regionwide
Department of Social Welfare and Development - CAR Total number of households who received seed capital fund and total number of households trained (Seed Capital Funds, Skills Training, and CBLA)
(Maintained)
Target: 0
Actual: 0 Expenditure:0 Release:0 Obligation:0
0
2088679552 BP2 Livelihood Settlement Grant
Regionwide
Department of Social Welfare and Development - CAR No. of Households provided with livelihood modalities
(Cumulative)
Target: 0
Actual: 8 Expenditure:0 Release:390000 Obligation:390000
0
2100877473 Conduct of external engagements with stakeholders for the implementation of target or or other related activities
Regionwide
Department of Information and Communications Technology - CAR # of external engagements conducted for the implementation of a target or other related activities
(default)
Target: 3
Actual: 17 Expenditure: Release:0 Obligation:0
466.66666666667
2122335159 CAPACITY DEVELOPMENT FOR FARMERS
Regionwide
Department of Social Welfare and Development - CAR No. of Households provided with livelihood modalities
(Cumulative)
Target: 222
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
2145842138 Conduct of DJPH orientations in preparation for the technical trainings
Regionwide
Department of Information and Communications Technology - CAR # of orientations conducted
(default)
Target: 3
Actual: 23 Expenditure: Release:0 Obligation:0
666.66666666667
25240127 Sustainable Livelihood Program
Abra
Department of Social Welfare and Development - CAR Total number of households who received seed capital fund and total number of households trained (Seed Capital Funds, Skills Training, and CBLA)
(Maintained)
Target: 88
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
34561790 Managed Internet Service - VSAT Network Services for Quarantine Centers and Medical Facilities - Langiden Central School
Abra
Department of Information and Communications Technology - CAR Percent Completed
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
37700013 Repair/Improvement/Upgrading of Luba RHU
Abra
Department of Health - CAR Percent completed
(Cumulative)
Target: 100
Actual: 98 Expenditure: Release:1000000 Obligation:987059.05
-9
37724764 Balaoang SIP
Abra
National Irrigation Administration - CAR 100% Completed
(default)
Target: 76
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
42354610 Direct Internet Subscription for the IP Transport Municipal in Licuan-Baay
Abra
Department of Information and Communications Technology - CAR Percent Completed
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
44777304 CONSTRUCTION OF HEALTH CENTER AT BARANGAY GAPANG, Pilar
Abra
Department of the Interior and Local Government - CAR percent completed
(Cumulative)
Target: 0
Actual: 100 Expenditure: Release:0 Obligation:0
0
46637750 Upgrading the Production Process and Efficiency of Equipment for Juno-Brad Antiques and Furniture
Abra
Department of Science and Technology - CAR No. of firms assisted
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
54107646 Construction of River Control, Cogon, Tineg
Abra
Department of Social Welfare and Development - CAR 100% completion
(Cumulative)
Target: 0
Actual: 0 Expenditure:0 Release:0 Obligation:0
0
62593478 Repair/Improvement/Upgrading of San Isidro RHU
Abra
Department of Health - CAR Percent completed
(Cumulative)
Target: 100
Actual: 95 Expenditure: Release:1000000 Obligation:995648.66
88
72162459 Upgrading of Ningching Noodles Processing-extra
Abra
Department of Science and Technology - CAR no. of firms assisted
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
79972148 Direct Internet Subscription for the IP Transport Municipal in Langiden
Abra
Department of Information and Communications Technology - CAR Percent Completed
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
84632349 REPAIR/IMPROVEMENT OF TIEMPO BHS
Abra
Department of Health - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 100 Expenditure: Release:500000 Obligation:500000
52.631578947368
97434138 Managed Internet Service - VSAT Network Services for Quarantine Centers and Medical Facilities - Tiempo National High School
Abra
Department of Information and Communications Technology - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0 Expenditure: Release:0 Obligation:0
-48.387034274311
104696830 CLUSTER 05 - Construction of various solar PIP (LAGBEN SOLAR PIP, PAGANAO SOLAR PIP, BAYAAN SOLAR PIP, NAMIT-INGAN SOLAR PIP)
Abra
National Irrigation Administration - CAR percent completed
(Cumulative)
Target: 100
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
116187247 Construction of Barangay Lingey Isolation Facility
Abra
Department of Social Welfare and Development - CAR 100% completion
(default)
Target: 0
Actual: 100 Expenditure:0 Release:31167.43 Obligation:79360
0
124856175 Direct Internet Subscription for the IP Transport Municipal in Daguioman
Abra
Department of Information and Communications Technology - CAR Percent Completed
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
125477198 Production Upgrade of 3J's Sweet Delights
Abra
Department of Science and Technology - CAR No. of firms assisted
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
130341462 Maguyepyep CIS
Abra
National Irrigation Administration - CAR 100 % Completed, 0.6 km lined canal
(Cumulative)
Target: 38
Actual: 27 Expenditure:0 Release:1140671 Obligation:1839791.19
-64
133046815 Sustainability of Production Capacity and Quality of Handwoven Products
Abra
Department of Science and Technology - CAR No. of firm assisted
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
133215239 'Upgrading the Production Process and Efficiency of Equipment for M. Liagao's Furniture
Abra
Department of Science and Technology - CAR No. of firms assisted
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
133913887 Construction of Level III Potable Water Supply System at Lugsong, Buanao, Malibcong, Abra
Abra
Department of the Interior and Local Government - CAR percent completed
(Cumulative)
Target: 100
Actual: 100 Expenditure: Release:3000000 Obligation:2969454
66.130952380952
138224333 IMPROVEMENT OF SLOPE PROTECTION ALONG SALAGPAT CREEK, POBLACION, Malibcong
Abra
Department of Social Welfare and Development - CAR 100% completion
(Cumulative)
Target: 0
Actual: 0 Expenditure:0 Release:0 Obligation:0
0
162488110 Construction of COVID-19 Isolation Facility, Dugong
Abra
Department of Social Welfare and Development - CAR 100% completion
(default)
Target: 0
Actual: 100 Expenditure:41603.6 Release:674814.83 Obligation:749794
0
163739392 Upgrading the Production Process and Efficiency of Equipment for M. Liagao's Furniture
Abra
Department of Science and Technology - CAR Number of firms assisted
(default)
Target: 0
Actual: 0 Expenditure:0 Release:0 Obligation:0
0
166938079 Installation of Solar-Powered Street Lights, Lat-ey, Lat-Ey, Malibcong
Abra
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
173062811 Manabo CIS
Abra
National Irrigation Administration - CAR 100% Completed
(default)
Target: 30
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
173930651 Provision of Cash Grant to 4Ps beneficiaries including the amount of Rice Subsidy
Abra
Department of Social Welfare and Development - CAR Number of Household beneficiaries provided with Conditional Cash Grants
(Maintained)
Target: 11907
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
175617729 Pacac Solar PIP
Abra
National Irrigation Administration - CAR 100% Completed
(default)
Target: 77
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
180717580 Upgrading of 348 Li. M. Road Access at Sitio Damulog, Caupasan
Abra
Department of Social Welfare and Development - CAR 100% completion
(default)
Target: 0
Actual: 100 Expenditure:0 Release:94668.35 Obligation:159221
0
184318572 Construction of Level II Potable Water System (So. Contang)
Abra
Department of the Interior and Local Government - CAR percent completed
(Cumulative)
Target: 100
Actual: 100 Expenditure: Release:3000000 Obligation:2227509
-8.4218406400599
189026965 Cagayungan Solar PIP
Abra
National Irrigation Administration - CAR 100% Completed
(default)
Target: 85
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
215514636 PARTNERSHIP ON SUSTAINABLE LIVING PROJECT
Abra
Department of Social Welfare and Development - CAR No. of Households provided with livelihood modalities
(Cumulative)
Target: 0
Actual: 0 Expenditure:0 Release:0 Obligation:0
0
224222763 New Construction of Boliney RHU
Abra
Department of Health - CAR Percent completed
(Cumulative)
Target: 100
Actual: 95 Expenditure: Release:990000 Obligation:989384.95
-3.3333333333333
226985089 Repair/Improvement of Dolores RHU
Abra
Department of Health - CAR Percent Completed
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
234069240 Liagan SIP
Abra
National Irrigation Administration - CAR 100% Completed
(default)
Target: 90
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
244335828 CONSTRUCTION OF HEALTH CENTER AT BARANGAY OCUP
Abra
Department of the Interior and Local Government - CAR percent completed
(Cumulative)
Target: 0
Actual: 100 Expenditure: Release:0 Obligation:0
0
245038192 Managed Internet Service - VSAT Network Services for Quarantine Centers and Medical Facilities - Danglas Municipal Isolation Unit
Abra
Department of Information and Communications Technology - CAR Percent Completed
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
250030437 Direct Internet Subscription for the IP Transport Municipal in Peñarrubia
Abra
Department of Information and Communications Technology - CAR Percent Completed
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
253718589 Productivity Enhancement of LIBAJI Integrated Farm's Heirloom Rice Production
Abra
Department of Science and Technology - CAR Number of firms assisted
(default)
Target: 0
Actual: 0 Expenditure:0 Release:0 Obligation:0
0
254949419 Construction of Multi-purpose Building at Sitio Batayan, Alangtin, Tubo
Abra
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
263583802 Direct Internet Subscription for the IP Transport Municipal in Luba
Abra
Department of Information and Communications Technology - CAR Percent Completed
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
274431769 Construction of Level II Potable Water System (So. Caniogan)
Abra
Department of the Interior and Local Government - CAR percent completed
(Cumulative)
Target: 0
Actual: 100 Expenditure: Release:2500000 Obligation:2473226.42
0
281924674 Installation of Solar Lights. Buneg Proper, Buneg, Lacub
Abra
National Commission on Indigenous Peoples - CAR no of projects implemented
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:226970
0
307192922 Construction of COVID-19 Isolation Facility, Layugan
Abra
Department of Social Welfare and Development - CAR 100% completion
(default)
Target: 0
Actual: 100 Expenditure:31156.58 Release:370461.34 Obligation:411624
0
320121315 Construction of Reinforced Concrete Lined Drainage Canal, Caganayan, Tineg
Abra
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
320933360 Scholarship Program
Abra
Technical Education and Skills Development Authority - CAR number of enrolled, number of graduates
(default)
Target: 250
Actual: 306 Expenditure: Release:0 Obligation:13711002.4
22.4
343634515 Construction of COVID-19 Isolation Facility, Labon
Abra
Department of Social Welfare and Development - CAR 100% completion
(default)
Target: 0
Actual: 100 Expenditure:17426.43 Release:234083.49 Obligation:260093
0
344046240 Repair/Improvement/Upgrading of Ba-i BHS
Abra
Department of Health - CAR Percent completed
(Cumulative)
Target: 100
Actual: 35 Expenditure: Release:500000 Obligation:499173.15
9.6
344579328 CLUSTER 02 - Construction of various PIP (LANGBABAN PIP, MANAYDAY-LAUD PIP, KADAKAD-BIOG-MAOAY-SAN ISIDRO PIP, DONGADONG PIP)
Abra
National Irrigation Administration - CAR percent completed
(Cumulative)
Target: 100
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
362017948 Lagayan-La Paz SIP
Abra
National Irrigation Administration - CAR percent completed
(Cumulative)
Target: 100
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
362962358 Vulnerability and Risk Assessment
Abra
Provincial Local Government of Abra Number of Vulnerability and Risk assessed
(default)
Target: 1
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
388605885 Forestry Seedling Production
Abra
Provincial Local Government of Abra Number of forestry seedlings produced
(default)
Target: 10000
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
390764045 CLUSTER 4 - Constrruction of various CIS (BAGATOY CIS, NAGUILLIAN CIS)
Abra
National Irrigation Administration - CAR percent completed
(Cumulative)
Target: 100
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
391272182 CONSTRUCTION OF HEALTH CENTER AT BARANGAY NAGCANASAN, Pilar
Abra
Department of the Interior and Local Government - CAR percent completed
(Cumulative)
Target: 0
Actual: 100 Expenditure: Release:0 Obligation:0
0
393533768 EO70 CVAs Livelihood Project
Abra
Department of Social Welfare and Development - CAR No. of Households provided with livelihood modalities
(Cumulative)
Target: 0
Actual: 0 Expenditure:0 Release:0 Obligation:0
0
397418314 REPAIR/IMPROVEMENT OF ABRA PROVINCIAL HOSPITAL
Abra
Department of Health - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 67 Expenditure: Release:7400000 Obligation:7400000
14.358974358974
404124308 Road Upgrading of Bayabas Barangay Road
Abra
Department of the Interior and Local Government - CAR percent completed
(Cumulative)
Target: 0
Actual: 99 Expenditure: Release:8000000 Obligation:7984741
0
406836981 Construction of Level II Water Supply System at Barangay Duldulao
Abra
Department of the Interior and Local Government - CAR percent completed
(Cumulative)
Target: 100
Actual: 100 Expenditure: Release:3000000 Obligation:2970134.2
18.51122489169
413122541 Construction of Portland Cement Concrete Pavement (PCCP) Along Tabacda Primary School to Pita Access Road, Tabacda, Tubo
Abra
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
421276154 Construction of 21.8 m Cable Footbridge, Belaat, Tineg
Abra
Department of Social Welfare and Development - CAR 100% completion
(Cumulative)
Target: 0
Actual: 0 Expenditure:0 Release:0 Obligation:0
0
435774543 Continuing Improvement of TM Digital Photography & Gen Mdse.
Abra
Department of Science and Technology - CAR Number of firms assisted
(default)
Target: 0
Actual: 0 Expenditure:0 Release:0 Obligation:0
0
436311171 Lagangilang CIS
Abra
National Irrigation Administration - CAR 100% Completed
(default)
Target: 45
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
438336207 Direct Internet Subscription for the IP Transport Municipal in DICT-ABRA FO, Bangued
Abra
Department of Information and Communications Technology - CAR Percent Completed
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
444799524 CONCRETING OF SABANGAN TO LUMANOS at Barangay Mataragan, Malibcong
Abra
Department of the Interior and Local Government - CAR percent completed
(Cumulative)
Target: 0
Actual: 100 Expenditure: Release:0 Obligation:0
0
457552991 Direct Internet Subscription for the IP Transport Municipal in Manabo
Abra
Department of Information and Communications Technology - CAR Percent Completed
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
458421816 CLUSTER 02 - Construction of various PIP (LANGBABAN PIP, MANAYDAY-LAUD PIP, KADAKAD-BIOG-MAOAY-SAN ISIDRO PIP, DONGADONG PIP)
Abra
National Irrigation Administration - CAR 100 % Completed, 57 ha total area generated
(Cumulative)
Target: 49
Actual: 60 Expenditure:0 Release:8633695 Obligation:23252931.48
17
463847694 Construction of Barangay Isolation Unit, Amtuagan, Tubo
Abra
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
476267678 REPAIR/IMPROVEMENT OF BUCLOC RHU
Abra
Department of Health - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 94 Expenditure: Release:1000000 Obligation:1000000
81.428571428571
478687855 Managed Internet Service - VSAT Network Services for Quarantine Centers and Medical Facilities - Boliney National High School
Abra
Department of Information and Communications Technology - CAR Percent Completed
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
486185713 Retrofitting of Old Barangay Hall as Temporary Isolation Facility, Bugbog
Abra
Department of Social Welfare and Development - CAR 100% completion
(default)
Target: 0
Actual: 100 Expenditure:14301.79 Release:280989.92 Obligation:312211
0
489163696 CLUSTER 06 - Construction of various solar PIP (DALIT SOLAR PIP, PANG-OT SOLAR PIP, LAYUGAN SOLAR PIP, CALLAO SOLAR PIP, LAGAOSIAN SOLAR PIP)
Abra
National Irrigation Administration - CAR 100 % Completed, 78 ha total area generated
(Cumulative)
Target: 0
Actual: 98 Expenditure:16814165.94 Release:29302231 Obligation:29491230.66
0
491523729 Direct Internet Subscription for the IP Transport Municipal in Pidigan
Abra
Department of Information and Communications Technology - CAR Percent Completed
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
494353400 Construction of River Control (Linong to Polit), Poblacion (Agsimao), Tineg
Abra
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
500360668 Abra River Irrigation System
Abra
National Irrigation Administration - CAR 100% Completed
(default)
Target: 90
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
502309874 Direct Internet Subscription for the IP Transport Municipal in Tayum
Abra
Department of Information and Communications Technology - CAR Percent Completed
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
508662236 Construction of COVID-19 Isolation Facility, Banglolao
Abra
Department of Social Welfare and Development - CAR 100% completion
(default)
Target: 0
Actual: 100 Expenditure:0 Release:188230.87 Obligation:209145
0
511310150 Construction of PCCP Along Sitio Lucgay
Abra
Department of Social Welfare and Development - CAR 100% completion (0.25 km road)
(default)
Target: 0
Actual: 100 Expenditure:0 Release:0 Obligation:129463
0
525400838 Direct Internet Subscription for the IP Transport Municipal in Sallapadan
Abra
Department of Information and Communications Technology - CAR Percent Completed
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
558918416 Managed Internet Service - VSAT Network Services for Quarantine Centers and Medical Facilities - Luba Rural Health Unit
Abra
Department of Information and Communications Technology - CAR Percent Completed
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
566138789 Managed Internet Service - VSAT Network Services for Quarantine Centers and Medical Facilities - Piddigan Rural Health Unit
Abra
Department of Information and Communications Technology - CAR Percent Completed
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
575137782 CONSTRUCTION OF SCHOOL BUILDING AT BARANGAY UMNAP, Malibcong
Abra
Department of the Interior and Local Government - CAR percent completed
(Cumulative)
Target: 0
Actual: 100 Expenditure: Release:0 Obligation:0
0
578768638 Increasing the Production Volume of Print Central thru Adoption of 3D Printing Technology
Abra
Department of Science and Technology - CAR Number of firms assisted
(default)
Target: 0
Actual: 0 Expenditure:0 Release:0 Obligation:0
0
580478546 Improvement of Multi-purpose Building as Temporary COVID-19 Isolation Facility, Pakiling
Abra
Department of Social Welfare and Development - CAR 100% completion
(default)
Target: 0
Actual: 0 Expenditure:0 Release:0 Obligation:0
0
584923353 Construction of Reinforced Concrete Lined Drainage Canal, Lapat-Balantay
Abra
Department of Social Welfare and Development - CAR 100% completion
(Cumulative)
Target: 0
Actual: 0 Expenditure:0 Release:0 Obligation:0
0
592364849 Construction of Barangay Isolation Unit, Wayangan, Tubo
Abra
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
592408190 Managed Internet Service - VSAT Network Services for Quarantine Centers and Medical Facilities - Licuan-Baay Municipal Quarantine Facility
Abra
Department of Information and Communications Technology - CAR Percent Completed
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
599249682 Family Transitory Support Package
Abra
Department of Social Welfare and Development - CAR 100% payment of beneficiaries
(default)
Target: 0
Actual: 0 Expenditure:0 Release:0 Obligation:0
0
605904355 ABRA RIS
Abra
National Irrigation Administration - CAR percent completed
(Cumulative)
Target: 100
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
606742767 Managed Internet Service - VSAT Network Services for Quarantine Centers and Medical Facilities - San Isidro Gymnasium
Abra
Department of Information and Communications Technology - CAR Percent Completed
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
628043874 Managed Internet Service - VSAT Network Services for Quarantine Centers and Medical Facilities - Tayum CRRC
Abra
Department of Information and Communications Technology - CAR Percent Completed
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
628798669 Direct Internet Subscription for the IP Transport Municipal in San Quintin
Abra
Department of Information and Communications Technology - CAR Percent Completed
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
636446706 Binolawan SIP
Abra
National Irrigation Administration - CAR 100% Completed
(default)
Target: 85
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
647334041 Abra River Irrigation System
Abra
National Irrigation Administration - CAR 100% Completed
(default)
Target: 25
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
654103496 CLUSTER 06 - Construction of various solar PIP (DALIT SOLAR PIP, PANG-OT SOLAR PIP, LAYUGAN SOLAR PIP, CALLAO SOLAR PIP, LAGAOSIAN SOLAR PIP)
Abra
National Irrigation Administration - CAR percent completed
(Cumulative)
Target: 100
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
658196850 CLUSTER 03 - Construction of various PIP (SAYAO GALU-OS PIP, TAGAYTAY PIP, BACOOC PIP, CALUMBAYA PIP)
Abra
National Irrigation Administration - CAR percent completed
(Cumulative)
Target: 100
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
669281139 Improvement of Day Care Center as Temporary Isolation Facility, Abang
Abra
Department of Social Welfare and Development - CAR 100% completion
(default)
Target: 0
Actual: 100 Expenditure:23245.15 Release:322851.27 Obligation:358724
0
673742790 Enhancement of Production Capacity and Production Quality of Pablo’s Bread and Pastries through Equipment Upgrading
Abra
Department of Science and Technology - CAR Number of firms assisted
(default)
Target: 1
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
674757799 Capacitating Lyros Agricultural Farm on the Production of Year-round Supply of Healthy Feed Ration for Small Ruminants through S&T Interventions
Abra
Department of Science and Technology - CAR Number of firms assisted
(default)
Target: 0
Actual: 0 Expenditure:0 Release:0 Obligation:0
0
675044332 Repair/Improvement/Upgrading of Buneg BHS
Abra
Department of Health - CAR Percent completed
(Cumulative)
Target: 25
Actual: 2 Expenditure: Release:500000 Obligation:499466.3
-92
686722268 Managed Internet Service - VSAT Network Services for Quarantine Centers and Medical Facilities - Dilong Elementary School
Abra
Department of Information and Communications Technology - CAR Percent Completed
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
699037727 Direct Internet Subscription for the IP Transport Municipal in Dolores
Abra
Department of Information and Communications Technology - CAR Percent Completed
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
723542034 Technology Upgrading: A Road to Shaping the Future of Construction - Alijede Construction
Abra
Department of Science and Technology - CAR Number of firms assisted
(default)
Target: 0
Actual: 0 Expenditure:0 Release:0 Obligation:0
0
724883448 CLUSTER 03 - Construction of various PIP (SAYAO GALU-OS PIP, TAGAYTAY PIP, BACOOC PIP, CALUMBAYA PIP)
Abra
National Irrigation Administration - CAR 100 % Completed, 45 ha Total area generated
(Cumulative)
Target: 49
Actual: 60 Expenditure:0 Release:6568193 Obligation:12878810
15
730830555 Construction of Brgy. Health Station in Barangay Buanao, Malibcong, Abra
Abra
Department of the Interior and Local Government - CAR percent completed
(Cumulative)
Target: 100
Actual: 42.97 Expenditure: Release:4000000 Obligation:3935980.4
-56.735803463552
737455336 Scholarship Program-UAQTEA
Abra
Technical Education and Skills Development Authority - CAR number of enrolled, number of graduates
(default)
Target: 320
Actual: 320 Expenditure: Release:0 Obligation:39648414
0
743214079 Waterworks Development Projects
Abra
Provincial Local Government of Abra number of systems constructed/rehabilitated/improved
(default)
Target: 1
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
756314554 CONCRETING OF GUINGUINABANG ACCESS ROAD at Barangay Guinguinabang, Lacub
Abra
Department of the Interior and Local Government - CAR percent completed
(Cumulative)
Target: 0
Actual: 19.65 Expenditure: Release:3511471 Obligation:0
0
758957109 Direct Internet Subscription for the IP Transport Municipal in Bucloc
Abra
Department of Information and Communications Technology - CAR Percent Completed
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
762688345 Equipment Upgrading of TM Digital Photography and General Merchandise
Abra
Department of Science and Technology - CAR No. of firms assisted
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
776934093 Construction of Barangay Isolation Unit, Supo, Tubo
Abra
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
777422684 Repair/Improvement/Upgrading of Talogtog BHS
Abra
Department of Health - CAR Percent completed
(Cumulative)
Target: 100
Actual: 95 Expenditure: Release:500000 Obligation:491330.69
-34.333333333333
803298456 Sulvec Pidigan Solar PIP
Abra
National Irrigation Administration - CAR 100% Completed
(default)
Target: 80
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
817071326 Improvement of Alingganao-Taper Footpath with Railings, Bekigan
Abra
Department of Social Welfare and Development - CAR 100% completion
(default)
Target: 0
Actual: 100 Expenditure:40166.37 Release:429636.38 Obligation:477374
0
830146477 Construction of Brgy. Health Station at Barangay Bayabas.
Abra
Department of the Interior and Local Government - CAR percent completed
(Cumulative)
Target: 0
Actual: 97.27 Expenditure: Release:2000000 Obligation:1969776.38
0
847273166 Opening of Access Road at Sitio Padpadsek, Binasaran, Malibcong
Abra
Department of Social Welfare and Development - CAR 100% completion
(Cumulative)
Target: 0
Actual: 0 Expenditure:0 Release:0 Obligation:0
0
849674868 Retrofitting of Old Multi-Purpose Building as Temporary Isolation Facility, Madalipay
Abra
Department of Social Welfare and Development - CAR 100% completion
(default)
Target: 0
Actual: 100 Expenditure:0 Release:132238.42 Obligation:146932
0
857276863 Various Health Programs
Abra
Provincial Local Government of Abra Number of beneficiaries served
(default)
Target: 25000
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
865233636 Social Pension Program
Abra
Department of Social Welfare and Development - CAR Number of beneficiaries served
(Maintained)
Target: 25806
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
869691352 Improvement of Barangay Poblacion Drainage Canal From School Entrance to Wanasen Residence Along Barangay Road
Abra
Department of Social Welfare and Development - CAR 100% completion (120 ln.m drainage canal)
(default)
Target: 0
Actual: 100 Expenditure:0 Release:0 Obligation:38425
0
871362823 Direct Internet Subscription for the IP Transport Municipal in La Paz
Abra
Department of Information and Communications Technology - CAR Percent Completed
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
877898959 Improvement of Barangay Poblacion Water System, Poblacion (Mayabo), Tubo
Abra
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
896821045 Packaging Technology Solutions for Retail Sales in Increasing the Productivity of D&C Enterprise Products (SETUP Phase II)
Abra
Department of Science and Technology - CAR Number of firms assisted
(default)
Target: 0
Actual: 0 Expenditure:0 Release:0 Obligation:0
0
913996560 Abra RIS (Bangued)
Abra
National Irrigation Administration - CAR percent completed
(Cumulative)
Target: 100
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
916772888 Managed Internet Service - VSAT Network Services for Quarantine Centers and Medical Facilities - Tineg Rural Health Unit
Abra
Department of Information and Communications Technology - CAR Percent Completed
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
922133975 Repair/Improvement/Upgrading of Manabo RHU
Abra
Department of Health - CAR Percent completed
(Cumulative)
Target: 100
Actual: 100 Expenditure: Release:1000000 Obligation:1000000
0
924889199 Repair/Improvement/Upgrading of Villaviciosa MCH
Abra
Department of Health - CAR Percent completed
(Cumulative)
Target: 25
Actual: 10 Expenditure: Release:3000000 Obligation:2991809.15
140
927980739 CONCRETING OF BUYATAN ACCESS ROAD at Barangay Pacoc, Lacub
Abra
Department of the Interior and Local Government - CAR percent completed
(Cumulative)
Target: 0
Actual: 7.48 Expenditure: Release:3700780 Obligation:0
0
932232183 ABRA RIS
Abra
National Irrigation Administration - CAR 100 % Completed, 0.38 km road gravelling
(Cumulative)
Target: 0
Actual: 100 Expenditure:0 Release:722815 Obligation:722814.64
0
937603071 Pacqued SIP
Abra
National Irrigation Administration - CAR 100 % Completed, 7 ha area generated
(Cumulative)
Target: 0
Actual: 25 Expenditure:0 Release:2458631 Obligation:2458631.2
0
943459627 Improvement of Old Women's Center as COVID 19 Isolation Facility, Salnec
Abra
Department of Social Welfare and Development - CAR 100% completion
(default)
Target: 0
Actual: 100 Expenditure:0 Release:120267.1 Obligation:133630
0
949840830 UPGRADING OF AP-APOK TO TUMBEB FMR AT BARANGAY KILI, Tubo
Abra
Department of the Interior and Local Government - CAR percent completed
(Cumulative)
Target: 0
Actual: 100 Expenditure: Release:0 Obligation:0
0
950711230 CLUSTER 1 -Construction of Various SIP (REBID) (LOWER-BARIT SIP, NAPOLISAN-KOLLO-OY SIP)
Abra
National Irrigation Administration - CAR percent completed
(Cumulative)
Target: 100
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
954557729 Dalayap SIP
Abra
National Irrigation Administration - CAR 100 % Completed, 4 ha area generated
(Cumulative)
Target: 0
Actual: 16 Expenditure:15812.57 Release:1767920 Obligation:1813460.39
0
959031113 REPAIR/IMPROVEMENT OF DAGUIOMAN RHU
Abra
Department of Health - CAR PERCENT COMPLETED
(default)
Target: 0
Actual: 90 Expenditure: Release:0 Obligation:0
0
961862555 Direct Internet Subscription for the IP Transport Municipal in San Juan
Abra
Department of Information and Communications Technology - CAR Percent Completed
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
988842020 CLUSTER 07 - Construction of various SIP (REBID) (MANGMANGABANG LUS-OD SIP, NAGUILLIAN MADALDAL SIP, SABSABAWIL-SUCOK SIP)
Abra
National Irrigation Administration - CAR 100 % Completed, 28 ha Total area generated
(Cumulative)
Target: 49
Actual: 34 Expenditure:0 Release:4798599 Obligation:9409017.11
-58
993562870 Construction of Barangay Lenneng Isolation Facility
Abra
Department of Social Welfare and Development - CAR 100% completion (1 unit isolation facility)
(default)
Target: 0
Actual: 100 Expenditure:0 Release:36398.3 Obligation:42298
0
995075512 Direct Internet Subscription for the IP Transport Municipal in Lagayan
Abra
Department of Information and Communications Technology - CAR Percent Completed
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
999845220 Managed Internet Service - VSAT Network Services for Quarantine Centers and Medical Facilities - Supo Elementary School
Abra
Department of Information and Communications Technology - CAR Percent Completed
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
1022928952 Direct Internet Subscription for the IP Transport Municipal in Bucay
Abra
Department of Information and Communications Technology - CAR Percent Completed
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
1024814166 Abra River Irrigation System
Abra
National Irrigation Administration - CAR 100% Completed
(default)
Target: 40
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1040021832 Direct Internet Subscription for the IP Transport Municipal in Tubo
Abra
Department of Information and Communications Technology - CAR Percent Completed
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
1050433224 Sallapadan CIS
Abra
National Irrigation Administration - CAR 100% Completed
(default)
Target: 91
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1051164919 Construction of Reinforced Concrete Lined Drainage Canal, Alaoa, Tineg
Abra
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1051751599 Lagayan-La Paz SIP
Abra
National Irrigation Administration - CAR 100 % Completed, 302 ha area generated
(Cumulative)
Target: 48
Actual: 40 Expenditure:21866133.38 Release:27591479 Obligation:53060536.89
-26
1055021942 Repair/Improvement of Bucay RHU
Abra
Department of Health - CAR Percent Completed
(default)
Target: 0
Actual: 73 Expenditure: Release:0 Obligation:0
0
1063133436 Upgrading the Production Process and Efficiency of Equipment for Window Tek Window Installation Services
Abra
Department of Science and Technology - CAR Number of firms assisted
(default)
Target: 1
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1092632203 Enhancement of Production Capacity, Efficiency, and Precision for Fabrication and Machining of DUV Machine Shop
Abra
Department of Science and Technology - CAR No. of firms assisted
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
1109414642 NEW CONSTRUCTION OF LA PAZ MH
Abra
Department of Health - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 65 Expenditure: Release:10000000 Obligation:10000000
53.333333333333
1131643074 Construction of COVID-19 Isolation Facility, Bangcagan
Abra
Department of Social Welfare and Development - CAR 100% completion
(default)
Target: 0
Actual: 100 Expenditure:21412.91 Release:234032.99 Obligation:260037
0
1136540427 Supplemental Feeding Program
Abra
Department of Social Welfare and Development - CAR Number of Children Served
(Maintained)
Target: 10025
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1142434766 Improvement of Community Irrigation Canal at Sitio Putol, Mataragan, Mataragan, Malibcong
Abra
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1145288033 Improvement of Multi-purpose Building as Temporary COVID-19 Isolation Facility, San Miguel
Abra
Department of Social Welfare and Development - CAR 100% completion
(default)
Target: 0
Actual: 0 Expenditure:0 Release:0 Obligation:0
0
1151694385 Science-based Assistance of S&G Agricultural Supply in Oyster Mushroom Production as an Alternative Source of Livelihood
Abra
Department of Science and Technology - CAR Number of firms assisted
(default)
Target: 0
Actual: 0 Expenditure:0 Release:0 Obligation:0
0
1152526381 Construction Of Portland Cement Concrete Pavement (Pccp) Along Sitio Napatnay To Lamag Access Road, Dilong, Tubo
Abra
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1157752230 Regular and Frontloaded Livelihood Projects
Abra
Department of Social Welfare and Development - CAR No. of Households provided with livelihood modalities
(Cumulative)
Target: 78
Actual: 0 Expenditure:0 Release:0 Obligation:0
-82.978723404255
1161244056 Repair/Improvement/Upgrading of Bucay MH
Abra
Department of Health - CAR Percent completed
(Cumulative)
Target: 100
Actual: 80 Expenditure: Release:2000000 Obligation:1975132.28
104
1172259633 Nagpawayan SIP
Abra
National Irrigation Administration - CAR 100 % Completed, 6 ha area generated
(Cumulative)
Target: 0
Actual: 8 Expenditure:0 Release:1209404 Obligation:1209404.26
0
1194814501 Construction of Concrete Pathway at Battong-Saal, Gacab, Gacab, Malibcong
Abra
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1205084543 CONCRETING OF BUNEG ACCESS ROAD at Barangay Buneg, Lacub
Abra
Department of the Interior and Local Government - CAR percent completed
(Cumulative)
Target: 0
Actual: 100 Expenditure: Release:0 Obligation:0
0
1207605596 San Marcial Solar PIP
Abra
National Irrigation Administration - CAR 100% Completed
(Cumulative)
Target: 76
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1213698417 Enhancement of the Production Quality and Capacity of Tinguian Ethnic Arts Handloom Products through Upgrading of Equipment
Abra
Department of Science and Technology - CAR No. of firms assisted
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
1225370013 Direct Internet Subscription for the IP Transport Municipal in Danglas
Abra
Department of Information and Communications Technology - CAR Percent Completed
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
1248174067 Construction of Reinforced Concrete Lined Drainage Canal, Lapat-Balantay, Tineg
Abra
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1267654273 Construction of Irrigation System, Lanec, Tineg
Abra
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1273994889 Enhancement of production capacity and quality of metal works for fabrircation for Jerome Bejarin's Iron Works
Abra
Department of Science and Technology - CAR No. of firms assisted
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
1278709788 Repair/Improvement/Upgrading of San Miguel BHS
Abra
Department of Health - CAR Percent completed
(Cumulative)
Target: 100
Actual: 0 Expenditure: Release:500000 Obligation:495860.93
-66.666666666667
1281160318 CLUSTER 05 - Construction of various solar PIP (LAGBEN SOLAR PIP, PAGANAO SOLAR PIP, BAYAAN SOLAR PIP, NAMIT-INGAN SOLAR PIP)
Abra
National Irrigation Administration - CAR 100 % Completed, 80 ha total area generated
(Cumulative)
Target: 0
Actual: 74 Expenditure:3996929.06 Release:26646194 Obligation:26748193.7
0
1292416274 Purchase of One set Hand Tractor. Tangadan, San Quintin
Abra
National Commission on Indigenous Peoples - CAR no of projects implemented
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:144500
0
1292870502 Gaang-Tagaytay SIP
Abra
National Irrigation Administration - CAR 100% Completed
(default)
Target: 81
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1298694638 Construction of Day Care Center at Sitio Proper Tiempo, Tiempo, Tubo
Abra
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1301086617 Enhancement of Production and Productrion Quality of Pablo's Bread and Pastries through Equipment Upgrading
Abra
Department of Science and Technology - CAR No. of firms assisted
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
1303591140 Construction of COVID-19 Isolation Facility, Tabiog
Abra
Department of Social Welfare and Development - CAR 100% completion
(default)
Target: 0
Actual: 100 Expenditure:15406.16 Release:454085.55 Obligation:504540
0
1337950971 Improvement and Refurbishment of Barangay Health Station as Temporary COVID-19 Isolation Facility, Patoc
Abra
Department of Social Welfare and Development - CAR 100% completion
(default)
Target: 0
Actual: 100 Expenditure:24292.86 Release:295972.8 Obligation:328859
0
1354315795 Upland Vegetable Production Project
Abra
Provincial Local Government of Abra Number of beneficiaries served
(default)
Target: 124
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1359147318 Pacqued SIP
Abra
National Irrigation Administration - CAR percent completed
(Cumulative)
Target: 100
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1376135140 Eco-friendly pre-processing and Value-Addition through sorting and compressed baling with acquisition of facility for Joker Junkshop
Abra
Department of Science and Technology - CAR No. of firms assisted
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
1378122027 CLUSTER 4 - Constrruction of various CIS (BAGATOY CIS, NAGUILLIAN CIS)
Abra
National Irrigation Administration - CAR 100 % Completed, 2.29 km lined Canal and 13 units canal Structure
(Cumulative)
Target: 38
Actual: 65 Expenditure:11877125.66 Release:13523888 Obligation:21812723.32
28
1395675615 Construction of COVID-19 Isolation Facility, Calao
Abra
Department of Social Welfare and Development - CAR 100% completion
(default)
Target: 0
Actual: 100 Expenditure:22926.61 Release:328674.06 Obligation:365193
0
1398082026 Lat-ey SIP
Abra
National Irrigation Administration - CAR percent completed
(Cumulative)
Target: 100
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1398859628 Sustainable Livelihood Program
Abra
Department of Social Welfare and Development - CAR Total number of households who received seed capital fund and total number of households trained (Seed Capital Funds, Skills Training, and CBLA)
(Maintained)
Target: 767
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1406468480 Social Pension Program
Abra
Department of Social Welfare and Development - CAR Percentage of beneficiaries using social pension to augment daily living subsistence and medical needs
(default)
Target: 25806
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1411856118 Managed Internet Service - VSAT Network Services for Quarantine Centers and Medical Facilities - Luba Municipal Hall
Abra
Department of Information and Communications Technology - CAR Percent Completed
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
1414684308 Improvement of Barangay Health Station as Temporary COVID-19 Isolation Facility, Palaquio
Abra
Department of Social Welfare and Development - CAR 100% completion
(default)
Target: 0
Actual: 0 Expenditure:0 Release:0 Obligation:0
0
1433286562 Lumaba Solar PIP
Abra
National Irrigation Administration - CAR 100% Completed
(default)
Target: 78
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1440529985 Construction of COVID-19 Isolation Facility, Quimloong
Abra
Department of Social Welfare and Development - CAR 100% completion
(default)
Target: 0
Actual: 100 Expenditure:26009 Release:234081.81 Obligation:260091
0
1459639117 Bangtig Malanas CIS
Abra
National Irrigation Administration - CAR 100% Completed
(default)
Target: 40
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1478387356 Direct Internet Subscription for the IP Transport Municipal in Pilar
Abra
Department of Information and Communications Technology - CAR Percent Completed
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
1484866780 Road Upgrading of Brgy. Dulao Access Road
Abra
Department of the Interior and Local Government - CAR percent completed
(Cumulative)
Target: 100
Actual: 71.97 Expenditure: Release:17000000 Obligation:16976352
-23.845277676255
1489333564 Repair/Improvement of Langiden RHU
Abra
Department of Health - CAR Percent Completed
(default)
Target: 0
Actual: 78 Expenditure: Release:0 Obligation:0
0
1495117035 Construction of Level III Potable Water System at Barangay Bayabas, Malibcong, Abra
Abra
Department of the Interior and Local Government - CAR percent completed
(Cumulative)
Target: 0
Actual: 100 Expenditure: Release:4000000 Obligation:2386443.06
0
1497876389 Road Upgrading of Duldulao Barangay Road
Abra
Department of the Interior and Local Government - CAR percent completed
(Cumulative)
Target: 0
Actual: 68.57 Expenditure: Release:9000000 Obligation:8977687
0
1505166941 Provision of Cash Grants including the amount of Rice Subsidy
Abra
Department of Social Welfare and Development - CAR Number of Household beneficiaries provided with Conditional Cash Grants
(Maintained)
Target: 0
Actual: 0 Expenditure:0 Release:0 Obligation:0
0
1545003498 Nagpawayan SIP
Abra
National Irrigation Administration - CAR percent completed
(Cumulative)
Target: 100
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1553754615 Improvement of Multi-purpose Building as Temporary COVID-19 Isolation Facility, South Poblacion
Abra
Department of Social Welfare and Development - CAR 100% completion
(default)
Target: 0
Actual: 0 Expenditure:0 Release:0 Obligation:0
0
1577547661 Layugan Solar PIP
Abra
National Irrigation Administration - CAR 100% Completed
(default)
Target: 82
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1580132345 Direct Internet Subscription for the IP Transport Municipal in Villaviciosa
Abra
Department of Information and Communications Technology - CAR Percent Completed
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
1580799521 Nagcanasan Solar PIP
Abra
National Irrigation Administration - CAR 100% Completed
(default)
Target: 78
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1592707931 Medical Mission and Provision of Basic Medical Equipment to the Inlaud ICCs/IPs of Abang, Bucay
Abra
National Commission on Indigenous Peoples - CAR no of projects implemented
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:125390
0
1599114698 Abra RIS (Bangued)
Abra
National Irrigation Administration - CAR 100 % Completed, 110 ha area restored
(Cumulative)
Target: 48
Actual: 38 Expenditure:4603574.26 Release:15959057 Obligation:30690495.05
-62
1602533182 Construction of 2 Bedroom COVID 19 Isolation Facility, Bangbangcag
Abra
Department of Social Welfare and Development - CAR 100% completion
(default)
Target: 0
Actual: 100 Expenditure:39110.2 Release:477751.29 Obligation:530835
0
1619763469 CLUSTER 1 -Construction of Various SIP (REBID) (LOWER-BARIT SIP, NAPOLISAN-KOLLO-OY SIP)
Abra
National Irrigation Administration - CAR 100 % Completed, 31 ha total area generated
(Cumulative)
Target: 28
Actual: 52 Expenditure:0 Release:4137321 Obligation:5758279.64
3
1652369662 CONCRETING OF SABANGAN TO LAT-EY PROPER FARM TO MARKET ROAD at Barangay Lat-ey, Malibcong
Abra
Department of the Interior and Local Government - CAR percent completed
(Cumulative)
Target: 0
Actual: 100 Expenditure: Release:0 Obligation:0
0
1659448387 Construction Of Portland Cement Concrete Pavement (Pccp) At Pilao Access Road, Tubtuba, Tubo
Abra
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1663779014 Cabaroan SIP
Abra
National Irrigation Administration - CAR 100% Completed
(default)
Target: 11
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1671233698 CLUSTER 07 - Construction of various SIP (REBID) (MANGMANGABANG LUS-OD SIP, NAGUILLIAN MADALDAL SIP, SABSABAWIL-SUCOK SIP)
Abra
National Irrigation Administration - CAR percent completed
(Cumulative)
Target: 100
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1675939470 Production Upgrade of 3J's Sweet Delights
Abra
Department of Science and Technology - CAR Number of firms assisted
(default)
Target: 1
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1676904930 Social Pension Program
Abra
Department of Social Welfare and Development - CAR Number of indigent senior citizens provided with Social Pension
(Maintained)
Target: 23837
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1682818862 Managed Internet Service - VSAT Network Services for Quarantine Centers and Medical Facilities - Alangtin Elementary School
Abra
Department of Information and Communications Technology - CAR Percent Completed
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
1683804395 NEW CONSTRUCTION OF NAGLIBACAN BHS
Abra
Department of Health - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 80 Expenditure: Release:1000000 Obligation:1000000
46.666666666667
1684819590 Repair/Improvement/Upgrading of Bangued RHU
Abra
Department of Health - CAR Percent completed
(Cumulative)
Target: 45
Actual: 45 Expenditure: Release:1000000 Obligation:999104.93
92.857142857143
1696428289 New Construction of Tayum Super Health Center
Abra
Department of Health - CAR Percent Completed
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
1700273966 Lat-ey SIP
Abra
National Irrigation Administration - CAR 100 % Completed, 4 ha area generated
(Cumulative)
Target: 0
Actual: 23 Expenditure:0 Release:1581781 Obligation:1613359.69
0
1700856371 Repair/Improvement of Lagayan RHU
Abra
Department of Health - CAR Percent Completed
(default)
Target: 0
Actual: 100 Expenditure: Release:0 Obligation:0
0
1708226898 Improvement of Barangay Labaan Water Supply System
Abra
Department of Social Welfare and Development - CAR 100% of 1 unit water system
(default)
Target: 0
Actual: 100 Expenditure:0 Release:38553.07 Obligation:116824
0
1717112372 Construction of 6m x 9m Barangay Isolation Facility
Abra
Department of Social Welfare and Development - CAR 100% completion (1 unit isolation facility)
(default)
Target: 0
Actual: 100 Expenditure:0 Release:167426.66 Obligation:213666
0
1749842425 REPAIR/IMPROVEMENT OF LAGANGILANG RHU
Abra
Department of Health - CAR PERCENT COMPLETED
(default)
Target: 0
Actual: 100 Expenditure: Release:0 Obligation:0
0
1783792197 Supplemental Feeding Program
Abra
Department of Social Welfare and Development - CAR Number of beneficiaries served
(Maintained)
Target: 9155
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1787643946 Direct Internet Subscription for the IP Transport Municipal in San Isidro
Abra
Department of Information and Communications Technology - CAR Percent Completed
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
1796255403 Construction of COVID-19 Isolation Facility, Pagala
Abra
Department of Social Welfare and Development - CAR 100% completion
(default)
Target: 0
Actual: 100 Expenditure:36598.5 Release:451927.47 Obligation:502142
0
1805021938 Dalayap SIP
Abra
National Irrigation Administration - CAR percent completed
(Cumulative)
Target: 100
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1806184881 Maguyepyep CIS
Abra
National Irrigation Administration - CAR percent completed
(Cumulative)
Target: 100
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1807989062 Installation of Solar-Powered Street Light, Umnap, Umnap, Malibcong
Abra
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1817229778 Installation of Solar Streetlights, Caupasan
Abra
Department of Social Welfare and Development - CAR 100% (53 units solar streetlights)
(default)
Target: 0
Actual: 100 Expenditure:0 Release:142497.49 Obligation:150000
0
1820794103 Construction of Level II Potable Water System (So. Naguilian Lower)
Abra
Department of the Interior and Local Government - CAR percent completed
(Cumulative)
Target: 0
Actual: 100 Expenditure: Release:3000000 Obligation:2970208.04
0
1839756699 Direct Internet Subscription for the IP Transport Municipal in Boliney
Abra
Department of Information and Communications Technology - CAR Percent Completed
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
1844798672 Improvement of Cabaruan Village Water Supply System Level II
Abra
Department of Social Welfare and Development - CAR one unit water system
(default)
Target: 0
Actual: 100 Expenditure:0 Release:70595.61 Obligation:70813
0
1873450134 REPAIR/IMPROVEMENT OF LUMABA BHS
Abra
Department of Health - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 100 Expenditure: Release:500000 Obligation:500000
50
1875844410 Kagaloan SIP
Abra
National Irrigation Administration - CAR 100% Completed
(default)
Target: 94
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1912579637 Construction of Slope Protection, Anayan, Tineg
Abra
Department of Social Welfare and Development - CAR 100% completion
(Cumulative)
Target: 0
Actual: 0 Expenditure:0 Release:0 Obligation:0
0
1924040284 Upgrading the Production Process and Efficiency of Equipment for C and L Furniture shop
Abra
Department of Science and Technology - CAR No. of firms assisted
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
1935250976 Improving Productivity and efficiency of 7th GJ Bakery Through Equipment Upgrading
Abra
Department of Science and Technology - CAR No. of firms assisted
(default)
Target: 0
Actual: 0 Expenditure: Release:320000 Obligation:320000
0
1966968416 REPAIR/IMPROVEMENT OF VILLAVICIOSA RHU
Abra
Department of Health - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 100 Expenditure: Release:1000000 Obligation:1000000
96
1986205985 REPAIR/IMPROVEMENT OF SALLAPADAN RHU
Abra
Department of Health - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 93 Expenditure: Release:1000000 Obligation:1000000
50.27027027027
1987823831 Sustainable Livelihood Program
Abra
Department of Social Welfare and Development - CAR Total number of households who received seed capital fund and total number of households trained (Seed Capital Funds, Skills Training, and CBLA)
(Maintained)
Target: 54
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1999483153 Improvement and Upgrading of Farm-To-Market
Abra
Provincial Local Government of Abra number of kilometers of road constructed/rehabilitated/upgraded/improved
(default)
Target: 5
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
2005338407 Construction of Level II Potable Water System (So. Naguilian Upper)
Abra
Department of the Interior and Local Government - CAR percent completed
(Cumulative)
Target: 0
Actual: 100 Expenditure: Release:3500000 Obligation:3469274
0
2028625927 Empowering Production Sustainability for Leila's Loomweaving
Abra
Department of Science and Technology - CAR No. of firms assisted
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
2033265135 Magmaguey CIS
Abra
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0 Expenditure:0 Release:0 Obligation:0
0
2036555452 Construction of COVID-19 Isolation Facility, North Poblacion
Abra
Department of Social Welfare and Development - CAR 100% completion
(default)
Target: 0
Actual: 100 Expenditure:27515.06 Release:312538.91 Obligation:347265
0
2040201230 Dalit Proper Solar PIP
Abra
National Irrigation Administration - CAR 100% Completed
(default)
Target: 81
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
2058499172 Construction of 25 meters Cable Footbridge, Naglibacan, Tineg
Abra
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
2058625127 INSTALLATION OF SOLAR-POWERED STREET LIGHTS, PACGUED, Malibcong
Abra
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
2068991311 Repair/Improvement/Upgrading of Lat-ey BHS
Abra
Department of Health - CAR Percent completed
(Cumulative)
Target: 100
Actual: 100 Expenditure: Release:500000 Obligation:499425.61
0
2085026544 Lengleng Solar PIP
Abra
National Irrigation Administration - CAR 100% Completed
(default)
Target: 83
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
2091129741 Direct Internet Subscription for the IP Transport Municipal in Malibcong
Abra
Department of Information and Communications Technology - CAR Percent Completed
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
2092881641 Upgrading of Local Access Road in Barangay Ud-udiao
Abra
Department of the Interior and Local Government - CAR percent completed
(Cumulative)
Target: 0
Actual: 99 Expenditure: Release:20000000 Obligation:19975030
0
2109316989 CONCRETING OF BUYATAN ACCESS ROAD at Barangay Gacab, Malibcong
Abra
Department of the Interior and Local Government - CAR percent completed
(Cumulative)
Target: 0
Actual: 100 Expenditure: Release:0 Obligation:0
0
2115793252 San Marcial-Tumok SIP
Abra
National Irrigation Administration - CAR 100% Completed
(default)
Target: 81
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
2116357507 Construction of COVID-19 Isolation Facility, Siblong
Abra
Department of Social Welfare and Development - CAR 100% completion
(default)
Target: 0
Actual: 100 Expenditure:27892.6 Release:356834.41 Obligation:396483
0
2120728062 Construction of 48 m Cable Footbridge, Apao, Tineg
Abra
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
2123308187 Direct Internet Subscription for the IP Transport Municipal in Lagangilang
Abra
Department of Information and Communications Technology - CAR Percent Completed
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
2127497588 Direct Internet Subscription for the IP Transport Municipal in Lacub
Abra
Department of Information and Communications Technology - CAR Percent Completed
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
2127970435 IMPROVEMENT OF LEVEL II WATER SUPPLY SYSTEM, TARIPAN, Malibcong
Abra
Department of Social Welfare and Development - CAR 100% completion
(Cumulative)
Target: 0
Actual: 0 Expenditure:0 Release:0 Obligation:0
0
1810944 KOBOL KODOG KOBAIT CIS
Kalinga
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
10787830 Completion of 4 storey Academic Building Phase III-Bulanao Campus
Kalinga
Kalinga State University percentage of accomplishment
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
24508742 CW-KALINGA-21-2022 / CANTONG CIS
Kalinga
National Irrigation Administration - CAR 100% Completed, (Length of Canal Lining and length of Protection Works)
(Cumulative)
Target: 0
Actual: 100 Expenditure:36759.6 Release:422159 Obligation:469850.61
0
28502901 DOLGADOG CIS
Kalinga
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
30971742 Construction of Livestock R&D-Native Animals Nucleus herd Center ( Native pig, Poultry Layer and Broiler)
Kalinga
Kalinga State University percentage of accomplishment
(Cumulative)
Target: 5.26
Actual: 21.2 Expenditure: Release:6787950.59 Obligation:6787950.59
303.04182509506
39502398 Completion of Motorpool-Bulanao Campus
Kalinga
Kalinga State University percentage of accomplishment
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
47787457 Bultot (Pulak) PIS
Kalinga
National Irrigation Administration - CAR 100% Completed
(default)
Target: 30
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
51079999 Alitukan-longpa SIP
Kalinga
National Irrigation Administration - CAR 100% Completed 1,050.00
(default)
Target: 11
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
55996544 DANGTALAN CIS
Kalinga
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
71730677 CW-KALINGA-27-2022 / MADAPDAPIG CIS
Kalinga
National Irrigation Administration - CAR 100% Completed, (Length of Canal Lining)
(Cumulative)
Target: 0
Actual: 100 Expenditure:818207.32 Release:868869 Obligation:943973
0
81110010 BAKO SPIP
Kalinga
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
90624569 Repai/Improvement of Lower Uma BHS
Kalinga
Department of Health - CAR Percent completed
(Cumulative)
Target: 100
Actual: 100 Expenditure: Release:500000 Obligation:500000
0
99271403 CW-KALINGA-35-2022 / SUYANG CIS
Kalinga
National Irrigation Administration - CAR 100% Completed, (Length of Canal Lining)
(Cumulative)
Target: 0
Actual: 100 Expenditure:57372.86 Release:1372658 Obligation:1476580.97
0
108161366 CW-KALINGA-20-2022 / CALLATI CIS
Kalinga
National Irrigation Administration - CAR 100% Completed, (Length of Canal Lining and length of Protection Works)
(Cumulative)
Target: 0
Actual: 100 Expenditure:22877.63 Release:621285 Obligation:679189.85
0
113307631 Upper Chico RIS
Kalinga
National Irrigation Administration - CAR 100% Completed
(default)
Target: 45
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
113976980 MADAPDAPIG CIS
Kalinga
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
133543140 Purchase of Medical Equipment. Mabaca, Balbalan
Kalinga
National Commission on Indigenous Peoples - CAR no of projects implemented
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:127140
0
154037150 RIS TECH4ED Center Launching
Kalinga
Department of Information and Communications Technology - CAR number of activities
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
159697265 Delineation, Recognition and Titling of Mabongtot Ancestral Domain (Stage 1 and 2)
Kalinga
National Commission on Indigenous Peoples - CAR number of stages of CADT application completed
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:225150
0
161055928 Construction of Bugnay Water Sysytem
Kalinga
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
161575688 Construction of Public Sanitary Toilet, Western Uma
Kalinga
Department of Social Welfare and Development - CAR 100% completion
(default)
Target: 0
Actual: 100 Expenditure:0 Release:54138.98 Obligation:66549
0
166385023 CW-KALINGA-08-2022 / NAAPAGAP SPIP
Kalinga
National Irrigation Administration - CAR 100% Completed, 7 hectares area generated
(Cumulative)
Target: 35
Actual: 100 Expenditure:0 Release:1933781 Obligation:3157110.53
29
175325476 BALONG NORTE CIS
Kalinga
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
191804399 CW-KALINGA-12-2022 / SAN FRANCISCO SIP PH. 2
Kalinga
National Irrigation Administration - CAR 100% Completed (Unit of Canal Structure and Length of Canal)
(Cumulative)
Target: 35
Actual: 10 Expenditure:0 Release:11261059 Obligation:4348506.96
-78.666666666667
196383116 Reconstruction of Picoc Child Development Center, Balbalan Proper, Balbalan
Kalinga
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
202859990 CW-KALINGA-13-2022 / UPPER CHICO RIVER IRRIGATION SYSTEM SPIP
Kalinga
National Irrigation Administration - CAR 100% Completed, 33.65 hectares area generated
(Cumulative)
Target: 35
Actual: 100 Expenditure:12078408.47 Release:8230148 Obligation:19830726.57
122.85714285714
203285266 ALUTTIT PIP
Kalinga
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
217851620 BICONGCONG CIS
Kalinga
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
227327771 Concreting of Pat-ting, Sumadel 2 Pathway for Quicker Covid-19 Response, Sumadel 2
Kalinga
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
232300152 CW-KALINGA-06-2022 / UPPER CHICO RIVER IRRIGATION SYSTEM
Kalinga
National Irrigation Administration - CAR 100% Completed (Length of service road)
(Cumulative)
Target: 100
Actual: 100 Expenditure:4415823.57 Release:2736465 Obligation:5817267.38
34.666666666667
235613180 Highschool building-electrical rewiring
Kalinga
Kalinga State University percentage of accomplishment
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
248991776 Construction of Additional Communal Latrine, Lower Lubo
Kalinga
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
255629629 CW-BLDG-QUEZON-01-2022 / CONSTRUCTION OF NIA - QUEZON BUILDING
Kalinga
National Irrigation Administration - CAR 100% Completed
(Cumulative)
Target: 8
Actual: 0.27 Expenditure:0 Release:6606070 Obligation:21962144.4
-96.625
269765191 Upper Chico RIS (Quezon)
Kalinga
National Irrigation Administration - CAR 100% Completed
(default)
Target: 100
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
284884997 CW-KALINGA-16-2022 / AMBALI CIS
Kalinga
National Irrigation Administration - CAR 100% Completed, (Length of Canal Lining)
(Cumulative)
Target: 0
Actual: 100 Expenditure:18824.58 Release:704669 Obligation:754157.53
0
288374368 GALDANG CIS
Kalinga
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
298225586 New Construction of Tabuk Super Health Center
Kalinga
Department of Health - CAR Percent Completed
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
300629081 ZIPLA SPIP
Kalinga
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
316444526 Rehabilitation Of Upper Bangad Water System, Upper Bangad
Kalinga
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
320404269 Managed Internet Service - VSAT Network Services for Quarantine Centers and Medical Facilities - Kalinga District Hospital, Lubuagan
Kalinga
Department of Information and Communications Technology - CAR Percent completed
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
322320289 Perimeter Fencing of Provincial Government Facilities/Properties
Kalinga
Provincial Local Government of Kalinga length of fence
(default)
Target: 0
Actual: 0 Expenditure:0 Release:0 Obligation:0
0
323954808 Installation of Solar-Powered Streetlight, Lower Uma
Kalinga
Department of Social Welfare and Development - CAR 100% completion
(default)
Target: 0
Actual: 100 Expenditure:0 Release:39236.68 Obligation:41174
0
341521006 CONSTRUCTION OF LEVEL II POTABLE WATER SUPPLY SYSTEM at Purok 3 and 4, Apatan
Kalinga
Department of the Interior and Local Government - CAR percent completed
(Cumulative)
Target: 0
Actual: 100 Expenditure: Release:0 Obligation:0
0
347140635 MABATO PIP
Kalinga
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
368991981 Rehabilitation of Layawan Irrigation System Intake, Lower Taloctoc
Kalinga
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
376806411 iFWD Project for Mr. Marston Russel Malabanan
Kalinga
Department of Science and Technology - CAR No. of firms assisted
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
387770069 CW-KALINGA-41-2022 / UPPER CHICO RIVER IRRIGATION SYTEM (MALLIG)
Kalinga
National Irrigation Administration - CAR 100% Completed (Length of Canal & length of protection works)
(Cumulative)
Target: 100
Actual: 100 Expenditure:96380.23 Release:2588567 Obligation:5353593.79
-9.3333333333333
390274266 Construction of waterline system at Bulanao campus
Kalinga
Kalinga State University percentage of accomplishment
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
391145629 CONSTRUCTION OF BARANGAY HEALTH STATION AT BARANGAY LIMOS
Kalinga
Department of the Interior and Local Government - CAR percent completed
(Cumulative)
Target: 18.78
Actual: 16.7 Expenditure: Release:2021949 Obligation:0
-83.3
391962527 Kobol-Kodog-Kobait CIS
Kalinga
National Irrigation Administration - CAR 100% Completed
(default)
Target: 40
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
392420735 Repair/Improvement of Kalinga District Hospital
Kalinga
Department of Health - CAR Percent Completed
(default)
Target: 0
Actual: 63 Expenditure: Release:0 Obligation:0
0
395276211 CW-KALINGA-11-2022 / CODDOG NANENG CIS
Kalinga
National Irrigation Administration - CAR 100% Completed, (Length of Canal Lining)
(Cumulative)
Target: 0
Actual: 100 Expenditure:46434.69 Release:1351013 Obligation:1452621.31
0
406248593 UCRIS
Kalinga
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-55.333333333333
407538879 Mallong Olosan Solar PIP
Kalinga
National Irrigation Administration - CAR 100% Completed
(default)
Target: 45
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
416702444 Rehabilitation of Bangad Centro Water System
Kalinga
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
418797404 UPPER CHICO RIVER IRRIGATION SYSTEM
Kalinga
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
420289925 Repair/Improvement of Western Kalinga District Hospital
Kalinga
Department of Health - CAR Percent Completed
(default)
Target: 0
Actual: 40 Expenditure: Release:0 Obligation:0
0
425315050 Gaogao CIS
Kalinga
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0 Expenditure:0 Release:0 Obligation:0
0
428491528 Rehabilitation of Ngibat Water System, Ngibat
Kalinga
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
445336943 AMLAWANG CIS
Kalinga
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
447273993 CALLATI CIS
Kalinga
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
468353793 Completion of HRM Extension Building
Kalinga
Kalinga State University percentage of accomplishment
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
468949543 Upgrading/Improvement of Drainage Canal, De Jesus St., Bulanao Norte, Tabuk City
Kalinga
Provincial Local Government of Kalinga Length of Drainage Canal Improved
(Cumulative)
Target: 100
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
472666020 Social Pension Program
Kalinga
Department of Social Welfare and Development - CAR Percentage of beneficiaries using social pension to augment daily living subsistence and medical needs
(default)
Target: 17552
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
474356079 Upgrading of Food Processing and Research Center
Kalinga
Kalinga State University percentage of accomplishment
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
474375161 Repair of Ladies Dormitory-Bulanao Campus
Kalinga
Kalinga State University percentage of accomplishment
(Cumulative)
Target: 100
Actual: 92.24 Expenditure: Release:2000000 Obligation:2000000
-11.104728236854
477196008 CW-KALINGA-26-2022 / KOBOL KODOG KOBAIT CIS
Kalinga
National Irrigation Administration - CAR 100% Completed, (Length of Canal Lining and length of Protection Works)
(Cumulative)
Target: 0
Actual: 100 Expenditure:20395.29 Release:898590 Obligation:970680.02
0
495687703 Upgrading of Aplag Casket Manufacturing
Kalinga
Department of Science and Technology - CAR Number of firms assisted
(default)
Target: 1
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
495752124 Improvement of Ambato-Legleg Water System
Kalinga
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
498105400 Improvement of Manufur to Arang-ang CIS, Luplupa
Kalinga
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
512857374 GUBONG MAGSILAY CIS
Kalinga
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
521868597 CW-KALINGA-09-2022 / MALLONG SULAY PIP
Kalinga
National Irrigation Administration - CAR 100% Completed, 12 hectares area generated
(Cumulative)
Target: 0
Actual: 94 Expenditure:10406.04 Release:917130 Obligation:984570.52
0
522887051 CW-KALINGA-51-2022 / UCRIS
Kalinga
National Irrigation Administration - CAR 100% Completed
(Cumulative)
Target: 1
Actual: 7.64 Expenditure:0 Release:6606070 Obligation:49975357.39
664
528261006 Juan M. Duyan Memorial Hospital
Kalinga
Department of Health - CAR percent completed
(Cumulative)
Target: 0
Actual: 2 Expenditure: Release:0 Obligation:0
0
536488001 Improvement of Bansar Communal Irrigation System, Upper Lubo
Kalinga
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
541594926 CW-KALINGA-49-2022 / UCRIS
Kalinga
National Irrigation Administration - CAR 100% Completed
(Cumulative)
Target: 2
Actual: 20 Expenditure:0 Release:6606070 Obligation:24940223.74
900
544501235 MANANIG-ELEB CIS
Kalinga
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
544989215 Chico Solar PIP
Kalinga
National Irrigation Administration - CAR 100% Completed
(default)
Target: 32
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
553662766 Repair/Improvement of Luplupa BHS
Kalinga
Department of Health - CAR Percent completed
(Cumulative)
Target: 100
Actual: 100 Expenditure: Release:500000 Obligation:498660.41
0
556785847 Improvement of Baccong-Seet Farm to Market Road
Kalinga
Provincial Local Government of Kalinga Length of road improved
(Cumulative)
Target: 70
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
557680422 CW-KALINGA-10-2022 / CALANAN PIP
Kalinga
National Irrigation Administration - CAR 100% Completed, 6 hectares area generated
(Cumulative)
Target: 0
Actual: 100 Expenditure:0 Release:917130 Obligation:983362.95
0
558603500 UCRIS
Kalinga
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
565589280 Provision of Cash Grant to 4Ps beneficiaries including the amount of Rice Subsidy
Kalinga
Department of Social Welfare and Development - CAR Number of Household beneficiaries provided with Conditional Cash Grants
(Maintained)
Target: 10640
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
576162856 OB-OB SPIP
Kalinga
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-43.333333333333
583484384 Construction of Makilo Water System, Mabongtot
Kalinga
Department of Social Welfare and Development - CAR 100% completion
(default)
Target: 0
Actual: 100 Expenditure:0 Release:42128.71 Obligation:45677
0
588062068 UPPER CHICO RIVER IRRIGATION SYSTEM (TABUK CITY)
Kalinga
National Irrigation Administration - CAR 100% Completed (Unit of Canal Structure, Length of Canal and Length of Protection Works)
(Cumulative)
Target: 70
Actual: 33.6 Expenditure:58934077.3 Release:25360968 Obligation:135891744.9
-12.293577981651
594816755 CW-KALINGA-25-2022 / GUBONG MAGSILAY CIS
Kalinga
National Irrigation Administration - CAR 100% Completed, (Length of Canal Lining and length of Protection Works)
(Cumulative)
Target: 0
Actual: 100 Expenditure:414299.43 Release:439538 Obligation:491613.02
0
602486393 CW-KALINGA-24-2022 / GALDANG CIS
Kalinga
National Irrigation Administration - CAR 100% Completed, (Length of Canal Lining)
(Cumulative)
Target: 0
Actual: 100 Expenditure:850379.75 Release:886138 Obligation:957945.28
0
602795415 BATO SADOL TAWILING CIS
Kalinga
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
602986485 (a) UPPER CHICO RIVER IRRIGATION SYSTEM
Kalinga
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
605524440 Upper Chico River Irrigation System
Kalinga
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
615841403 Sibil-Besong CIS
Kalinga
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0 Expenditure:0 Release:0 Obligation:0
0
617832353 CW-KALINGA-10-2022 / UPPER CALANAN PIP
Kalinga
National Irrigation Administration - CAR 100% Completed, 4 hectares area generated
(Cumulative)
Target: 0
Actual: 100 Expenditure:0 Release:917130 Obligation:490010.24
0
619896982 SIWAC SPIP
Kalinga
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
625108663 CW-KALINGA-18-2022 / BATO SADOL TAWILING CIS
Kalinga
National Irrigation Administration - CAR 100% Completed (Unit of Canal Structure and Protection Works)
(Cumulative)
Target: 0
Actual: 100 Expenditure:18682.11 Release:911470 Obligation:982396.17
0
627018946 CW-KALINGA-19-2022 / BICONGCONG CIS
Kalinga
National Irrigation Administration - CAR 100% Completed, (Length of Canal Lining)
(Cumulative)
Target: 0
Actual: 100 Expenditure:435266.13 Release:446546 Obligation:491227.4
0
636874110 Supplemental Feeding Program
Kalinga
Department of Social Welfare and Development - CAR Number of beneficiaries served
(Maintained)
Target: 7260
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
637584953 Renovation of ceiling and wall partitions at the ground floor of the high school building
Kalinga
Kalinga State University percentage of accomplishment
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
639385433 Construction of 4 storey Library Building at Bulanao Campus Phase I
Kalinga
Kalinga State University percentage of accomplishment
(Cumulative)
Target: 0
Actual: 94 Expenditure: Release:45000000 Obligation:45000000
0
651682749 CW-KALINGA-10-2022 / SAGPAT PASTO PIP
Kalinga
National Irrigation Administration - CAR 100% Completed, 6 hectares area generated
(Cumulative)
Target: 0
Actual: 100 Expenditure:14816.54 Release:917130 Obligation:986120.74
0
652229546 Battong SIS
Kalinga
National Irrigation Administration - CAR 100% Completed
(default)
Target: 50
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
673359702 CW-KALINGA-02-2022 / MAKILO SPIP
Kalinga
National Irrigation Administration - CAR 100% Completed, 7 hectares area generated
(Cumulative)
Target: 17.5
Actual: 100 Expenditure:28808.51 Release:2421065 Obligation:3120462.11
68
675394782 ESA and Cash for Work
Kalinga
Department of Social Welfare and Development - CAR number of beneficiaries served
(default)
Target: 0
Actual: 0 Expenditure:0 Release:0 Obligation:0
0
678527365 AMBALI CIS
Kalinga
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
684735832 Repair/Improvement of Tinglayan RHU
Kalinga
Department of Health - CAR Percent Completed
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
697061145 S&T Intervention for Dry-On-Wow Food Processing and Preserving (iFWRD PH)
Kalinga
Department of Science and Technology - CAR Number of firms assisted
(default)
Target: 0
Actual: 0 Expenditure:0 Release:0 Obligation:0
0
707389395 CW-KALINGA-34-2022 / NAMNAMA CIS
Kalinga
National Irrigation Administration - CAR 100% Completed, (Length of Canal Lining)
(Cumulative)
Target: 0
Actual: 100 Expenditure:1253594.94 Release:1379430 Obligation:1475661.55
0
713969647 CW-KALINGA-32-2022 / UPPER CHICO RIVER IRRIGATION SYSTEM
Kalinga
National Irrigation Administration - CAR 100% Completed (Length of service road)
(Cumulative)
Target: 0
Actual: 100 Expenditure:266320.35 Release:258627 Obligation:273261.13
0
721581479 Upper Chico River Irrigation System
Kalinga
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
725424994 Construction of Technology and Innovation Park-Bulanao Campus
Kalinga
Kalinga State University percentage of accomplishment
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
728522013 Establishment of Kalinga Cultural Heritage and Edu-Tourism Center
Kalinga
Kalinga State University percentage of accomplishment
(Cumulative)
Target: 100
Actual: 73.16 Expenditure: Release:3935949.63 Obligation:3935949.63
-24.936189102208
728713866 Improvement in the Kalinga Mountain Coffee Products
Kalinga
Department of Science and Technology - CAR No. of firms assisted
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
732192600 CW-KALINGA-10-2022 / AGAP PIP
Kalinga
National Irrigation Administration - CAR 100% Completed, 4 hectares area generated
(Cumulative)
Target: 0
Actual: 100 Expenditure:0 Release:446854 Obligation:491972.04
0
737700622 Supplemental Feeding Program
Kalinga
Department of Social Welfare and Development - CAR Number of Children Served
(Maintained)
Target: 7570
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
741190699 Upper Chico RIS
Kalinga
National Irrigation Administration - CAR 100% Completed
(default)
Target: 59
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
742291791 Improvement of Mabalusa Communal Irrigation System, Dao-angan, Balbalan
Kalinga
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
749313211 Repai/Improvement of Poswoy BHS
Kalinga
Department of Health - CAR Percent completed
(Cumulative)
Target: 100
Actual: 100 Expenditure: Release:500000 Obligation:499870.88
0
754310735 CONSTRUCTION OF LEVEL II POTABLE WATER SUPPLY SYSTEM AT BARANGAY APATAN at Sitio Tappo, Apatan
Kalinga
Department of the Interior and Local Government - CAR percent completed
(Cumulative)
Target: 0
Actual: 100 Expenditure: Release:0 Obligation:0
0
757389814 Construction of Tulgao East Water System, Tulgao East
Kalinga
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
763093918 Balong Norte CIS
Kalinga
National Irrigation Administration - CAR 100% Completed
(default)
Target: 30
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
768406566 Social Pension Program
Kalinga
Department of Social Welfare and Development - CAR Number of indigent senior citizens provided with Social Pension
(Maintained)
Target: 17163
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
769245944 high school building repair ( roofing, ceiling and downspout)
Kalinga
Kalinga State University percentage of accomplishment
(Cumulative)
Target: 25
Actual: 10 Expenditure: Release:0 Obligation:0
-60
815892305 CW-KALINGA-10-2022 / MABATO PIP
Kalinga
National Irrigation Administration - CAR 100% Completed, 10 hectares area generated
(Cumulative)
Target: 0
Actual: 100 Expenditure:0 Release:917130 Obligation:986120.74
0
824841572 CW-KALINGA-04-2022 / CUDAL SPIP
Kalinga
National Irrigation Administration - CAR 100% Completed, 7 hectares area generated
(Cumulative)
Target: 25
Actual: 88 Expenditure:487470.61 Release:2194355 Obligation:3120884.23
59
827006386 MANANING CREEK UPPER MANANING CIS
Kalinga
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
836233879 SAGPAT PASTO PIP
Kalinga
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
837141095 Marcela SPIP
Kalinga
National Irrigation Administration - CAR 100% Completed
(default)
Target: 40
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
837655872 Construction of Mabongtot Communal Irrigation System, Buaya, Balbalan
Kalinga
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
849622226 UPPER CHICO RIVER IRRIGATION SYSTEM (QUEZON)
Kalinga
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
855309450 Completion of Performing Arts Theater
Kalinga
Kalinga State University percentage of accomplishment
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
866878448 Electricity Primary Metering for KSU-Bulanao Campus
Kalinga
Kalinga State University percentage of accomplishment
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
870080049 Repair/Improvement of Lubuagan RHU
Kalinga
Department of Health - CAR Percent Completed
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
872697436 PARTNERSHIP ON SAAD (DA)
Kalinga
Department of Social Welfare and Development - CAR No. of Households provided with livelihood modalities
(Cumulative)
Target: 50
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
876583162 Upgrading Project of RIPPLES Soaps and Scents Trading
Kalinga
Department of Science and Technology - CAR No. of firms assisted
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
879611072 NAMNAMA CIS
Kalinga
National Irrigation Administration - CAR 50
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
886773851 Magabbangon PIS
Kalinga
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0 Expenditure:0 Release:0 Obligation:0
0
893018035 S&T Intervention of Parway's Handicrafts Manufacturing
Kalinga
Department of Science and Technology - CAR No. of firms assisted
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
906992192 SAN ISIDRO PIP
Kalinga
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
916202816 Rehabilitation of Water System at Sitio Lisbong, Poswoy, Balbalan
Kalinga
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
919220725 Improvement of Main Drainage Canal at Manggawa, Loccong
Kalinga
Department of Social Welfare and Development - CAR Percent Completed
(default)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
932123924 Improvement of Layawan Irrigation System, Lower Taloctoc
Kalinga
Department of Social Welfare and Development - CAR 100% completion (1 unit small scale irrigation (917.10 cu.m. unclassified excavation, 207.95 structure excavation, 84 li.,. RCPC with 7 manholes)
(default)
Target: 0
Actual: 100 Expenditure:0 Release:79582 Obligation:100000
0
948988736 Upper Chico RIS
Kalinga
National Irrigation Administration - CAR 100% Completed
(default)
Target: 59
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
952825546 CW-KALINGA-37-2022 / GAWIDAN CIS
Kalinga
National Irrigation Administration - CAR 100% Completed, (Length of Canal Lining, Diversion works and length of Protection Works)
(Cumulative)
Target: 20
Actual: 100 Expenditure:53972.86 Release:1474851 Obligation:1970382.95
50
957422268 Upgrading of Belong Credit Cooperative
Kalinga
Department of Science and Technology - CAR No. of firms assisted
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
964278053 CW-KALINGA-03-2022 / CAFAYU SPIP
Kalinga
National Irrigation Administration - CAR 100% Completed, 7 hectares area generated
(Cumulative)
Target: 27
Actual: 100 Expenditure:0 Release:2155343 Obligation:3138063.41
30
969211981 Construction of Water System at Purok 3, Babalag East, Rizal
Kalinga
Department of the Interior and Local Government - CAR percent completed
(Cumulative)
Target: 0
Actual: 100 Expenditure: Release:3000000 Obligation:2949189
0
981049614 TIWONG SPIP
Kalinga
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
981365369 CW-KALINGA-07-2022 / NAYUD BALANI SPIP
Kalinga
National Irrigation Administration - CAR 100% Completed, 7 hectares area generated
(Cumulative)
Target: 40
Actual: 49 Expenditure:0 Release:1788030 Obligation:3155637.8
-24
981691250 Construction of Technology and Innovation Park-Bulanao Campus
Kalinga
Kalinga State University percentage of accomplishment
(Cumulative)
Target: 0
Actual: 54 Expenditure: Release:6695065.24 Obligation:6695065.24
0
989427798 Construction of Gannapi Bayowong Footpath, Mabaca, Balbalan
Kalinga
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
990378786 CW-KALINGA-UPPER CHICO RIVER IRRIGATION SYSTEM (PINUKPUK)
Kalinga
National Irrigation Administration - CAR 100% Completed, (Length of Canal Lining and length of Protection Works)
(Cumulative)
Target: 80
Actual: 0 Expenditure:0 Release:0 Obligation:0
-96.774193548387
994555484 Construction of Talalang Proper to Sitio Gukguk Footpath, Talalang, Balbalan
Kalinga
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1012635135 CONSTRUCTION OF NIA - QUEZON BUILDING
Kalinga
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 30
Actual: 0 Expenditure:0 Release:0 Obligation:0
-17.85
1016012180 Lamagan SIP
Kalinga
National Irrigation Administration - CAR 100% Completed
(default)
Target: 36
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1017341699 Social Pension Program
Kalinga
Department of Social Welfare and Development - CAR Number of beneficiaries served
(Maintained)
Target: 17553
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1019721440 LUBUAGAN PASIL SIP
Kalinga
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 0
Actual: 0 Expenditure:0 Release:0 Obligation:0
0
1021029359 Continuing S&T Improvement of JAC Farm's Coffee Processing
Kalinga
Department of Science and Technology - CAR No. of firms assisted
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
1022879445 CW-KALINGA-42-2022 / UPPER CHICO RIVER IRRIGATION SYSTEM (QUEZON)
Kalinga
National Irrigation Administration - CAR 100% Completed (Length of Canal and Protection Works)
(Cumulative)
Target: 90
Actual: 100 Expenditure:304730.55 Release:3771090 Obligation:9855703.24
-3.8461538461538
1032164117 Improvement of Barangay Open Conference Hall (Barangay Isolation Unit), Lay-asan
Kalinga
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1036588190 GAWIDAN CIS
Kalinga
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1044335408 MAKILO SPIP
Kalinga
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1045189059 Construction of Nursery-KSU Bulanao Campus
Kalinga
Kalinga State University percentage of accomplishment
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
1046710389 Dalutag Solar PIP
Kalinga
National Irrigation Administration - CAR 100% Completed
(default)
Target: 68
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1047625747 Livelihood for Enhanced Livestock related activities
Kalinga
Department of Agriculture - CAR Number of Projects Completed, Number of Beneficiaries Serve, Number of Community Based Enterprise
(default)
Target: 25
Actual: 0 Expenditure: Release:0 Obligation:0
-100
1048196463 Formulation of ADSDPP of Gaang AD
Kalinga
National Commission on Indigenous Peoples - CAR number of phases of ADSDPP formulation completed within the year
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:20800
0
1053518914 Improvement of Bonong Water System, Tawang, Balbalan
Kalinga
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1055251892 Construction of Material Recovery Facility-KSU Bulanao Campus
Kalinga
Kalinga State University percentage of accomplishment
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
1079997581 CODDOG NANENG CIS
Kalinga
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1080806809 Construction and Improvement of Banagao to Cawi, Poblacion Farm to Market Road (Banagao-Mangali Road)
Kalinga
Department of the Interior and Local Government - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 69.28 Expenditure: Release:0 Obligation:0
-32.005103543037
1093287021 MALLONG SULAY PIP
Kalinga
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1101316381 San Pacual Solar PIP
Kalinga
National Irrigation Administration - CAR 100% Completed
(default)
Target: 79
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1105701015 CW-KALINGA-30-2022 / PAKAK CRK, BALATOC LIGOY CIS
Kalinga
National Irrigation Administration - CAR 100% Completed, (Length of Canal Lining)
(Cumulative)
Target: 0
Actual: 100 Expenditure:16603.38 Release:424642 Obligation:477732.26
0
1110462481 CW-KALINGA-09-2022 / CABUYAO PIP
Kalinga
National Irrigation Administration - CAR 100% Completed, 6 hectares area generated
(Cumulative)
Target: 0
Actual: 95 Expenditure:14064.47 Release:917130 Obligation:985576.28
0
1111282118 Improvement of School Perimeter Fencing - Anggacan Elementary School, Anggacan, Tanudan
Kalinga
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1111378462 Repair/Improvement/Upgrading of Rizal RHU
Kalinga
Department of Health - CAR Percent completed
(default)
Target: 100
Actual: 100 Expenditure: Release:1000000 Obligation:1000000
0
1111749551 Angngalipan Solar PIP
Kalinga
National Irrigation Administration - CAR 100% Completed
(default)
Target: 30
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1120132051 Procurement and Installation of Solar-Powered Streetlights, Poblacion
Kalinga
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1127753630 UPPER CALANAN PIP
Kalinga
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1128366942 Construction of Perimeter Fencing at Bulanao Campus Phase IV
Kalinga
Kalinga State University percentage of accomplishment
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
1133121560 CABUYAO PIP
Kalinga
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1137522029 Construction of Sumegcol to Brgy. Hall Footpath, Ababaan, Balbalan
Kalinga
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1138657262 Improvement of Barangay Open Conference Hall (Barangay Isolation Unit), Lay-asan
Kalinga
Department of Social Welfare and Development - CAR Percent Completed
(default)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1138911470 REPAIR OF FLOOR TILES,DOORS,CANOPY AND PLUMBING WORKS AT LAW BUILDING
Kalinga
Kalinga State University percentage of accomplishment
(Cumulative)
Target: 100
Actual: 27.51 Expenditure: Release:514170.96 Obligation:514170.96
-72.49
1144486439 CAFAYU SPIP
Kalinga
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1152083945 Repair and Maintenance of Research, Agriculture and Forestry laboratory Building's Ceiling and Flooring
Kalinga
Kalinga State University percentage of accomplishment
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
1178859374 Livestock R & D- Native Animals Nucleus Herd Center ( Native Pig, Poultry-layer and broiler
Kalinga
Kalinga State University percentage of accomplishment
(Cumulative)
Target: 97.322
Actual: 84.65 Expenditure: Release:32922000 Obligation:32922000
-18.237177371444
1182890833 Sustainable Livelihood Program
Kalinga
Department of Social Welfare and Development - CAR Total number of households who received seed capital fund and total number of households trained (Seed Capital Funds, Skills Training, and CBLA)
(Maintained)
Target: 0
Actual: 0 Expenditure:0 Release:0 Obligation:0
0
1183148669 Delineation, Recognition and Titling of Taloctoc Ancestral Domain (portion of Stage 3 to Stage 5)
Kalinga
National Commission on Indigenous Peoples - CAR number of stages of CADT application completed
(default)
Target: 1
Actual: 0 Expenditure: Release:150000 Obligation:11587
-100
1187014188 NAMANGGAAN PIP
Kalinga
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1196472381 Coddog Naneng CIS
Kalinga
National Irrigation Administration - CAR 100% Completed
(default)
Target: 70
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1198856741 UPPER CHICO RIVER IRRIGATION SYSTEM (PINUKPUK)
Kalinga
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1202086141 CW-KALINGA-23-2022 / DOLGADOG CIS
Kalinga
National Irrigation Administration - CAR 100% Completed, (Length of Canal Lining)
(Cumulative)
Target: 25
Actual: 100 Expenditure:20462.06 Release:668634 Obligation:958196.99
60
1205619024 Repair/Improvement/Upgrading of Kalinga District Hospital
Kalinga
Department of Health - CAR Percent completed
(Cumulative)
Target: 100
Actual: 100 Expenditure: Release:4000000 Obligation:4000000
0
1216944720 CW-KALINGA-08-2022 / SIWAC SPIP
Kalinga
National Irrigation Administration - CAR 100% Completed, 7 hectares area generated
(Cumulative)
Target: 40
Actual: 100 Expenditure:77932.89 Release:1774245 Obligation:3155646.4
87
1221151657 WATA SIP PH. 6
Kalinga
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1227034701 Improvement of Gatgat Communal Irrigation System, Gawaan, Balbalan
Kalinga
Department of Social Welfare and Development - CAR Percent Completed
(default)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1251814465 Construction of Technology and Innovation Park Savings -generator set and pump house
Kalinga
Kalinga State University percentage of accomplishment
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
1259841216 CW-KALINGA-09-2022 / SAN ISIDRO PIP
Kalinga
National Irrigation Administration - CAR 100% Completed, 10 hectares area generated
(Cumulative)
Target: 0
Actual: 100 Expenditure:14816.54 Release:917130 Obligation:986120.74
0
1265804000 SAN FRANCISCO SIP PH. 2
Kalinga
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 30
Actual: 0 Expenditure:0 Release:0 Obligation:0
-26.666666666667
1267532715 CW-KALINGA-14-2022 / UPPER CHICO RIVER IRRIGATION SYSTEM SPIP
Kalinga
National Irrigation Administration - CAR 100% Completed, 110 hectares area generated
(Cumulative)
Target: 50
Actual: 100 Expenditure:13364511.14 Release:9390135 Obligation:24707105.42
53
1279300398 Construction of 4 storey Library Building at Bulanao Campus Phase I
Kalinga
Kalinga State University percentage of accomplishment
(Cumulative)
Target: 100
Actual: 62.84 Expenditure: Release:26026740.83 Obligation:26026740.83
-31.519468894525
1292896860 Improvement of Pitang Water Work System, Anggacan Sur, Tanudan
Kalinga
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1322556654 CALUMNAG PIP
Kalinga
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1324217478 Scholarship Program-RESP
Kalinga
Technical Education and Skills Development Authority - CAR number of enrolled, number of graduates
(default)
Target: 475
Actual: 324 Expenditure: Release:20103235 Obligation:408595
-31.789473684211
1324281629 Sustainable Livelihood Program
Kalinga
Department of Social Welfare and Development - CAR Total number of households who received seed capital fund and total number of households trained (Seed Capital Funds, Skills Training, and CBLA)
(Maintained)
Target: 3350
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1327478617 Upper Chico RIS
Kalinga
National Irrigation Administration - CAR 100% Completed
(default)
Target: 9
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1327599067 Improvement of Guilguila-Licwotan Footpath, Mangali Centro
Kalinga
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1330233707 CW-KALINGA-29-2022 / MANANING CREEK UPPER MANANING CIS
Kalinga
National Irrigation Administration - CAR 100% Completed, (Length of Canal Lining)
(Cumulative)
Target: 0
Actual: 100 Expenditure:397635.53 Release:419123 Obligation:459194.73
0
1330997211 Upgrading of Benz furniture and woodcraft
Kalinga
Department of Science and Technology - CAR No. of firms assisted
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
1332864626 Santor Rizal Solar PIP II
Kalinga
National Irrigation Administration - CAR 100% Completed
(default)
Target: 29
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1354489108 Improvement of Calaocan Drainage Canal, Balantoy, Balbalan
Kalinga
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1365233594 Improvement of Tulgao West Water System, Tulgao West
Kalinga
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1369442840 Managed Internet Subscription for KALINGA
Kalinga
Department of Information and Communications Technology - CAR Percent completed
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
1373152996 CW-KALINGA-10-2022 / CALUMNAG PIP
Kalinga
National Irrigation Administration - CAR 100% Completed, 7 hectares area generated
(Cumulative)
Target: 0
Actual: 92 Expenditure:0 Release:917130 Obligation:985527.42
0
1386570805 CW-KALINGA-10-2022 / ALUTTIT PIP
Kalinga
National Irrigation Administration - CAR 100% Completed, 8 hectares area generated
(Cumulative)
Target: 0
Actual: 100 Expenditure:0 Release:917130 Obligation:986156.15
0
1391672112 Improvements of Water Work System, Mabaca
Kalinga
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1393860087 CUDAL SPIP
Kalinga
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1396325445 CONCRETING OF ROAD OF BULANAO CAMPUS
Kalinga
Kalinga State University percentage of accomplishment
(Cumulative)
Target: 100
Actual: 87.39 Expenditure: Release:2108000 Obligation:2108000
-12.61
1402596555 CW-KALINGA-09-2022 / BANNENG BACCAN PIP
Kalinga
National Irrigation Administration - CAR 100% Completed, 7 hectares area generated
(Cumulative)
Target: 0
Actual: 88 Expenditure:11085.68 Release:917129052 Obligation:983.58755
0
1413037497 Improvement of Barangay Isolation Unit, Babbanoy, Tanudan
Kalinga
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1419155184 TANAP WAGAYAN CIS
Kalinga
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1426404352 Improvement of Dacudak Communal Irrigation System, Dacalan, Tanudan
Kalinga
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1429849763 AGO-OWAN CIS
Kalinga
National Irrigation Administration - CAR percent completed
(Cumulative)
Target: 100
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1439464992 Construction of Generator set House for Button Mushroom Building-KSU Bulanao Campus
Kalinga
Kalinga State University percentage of accomplishment
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
1440290254 Upgrading of Radio room, Server room of Rizal Campus, ICT computer and speech laboratory of all campus
Kalinga
Kalinga State University percentage of accomplishment
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
1450213072 Electrical repairs for additional loads at central laboratory
Kalinga
Kalinga State University percentage of accomplishment
(Cumulative)
Target: 100
Actual: 100 Expenditure: Release:234911.16 Obligation:234911.16
0
1452542509 CONSTRUCTION OF LEVEL II WATER SYSTEM AT BARANGAY LIMOS
Kalinga
Department of the Interior and Local Government - CAR percent completed
(Cumulative)
Target: 0
Actual: 6.64 Expenditure: Release:1489551 Obligation:0
0
1453654530 CW-KALINGA-33-2022 / CALAOCAN CHANUM PIP
Kalinga
National Irrigation Administration - CAR 100% Completed, 60 hectares area generated
(Cumulative)
Target: 30
Actual: 80 Expenditure:2396779.99 Release:5752272 Obligation:16808706.25
90.909090909091
1455971513 CW-KALINGA-31-2022 / TANAP WAGAYAN CIS
Kalinga
National Irrigation Administration - CAR 100% Completed (Unit of Canal Structure and Length of Canal)
(Cumulative)
Target: 0
Actual: 100 Expenditure:30490.99 Release:405669 Obligation:463250.19
0
1463761743 (a) UPPER CHICO RIVER IRRIGATION SYSTEM (TABUK CITY)
Kalinga
National Irrigation Administration - CAR percent completed
(Cumulative)
Target: 100
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1472338445 CONSTRUCTION OF LEVEL II POTABLE WATER SYSTEM AT BARANGAY BA-AY
Kalinga
Department of the Interior and Local Government - CAR percent completed
(Cumulative)
Target: 0
Actual: 16 Expenditure: Release:2989778 Obligation:0
0
1477235007 River Block/Control Along Bakungkong River Bank, Anggacan
Kalinga
Department of Social Welfare and Development - CAR 100% completion
(default)
Target: 0
Actual: 100 Expenditure:97000.25 Release:0 Obligation:100000
0
1485174602 Construction of Alubaggan Child Development Center, Dupligan, Tanudan
Kalinga
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1489777993 UPPER CHICO RIVER IRRIGATION SYSTEM
Kalinga
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1496605020 CW-KALINGA-17-2022 AMLAWANG CIS
Kalinga
National Irrigation Administration - CAR 100% Completed, (Length of Canal Lining)
(Cumulative)
Target: 50
Actual: 100 Expenditure:18824.58 Release:452045 Obligation:981654.05
102
1498175282 CALANAN PIP
Kalinga
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1517660631 Managed Internet Service - VSAT Network Services for Quarantine Centers and Medical Facilities - Juan M. Duyan District Hospital, Rizal
Kalinga
Department of Information and Communications Technology - CAR Percent completed
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
1517784325 Construction of Dananao Motorpath for Quicker Covid-19 Response
Kalinga
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1519104664 Improvement of Banneng-Darulog-Bawac Farm to Market Road
Kalinga
Department of Agriculture - CAR number of kilometer constructed
(Cumulative)
Target: 5.35
Actual: 5.2 Expenditure: Release:102551481.76 Obligation:102551481.76
2.1720243266725
1523627078 SUYANG CIS
Kalinga
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1540098943 Rehabilitation of Kinama Small Water Impounding Project
Kalinga
Department of Agriculture - CAR number of Small Scale Irrigation Projects (SSIP) rehabilitated, service area (ha) restored, number of groups
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
1551406094 CW-KALINGA-05-2022 / SALIGO BULANAO SPIP
Kalinga
National Irrigation Administration - CAR 100% Completed, 15 hectares area generated
(Cumulative)
Target: 0
Actual: 100 Expenditure:152430.43 Release:4664442 Obligation:4917522.16
0
1557364164 Rehabilitation of Layawan Irrigation System, Upper Taloctoc
Kalinga
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1568641855 Construction of Buscalan Communal Irrigation System (CIS)
Kalinga
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1575294703 Repair and Renovation of Forestry Building
Kalinga
Kalinga State University percentage of accomplishment
(Cumulative)
Target: 70.13
Actual: 70.13 Expenditure: Release:0 Obligation:0
0
1578522413 BANNENG BACCAN PIP
Kalinga
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1587376707 Pinukpuk DH
Kalinga
Department of Health - CAR percent completed
(Cumulative)
Target: 0
Actual: 85 Expenditure: Release:0 Obligation:0
0
1592994469 Facility Improvement of Dar-awan Poultry Farm
Kalinga
Department of Science and Technology - CAR Number of firms assisted
(default)
Target: 0
Actual: 0 Expenditure:0 Release:0 Obligation:0
0
1595443493 NAYUD BALANI SPIP
Kalinga
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1597477994 S&T Interventions for FLQ Food and Panciteria
Kalinga
Department of Science and Technology - CAR No. of firms assisted
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
1619016574 Construction of Toilet Piping, Gaang
Kalinga
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1624959763 Rehabilitation of Congot Communal Irrigation System, Maling, Balbalan
Kalinga
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1629998794 Rehabilitation of Lower Bangad Water System
Kalinga
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1639454511 CW-KALINGA-28-2022 / MANANIG-ELEB CIS
Kalinga
National Irrigation Administration - CAR 100% Completed, (Length of Canal Lining)
(Cumulative)
Target: 0
Actual: 100 Expenditure:414663.76 Release:437666 Obligation:472084.06
0
1659854182 Repair/Improvement/Upgrading of Taga-Pinukpuk RHU 1
Kalinga
Department of Health - CAR Percent completed
(Cumulative)
Target: 50
Actual: 21 Expenditure: Release:1000000 Obligation:962593.77
142
1678442742 Family Transitory Support Package
Kalinga
Department of Social Welfare and Development - CAR 100% payment of beneficiaries
(default)
Target: 0
Actual: 0 Expenditure:0 Release:0 Obligation:0
0
1683086264 Improvement in the Processing of Bongngat's Food Products
Kalinga
Department of Science and Technology - CAR Number of firms assisted
(default)
Target: 1
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1690068740 PAKAK CRK, BALATOC LIGOY CIS
Kalinga
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1703512815 Completion of Performing Arts Theater
Kalinga
Kalinga State University percentage of accomplishment
(Cumulative)
Target: 0
Actual: 76.28 Expenditure: Release:5956906.24 Obligation:5956906.24
0
1703539849 Construction of Multi-purpose Building, Pangol
Kalinga
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1704629762 Regular and Frontloaded Livelihood Projects
Kalinga
Department of Social Welfare and Development - CAR No. of Households provided with livelihood modalities
(Cumulative)
Target: 34
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1715673959 Construction of Drainage Canal at Proper Mallango
Kalinga
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1721939419 CW-KALINGA-39-2022 / LUBUAGAN PASIL SIP
Kalinga
National Irrigation Administration - CAR 100% Completed, 148 hectares area generated
(Cumulative)
Target: 30
Actual: 18 Expenditure:4631157.44 Release:9262315 Obligation:32593637.93
-56.666666666667
1722551837 Upper Chico RIS (Mallig)
Kalinga
National Irrigation Administration - CAR 100% Completed
(default)
Target: 100
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1744000348 IMPROVEMENT OF HEALTH STATION AT BARANGAY BA-AY
Kalinga
Department of the Interior and Local Government - CAR percent completed
(Cumulative)
Target: 0
Actual: 6.35 Expenditure: Release:999599 Obligation:0
0
1744704574 Repair/Improvement/Upgrading of Kalinga Provincial Hospital
Kalinga
Department of Health - CAR Percent completed
(Cumulative)
Target: 100
Actual: 70 Expenditure: Release:10000000 Obligation:10000000
-25
1748334625 CANTONG CIS
Kalinga
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1750134436 CW-KALINGA-08-2022 / OB-OB SPIP
Kalinga
National Irrigation Administration - CAR 100% Completed, 7 hectares area generated
(Cumulative)
Target: 35
Actual: 78 Expenditure:0 Release:1922166 Obligation:3153524.27
25
1772785955 Livelihood for Enhancement High Value Crops Related activities
Kalinga
Department of Agriculture - CAR Number of Projects Completed, Number of Beneficiaries Serve, Number of Community Based Enterprise
(default)
Target: 12
Actual: 0 Expenditure: Release:0 Obligation:0
-100
1773369427 Upgrading Project in the Processing and Packaging of Garcia's Food Products
Kalinga
Department of Science and Technology - CAR No. of firms assisted
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
1781765569 SALIGO BULANAO SPIP
Kalinga
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1782534275 Electrification of KSU Mushroom Building-KSU Bulanao campus
Kalinga
Kalinga State University percentage of accomplishment
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
1783724230 Construction of Fin-ac Communal Irrigation System, Sumadel 1
Kalinga
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1784198056 Concreting of Amis Communal Irrigation System (CIS), Basao, Tinglayan
Kalinga
Department of Social Welfare and Development - CAR 100% completion
(Cumulative)
Target: 0
Actual: 0 Expenditure:0 Release:0 Obligation:0
0
1788611099 CW-KALINGA-38-2022 / WATA SIP PH. 6
Kalinga
National Irrigation Administration - CAR 100% Completed, 60 hectares area generated
(Cumulative)
Target: 40
Actual: 15288000 Expenditure:0 Release:9909351 Obligation:0
18199934.52381
1799762456 CW-KALINGA-01-2022 / BAKO SPIP
Kalinga
National Irrigation Administration - CAR 100% Completed, 7 hectares area generated
(Cumulative)
Target: 20
Actual: 91 Expenditure:22933.1 Release:2364554 Obligation:3138477.77
32
1818014887 UPPER CHICO RIVER IRRIGATION SYSTEM SPIP
Kalinga
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1823485279 CW-KALINGA-10-2022 / AGAP PIP
Kalinga
National Irrigation Administration - CAR percent completed
(Cumulative)
Target: 100
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1834650452 S&T Innovation for Teckon Construction
Kalinga
Department of Science and Technology - CAR Number of firms assisted
(default)
Target: 0
Actual: 0 Expenditure:0 Release:0 Obligation:0
0
1850818614 UPPER CHICO RIVER IRRIGATION SYSTEM SPIP
Kalinga
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1852551350 NAAPAGAP SPIP
Kalinga
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1867824008 CW-KALINGA-09-2022 / NAMANGGAAN PIP
Kalinga
National Irrigation Administration - CAR 100% Completed, 6 hectares area generated
(Cumulative)
Target: 0
Actual: 100 Expenditure:13764.49 Release:917130 Obligation:986156.15
0
1868359739 CW-KALINGA-36-2022 / BALONG NORTE CIS
Kalinga
National Irrigation Administration - CAR 100% Completed, (Length of Canal Lining)
(Cumulative)
Target: 0
Actual: 100 Expenditure:23015.45 Release:1850245 Obligation:1973884.72
0
1870774224 Improvement in the Packaging of EJ Food Products
Kalinga
Department of Science and Technology - CAR No. of firms assisted
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
1888377732 Rehabilitation of Belong-Manubal Pathway with Proposed Fencing for Quicker Covid-19 Response
Kalinga
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1907904943 Makutay Solar PIP
Kalinga
National Irrigation Administration - CAR 100% Completed
(default)
Target: 30
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1911561021 Improvement of Pascua Farm Machineries and Welding Shop
Kalinga
Department of Science and Technology - CAR Number of firms assisted
(default)
Target: 0
Actual: 0 Expenditure:0 Release:0 Obligation:0
0
1912690129 Improvement of Old Tinglayan Pathway for Quicker Covid-19 Response, Old Tinglayan
Kalinga
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1915054341 Improvement of Ullaga Water Work System, Lower Mangali
Kalinga
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1918549449 Improvement of Sagsagacat Water System, Balbalasang, Balbalan
Kalinga
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1923685859 CW-KALINGA-07-2022 / ZIPLA SPIP
Kalinga
National Irrigation Administration - CAR 100% Completed, 7 hectares area generated
(Cumulative)
Target: 40
Actual: 100 Expenditure:46411.24 Release:1784066 Obligation:3155953.41
60
1925053831 Managed Internet Service - VSAT Network Services for Quarantine Centers and Medical Facilities - Birthing Home Facility - Balinciagao Sur, Pasil
Kalinga
Department of Information and Communications Technology - CAR Percent completed
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
1938694082 Construction of Slope Protection, Butbut Proper
Kalinga
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1941766260 Sustainable Livelihood Program
Kalinga
Department of Social Welfare and Development - CAR Total number of households who received seed capital fund and total number of households trained (Seed Capital Funds, Skills Training, and CBLA)
(Maintained)
Target: 603
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1966106329 Upgrading of Skidmarks Tires and Auto Supplies
Kalinga
Department of Science and Technology - CAR No. of firms assisted
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
1971260417 Installation of Solar-Powered Streetlight to Enhance Disaster Response, Dangoy
Kalinga
Department of Social Welfare and Development - CAR 100% completion
(default)
Target: 0
Actual: 100 Expenditure:0 Release:50186.62 Obligation:74208
0
1972200016 Managed Internet Service - VSAT Network Services for Quarantine Centers and Medical Facilities - Pinupuk District Hospital
Kalinga
Department of Information and Communications Technology - CAR Percent completed
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
1973983530 Improvement of Drainage Canal to Enhance Disaster Response, Antonio Canao
Kalinga
Department of Social Welfare and Development - CAR 100% completion
(default)
Target: 0
Actual: 100 Expenditure:0 Release:42468.99 Obligation:55753
0
1976555788 CW-KALINGA-45-2022 / UPPER CHICO RIVER IRRIGATION SYSTEM
Kalinga
National Irrigation Administration - CAR 100% Completed, 190 hectares area generated
(Cumulative)
Target: 9
Actual: 100 Expenditure:38754608.06 Release:42550458 Obligation:49415862.28
75
1981711015 AGO-OWAN CIS
Kalinga
National Irrigation Administration - CAR 100 % Completed, 0.25 km concrete canal
(Cumulative)
Target: 0
Actual: 100 Expenditure:487474.63 Release:439333 Obligation:487474.63
0
1985539661 Installation of Roofing at central Laboratory at KSU Bulanao Campus
Kalinga
Kalinga State University percentage of accomplishment
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
1986680558 CW-KALINGA-07-2022 / TIWONG SPIP
Kalinga
National Irrigation Administration - CAR 100% Completed, 15 hectares area generated
(Cumulative)
Target: 25
Actual: 36 Expenditure:152430.43 Release:3495905 Obligation:4933801.48
-45
1999789321 S&T Upgrading Facilities of Challengers Agriculture Cooperative
Kalinga
Department of Science and Technology - CAR No. of firms assisted
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
2032587041 TICAN SPIP
Kalinga
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
2059064443 Improvement of Bullalayao Water System, Pantikian, Balbalan
Kalinga
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
2068605252 Improvement for the Coffee and Wine Products of Elju's Food Products (Phase II)
Kalinga
Department of Science and Technology - CAR No. of firms assisted
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
2073710869 UPPER CHICO RIVER IRRIGATION SYTEM (MALLIG)
Kalinga
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
2074421222 CW-KALINGA-08-2022 / TICAN SPIP
Kalinga
National Irrigation Administration - CAR 100% Completed, 7 hectares area generated
(Cumulative)
Target: 40
Actual: 74 Expenditure:0 Release:1786372 Obligation:3157805.56
20
2077780083 Improvement of Water Work System, Poblacion
Kalinga
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
2087598631 CW-KALINGA-22-2022 / DANGTALAN CIS
Kalinga
National Irrigation Administration - CAR 100% Completed (Unit of Canal Structure and Length of Canal)
(Cumulative)
Target: 0
Actual: 100 Expenditure:866229.38 Release:91777252 Obligation:979630.92
0
2088177470 CALAOCAN CHANUM PIP
Kalinga
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
2097293288 Improvement of Poblacion Water System, Poblacion, Balbalan
Kalinga
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
2104632624 iFWRD Assistance to Enhance the Quality and Production of Chuchay Cakes and Pastries Shop
Kalinga
Department of Science and Technology - CAR Number of firms assisted
(default)
Target: 0
Actual: 0 Expenditure:0 Release:0 Obligation:0
0
2115216174 Pagtayan Dampog SIP
Kalinga
National Irrigation Administration - CAR 100% Completed
(default)
Target: 45
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
2116695166 Wata SIP
Kalinga
National Irrigation Administration - CAR 100% Completed
(default)
Target: 39
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
2117627461 Repair/Improvement of Tanudan Rural Health Unit
Kalinga
Department of Health - CAR Percent Completed
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
2118058231 Provision of Cash Grants including the amount of Rice Subsidy
Kalinga
Department of Social Welfare and Development - CAR Number of Household beneficiaries provided with Conditional Cash Grants
(Maintained)
Target: 11602
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
2128392200 Completion of Technology and Innovation Park-Bulanao Campus
Kalinga
Kalinga State University percentage of accomplishment
(Cumulative)
Target: 77.07
Actual: 64.45 Expenditure: Release:25000000 Obligation:25000000
31.538210852208
2142741689 Uno Spring Solar PIP
Kalinga
National Irrigation Administration - CAR 100% Completed
(default)
Target: 35
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
2143547823 Calaocan BHS
Kalinga
Department of Health - CAR percent completed
(default)
Target: 10
Actual: 20 Expenditure: Release:0 Obligation:0
100
5370586 Kanawalan Pitican SIP
Ifugao
National Irrigation Administration - CAR 100% Completed
(default)
Target: 49
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
7175265 REPAIR/IMPROVEMENT/UPGRADING OF AGUINALDO PEOPLE'S HOSPITAL
Ifugao
Department of Health - CAR Percent completed
(Cumulative)
Target: 100
Actual: 100 Expenditure: Release:4000000 Obligation:3817849.27
-1
16602138 Tigtigangan SIP
Ifugao
National Irrigation Administration - CAR 100% Completed
(default)
Target: 90
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
30335842 Nunhapang SIP
Ifugao
National Irrigation Administration - CAR 100% Completed
(default)
Target: 88
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
39280509 CONSTRUCTION OF GAHA-BAGIMBING-LAB-ONG FMR at Barangay Danggo, Tinoc
Ifugao
Department of the Interior and Local Government - CAR percent completed
(Cumulative)
Target: 0
Actual: 100 Expenditure: Release:0 Obligation:0
0
43064339 Technology Upgrading of Production Process and Facilities of A & I Bakery
Ifugao
Department of Science and Technology - CAR No. of firms assisted
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
53008968 CONSTRUCTION OF BALINGAW TO CHUMMANGNA PATHWAY, Magulon, Mayoyao
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
57220974 Improvement/Concreting Of Halag-Itab-Buwag Fmr, Itab, Aguinaldo
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
61991500 IMPROVEMENT OF BONGAN VARIOUS CIS, Bongan, Mayoyao
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
63498785 Technology Upgrading for the Hollow Blocks Production of 3J's Hardware & Construction Supplies
Ifugao
Department of Science and Technology - CAR Number of firms assisted
(default)
Target: 0
Actual: 0 Expenditure:0 Release:0 Obligation:0
0
71537218 Direct Internet Subscription for the IP Transport Municipal in Alfonso Lista
Ifugao
Department of Information and Communications Technology - CAR Percent Completed
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
72519115 Improvement of Mabulon-Pitawan Farm to Market Road, Cababuyan South
Ifugao
Department of Social Welfare and Development - CAR 100% completion
(Cumulative)
Target: 0
Actual: 100 Expenditure:0 Release:411882.08 Obligation:411882
0
82001172 Improvement of Pula- Balacbac FMR
Ifugao
Department of Social Welfare and Development - CAR 100% completion
(default)
Target: 0
Actual: 100 Expenditure:0 Release:51366.66 Obligation:82995
0
83796918 Installation Of Damag Solar Street Lights, Damag, Aguinaldo
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
89789323 Improvement of Junction-Alimit-Nattum Farm to Market Road
Ifugao
Department of Agriculture - CAR number of kilometer constructed
(Cumulative)
Target: 4.6
Actual: 4.6 Expenditure: Release:140528029 Obligation:140528029
-1.4492753623188
92812616 REPAIR/IMPROVEMENT/UPGRADING OF PANOPDOPAN DISTRICT HOSPITAL
Ifugao
Department of Health - CAR Percent completed
(Cumulative)
Target: 100
Actual: 100 Expenditure: Release:5000000 Obligation:4999038.16
6.075
115799572 HUMALOPHOP SIP
Ifugao
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 60
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
118585867 Managed Internet Service - VSAT Network Services for Quarantine Centers and Medical Facilities - Mompolia Brgy Hall, Hingyon
Ifugao
Department of Information and Communications Technology - CAR Percent completed
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
145240330 REPAIR/IMPROVEMENT/UPGRADING OF KIANGAN RHU
Ifugao
Department of Health - CAR Percent completed
(Cumulative)
Target: 100
Actual: 100 Expenditure: Release:1000000 Obligation:995168.79
-1
150157539 Completion of Right and Left Wing of Engineering Building
Ifugao
Ifugao State University Percentage Completion
(default)
Target: 16
Actual: 0 Expenditure: Release:0 Obligation:0
-100
152350704 Balawis CIS
Ifugao
National Irrigation Administration - CAR 100% Completed
(default)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
181745229 New Construction of Lagawe Super Health Center
Ifugao
Department of Health - CAR Percent Completed
(default)
Target: 50
Actual: 100 Expenditure: Release:0 Obligation:0
100
182025571 REPAIR/IMPROVEMENT/UPGRADING OF IFUGAO GENERAL HOSPITAL (PHASE VI)
Ifugao
Department of Health - CAR Percent completed
(Cumulative)
Target: 86.67
Actual: 18 Expenditure: Release:44654651.85 Obligation:44526057.64
-1.4757727309994
183071809 Construction of Multipurpose Pavement at Sitio Halingat, Northern Cababuyan
Ifugao
Department of Social Welfare and Development - CAR 100% completion
(Cumulative)
Target: 0
Actual: 100 Expenditure:0 Release:455429.01 Obligation:455429
0
200733758 IMPROVEMENT OF SITIO NATIMLAN-SITIO PROPER PATHWAY, Mongol, Mayoyao
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
233225911 HAPID IS (SERVICE ROAD ADDT'L)
Ifugao
National Irrigation Administration - CAR 100% Completed
(default)
Target: 10
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
234044329 Enhancement of Drainage System
Ifugao
Ifugao State University 2000 meters drainage system within the school campus
(Cumulative)
Target: 75
Actual: 65 Expenditure: Release:9259939.79 Obligation:13228485.41
-16.666666666667
240378650 Construction of FMR at Sitio Ang-angan to Sitio Higib, Mungayang, Kiangan
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
245039507 IMPROVEMENT OF AYANGAN BARANGAY HEALTH STATION, Ayangan, Mayoyao
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
263664508 Health Care and Culture Approach Reaching the Barangays through Free Health Kits
Ifugao
National Commission on Indigenous Peoples - CAR no of projects implemented
(default)
Target: 0
Actual: 0 Expenditure: Release:207000 Obligation:108000
0
266680441 Sustainable Livelihood Program
Ifugao
Department of Social Welfare and Development - CAR Total number of households who received seed capital fund and total number of households trained (Seed Capital Funds, Skills Training, and CBLA)
(Maintained)
Target: 569
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
276513493 Construction Of Chalalo Isolation Facility, Chalalo, Aguinaldo
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
286675291 HUHLUCAN SIP
Ifugao
National Irrigation Administration - CAR 100% completed, 60 has area generated
(Cumulative)
Target: 28
Actual: 100 Expenditure:169358.67 Release:4699295 Obligation:6696156.58
72
287199768 Supplemental Feeding Program
Ifugao
Department of Social Welfare and Development - CAR Number of beneficiaries served
(Maintained)
Target: 6560
Actual: 7981 Expenditure:0 Release:0 Obligation:0
21.661585365854
307862169 IMPROVEMENT OF HOLANG FOOTBRIDGE, Liwo, Mayoyao
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
310559284 Direct Internet Subscription for the IP Transport Municipal in Tinoc
Ifugao
Department of Information and Communications Technology - CAR Percent Completed
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
314163312 Improvement of Balangbang FMR along Sitio Proper, Balangbang, Mayoyao
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
322853948 BANGTINON SIP
Ifugao
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
326883996 CONSTRUCTION OF PULITANG-MUTUK FMR at Barangay Wangwang
Ifugao
Department of the Interior and Local Government - CAR percent completed
(Cumulative)
Target: 0
Actual: 100 Expenditure: Release:0 Obligation:0
0
327600208 Amduntog Attaban CIS
Ifugao
National Irrigation Administration - CAR 100% Completed
(default)
Target: 80
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
346720589 Hapid IS
Ifugao
National Irrigation Administration - CAR 100% completed
(Cumulative)
Target: 0
Actual: 100 Expenditure:0 Release:6360104 Obligation:46568851.94
0
351914908 Tiger Grass Broom Making Business for the Ayangan IPs/ICCs of Eastern Lagawe
Ifugao
National Commission on Indigenous Peoples - CAR no of projects implemented
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:216000
0
356430475 IMPROVEMENT OF PATHWAY AT SITIO LINOG, Mayoyao Proper, Mayoyao
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
374300008 TAMMANGAN PAH-DUAN SIP
Ifugao
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
387260460 BANGHALLAN HAGUD SIP
Ifugao
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
399572822 Rehabilitation/ Enhancement of Library Building
Ifugao
Ifugao State University 100 % completion
(Cumulative)
Target: 0
Actual: 100 Expenditure: Release:15985167.51 Obligation:15985167.51
0
419543176 Managed Internet Service - VSAT Network Services for Quarantine Centers and Medical Facilities - Hapao Brgy Hall, Hungduan
Ifugao
Department of Information and Communications Technology - CAR Percent completed
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
430766473 Regular and Frontloaded Livelihood Projects
Ifugao
Department of Social Welfare and Development - CAR No. of Households provided with livelihood modalities
(Cumulative)
Target: 34
Actual: 78 Expenditure:0 Release:0 Obligation:1170000
122.22222222222
451770486 Chalog Alinog SIP
Ifugao
National Irrigation Administration - CAR 100% Completed
(default)
Target: 89
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
458920962 Constructions of Level II Water System at Talabing, Sitio Babalak, Tawangan, Kabayan, Benguet to Sitio Dua-an, Poblacion, Tinoc
Ifugao
Department of Social Welfare and Development - CAR 100% completion
(default)
Target: 0
Actual: 0 Expenditure:0 Release:0 Obligation:0
0
460278163 Hapid IS
Ifugao
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
473497690 REPAIR/IMPROVEMENT OF MAYOYAO RHU
Ifugao
Department of Health - CAR Percent completed
(Cumulative)
Target: 100
Actual: 100 Expenditure: Release:1000000 Obligation:998887.15
25
476700050 S&T Intervention for Improved Market Competitiveness of Zairiz Bakery & Mini Store
Ifugao
Department of Science and Technology - CAR No. of firms assisted
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
482287184 Hapid IS
Ifugao
National Irrigation Administration - CAR 100% completed, 250 has area Restored
(Cumulative)
Target: 5
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
482508028 IMPROVEMENT ABABBA-TUMMINGEB ROAD at Barangay Tukukan,Tinoc
Ifugao
Department of the Interior and Local Government - CAR percent completed
(Cumulative)
Target: 0
Actual: 100 Expenditure: Release:0 Obligation:0
0
485444884 Technology Upgrading of Production Process and Facility of BMK Bakery (Phase II)
Ifugao
Department of Science and Technology - CAR Number of firms assisted
(default)
Target: 0
Actual: 0 Expenditure:0 Release:0 Obligation:0
0
501800976 Managed Internet Service - VSAT Network Services for Quarantine Centers and Medical Facilities - Talboc Brgy Hall, Mayoyao
Ifugao
Department of Information and Communications Technology - CAR Percent completed
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
509907762 INSTALLATION OF SOLAR STREETLIGHTS, Poblacion, Mayoyao
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
515080961 Social Pension Program
Ifugao
Department of Social Welfare and Development - CAR Percentage of beneficiaries using social pension to augment daily living subsistence and medical needs
(default)
Target: 17289
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
526050579 Improvement of Makalawag to Hingalan Community Drainage Canal, Amduntog
Ifugao
Department of Social Welfare and Development - CAR 100% completion
(default)
Target: 0
Actual: 100 Expenditure:0 Release:105897.08 Obligation:106176
0
532441356 IMPROVEMENT OF ADUYONGAN FMR ALONG SITIO PIDLAN, Aduyongan, Mayoyao
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
539495758 NATTUM TUBOG SIP PH. III
Ifugao
National Irrigation Administration - CAR 100% completed, 12 has area generated
(Cumulative)
Target: 0
Actual: 100 Expenditure:5863.82 Release:6509232 Obligation:6515095.63
0
555938712 Damag River Munggayang Manaot SIP
Ifugao
National Irrigation Administration - CAR 100% Completed
(default)
Target: 43
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
566448088 Sitio's Tikidan to Saddle Single Phase Line Extension, Ubuag, Hingyon
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
575971704 Improvement/Widening Of Majlong Access Road, Majlong, Aguinaldo
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
577133014 Hapid IS
Ifugao
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
578519920 Continuation of CIS at Guliwad, Bokiawan, Kiangan
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
583924289 Improvement of Langayan FMR Along Sitio Awayan, Langayan, Mayoyao
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
592082471 Baley Uleg Uyok SIP
Ifugao
National Irrigation Administration - CAR 100% Completed
(default)
Target: 59
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
623685365 CONSTRUCTION OF PULITANG-ACAK-BINGBING FMR at Barangay Binablayan, Tinoc
Ifugao
Department of the Interior and Local Government - CAR percent completed
(Cumulative)
Target: 0
Actual: 100 Expenditure: Release:0 Obligation:0
0
629623490 Improvement of Sitio Alatbang Pathway, Bato-Alatbang, Mayoyao
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
638772759 Managed Internet Service - VSAT Network Services for Quarantine Centers and Medical Facilities - Caba Brgy Hall, Lagawe
Ifugao
Department of Information and Communications Technology - CAR Percent completed
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
643349155 ALFONSO LISTA PIP
Ifugao
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 60
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
650696604 Completion Of Tuayong Day Care Center, Butac, Aguinaldo
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
664192442 Establishment of Technology Based Enterprise for Iron Works & Variety Shop
Ifugao
Department of Science and Technology - CAR No. of firms assisted
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
667035194 REPAIR/IMPROVEMENT/UPGRADING OF IFUGAO GENERAL HOSPITAL
Ifugao
Department of Health - CAR Percent completed
(Cumulative)
Target: 100
Actual: 100 Expenditure: Release:4000000 Obligation:3257095.22
-0.66666666666667
676884408 Installation of Solar Street Lights at Namulditan, Hingyon
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
684486880 Concreting of Barangay Road at Sitio Kiluguwan, Lingay, Kiangan
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
694708435 DAMAG RIVER MUNGGAYANG MANAOT SIP PH. IV (REBID)
Ifugao
National Irrigation Administration - CAR 100% completed, 50 has area Restored
(Cumulative)
Target: 54
Actual: 25 Expenditure:13907.66 Release:16573391 Obligation:46191684.52
-58.620689655172
728303917 Direct Internet Subscription for the IP Transport Municipal in HINGYON
Ifugao
Department of Information and Communications Technology - CAR Percent completed
(Cumulative)
Target: 100
Actual: 0 Expenditure: Release:0 Obligation:0
-19.161676646707
736781801 Construction of Slope Protection along Brgy. Hall Play Ground at Sitio Molong, Alimit, Mayoyao
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
749840706 Upgrading of Production Facility of Tonton's Iron Works and Welding Shop (Phase II)
Ifugao
Department of Science and Technology - CAR No. of firms assisted
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
750178313 Improvement of Sitio Tagguiyang - Sitio Banao Pathway, Banhal, Mayoyao
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
752049693 PUGO CIS
Ifugao
National Irrigation Administration - CAR 100% completed, 8 has area Restored
(Cumulative)
Target: 43
Actual: 100 Expenditure:0 Release:759071 Obligation:1331702.95
40
778131514 Picdot Hapao CIS
Ifugao
National Irrigation Administration - CAR 100% Completed
(default)
Target: 30
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
800680660 Upgrading of Production Facility of Regidor's Tailoring
Ifugao
Department of Science and Technology - CAR No. of firms assisted
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
803709874 Rehabilitation of Sitio Bannao-Maalig to Sitio Proper Bolog Level 1 Water Pipelines and Construction of Water Tank, Bolog, Kiangan
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
814151568 Managed Internet Service - VSAT Network Services for Quarantine Centers and Medical Facilities - Eheb Brgy Hall, Tinoc
Ifugao
Department of Information and Communications Technology - CAR Percent completed
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
818764983 Concreting of Barangay Road from Sitio Anapawon to Sitio Imbay-o, Dalligan, Kiangan
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
820741368 Improvement of Gumhang Mushroom Production Building (2nd Floor) to be utilized as Isolation Facility
Ifugao
Department of Social Welfare and Development - CAR 100% completion
(default)
Target: 0
Actual: 100 Expenditure:0 Release:86829.91 Obligation:87271
0
827680943 Hapid IS (Additional)
Ifugao
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
848168917 Social Pension Program
Ifugao
Department of Social Welfare and Development - CAR Number of beneficiaries served
(Maintained)
Target: 17288
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
848647351 IMPROVEMENT OF CHAYA LEVEL II WATER SYSTEM, Chaya, Mayoyao
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
869231195 Construction of Community Learning Center
Ifugao
Ifugao State University 100 % completion
(Cumulative)
Target: 0
Actual: 100 Expenditure: Release:2197593 Obligation:2197593
0
877946404 Improvement of Viewpoint-San Fernando Farm to Market Road
Ifugao
Department of Agriculture - CAR km constructed
(Cumulative)
Target: 4.6
Actual: 4.6 Expenditure: Release:112444200 Obligation:112444200
-0.72463768115942
886849194 Scholarship Program-RESP
Ifugao
Technical Education and Skills Development Authority - CAR number of enrolled, number of graduates
(default)
Target: 225
Actual: 300 Expenditure: Release:2073120 Obligation:0
33.333333333333
890402152 Direct Internet Subscription for the IP Transport Municipal in KIANGAN
Ifugao
Department of Information and Communications Technology - CAR Percent completed
(Cumulative)
Target: 100
Actual: 0 Expenditure: Release:0 Obligation:0
-59.880239520958
912941319 Upgrading of BS Nursing Laboratory
Ifugao
Ifugao State University 100 % completion
(Cumulative)
Target: 0
Actual: 100 Expenditure: Release:4689952 Obligation:4689952
0
957930751 Improvement of Upper Haliap to Dinucao FMR
Ifugao
Department of Social Welfare and Development - CAR 100% completion
(default)
Target: 0
Actual: 100 Expenditure:0 Release:82312.32 Obligation:85615
0
962032836 UPGRADING OF NANHABTAN TO BANGA at Barangay Pula, Asipulo
Ifugao
Department of the Interior and Local Government - CAR percent completed
(Cumulative)
Target: 0
Actual: 100 Expenditure: Release:0 Obligation:0
0
970588244 Construction of Slope Protection at Sitio Awwa, Bangtinon
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
983842737 REPAIR/IMPROVEMENT/UPGRADING OF MAYOYAO DISTRICT HOSPITAL
Ifugao
Department of Health - CAR Percent completed
(Cumulative)
Target: 100
Actual: 100 Expenditure: Release:4000000 Obligation:3984391.66
0
999423213 IMPROVEMENT OF PAH-IGAN LUBBAN-TUHDAW FMR at Barangay Gumhang, Tinoc
Ifugao
Department of the Interior and Local Government - CAR percent completed
(Cumulative)
Target: 0
Actual: 100 Expenditure: Release:0 Obligation:0
0
1014065883 Improvement of Witig- Panuupan FMR (Intukil Section), Nungawa
Ifugao
Department of Social Welfare and Development - CAR 100% completion
(default)
Target: 0
Actual: 100 Expenditure:0 Release:0 Obligation:38076
0
1019064071 REPAIR/IMPROVEMENT/UPGRADING OF IBAYONG BHS
Ifugao
Department of Health - CAR Percent completed
(Cumulative)
Target: 100
Actual: 100 Expenditure: Release:500000 Obligation:478828.39
9.0909090909091
1026827604 IMPROVEMENT OF BUNINAN FMR ALONG SITIO HUJU, Buninan, Mayoyao
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1037580517 Managed Internet Service - VSAT Network Services for Quarantine Centers and Medical Facilities - Panopdopan District Hospital, Lamut
Ifugao
Department of Information and Communications Technology - CAR Percent completed
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
1041081220 Improvement of Level II Water System at Sitio Palabayan and Proper Ap-apid
Ifugao
Department of Social Welfare and Development - CAR 100% completion
(default)
Target: 0
Actual: 100 Expenditure:0 Release:64811.94 Obligation:69704
0
1042399179 Managed Internet Service - VSAT Network Services for Quarantine Centers and Medical Facilities - Asipulo NHS
Ifugao
Department of Information and Communications Technology - CAR Percent completed
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
1045229498 Supplemental Feeding Program
Ifugao
Department of Social Welfare and Development - CAR Number of Children Served
(Maintained)
Target: 6869
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1063266270 Pantal Health Center Improvement (2nd floor to serve as Isolation/Quarantine Facility)
Ifugao
Department of Social Welfare and Development - CAR 100% completion
(default)
Target: 0
Actual: 100 Expenditure:0 Release:83576.88 Obligation:88808
0
1063508193 Upgrading of the Production Facilities of Hannies Cut & Sew for Improved Quality and Productivity
Ifugao
Department of Science and Technology - CAR Number of firms assisted
(default)
Target: 0
Actual: 0 Expenditure:0 Release:0 Obligation:0
0
1076461184 HAPID IS
Ifugao
National Irrigation Administration - CAR 100% Completed
(default)
Target: 25
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1097788283 Sustainable Livelihood Program
Ifugao
Department of Social Welfare and Development - CAR Total number of households who received seed capital fund and total number of households trained (Seed Capital Funds, Skills Training, and CBLA)
(Maintained)
Target: 480
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1099053219 PARTNERSHIP ON SUSTAINABLE LIVING PROJECT
Ifugao
Department of Social Welfare and Development - CAR No. of Households provided with livelihood modalities
(Cumulative)
Target: 0
Actual: 0 Expenditure:0 Release:0 Obligation:0
0
1101733279 Equipment Upgrading of Balubal Sash and Furniture Shop (Phase II)
Ifugao
Department of Science and Technology - CAR No. of firms assisted
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
1121929205 Direct Internet Subscription for the IP Transport Municipal in Banaue
Ifugao
Department of Information and Communications Technology - CAR Percent Completed
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
1126517273 Improvement of Barangay Anao Drainage Canal at Sitio Mangabat, Anao
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1128222195 REPAIR/IMPROVEMENT/UPGRADING OF BANAUE RHU
Ifugao
Department of Health - CAR Percent completed
(Cumulative)
Target: 100
Actual: 100 Expenditure: Release:1000000 Obligation:966933.43
7.1428571428571
1128835265 CONSTRUCTION OF DRAINAGE CANAL ALONG THE BARANGAY HEALTH STATION, Tulaed, Mayoyao
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1136785014 Continuation of Sitio Balunglung FMR, Hucab, Kiangan
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1150626597 IMPROVEMENT OF 3 UNITS MAPAWOY CIS, Mapawoy, Mayoyao
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1150667491 Improvement of BHS- Habangan Access Road
Ifugao
Department of Social Welfare and Development - CAR 100% completion
(default)
Target: 0
Actual: 100 Expenditure:0 Release:20028.28 Obligation:36108
0
1154277694 Improvement/Concreting Of Namnama-Halag-Itab Fmr, Halag, Aguinaldo
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1157969736 IMPROVEMENT OF LIGO-KHOHANG CIS, Chumang, Mayoyao
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1161519802 Puhing Ilat CIS (Fhukig CIS)
Ifugao
National Irrigation Administration - CAR 100% Completed
(default)
Target: 85
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1172776380 Improvement of Sitio Ambuwaya to Sitio Bae FMR, Ambabag, Kiangan
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1191013879 Construction of Sitio Nangpilan Hanging Bridge, Baguinge, Kiangan
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1198058975 Construction Of Awayan Isolation Facility, Awayan, Aguinaldo
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1203238044 Managed Internet Service - VSAT Network Services for Quarantine Centers and Medical Facilities - Julongan Brgy Hall, Kiangan
Ifugao
Department of Information and Communications Technology - CAR Percent completed
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
1218677836 UPGRADING OF NAMAL PROPER TO BUDU FMR at Barangay Namal, Asipulo
Ifugao
Department of the Interior and Local Government - CAR percent completed
(default)
Target: 0
Actual: 100 Expenditure: Release:0 Obligation:0
0
1248218953 Pole CIS
Ifugao
National Irrigation Administration - CAR 100% Completed
(default)
Target: 35
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1252396179 Upgrading of Production Facilities and Product Quality Improvement of 2D's Mini Bakery
Ifugao
Department of Science and Technology - CAR No. of firms assisted
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
1256477797 Construction of Level II Water System at Proper Tulludan
Ifugao
Department of Social Welfare and Development - CAR 100% completion
(default)
Target: 0
Actual: 100 Expenditure:0 Release:20651.98 Obligation:60322
0
1266922172 PUGO CIS
Ifugao
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1282709143 Provision of Cash Grant to 4Ps beneficiaries including the amount of Rice Subsidy
Ifugao
Department of Social Welfare and Development - CAR Number of Household beneficiaries provided with Conditional Cash Grants
(Maintained)
Target: 9433
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1299707874 Improvement/Opening Of Posnaan Access Road, Posnaan, Aguinaldo
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1313520997 Installation of Solar Street Lights at Piwong, Hingyon
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1326048369 TAMMANGAN PAH-DUAN SIP
Ifugao
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1329708173 Direct Internet Subscription for the IP Transport Municipal in HUNGDUAN
Ifugao
Department of Information and Communications Technology - CAR Percent completed
(default)
Target: 29
Actual: 0 Expenditure: Release:0 Obligation:0
-100
1341154330 Refurbishing of BHS for Effective and Efficient Delivery of Health Services, Oong
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1347233383 Direct Internet Subscription for the IP Transport Municipal in Lagawe
Ifugao
Department of Information and Communications Technology - CAR Percent Completed
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
1358247763 Construction of Lacdag Road Box Culvert, Julongan, Kiangan
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1361635012 Upgrading of H&H Aluminum and Welding Fabrication Services
Ifugao
Department of Science and Technology - CAR No. of firms assisted
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
1369381364 Construction of PCCP at Sitio Naghudcha, Halag, Aguinaldo
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1371416262 HUMALOPHOP SIP
Ifugao
National Irrigation Administration - CAR 100% completed, 9 has area Restored
(Cumulative)
Target: 63
Actual: 33 Expenditure:421975.45 Release:928346 Obligation:2813169.64
-46.875
1398509864 Widening of Nalbu FMR at Sitio Gulon, Nalbu, Mayoyao
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1410405341 Direct Internet Subscription for the IP Transport Municipal in LAMUT
Ifugao
Department of Information and Communications Technology - CAR Percent completed
(Cumulative)
Target: 100
Actual: 0 Expenditure: Release:0 Obligation:0
-59.880239520958
1419948774 REPAIR/IMPROVEMENT OF TINOC RHU
Ifugao
Department of Health - CAR Percent completed
(Cumulative)
Target: 100
Actual: 100 Expenditure: Release:1000000 Obligation:998368.46
76.691729323308
1422749447 Direct Internet Subscription for the IP Transport Municipal in Lamut
Ifugao
Department of Information and Communications Technology - CAR Percent Completed
(Cumulative)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
1427101429 Improvement of Ubao - Manaot FMR
Ifugao
Department of Agriculture - CAR number of kilometer constructed
(Cumulative)
Target: 4.11
Actual: 1.14 Expenditure: Release:163579111.98 Obligation:163579111.98
-63.945578231293
1428082233 Managed Internet Subscription for IFUGAO
Ifugao
Department of Information and Communications Technology - CAR Percent completed
(Cumulative)
Target: 100
Actual: 0 Expenditure: Release:0 Obligation:0
-59.171597633136
1442814866 UPGRADING OF CAMANDAG TO CAWAYAN FMR at Barangay Camandag, Asipulo
Ifugao
Department of the Interior and Local Government - CAR percent completed
(Cumulative)
Target: 0
Actual: 100 Expenditure: Release:0 Obligation:0
0
1454105690 Uud SIP
Ifugao
National Irrigation Administration - CAR 100% Completed
(default)
Target: 89
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1455722295 Improvement of Banao Pathway along Sitio Proper, Banao, Mayoyao
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1466613553 REPAIR/IMPROVEMENT/UPGRADING OF BANHAL BHS
Ifugao
Department of Health - CAR Percent completed
(Cumulative)
Target: 100
Actual: 100 Expenditure: Release:500000 Obligation:499390.7
-6
1505421882 DAMAG RIVER MUNGGAYANG MANAOT SIP PH. IV (REBID)
Ifugao
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 45
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1506774590 Construction/Completion of Slope Protection
Ifugao
Department of the Interior and Local Government - CAR percent completed
(Cumulative)
Target: 75
Actual: 0 Expenditure: Release:0 Obligation:0
-100
1508199886 BUYO SIP
Ifugao
National Irrigation Administration - CAR 100% completed, 12 has area generated
(Cumulative)
Target: 0
Actual: 100 Expenditure:12231.8 Release:788253 Obligation:810313.38
0
1511833810 Extension of Lohob and Dotal CIS, Tuplac, Kiangan
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1512971696 NATTUM TUBOG SIP PH. III
Ifugao
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1519846446 Construction of PCCP at Sitio Chayag, Majlong, Aguinaldo
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1528630069 Pulitang Tang-il CIS
Ifugao
National Irrigation Administration - CAR 100% Completed
(default)
Target: 35
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1532966502 Direct Internet Subscription for the IP Transport Municipal in ASIPULO
Ifugao
Department of Information and Communications Technology - CAR Percent completed
(Cumulative)
Target: 100
Actual: 0 Expenditure: Release:0 Obligation:0
-59.880239520958
1534212333 Completion Of Hinalong Day Care Center, Talite, Aguinaldo
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1536395283 Completion of Quarantine Facility
Ifugao
Department of Social Welfare and Development - CAR 100% completion
(default)
Target: 0
Actual: 100 Expenditure:0 Release:71310.82 Obligation:72729
0
1541270177 Social Pension Program
Ifugao
Department of Social Welfare and Development - CAR Number of indigent senior citizens provided with Social Pension
(Maintained)
Target: 16320
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1561107045 UPGRADING OF MALOY TO NUNHAPANG FMR at Barangay Cawayan, Asipulo
Ifugao
Department of the Interior and Local Government - CAR percent completed
(Cumulative)
Target: 0
Actual: 100 Expenditure: Release:0 Obligation:0
0
1562420726 Road Opening at Sitio Anuling to Sitio Nabhingan, Bitu
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1578655176 Installation Of Ubao Solar Street Lights, Ubao, Aguinaldo
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1583244007 Upgrading of Bros Welding Shop (Phase II)
Ifugao
Department of Science and Technology - CAR No. of firms assisted
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
1586790287 Ticom Buy-o CIS
Ifugao
National Irrigation Administration - CAR 100% Completed
(default)
Target: 40
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1588819550 Improvement of Antipolo- Pengsiwan Access Road
Ifugao
Department of Social Welfare and Development - CAR 100% completion
(default)
Target: 0
Actual: 100 Expenditure:0 Release:19121.25 Obligation:82309
0
1598686564 CONSTRUCTION OF SITIO ABAGONG PATHWAY, Nattum Mayoyao
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1613780973 BANGTINON SIP
Ifugao
National Irrigation Administration - CAR 100% completed, 4 has area Restored
(Cumulative)
Target: 0
Actual: 76 Expenditure:385880.19 Release:2572535 Obligation:2572534.61
0
1634713617 Lomanag Banawol CIS
Ifugao
National Irrigation Administration - CAR 100% Completed
(default)
Target: 80
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1638530344 TAMMANGAN PAH-DUAN SIP
Ifugao
National Irrigation Administration - CAR 100% completed, 6 has area generated
(Cumulative)
Target: 0
Actual: 100 Expenditure:13902.36 Release:1404138 Obligation:1418040.3
0
1646845574 TAMMANGAN PAH-DUAN SIP
Ifugao
National Irrigation Administration - CAR 100% completed, 6 has area Restored
(Cumulative)
Target: 0
Actual: 0 Expenditure:0 Release:0 Obligation:0
0
1694382958 REPAIR/IMPROVEMENT/UPGRADING OF UHAJ BHS
Ifugao
Department of Health - CAR Percent completed
(Cumulative)
Target: 100
Actual: 100 Expenditure: Release:500000 Obligation:478786.69
7.1428571428571
1696672138 Improvement/Concreting Of Ta-Ang Access Road, Ta-Ang, Aguinaldo
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1708657431 Construction of Anaba-Ducligan-Banao Farm to Market Road
Ifugao
Department of Agriculture - CAR number of kilometer constructed
(Cumulative)
Target: 8
Actual: 8 Expenditure: Release:221400900 Obligation:221400900
-0.84388185654008
1716714545 ALFONSO LISTA PIP
Ifugao
National Irrigation Administration - CAR 100% completed, 1500 has area generated
(Cumulative)
Target: 45
Actual: 69 Expenditure:27644272.89 Release:94402041 Obligation:171640074.6
2
1717548232 CONSTRUCTION OF SLEDGE TRAIL ALONG SITIO CHONGLA, Inwaloy, Mayoyao
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1726881894 Improvement of Pinnang-Pigku and Lichu CIS, Guinihon, Mayoyao
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1729951750 Improvement of FMR at Sitio Bocoh, Mompolia
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1765103857 CONCRETING OF MANAAN TO LAB-ONG FMR at Barangay Luhong, Tinoc
Ifugao
Department of the Interior and Local Government - CAR percent completed
(Cumulative)
Target: 0
Actual: 100 Expenditure: Release:0 Obligation:0
0
1768384763 Upgrading of Production Facilities & Equipment of Nesalyn Bakery (Phase II)
Ifugao
Department of Science and Technology - CAR Number of firms assisted
(default)
Target: 0
Actual: 0 Expenditure:0 Release:0 Obligation:0
0
1770315683 IMPROVEMENT OF CURB AND GUTTER ALONG SITIO PROPER, Palaad, Mayoyao
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1774182475 Construction of Drainage Canal From Sitio Iyagan to Sitio Boble, Poblacion, Hingyon
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1787482994 Site Development
Ifugao
Department of Environment and Natural Resources - CAR No. of Assisting Professionals Hired
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
1788725605 Rerouting and Re-construction of Sitio Linda Drainage System, Poblacion, Kiangan
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1799261575 Provision of Cash Grants including the amount of Rice Subsidy
Ifugao
Department of Social Welfare and Development - CAR Number of Household beneficiaries provided with Conditional Cash Grants
(Maintained)
Target: 10096
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1823373064 Improvement Of Naumog-Lupao-Lower Jacmal Potable Water System, Jacmal, Aguinaldo
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1840559928 Wanitan SIP
Ifugao
National Irrigation Administration - CAR 100% Completed
(default)
Target: 90
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1842164910 Extension of Lohob and Dotal CIS, Pindongan, Kiangan
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1857309857 Construction of Academic Building-Phase II
Ifugao
Ifugao State University Percentage Completion
(default)
Target: 25
Actual: 10 Expenditure: Release:0 Obligation:0
-60
1872212676 Installation of Solar Streetlights in Various Barangays, Posnaan, Aguinaldo
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1875523870 Repair/Improvement of Ifugao General Hospital (Phase VII)
Ifugao
Department of Health - CAR Percent Completed
(default)
Target: 50
Actual: 97 Expenditure: Release:0 Obligation:0
94
1883502554 Installation Of Bunhian Solar Street Lights, Bunhian, Aguinaldo
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1892677790 Continuation of PCCP at Sitio Bayninan, Nagacadan, Kiangan
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1895999024 Hahlin CIS
Ifugao
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0 Expenditure:0 Release:0 Obligation:0
0
1896692583 Aliguyon CIS
Ifugao
National Irrigation Administration - CAR 100% Completed
(default)
Target: 50
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1933425472 HAPID IS
Ifugao
National Irrigation Administration - CAR 100% Completed
(default)
Target: 25
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1951081952 Construction of Level II Water System at Sitio Tongolan and Kay-ang
Ifugao
Department of Social Welfare and Development - CAR 100% completion
(default)
Target: 0
Actual: 100 Expenditure:0 Release:24554.71 Obligation:39905
0
1955301381 Tugaw- Naliwhan SIP
Ifugao
National Irrigation Administration - CAR 100% Completed
(default)
Target: 50
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1956529303 HAPID IS
Ifugao
National Irrigation Administration - CAR 100% Completed
(default)
Target: 25
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1969580825 Improvement/Concreting Of Majlong-Buwag-Itab Fmr, Buwag, Aguinaldo
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1975743320 Sustainable Livelihood Program
Ifugao
Department of Social Welfare and Development - CAR Total number of households who received seed capital fund and total number of households trained (Seed Capital Funds, Skills Training, and CBLA)
(Maintained)
Target: 111
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1977850935 Pula (Banghalan) SIP
Ifugao
National Irrigation Administration - CAR 100% Completed
(default)
Target: 80
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1989306874 Road Improvement at Sitio Boco-Liyang-Ikidul, Umalbong
Ifugao
Department of Social Welfare and Development - CAR 100% completion
(Cumulative)
Target: 0
Actual: 100 Expenditure:0 Release:386242.19 Obligation:386242
0
1996269468 BUYO SIP
Ifugao
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
1998991256 BANGHALLAN HAGUD SIP
Ifugao
National Irrigation Administration - CAR 100% completed, 5 has area Restored
(Cumulative)
Target: 0
Actual: 100 Expenditure:3016.91 Release:1349249 Obligation:1352265.78
0
2019949872 Improvement of Access Road Along Mompolia Elementary School, Mompolia
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
2039248478 Tatawang CIS
Ifugao
National Irrigation Administration - CAR 100% Completed
(default)
Target: 39
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
2044400249 S&T Intervention on Corn Processing for Poultry of MJM Grains for market competitiveness
Ifugao
Department of Science and Technology - CAR No. of firms assisted
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0
2074840192 IMPROVEMENT OF SITIO MAPIPIWONG TO MAUGAW COMMUNAL IRRIGATION SYSTEM, Talboc, Mayoyao
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
2092142798 Improvement of the Product Quality and Productivity through Upgrading of the Production Equipment of Tri-Star Enterprises (Phase II)
Ifugao
Department of Science and Technology - CAR Number of firms assisted
(default)
Target: 0
Actual: 0 Expenditure:0 Release:0 Obligation:0
0
2092717976 Construction of Duit Elementary School Slope Protection, Duit, Kiangan
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
2094316839 Construction of Crime Laboratory Building
Ifugao
Ifugao State University 100 % completion
(default)
Target: 25
Actual: 24 Expenditure: Release:0 Obligation:0
-4
2116260447 IMPROVEMENT OF SITIO UPAG CIS, Epeng, Mayoyao
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
2119104317 Direct Internet Subscription for the IP Transport Municipal in MAYOYAO
Ifugao
Department of Information and Communications Technology - CAR Percent completed
(Cumulative)
Target: 100
Actual: 0 Expenditure: Release:0 Obligation:0
-57.803468208092
2121642607 Widening of Maga Sledge Trail, Maga, Mayoyao
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
2123766682 DAMAG RIVER MUNGGAYANG MANAOT SIP PH. IV (REBID)
Ifugao
National Irrigation Administration - CAR 100% completed, 50 has area generated
(Cumulative)
Target: 55
Actual: 0 Expenditure:0 Release:0 Obligation:0
-87.912087912088
2130474217 Construction/Opening Of Saddle-Paguid-Id-Lutupan-Hegwang Fmr, Galonogon, Aguinaldo
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
2138830701 Improvement/Concreting Of Monggayang-Pinto Fmr, Mongayang, Aguinaldo
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 75
Actual: 0 Expenditure:0 Release:0 Obligation:0
-100
2139511120 Policy Initiative for Watershed Management
Ifugao
Department of Environment and Natural Resources - CAR No. of Meetings/ Workshops Conducted
(default)
Target: 0
Actual: 0 Expenditure: Release:0 Obligation:0
0