Qtr:1 NON-DPWH Project Performance

Filter by:
Project ID Project Name Agency Ouput Indicator Physical Performance Slippage(%)
30271288 Improving Production Efficiency of Denden's Furniture and Handicraft through Upgrading
Benguet
Department of Science and Technology - CAR No. of firms assisted
(default)
Target: 1
Actual: 1
Expenditure:
Release:0
Obligation:0
0
32875009 Improvement of Barangay Hall, Twin Peaks, Tuba
Benguet
Provincial Local Government of Benguet percent
(default)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
52045756 Science, Technology, Innovation for Berry Benj Wines and jams
Benguet
Department of Science and Technology - CAR Number of firms assisted
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
58426821 Construction of Gymnasium at Ebbes Elementary School, Banengbeng, Sablan
Benguet
Provincial Local Government of Benguet percent completed
(Cumulative)
Target: 99
Actual: 99
Expenditure:
Release:0
Obligation:0
0
66410164 Improvement Of the Road Cut Section along the Dalicno Barangay Road, Ampucao, Itogon
Benguet
Provincial Local Government of Benguet percent completed
(Cumulative)
Target: 79.8
Actual: 100
Expenditure:
Release:0
Obligation:0
25.31328320802
97284484 Managed Internet Service - VSAT Network Services for Quarantine Centers and Medical Facilities - Buguias Man-Atong Evacuation Center Brgy. Baculongan Sur
Benguet
Department of Information and Communications Technology - CAR Percent Completed
(Cumulative)
Target: 72
Actual: 72
Expenditure:
Release:0
Obligation:0
0
118817842 Continuing the Productivity Enhancement of Reinzi Natania Farm (Phase 2)
Benguet
Department of Science and Technology - CAR Number of firms assisted
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
144261243 a) Construction of a (Covid-19) Isolation Building Facility; b) Construction of an Isolation facility of Northern Benguet District Hospital, Abatan, Buguias, Benguet (additional - Phase II); c) Construction of an Isolation Facility of Northern Benguet District Hospital, Abatan, Buguias (Phase II - Additional)
Benguet
Provincial Local Government of Benguet percent
(default)
Target: 38
Actual: 0
Expenditure:
Release:0
Obligation:0
-100
158609092 DIGITAL WORKFORCE - RESEARCH AND EVALUATION: Implement the Apprenticeship Program
Benguet
Department of Information and Communications Technology - CAR # of students accepted in the program
(default)
Target: 5
Actual: 0
Expenditure:
Release:0
Obligation:0
-100
162442138 Impvt. Of Cotcot Brgy. Rd, Poblacion, Kabayan
Benguet
Provincial Local Government of Benguet percent completed
(Cumulative)
Target: 15
Actual: 60
Expenditure:
Release:0
Obligation:0
300
182956711 Tufil PIP
Benguet
National Irrigation Administration - CAR percent completed
(Cumulative)
Target: 100
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
209513945 Baugan - Cayapas CIP (Phase II)
Benguet
National Irrigation Administration - CAR percent completed
(Cumulative)
Target: 100
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
220443117 Galayap CIP
Benguet
National Irrigation Administration - CAR 100% Completed 2,500.00
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
223514565 Betwag PIP
Benguet
National Irrigation Administration - CAR percent completed
(Cumulative)
Target: 100
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
230314315 Sitio Sookan SIP
Benguet
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
232672657 Baculongan Norte PIS
Benguet
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
232935035 TABA-AO BHS
Benguet
Department of Health - CAR PERCENT COMPLETED
(default)
Target: 50
Actual: 0
Expenditure:
Release:0
Obligation:0
-100
245077796 Posposok Tilay SIP
Benguet
National Irrigation Administration - CAR 100 % Completed, 8 ha area generated
(Cumulative)
Target: 2
Actual: 5
Expenditure:2943260.53
Release:1667570
Obligation:3263947.06
150
246806562 Betwag PIP
Benguet
National Irrigation Administration - CAR 100 % Completed, 3 ha area generated
(Cumulative)
Target: 2
Actual: 10
Expenditure:253595.97
Release:297573
Obligation:1403310.73
400
253097338 Bayabas CIS
Benguet
National Irrigation Administration - CAR 100 % Completed, 9 units Canal Structures, 3.22 km HDPE pipe
(Cumulative)
Target: 2
Actual: 2
Expenditure:435597.55
Release:1357871
Obligation:2297194.42
0
267310518 Extension of Maintenance of DICT fiber optic cable (FOC) in Baguio City and Benguet
Benguet
Department of Information and Communications Technology - CAR number of agencies connected to the Government Network
(default)
Target: 69
Actual: 69
Expenditure:
Release:0
Obligation:0
0
268919292 Construction of Ampusongan Flood Control, Ampusongan, Bakun
Benguet
Provincial Local Government of Benguet percent
(default)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
273235904 REPAIR OF ELEMENTARY LABORATORY SCHOOL MAIN BUILDING, HOME ECONOMICS & SCIENCE AND HEALTH BUILDING
Benguet
Benguet State University PERCENTAGE COMPLETION
(Cumulative)
Target: 35
Actual: 13.97
Expenditure:
Release:0
Obligation:0
-60.085714285714
280245717 Bultot (Pulak) PIS
Benguet
National Irrigation Administration - CAR 100% Completion, Repair of Groundwater Pump irrigation System for 10 Farmer Beneficiaries
(Cumulative)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
284441000 Improvement along Longboy-Tacal FMR, Labueg, Kapangan
Benguet
Provincial Local Government of Benguet percent
(default)
Target: 8.5
Actual: 0
Expenditure:
Release:0
Obligation:0
-100
288971196 Renovation of Annex A Building for Dialysis Expansion at Benguet General Hospital, La Trinidad
Benguet
Provincial Local Government of Benguet percent
(default)
Target: 17.1
Actual: 0
Expenditure:
Release:0
Obligation:0
-100
294235266 Las-igan Creek - Mankayan Las-igan SIP (Phase II)
Benguet
National Irrigation Administration - CAR 100 % Completed, 11 ha area generated
(Cumulative)
Target: 2
Actual: 4
Expenditure:341019.81
Release:730952
Obligation:1820326.65
100
296895227 Const. of New Kapangan District Hospital (KDH) Building (Phase I)
Benguet
Provincial Local Government of Benguet percent completed
(Cumulative)
Target: 57.2
Actual: 79.52
Expenditure:
Release:0
Obligation:0
39.020979020979
297958294 Construction of Multi-Purpose Gym for Topdac Elementary School, Topdac, Atok
Benguet
Provincial Local Government of Benguet percent completed
(Cumulative)
Target: 30
Actual: 19.98
Expenditure:
Release:0
Obligation:0
-33.4
301195685 a. Impvt of FMR, EKIp(1M) b. Improvement of Proper Ekip FMR, Ekip, Bokod(4.4M)
Benguet
Provincial Local Government of Benguet percent completed
(Cumulative)
Target: 0
Actual: 84.19
Expenditure:
Release:0
Obligation:0
0
304185114 Kiweng Labey SIP
Benguet
National Irrigation Administration - CAR 100 % Completed, 12 ha area generated
(Cumulative)
Target: 2
Actual: 3
Expenditure:600524.59
Release:1629923
Obligation:3264822.23
50
334154257 BATUAN SIP PH II
Benguet
National Irrigation Administration - CAR 100% Completed, 88 ha Area Generated
(Cumulative)
Target: 1
Actual: 2
Expenditure:2278308.85
Release:3369551
Obligation:13865137.59
100
338708364 Construction of Isolation Facility of Northern Benguet District Hospital (NBDH) at Abatan, Buguias
Benguet
Provincial Local Government of Benguet percent completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
347014769 Kidpoan SIP
Benguet
National Irrigation Administration - CAR percent completed
(Cumulative)
Target: 100
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
358278773 Impvt. Along National Rd. Junction-Diboong-Bangao provincial Road
Benguet
Provincial Local Government of Benguet percent completed
(Cumulative)
Target: 81.52
Actual: 100
Expenditure:
Release:0
Obligation:0
22.669283611384
360570288 Balluay CIS
Benguet
National Irrigation Administration - CAR 100 % Completed, 6 units Canal Structures,5.27 km HDPE pipe
(Cumulative)
Target: 1
Actual: 1
Expenditure:87780.92
Release:1149734
Obligation:2342162.04
0
363560492 Lapalap River Dagdag SIS
Benguet
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
378535180 Equipment Upgrading of Ocataco Construction through S&T Intervention
Benguet
Department of Science and Technology - CAR Number of firms assisted
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
378802241 Opening and Improvement along Colong to Takayan-Nagawa-Nabuo FMR, Gambang Bakun From: Opening of Colong - Panakiyan - Bagtangan FMR, Gambang
Benguet
Provincial Local Government of Benguet percent completed
(Cumulative)
Target: 50
Actual: 27.25
Expenditure:
Release:0
Obligation:0
-45.5
380665909 Construction of School Building for Saguitlang Elementary School in Saguitlang, Tuba
Benguet
Provincial Local Government of Benguet percent completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
385509558 Demolition and reconstruction of Alternative Learning School(ALS)
Benguet
Provincial Local Government of Benguet percent completed
(Cumulative)
Target: 70.92
Actual: 70.92
Expenditure:
Release:0
Obligation:0
0
391296564 Repair/Improvement/Upgrading of Bakun RHU
Benguet
Department of Health - CAR Percent completed
(Cumulative)
Target: 100
Actual: 100
Expenditure:
Release:1000000
Obligation:781396.19
0
396855938 Construction of Gymnasium at Nalseb Elementary School, Ambassador, Tublay
Benguet
Provincial Local Government of Benguet percent completed
(Cumulative)
Target: 36.7
Actual: 36.7
Expenditure:
Release:0
Obligation:0
0
405378059 Managed Internet Subscription for BENGUET
Benguet
Department of Information and Communications Technology - CAR Percent completed
(default)
Target: 100
Actual: 100
Expenditure:
Release:0
Obligation:0
0
406145943 Construction of 3 Storey Provincial Health Services Multi-purpose Building, La Trinidad
Benguet
Provincial Local Government of Benguet percent completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
406885069 Construction of a 4 Storey Hospital Building, Phase 2 (3rd floor ICU, surgical ward, 4th floor prayer room, conference room and private room/suites
Benguet
Provincial Local Government of Benguet percent completed
(Cumulative)
Target: 76
Actual: 62.3
Expenditure:
Release:0
Obligation:0
-18.026315789474
417403706 B)Improvement of Aguyad-Lebbeng Barangay Road, Tadiangan, Tuba A)20% PDF 2021 (PN-21011)
Benguet
Provincial Local Government of Benguet percent completed
(Cumulative)
Target: 5
Actual: 65
Expenditure:
Release:0
Obligation:0
1200
424841376 CONSTRUCTION AND SITE IMPROVEMENT OF THE BENGUET AGRI-PINOY TRADING CENTER (BAPTC) MINIMAL PROCESSING AND PACKAGING FACILITY THROUGH DESIGN AND BUILD
Benguet
Benguet State University PERCENTAGE COMPLETION OF BUILDING FOR FOOD PROCESSING
(Cumulative)
Target: 100
Actual: 97.04
Expenditure:
Release:0
Obligation:0
-2.96
427189593 NAKIDOL CREEK POBLACION SIP PH. IV
Benguet
National Irrigation Administration - CAR percent completed
(Cumulative)
Target: 15
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
429612651 TSHI Acop PIP
Benguet
National Irrigation Administration - CAR percent completed
(Cumulative)
Target: 100
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
441790080 Social Pension Program
Benguet
Department of Social Welfare and Development - CAR Percentage of beneficiaries using social pension to augment daily living subsistence and medical needs
(default)
Target: 23687
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
443390737 Coruz-Bajating SIP
Benguet
National Irrigation Administration - CAR 100 % Completed, 11 ha area generated
(Cumulative)
Target: 2
Actual: 3
Expenditure:436527.87
Release:1452479
Obligation:4632273.19
50
447105900 Rehab of Alapang-Alno - Tuel Provincial Road, La Trinidad
Benguet
Provincial Local Government of Benguet Percent Completed
(Cumulative)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
467702501 Improvement of Multi-purpose Hall, Camp 4, Tuba
Benguet
Provincial Local Government of Benguet percent
(Cumulative)
Target: 19.83
Actual: 0
Expenditure:
Release:0
Obligation:0
-100
497981679 Improvement of Multi-Purpose Gym at Alno Kadorie Elementary School (E/S), Alno, La Trinidad
Benguet
Provincial Local Government of Benguet percent completed
(Cumulative)
Target: 55
Actual: 68.25
Expenditure:
Release:0
Obligation:0
24.090909090909
504412997 Repair/Improvement of Bayabas BHS
Benguet
Department of Health - CAR Percent completed
(Cumulative)
Target: 0
Actual: 100
Expenditure:
Release:850000
Obligation:690632.91
0
507991421 Improvement of Multi-Purpose Gym, Colalo, Mankayan
Benguet
Provincial Local Government of Benguet percent completed
(Cumulative)
Target: 25
Actual: 90
Expenditure:
Release:0
Obligation:0
260
508143923 Belong Pinanday SIP
Benguet
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
509053532 Improvement of Sookan-Gambang FMR, Bakun
Benguet
Provincial Local Government of Benguet percent
(default)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
518594484 CONSTRUCTION OF COLLEGE OF NURSING BUILDING
Benguet
Benguet State University PERCENTAGE COMPLETION
(Cumulative)
Target: 30
Actual: 33.69
Expenditure:
Release:22832782.4
Obligation:22832782.4
12.3
523394817 Pudong SIP (Phase II)
Benguet
National Irrigation Administration - CAR 100 % Completed, 2 ha area generated
(Cumulative)
Target: 1
Actual: 2
Expenditure:10079.25
Release:807902
Obligation:1377263.76
100
523800648 ESA and Cash for Work
Benguet
Department of Social Welfare and Development - CAR number of beneficiaries served
(default)
Target: 280
Actual: 280
Expenditure:3142750
Release:3142750
Obligation:3166250
0
525407463 construction of open Canal at Bolo-Tocdo, Poblacion, Buguias
Benguet
Provincial Local Government of Benguet percent completed
(Cumulative)
Target: 90.18
Actual: 90.18
Expenditure:
Release:0
Obligation:0
0
526097993 Construction of Multi-Purpose Building Phase 2, Catlubong, Buguias, Benguet
Benguet
Provincial Local Government of Benguet percent
(default)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
527050874 Completion of Waterworks System Marlboro, Beckel, La Trinidad
Benguet
Provincial Local Government of Benguet percent completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
545516197 Improvement of Alapang-Alno - Tuel Provincial Road, La Trinidad
Benguet
Provincial Local Government of Benguet percent completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
547739114 Akiki CIS
Benguet
National Irrigation Administration - CAR percent completed
(Cumulative)
Target: 100
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
551892133 Dontog SIP
Benguet
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
552432651 Boosting Agribusiness and Capability of the IP Women of Naguey on Rice Wine Production in Naguey, Atok
Benguet
National Commission on Indigenous Peoples - CAR no of projects implemented
(default)
Target: 0
Actual: 0
Expenditure:
Release:125000
Obligation:99210
0
556194380 Paswek Kalipkip CIS
Benguet
National Irrigation Administration - CAR percent completed
(Cumulative)
Target: 100
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
558188628 Esbo PIP
Benguet
National Irrigation Administration - CAR percent completed
(Cumulative)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
558512138 Rehabilitation of Bucao-Abucot-Taltalpok FMR, Eddet, Kabayan, Benguet
Benguet
Provincial Local Government of Benguet percent
(default)
Target: 12
Actual: 0
Expenditure:
Release:0
Obligation:0
-100
566493933 Construciton of Tublay School of Home Industries (Annex) Ground, Tublay Central
Benguet
Provincial Local Government of Benguet percent completed
(Cumulative)
Target: 90.58
Actual: 100
Expenditure:
Release:0
Obligation:0
10.39964672113
569399445 REPAIR AND IMPROVEMENT OF THE BSU BOKOD ROAD NETWORK
Benguet
Benguet State University LINEAR METER
(Cumulative)
Target: 300
Actual: 300
Expenditure:
Release:0
Obligation:0
0
570019006 Improvement of Gadang Copias FMR, Gadang, Kapangan
Benguet
Provincial Local Government of Benguet percent
(default)
Target: 12
Actual: 0
Expenditure:
Release:0
Obligation:0
-100
576514507 Balluay CIS
Benguet
National Irrigation Administration - CAR 100 % Completed, 6 units Canal Structures,5.27 km HDPE pipe
(Cumulative)
Target: 2
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
589166572 Pangablan CIS
Benguet
National Irrigation Administration - CAR 100 % Completed, 4 units Canal Structures,1 km HDPE pipe
(Cumulative)
Target: 2
Actual: 3
Expenditure:257784.98
Release:1306611
Obligation:1368404.05
50
605900414 Balingew SIP
Benguet
National Irrigation Administration - CAR percent completed
(Cumulative)
Target: 100
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
607113462 PROJECT FABULOUS
Benguet
Commission on Higher Education - CAR 0
(Maintained)
Target: 100
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
616300369 Tawangan CIS (Upper and Lower)
Benguet
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
624024832 Chackong CIS
Benguet
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
629185564 Completion of Lualhati Fire Sub- Station
Benguet
City Local Government of Baguio City commulative percentage
(Cumulative)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
644261325 Improvement along Sayangan-Bacayao FMR, Taloy Norte, Tuba
Benguet
Provincial Local Government of Benguet percent
(default)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
647301466 Improvement of Km. 49-Ambakian FMR (repackaged)
Benguet
Provincial Local Government of Benguet percent completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
657416162 Construction /Improvement of Barangay Hall, Paco, Mankayan
Benguet
Provincial Local Government of Benguet percent
(default)
Target: 28
Actual: 0
Expenditure:
Release:0
Obligation:0
-100
670938183 Repair/Improvement/Upgrading of Amgaleyguey BHS
Benguet
Department of Health - CAR Percent completed
(Cumulative)
Target: 0
Actual: 100
Expenditure:
Release:1000000
Obligation:787149.22
0
675701774 Product Improvement and Efficiency of Mother Sheperd Food Products (Phase 2)
Benguet
Department of Science and Technology - CAR Number of firms assisted
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
681385197 Yabyabuan PIP
Benguet
National Irrigation Administration - CAR 100 % Completed, 5 ha area generated
(Cumulative)
Target: 2
Actual: 4
Expenditure:44628.46
Release:1113847
Obligation:1874655.28
100
681868832 Pangablan CIS
Benguet
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
706199263 Sustainable Livelihood Program-PAMANA
Benguet
Department of Social Welfare and Development - CAR Total number of households who received seed capital fund and total number of households trained (Seed Capital Funds, Skills Training, and CBLA)
(Maintained)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
707145607 Scholarship Program
Benguet
Technical Education and Skills Development Authority - CAR number of enrolled, number of graduates
(default)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:6654358.801
0
715538131 (const. of mp shade at…) Construction of Gym at Karao Elementary School, Karao, Bokod
Benguet
Provincial Local Government of Benguet percent completed
(Cumulative)
Target: 41.2
Actual: 41.2
Expenditure:
Release:0
Obligation:0
0
717901835 Completion of Tawang Elementary School, Tawang, La Trinidad
Benguet
Provincial Local Government of Benguet percent
(Cumulative)
Target: 14.7
Actual: 0
Expenditure:
Release:0
Obligation:0
-100
742305907 Repair/Improvement/Upgrading of Loo BHS
Benguet
Department of Health - CAR Percent completed
(Cumulative)
Target: 90
Actual: 100
Expenditure:
Release:500000
Obligation:500000
11.111111111111
755882712 Pudong SIP (Phase II)
Benguet
National Irrigation Administration - CAR percent completed
(Cumulative)
Target: 100
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
766226826 Construction of School Building in Midas Elementary School, Midas, Ucab, Itogon, Benguet
Benguet
Provincial Local Government of Benguet percent
(default)
Target: 10
Actual: 0
Expenditure:
Release:0
Obligation:0
-100
769939446 Cabaritan SIP
Benguet
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
775401108 Palasaan Bulalacao PIS
Benguet
National Irrigation Administration - CAR 100% Completion, Repair of Groundwater Pump irrigation System for 15 Farmer Beneficiaries
(Cumulative)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
776171720 Basil CIS
Benguet
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
792510048 CONSTRUCTION OF INFORMATION TECHNOLOGY BUILDING
Benguet
Benguet State University PERCENTAGE COMPLETION OF BUILDING
(Cumulative)
Target: 65
Actual: 69.82
Expenditure:
Release:49999997.14
Obligation:49999997.14
7.4153846153846
803907642 Posposok Tilay SIP
Benguet
National Irrigation Administration - CAR percent completed
(Cumulative)
Target: 100
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
807201119 Improving the Production Efficiency of Gaewen Vegetable Farm towards SMART Agriculture
Benguet
Department of Science and Technology - CAR No. of firms assisted
(default)
Target: 1
Actual: 1
Expenditure:
Release:0
Obligation:0
0
807437913 Beleng PIS
Benguet
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
810199927 Managed Internet Service - VSAT Network Services for Quarantine Centers and Medical Facilities - Naguey, Atok Barangay Hall
Benguet
Department of Information and Communications Technology - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 100
Expenditure:
Release:0
Obligation:0
0
815166838 Tuba CIS
Benguet
National Irrigation Administration - CAR 100 % Completed, 1 units Canal Structures, 1.9 km HDPE pipe
(Cumulative)
Target: 1
Actual: 2
Expenditure:191277.46
Release:777862
Obligation:1275183.09
100
821146883 Balluay CIS
Benguet
National Irrigation Administration - CAR percent completed
(Cumulative)
Target: 100
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
841824603 A. Const. of Naubunan to Brgy. Daklan WW, Daklan; B. Const. of Naubunan to Daklan WW(p-2), Daklan, Bokod
Benguet
Provincial Local Government of Benguet percent completed
(Cumulative)
Target: 5
Actual: 5
Expenditure:
Release:0
Obligation:0
0
852060378 TSHI Acop PIP
Benguet
National Irrigation Administration - CAR 100 % Completed, 4 ha area generated
(Cumulative)
Target: 2
Actual: 5
Expenditure:237420.39
Release:791401
Obligation:1582802.61
150
865567061 IEC and Consultation of the CADT Owners/Holders of the 11 ADs in Benguet prior to Segregation of Titled Properties
Benguet
National Commission on Indigenous Peoples - CAR no of projects implemented in support to delineation function
(default)
Target: 0
Actual: 0
Expenditure:
Release:107550
Obligation:3000
0
873244248 PARTNERSHIP ON KAIBIGAN (DTI)
Benguet
Department of Social Welfare and Development - CAR No. of Households provided with livelihood modalities
(Cumulative)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
879596924 Completion of Loo National High School Gym, Loo Buguias
Benguet
Provincial Local Government of Benguet percent
(default)
Target: 10
Actual: 0
Expenditure:
Release:0
Obligation:0
-100
881647455 Beleng PIS
Benguet
National Irrigation Administration - CAR 100% Completion, Repair of Groundwater Pump irrigation System for 15 Farmer Beneficiaries
(Cumulative)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
899169622 Sitio Kapongan PIP
Benguet
National Irrigation Administration - CAR 100 % Completed, 4 ha area generated
(Cumulative)
Target: 2
Actual: 3
Expenditure:252847.22
Release:683857
Obligation:1370690.69
50
910603158 Baugan - Cayapas CIP (Phase II)
Benguet
National Irrigation Administration - CAR 100 % Completed, 10 ha area generated
(Cumulative)
Target: 2
Actual: 2
Expenditure:51418.84
Release:570678
Obligation:1834787.19
0
938725348 Ligenan SIP
Benguet
National Irrigation Administration - CAR 100 % Completed, 4 ha area generated
(Cumulative)
Target: 2
Actual: 2
Expenditure:309752.72
Release:805163
Obligation:1413605.8
0
945573195 Construction of Isolation Facility at Mulam, Ahin
Benguet
Department of Social Welfare and Development - CAR 100% completion
(default)
Target: 100
Actual: 100
Expenditure:0
Release:107581
Obligation:107788
0
951782823 Conig Pinipin Salat Getena Creek- Kapangan SIP (Phase II)
Benguet
National Irrigation Administration - CAR 100 % Completed, 8 ha area generated
(Cumulative)
Target: 2
Actual: 4
Expenditure:436527.87
Release:1499975
Obligation:2492945.27
100
952929150 Provision of Cash Grants including the amount of Rice Subsidy
Benguet
Department of Social Welfare and Development - CAR Number of Household beneficiaries provided with Conditional Cash Grants
(Maintained)
Target: 11814
Actual: 9922
Expenditure:0
Release:0
Obligation:0
-16.014897579143
954146673 Improvement along Daclan-Camangaan-Tickey-Bonagan Provincial Road, Bokod
Benguet
Provincial Local Government of Benguet percent completed
(default)
Target: 15
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
956026813 Repair/Improvement/Upgrading of Baayan BHS
Benguet
Department of Health - CAR Percent completed
(Cumulative)
Target: 0
Actual: 100
Expenditure:
Release:1000000
Obligation:865142.33
0
969376306 Road Upgrading and Improvement of Mankayan- Balili Provincial Road
Benguet
Provincial Local Government of Benguet percent completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
972405059 Construction of Two-Storey Multi-purpose Buidling/ Women's Center, Madaymen, Kibungan
Benguet
Provincial Local Government of Benguet percent completed
(Cumulative)
Target: 53.25
Actual: 100
Expenditure:
Release:0
Obligation:0
87.793427230047
975646615 Opening of Bayeng to Almasi Farm to Market Road, Palina, Kibungan
Benguet
Provincial Local Government of Benguet percent completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
986991720 Completion of Municipal Building with Stage at Ampusongan, Bakun
Benguet
Provincial Local Government of Benguet percent completed
(Cumulative)
Target: 18
Actual: 12.4
Expenditure:
Release:0
Obligation:0
-31.111111111111
991971200 Improvement /Completion of DRRM Building
Benguet
Provincial Local Government of Benguet percent
(default)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
992107631 Bayabas CIS
Benguet
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1013311061 Ulman Tabeyo PIP
Benguet
National Irrigation Administration - CAR 100 % Completed, 5 ha area generated
(Cumulative)
Target: 2
Actual: 10
Expenditure:1662103.09
Release:4670972
Obligation:1841755.85
400
1019334492 Continuing the Production efficiency and Enhancement of N.P. Milo Machine Shop
Benguet
Department of Science and Technology - CAR No. of firms assisted
(default)
Target: 1
Actual: 1
Expenditure:
Release:0
Obligation:0
0
1026880825 Managed Internet Service - VSAT Network Services for Quarantine Centers and Medical Facilities - Natubleng, Buguias Barangay Hall
Benguet
Department of Information and Communications Technology - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 100
Expenditure:
Release:0
Obligation:0
0
1034905881 Improvement of Multi-Purpose Hall, Cayapes, Kapangan
Benguet
Provincial Local Government of Benguet percent completed
(Cumulative)
Target: 45.7
Actual: 45.7
Expenditure:
Release:0
Obligation:0
0
1036817773 Bayuga SIP
Benguet
National Irrigation Administration - CAR percent completed
(Cumulative)
Target: 100
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1038382988 Shelpi Creek Sablan Peday - Patad SIP
Benguet
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
1051626351 Completion of the Buguias Public Market, Abatan, Buguias
Benguet
Provincial Local Government of Benguet percent completed
(Cumulative)
Target: 12
Actual: 23.51
Expenditure:
Release:0
Obligation:0
95.916666666667
1053229546 Construction of Two Classroom School Building with Comfort Room at Nabalicong Saltin Elementary School, Natubleng, Buguias
Benguet
Provincial Local Government of Benguet percent
(default)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
1054753085 Rehabilitation/ Improvement along Jose Mencio Provincial Road (Sowe-Naguey Section), Atok
Benguet
Provincial Local Government of Benguet percent completed
(Cumulative)
Target: 80.84
Actual: 96.1
Expenditure:
Release:0
Obligation:0
18.876793666502
1063255504 Social Pension Program
Benguet
Department of Social Welfare and Development - CAR Number of indigent senior citizens provided with Social Pension
(Maintained)
Target: 25140
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1068378815 Construction of Temporary Treatment and Monitoring Facility (TTMF)
Benguet
Provincial Local Government of Benguet percent completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
1073949224 Construction of Child Development Center, Abiang, Atok:Realligned to Const. of School bldg. at Aduyonan ES, Aduyonan, Abiang,
Benguet
Provincial Local Government of Benguet percent completed
(Cumulative)
Target: 12.84
Actual: 12.84
Expenditure:
Release:0
Obligation:0
0
1075151116 Construction of Sewage Treatment Plant, Capitol, La Trinidad, Bengeut
Benguet
Provincial Local Government of Benguet percent completed
(Cumulative)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
1082832046 Tuba CIS
Benguet
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1089431813 Supplemental Feeding Program
Benguet
Department of Social Welfare and Development - CAR Number of beneficiaries served
(Maintained)
Target: 8905
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1103723135 Regular and Frontloaded Livelihood Projects
Benguet
Department of Social Welfare and Development - CAR No. of Households provided with livelihood modalities
(Cumulative)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
1104973092 Conig Pinipin Salat Getena Creek- Kapangan SIP (Phase II)
Benguet
National Irrigation Administration - CAR percent completed
(Cumulative)
Target: 100
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1133929623 Baculongan Norte PIS
Benguet
National Irrigation Administration - CAR 100% Completed, Repair of Groundwater Pump irrigation System for 10 Farmer Beneficiaries
(Cumulative)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
1143670754 EXPANSION OF THE COLLEGE OF FORESTRY BUILDING
Benguet
Benguet State University PERCENTAGE COMPLETION OF BUILDING
(default)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
1169280983 Scholarship Programs-UAQTEA
Benguet
Technical Education and Skills Development Authority - CAR number of enrolled, number of graduates
(default)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:63524058
0
1178523713 Kabayan Central CIS
Benguet
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
1188797733 Managed Internet Service - VSAT Network Services for Quarantine Centers and Medical Facilities - Sablan Bagong Barangay Hall
Benguet
Department of Information and Communications Technology - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 100
Expenditure:
Release:0
Obligation:0
0
1194815798 Construction of Fire Station, Buguias, Benguet
Benguet
Provincial Local Government of Benguet percent
(default)
Target: 65
Actual: 0
Expenditure:
Release:0
Obligation:0
-100
1213591224 CONSTRUCTION OF SPOT TRADING BAY ANNEX BUILDING
Benguet
Benguet State University PERCENTAGE COMPLETION
(Cumulative)
Target: 60
Actual: 78.45
Expenditure:
Release:0
Obligation:0
30.75
1220176830 Upgrading MSMEs thru Science, Technology and Innovation: The Arca's Yard Café
Benguet
Department of Science and Technology - CAR No. of firms assisted
(default)
Target: 0
Actual: 1
Expenditure:
Release:0
Obligation:0
0
1225153967 Supplemental Feeding Program
Benguet
Department of Social Welfare and Development - CAR Number of Children Served
(Maintained)
Target: 10157
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1225341003 Linusod CIS
Benguet
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
1232080232 Dalumpi-it SIP
Benguet
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
1240698054 Construction of Cabuguiasan Elementary School Building, Natubleng, Buguias
Benguet
Provincial Local Government of Benguet percent
(default)
Target: 5
Actual: 0
Expenditure:
Release:0
Obligation:0
-100
1249312359 Managed Internet Service - VSAT Network Services for Quarantine Centers and Medical Facilities - Kabayan Barangay Tawangan
Benguet
Department of Information and Communications Technology - CAR Percent Completed
(Cumulative)
Target: 70
Actual: 70
Expenditure:
Release:0
Obligation:0
0
1256898585 CONSTRUCTION OF BIODIVERSITY RESEARCH CENTER - BOKOD CAMPUS
Benguet
Benguet State University PERCENTAGE COMPLETION OF BUILDING
(Cumulative)
Target: 98
Actual: 98
Expenditure:
Release:0
Obligation:0
0
1265462309 Managed Internet Service - VSAT Network Services for Quarantine Centers and Medical Facilities - Sinacbat, Bakun Barangay Hall
Benguet
Department of Information and Communications Technology - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 100
Expenditure:
Release:0
Obligation:0
0
1267357639 Opening of Bayeng to Almasi Farm to Market Road, Palina, Kibungan
Benguet
Provincial Local Government of Benguet percent completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
1279120730 Construction of concrete retaining wall at 1300 level, Poblacion, Itogon
Benguet
Provincial Local Government of Benguet percent completed
(Cumulative)
Target: 50
Actual: 98
Expenditure:
Release:0
Obligation:0
96
1282681485 Science, Technology, Innovation for Funcakes Bakeshop
Benguet
Department of Science and Technology - CAR Number of firms assisted
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
1292192612 Belong-Sayatan SIP
Benguet
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
1326360912 Improvement and COmpletion of Barangay Health Station , Banangan, Sablan
Benguet
Provincial Local Government of Benguet percent
(default)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
1332115469 Ulman Tabeyo PIP
Benguet
National Irrigation Administration - CAR percent completed
(Cumulative)
Target: 100
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1344413736 Upgrading of the Production Capacity and Capability of Wow Digital through S&T Intervention
Benguet
Department of Science and Technology - CAR No. of firms assisted
(default)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
1352152650 Kingking CIS
Benguet
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1367093144 Chackong CIS
Benguet
National Irrigation Administration - CAR 100% completed, 0.07 Lined Canal, 2 units canal structures, .04 km HDPE Pipe
(Cumulative)
Target: 2
Actual: 2
Expenditure:365735.37
Release:1636340
Obligation:2220253.91
0
1375682719 Bectey Poblacion CIS
Benguet
National Irrigation Administration - CAR 100% Completed
(Cumulative)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
1412396736 Opening of Batan-Bolok-Adaoay FMR, Kabayan
Benguet
Provincial Local Government of Benguet percent
(default)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
1415431915 Science, Technology, Innovation for Johecs Cakes and Cupcakes
Benguet
Department of Science and Technology - CAR Number of firms assisted
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
1423117462 Improvement of Talabis Elementary School, Bangao, Buguias
Benguet
Provincial Local Government of Benguet percent
(Cumulative)
Target: 15
Actual: 0
Expenditure:
Release:0
Obligation:0
-100
1433891042 Construction of Flood Control and Drainage Canal, Naba, Poblacion, Bakun
Benguet
Provincial Local Government of Benguet percent
(default)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
1453137175 Innovations for Filipinos Working Distantly from the Philippines (iFWD): Support to Uptown Iron Works, a Start-up Enterprise
Benguet
Department of Science and Technology - CAR No. of firms assisted
(default)
Target: 0
Actual: 1
Expenditure:
Release:0
Obligation:0
0
1462076754 Improvement of Pasbol Mankaet FMR, Taaw Section, Buguias
Benguet
Provincial Local Government of Benguet percent
(default)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
1463977472 Provision of Cash Grant to 4Ps beneficiaries including the amount of Rice Subsidy
Benguet
Department of Social Welfare and Development - CAR Number of Household beneficiaries provided with Conditional Cash Grants
(Maintained)
Target: 11015
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1487730797 REPAIR OF THE WATER TANK AT THE TABANGAOEN, BALILI
Benguet
Benguet State University PERCENTAGE COMPLETION
(Cumulative)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
1498013143 Improvement of Kamanbeey Bawing Pokingan FMR, Balili, Mankayan
Benguet
Provincial Local Government of Benguet percent
(default)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
1499316185 Improvement of Mankil-et Lebeng FMR, Catlubong, Buguias
Benguet
Provincial Local Government of Benguet percent completed
(Cumulative)
Target: 75.25
Actual: 95.5
Expenditure:
Release:0
Obligation:0
26.910299003322
1507068650 Kingking CIS
Benguet
National Irrigation Administration - CAR 100 % Completed, 4.85 Km HDPE pipe
(Cumulative)
Target: 1
Actual: 2
Expenditure:609182.06
Release:1732395
Obligation:3396853.07
100
1508678495 Upgrading the Peanut Butter Processing of Tereeque Food Products
Benguet
Department of Science and Technology - CAR No. of firms assisted
(default)
Target: 1
Actual: 1
Expenditure:
Release:0
Obligation:0
0
1515872669 Batanes CIS
Benguet
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
1522206102 Construction of 3-storey Provincial Health Services Multi-purpose Building
Benguet
Provincial Local Government of Benguet percent
(default)
Target: 5
Actual: 0
Expenditure:
Release:0
Obligation:0
-100
1523687896 Improvement along Camp 1-Indaoac-Twin Peaks Provincial Road, Tuba
Benguet
Provincial Local Government of Benguet percent completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
1529972233 Construction of Open Gymnasium at Kayapa Elementary School, Bakun
Benguet
Provincial Local Government of Benguet percent completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
1530615243 a. Const. of Annex Bldg( Capitol) Phase IV-40m b. Construction of Annex Building, (Capitol) Phase III -57m
Benguet
Provincial Local Government of Benguet percent completed
(default)
Target: 18.3
Actual: 32.3
Expenditure:
Release:0
Obligation:0
76.502732240437
1537508141 Social Pension Program
Benguet
Department of Social Welfare and Development - CAR Number of beneficiaries served
(Maintained)
Target: 23687
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1546752955 Akiki CIS
Benguet
National Irrigation Administration - CAR 100 % Completed, 6 units Canal Structures,3.57 km HDPE pipe
(Cumulative)
Target: 2
Actual: 4
Expenditure:423630.92
Release:1139862
Obligation:2286866.05
100
1548748689 Managed Internet Service - VSAT Network Services for Quarantine Centers and Medical Facilities - Kayapa, Bakun Barangay Hall
Benguet
Department of Information and Communications Technology - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 100
Expenditure:
Release:0
Obligation:0
0
1566904513 Balluay CIS
Benguet
National Irrigation Administration - CAR percent completed
(Cumulative)
Target: 100
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1567422221 Egval Togoy CIS
Benguet
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1571389767 Yabyabuan PIP
Benguet
National Irrigation Administration - CAR percent completed
(Cumulative)
Target: 15
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1579558313 Baayan CIS
Benguet
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1587017212 Ligenan SIP
Benguet
National Irrigation Administration - CAR percent completed
(Cumulative)
Target: 100
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1587382123 Construction of Flood Control with Pathway and Railings beside Tebteb Creek from Tebteb Guard House 1 towards Gibson James Pinas Area at Tebteb, Balili, La Trinidad
Benguet
Provincial Local Government of Benguet percent
(default)
Target: 13
Actual: 0
Expenditure:
Release:0
Obligation:0
-100
1591492570 IP Transport Domestic Managed Service (BAGUIO CITY & BENGUET)
Benguet
Department of Information and Communications Technology - CAR Percent completed
(default)
Target: 42
Actual: 42
Expenditure:
Release:0
Obligation:0
0
1594518088 Badiwan-Bongis-Maligsa SIP
Benguet
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
1599410218 CONSTRUCTION OF BSU AGRI PROCESSING CENTER - PHASE 1
Benguet
Benguet State University PERCENTAGE COMPLETION OF BUILDING
(Cumulative)
Target: 100
Actual: 99.75
Expenditure:
Release:0
Obligation:0
-0.25
1599949765 Batawil PIP
Benguet
National Irrigation Administration - CAR 100% Completed
(Cumulative)
Target: 2
Actual: 2
Expenditure:108577.66
Release:1036826
Obligation:1145403.51
0
1605823797 Construction of Multi-purpose Gym, Datakan, Kapangan
Benguet
Provincial Local Government of Benguet percent
(default)
Target: 12.57
Actual: 0
Expenditure:
Release:0
Obligation:0
-100
1607056399 Rehabilitation along Besocol-Ballay FMR, Ballay, Kabayan
Benguet
Provincial Local Government of Benguet percent completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
1608897584 Paswek Kalipkip CIS
Benguet
National Irrigation Administration - CAR 100 % Completed, 4 units Canal Structures,2.46 km HDPE pipe
(Cumulative)
Target: 2
Actual: 2
Expenditure:351871.61
Release:896306
Obligation:1875591.61
0
1630838654 Improvement along Badiwan-City Limit Provincial Road, Tuba
Benguet
Provincial Local Government of Benguet percent completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
1659333279 Improvement of Multi-purpose Building (Phase III) Panad West, Poblacion, Mankayan
Benguet
Provincial Local Government of Benguet percent
(default)
Target: 12.3
Actual: 0
Expenditure:
Release:0
Obligation:0
-100
1675308371 Kiweng Labey SIP
Benguet
National Irrigation Administration - CAR percent completed
(Cumulative)
Target: 100
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1691745703 Oring PIP
Benguet
National Irrigation Administration - CAR 100% Completed, 8ha area Generated
(Cumulative)
Target: 2
Actual: 2
Expenditure:166643.4
Release:1307849
Obligation:2762337.39
0
1703511232 Managed Internet Service - VSAT Network Services for Quarantine Centers and Medical Facilities - Itogon Quarantine Facility, Malasin, Brgy. Ucab
Benguet
Department of Information and Communications Technology - CAR Percent Completed
(Cumulative)
Target: 69
Actual: 69
Expenditure:
Release:0
Obligation:0
0
1713350982 Tufil PIP
Benguet
National Irrigation Administration - CAR 100% Completed, 3 ha area Generated
(Cumulative)
Target: 2
Actual: 2
Expenditure:447369.27
Release:908159
Obligation:1931860.2
0
1723799123 Improvement of Alapang-Alno - Tuel Provincial Road, La Trinidad
Benguet
Provincial Local Government of Benguet percent completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
1728106177 Linusod CIS
Benguet
National Irrigation Administration - CAR 100% Completion, Repair of Groundwater Pump irrigation System for 6 Farmer Beneficiaries
(Cumulative)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
1738760542 Esbo PIP
Benguet
National Irrigation Administration - CAR 100 % Completed, 12 ha area generated
(Cumulative)
Target: 2
Actual: 3
Expenditure:98566.5
Release:697126
Obligation:3311947.78
50
1759185355 Las-igan Creek - Mankayan Las-igan SIP (Phase II)
Benguet
National Irrigation Administration - CAR percent completed
(Cumulative)
Target: 100
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1762268692 NAKIDOL CREEK POBLACION SIP PH. IV
Benguet
National Irrigation Administration - CAR 100% Completed
(Cumulative)
Target: 2
Actual: 2
Expenditure:2910926.77
Release:4028408
Obligation:18475231.78
0
1783281162 Oring PIP
Benguet
National Irrigation Administration - CAR percent completed
(Cumulative)
Target: 100
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1799456514 Improvement along Yagyagan-Ampusa Provincial Road, Tuba
Benguet
Provincial Local Government of Benguet percent completed
(Cumulative)
Target: 90.4
Actual: 90.4
Expenditure:
Release:0
Obligation:0
0
1809575855 Baayan CIS
Benguet
National Irrigation Administration - CAR 100 % Completed, 11 units Canal Structures, 1.45 km HDPE pipe
(Cumulative)
Target: 2
Actual: 3
Expenditure:435757.65
Release:999675
Obligation:2069841.78
50
1818201927 Hiring of Job Order Personnel for Technical Support and Operations
Benguet
Department of Information and Communications Technology - CAR Hired Job Order Personnel for Technical Support and Operations
(Cumulative)
Target: 1
Actual: 2
Expenditure:
Release:381938.4
Obligation:381938.4
100
1818237394 Langew CIS
Benguet
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
1825857731 Road Opening/ Improvement of Dumanegdeg - Sayangan - Guinabayan Farm- to- Market Road, Poblacion, Bakun, Benguet
Benguet
Provincial Local Government of Benguet percent completed
(Cumulative)
Target: 68
Actual: 100
Expenditure:
Release:0
Obligation:0
47.058823529412
1826412866 Improvement of Domestic Water Works Tinekey to Lower Poblacion,Sablan
Benguet
Provincial Local Government of Benguet percent completed
(Cumulative)
Target: 10
Actual: 7.5
Expenditure:
Release:0
Obligation:0
-25
1832024689 Product and Productivity Enhancement Agreach Products Corporation
Benguet
Department of Science and Technology - CAR No. of firms assisted
(default)
Target: 0
Actual: 1
Expenditure:
Release:0
Obligation:0
0
1832557278 Baculongan Namatoc CIS
Benguet
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
1840389010 Managed Internet Service - VSAT Network Services for Quarantine Centers and Medical Facilities - Ekip, Bokod Barangay Hall
Benguet
Department of Information and Communications Technology - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 100
Expenditure:
Release:0
Obligation:0
0
1845393346 Sustainable Livelihood Program
Benguet
Department of Social Welfare and Development - CAR Total number of households who received seed capital fund and total number of households trained (Seed Capital Funds, Skills Training, Employment,and CBLA)
(Maintained)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
1849131585 Banengbeng CIS
Benguet
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
1863705021 Batawil PIP
Benguet
National Irrigation Administration - CAR percent completed
(Cumulative)
Target: 100
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1881240566 IADDA: Indigenous Peoples Building (Phase 2) with Maintenance of the Previous Nursery
Benguet
National Commission on Indigenous Peoples - CAR no of projects implemented
(default)
Target: 0
Actual: 0
Expenditure:
Release:102680
Obligation:470890
0
1890635483 Construction of National Educators Academy Building Extension
Benguet
Department of Education - CAR Percent Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
1911346631 Rehabilitation of Busan Barangay Road, Colalo, Mankayan
Benguet
Provincial Local Government of Benguet percent completed
(Cumulative)
Target: 90
Actual: 100
Expenditure:
Release:0
Obligation:0
11.111111111111
1912796421 a.Construction of Parking Area and Driveway with Slope Protection at the back of the Legislative (Phase I)-5m B. Impvt. Of Prov'l capitol cmpd.-1M
Benguet
Provincial Local Government of Benguet percent completed
(Cumulative)
Target: 92
Actual: 100
Expenditure:
Release:0
Obligation:0
8.695652173913
1919663999 Construction of Domestic Water Reservoir at All Sitios, Kabayan Barrio, Kabayan
Benguet
Provincial Local Government of Benguet percent
(default)
Target: 18.6
Actual: 0
Expenditure:
Release:0
Obligation:0
-100
1923435130 Shekdan SIP
Benguet
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
1944954219 Improvement of Km.49-Ambakian Farm to Market Road
Benguet
Department of Agriculture - CAR number of km constructed
(Cumulative)
Target: 9.8
Actual: 9.36
Expenditure:
Release:223862808.22
Obligation:223862808.22
-4.4897959183674
1951934965 Improvement of Ampusongan to Dacugan FMR, Ampusongan, Bakun
Benguet
Provincial Local Government of Benguet percent
(default)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
1955303092 Construction of three-storey Multi-purpose building (Phase 4) Lubas, La Trinidad
Benguet
Provincial Local Government of Benguet percent
(Cumulative)
Target: 14.85
Actual: 0
Expenditure:
Release:0
Obligation:0
-100
1957447544 Coruz-Bajating SIP
Benguet
National Irrigation Administration - CAR percent completed
(Cumulative)
Target: 100
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1959241723 Enclosure of Multi-purpose Gym, Poblacion, Sablan
Benguet
Provincial Local Government of Benguet percent completed
(Cumulative)
Target: 64.8
Actual: 93.4
Expenditure:
Release:0
Obligation:0
44.135802469136
1961316501 Sitio Kapongan PIP
Benguet
National Irrigation Administration - CAR percent completed
(Cumulative)
Target: 100
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1968333096 Improvement along La Trinidad-Capitol-Bineng Provincial Road, La Trinidad, Benguet
Benguet
Provincial Local Government of Benguet percent completed
(Cumulative)
Target: 0
Actual: 100
Expenditure:
Release:0
Obligation:0
0
1972373846 Babatan CIS
Benguet
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
1975089485 Opening and Improvement of Kayapa-Bulisay to Beyeng FMR, Kayapa, Bakun
Benguet
Provincial Local Government of Benguet percent completed
(Cumulative)
Target: 60
Actual: 100
Expenditure:
Release:0
Obligation:0
66.666666666667
1994575698 Managed Internet Service - VSAT Network Services for Quarantine Centers and Medical Facilities - Kabayan Public Market
Benguet
Department of Information and Communications Technology - CAR Percent Completed
(Cumulative)
Target: 72
Actual: 72
Expenditure:
Release:0
Obligation:0
0
2003094421 Improvement of Access Road to Barangay Hall of Naguey, Atok
Benguet
Provincial Local Government of Benguet percent completed
(Cumulative)
Target: 55
Actual: 50
Expenditure:
Release:0
Obligation:0
-9.0909090909091
2014727733 Repair/Improvement/Upgrading of Lam-ayan BHS
Benguet
Department of Health - CAR Percent completed
(Cumulative)
Target: 100
Actual: 100
Expenditure:
Release:500000
Obligation:470657.32
0
2017578020 REPAIR OF RIPRAP ALONG THE BSU COLLEGE OF FORESTRY NURSERY
Benguet
Benguet State University PERCENTAGE COMPLETED
(Cumulative)
Target: 50
Actual: 49.25
Expenditure:
Release:0
Obligation:0
-1.5
2038560065 Improvement along National Road Junction-Diboong-Bangao Provincial Road, Kabayan
Benguet
Provincial Local Government of Benguet percent completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
2038731754 Sabdang Creek Sablan Poblacion SIS
Benguet
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
2048957888 Improvement along Bolagabog-Mogao FMR, Ballay, Kabayan, Benguet
Benguet
Provincial Local Government of Benguet percent
(default)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
2053735481 Construction of Gym, Ampaguey Elementary School, Balluay, Sablan
Benguet
Provincial Local Government of Benguet percent completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
2054335333 Bayuga SIP
Benguet
National Irrigation Administration - CAR 100 % Completed, 12 ha area generated
(Cumulative)
Target: 2
Actual: 5
Expenditure:605685.07
Release:1919078
Obligation:4500000
150
2054795105 Construciton of Open Gym at Tapsan Elementary School, Loacan, Itogon
Benguet
Provincial Local Government of Benguet percent completed
(Cumulative)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
2062378265 Impvt of FMR, EKIp(1M) b. Improvement of Proper Ekip FMR, Ekip, Bokod(5.4M)
Benguet
Provincial Local Government of Benguet Percent Completed
(Cumulative)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
2062809512 Managed Internet Service - VSAT Network Services for Quarantine Centers and Medical Facilities - La Trinidad Benguet State University Gladiola Building
Benguet
Department of Information and Communications Technology - CAR Percent Completed
(Cumulative)
Target: 40
Actual: 40
Expenditure:
Release:0
Obligation:0
0
2064871417 Improvement of Besocol-Ballay FMR at Barangay Ballay, Kabayan, Benguet
Benguet
Provincial Local Government of Benguet percent
(default)
Target: 52.77
Actual: 0
Expenditure:
Release:0
Obligation:0
-100
2075534493 Balingew SIP
Benguet
National Irrigation Administration - CAR 100 % Completed, 6 ha area generated
(Cumulative)
Target: 2
Actual: 4
Expenditure:298806.86
Release:997630
Obligation:1666524.75
100
2083922730 Improvement of Ta-aw FMR, Ballay, Kabayan, Benguet
Benguet
Provincial Local Government of Benguet percent
(default)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
2084795664 Egval Togoy CIS
Benguet
National Irrigation Administration - CAR 100 % Completed, 12 units Canal Structures, 4.75 km HDPE pipe
(Cumulative)
Target: 2
Actual: 4
Expenditure:449324.72
Release:791585
Obligation:2473704.13
100
2088687118 BATUAN SIP PH II
Benguet
National Irrigation Administration - CAR percent completed
(Cumulative)
Target: 100
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
2100105551 Construction of Oil Depot for the Province, La Trinidad
Benguet
Provincial Local Government of Benguet percent completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
2106230025 Palasaan Bulalacao PIS
Benguet
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
2114047393 Pongew Creek Sablan Alog SIP
Benguet
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
2114136551 Kidpoan SIP
Benguet
National Irrigation Administration - CAR 100 % Completed, 6 ha area generated
(Cumulative)
Target: 2
Actual: 5
Expenditure:327817.7
Release:801832
Obligation:1427103.36
150
2139607196 Improvement of Legislative Building
Benguet
Provincial Local Government of Benguet percent completed
(Cumulative)
Target: 83.7
Actual: 91.3
Expenditure:
Release:0
Obligation:0
9.0800477897252
140527835 S&T Intervention in Upgrading the Processing Center of Emma’s Special Food Manufacturing
Baguio City
Department of Science and Technology - CAR No. of firms assisted
(default)
Target: 1
Actual: 1
Expenditure:
Release:0
Obligation:0
0
149005368 Sidewalk recovery and improvement and rehabilitation of Drainage at Dominican Hill road, Lourdes Proper, san Roque
Baguio City
City Local Government of Baguio City percent completed
(Cumulative)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
188276418 Program Management
Baguio City
National Economic and Development Authority - CAR percent completed
(default)
Target: 25
Actual: 11.87
Expenditure:
Release:0
Obligation:0
-52.52
218073996 Continuation of Sidewalk recovery and improvement from Jose Felipe St. to Legarda Road
Baguio City
City Local Government of Baguio City percent completed
(Cumulative)
Target: 0
Actual: 0
Expenditure:
Release:3702052.5
Obligation:3702052.5
0
242703949 Proposed Tennis Court at Athletic Bowl
Baguio City
City Local Government of Baguio City PERCENTAGE OF ACCOMPLISHMENT
(Cumulative)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
337805217 Provision of Cash Grant to 4Ps beneficiaries including the amount of Rice Subsidy
Baguio City
Department of Social Welfare and Development - CAR Number of Household beneficiaries provided with Conditional Cash Grants
(Maintained)
Target: 2934
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
343929547 Social Pension Program
Baguio City
Department of Social Welfare and Development - CAR Number of indigent senior citizens provided with Social Pension
(Maintained)
Target: 5930
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
346977104 Social Pension Program
Baguio City
Department of Social Welfare and Development - CAR Percentage of beneficiaries using social pension to augment daily living subsistence and medical needs
(default)
Target: 3519
Actual: 0
Expenditure:0
Release:0
Obligation:150072000
-100
351077052 Sidewalk recovery and improvement at Upper P.Burgos road going to Sto.Nino Hospital to Junction Magsaysay
Baguio City
City Local Government of Baguio City percent completed
(Cumulative)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
388236982 Supplemental Feeding Program
Baguio City
Department of Social Welfare and Development - CAR Number of Children Served
(Maintained)
Target: 5030
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
409921618 REHABILITATION OF ERODED RIPRAP BELOW LINDAOAN RESIDENCE AT PUROK 2 ALONG LUCNAB ROAD
Baguio City
City Local Government of Baguio City percentage completed
(Cumulative)
Target: 0
Actual: 0
Expenditure:
Release:790381.38
Obligation:790381.38
0
453543197 Construction of Perimeter Fence at CBAO and Improvement of CBAO building
Baguio City
City Local Government of Baguio City percent completed
(Cumulative)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
481535825 Proposed Tennis Court at Athletic Bowl
Baguio City
City Local Government of Baguio City Percentage of Accomplishment
(Cumulative)
Target: 25
Actual: 43.81
Expenditure:
Release:57014888.66
Obligation:0
75.24
622260767 Continuation of the construction of sewerline along the creek, Imelda Village barangay, Baguio city
Baguio City
City Local Government of Baguio City percent completed
(Cumulative)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
677443938 Sidewalk Recovery and improvement at Hillside road towards Baguio city National High School, Hillside Annex
Baguio City
City Local Government of Baguio City percent completed
(Cumulative)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
831308024 Demolition and Reconstruction of Pacdal Day Care center
Baguio City
City Local Government of Baguio City percent completed
(Cumulative)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
848069806 Repair/Improvement/Upgrading/Completion of Baguio City Health Services Office Annex Building
Baguio City
Department of Health - CAR Percent completed
(Cumulative)
Target: 0
Actual: 96
Expenditure:
Release:2000000
Obligation:1734288.14
0
850528740 Construction of sewerline at Holyghost Extension
Baguio City
City Local Government of Baguio City percent completed
(Cumulative)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
852652260 Redevelopment of Bayan Park,Phase II
Baguio City
City Local Government of Baguio City percent completed
(Cumulative)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
884029755 Supplemental Feeding Program
Baguio City
Department of Social Welfare and Development - CAR Number of beneficiaries served
(default)
Target: 4960
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
887195046 NEW CONSTRUCTION OF ATAB SUPER HEALTH CENTER
Baguio City
Department of Health - CAR PERCENT COMPLETED
(default)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
910953730 Road recovery from Military Cut-off Road to Loakan Road via Sta. Escolastica Barangay Street
Baguio City
City Local Government of Baguio City percentage of accomplishment
(Cumulative)
Target: 0
Actual: 0
Expenditure:
Release:2500000
Obligation:0
0
919319394 Continuation of Sidewalk recovery and improvement From Jose Felipe St. to Legarda Rd.
Baguio City
City Local Government of Baguio City Percentage of Accomplishment
(Cumulative)
Target: 75
Actual: 8.57
Expenditure:
Release:0
Obligation:0
-88.573333333333
939242779 Repair/Improvement/Upgrading of Campo Filipino DHC
Baguio City
Department of Health - CAR Percent completed
(Cumulative)
Target: 100
Actual: 100
Expenditure:
Release:500000
Obligation:474898.18
0
1004023233 CONSTRUCTION OF ATHLETES QUARTERS/ISOLATION FACILITY
Baguio City
City Local Government of Baguio City PERCENT OF ACCOMPLISHMENT
(Cumulative)
Target: 25
Actual: 0
Expenditure:
Release:8535732.38
Obligation:0
-100
1086368148 Installation of Pumps at CBAO/Plumbing Works
Baguio City
City Local Government of Baguio City percent completed
(Cumulative)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
1119737916 Rehabilitation of the Swimming Pool, Old Bleachers and Old Office Building
Baguio City
City Local Government of Baguio City percent completed
(Cumulative)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
1170787968 Social Pension Program
Baguio City
Department of Social Welfare and Development - CAR Number of beneficiaries served
(Maintained)
Target: 3519
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1248046618 Construction of Rain Harvesting and Treatment Facility (Phase II), Busol Watershed, Ambiong, Baguio City
Baguio City
Department of Public Works and Highways - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1250459306 Rehabilitation of Urban Waterway at Botanical Garden
Baguio City
City Local Government of Baguio City percent completed
(Cumulative)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
1263863762 REHABILITATION OF MAIN DRAINAGE SYSTEM ALONG HAPPY HOMES LOOP
Baguio City
City Local Government of Baguio City PERCENTAGE COMPLETED
(Cumulative)
Target: 0
Actual: 0
Expenditure:
Release:2391149.92
Obligation:2391149.92
0
1311770695 Enhancing the Production Capability of Veckamps Printing Press through S&T Intervention
Baguio City
Department of Science and Technology - CAR No. of firms assisted
(default)
Target: 1
Actual: 1
Expenditure:
Release:0
Obligation:0
0
1419443871 ICT Industry Development Bureau.
Baguio City
Department of Information and Communications Technology - CAR # of preparatory activities conducted for the establishment of ICT Councils
(default)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
1430712712 Construction of Athletes Quarters/Isolation Facility
Baguio City
City Local Government of Baguio City percent completed
(Cumulative)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
1449135383 Construction of sewerline at Gen. De Jesus Street, north Central Aurora Hill, Baguio City
Baguio City
City Local Government of Baguio City percent completed
(Cumulative)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
1475962234 ICT Industry Development Bureau
Baguio City
Department of Information and Communications Technology - CAR # of ICT Councils created, InDev 101
(default)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
1499058033 Repair/Improvement of Pacdal District Health Center
Baguio City
Department of Health - CAR Percent completed
(Cumulative)
Target: 0
Actual: 100
Expenditure:
Release:1000000
Obligation:793589.28
0
1523845897 ICT Industry Development Bureau
Baguio City
Department of Information and Communications Technology - CAR # of Strategic Planning Workshop conducted, InDev 102
(default)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
1572327401 ICT Industry Development Bureau
Baguio City
Department of Information and Communications Technology - CAR # of startup related activities conducted/attended
(default)
Target: 2
Actual: 2
Expenditure:
Release:0
Obligation:0
0
1588855313 Continuation of construction of sewerline along Balili river, Brookside barangay, Baguio City
Baguio City
City Local Government of Baguio City percent completed
(Cumulative)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
1608611475 City Camp DHC
Baguio City
Department of Health - CAR percent completed
(default)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
1676633383 Sidewalk Recovery and improvement along Central Business District
Baguio City
City Local Government of Baguio City percent completed
(Cumulative)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
1694997004 Construction of Outdoor Facilities for OCR and Wall Climbing Facility/ Skate park
Baguio City
City Local Government of Baguio City percent completed
(Cumulative)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
1833975346 Provision of Cash Grants including the amount of Rice Subsidy
Baguio City
Department of Social Welfare and Development - CAR Number of Household beneficiaries provided with Conditional Cash Grants
(Maintained)
Target: 3214
Actual: 2581
Expenditure:0
Release:0
Obligation:0
-19.695084007467
1880202899 Perimeter Fence and Rehabilitation of Athletic Bowl Access Road and Gates
Baguio City
City Local Government of Baguio City percent completed
(Cumulative)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
1904301527 Repair/Improvement/Upgrading of Pinsao DHC
Baguio City
Department of Health - CAR Percent completed
(Cumulative)
Target: 100
Actual: 100
Expenditure:
Release:500000
Obligation:478486.05
0
1950336458 Perimeter Fence and Rehabilitation of Athletic Bowl Access Road and Gates (3)
Baguio City
City Local Government of Baguio City Percentage of Accomplishment
(Cumulative)
Target: 0
Actual: 0
Expenditure:
Release:4417500
Obligation:0
0
1954880151 Rehabilitation of Outdoor Archery Range
Baguio City
City Local Government of Baguio City percent completed
(Cumulative)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
1989721449 Rehabilitation of Urban Waterway at Botanical Garden
Baguio City
City Local Government of Baguio City Percentage of Accomplishment
(Cumulative)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
2027765167 Kayapa SIP
Baguio City
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
2035882727 Construction of Sewerline along the creek from St.Joseph going up to Pacdal and Gibraltar Barangay
Baguio City
City Local Government of Baguio City percent completed
(Cumulative)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
2048690365 Construction of sewerline at Gen. De Jesus Street, North Central Aurora Hill, Baguio City
Baguio City
City Local Government of Baguio City Percentage of Accomplishment
(Cumulative)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
2070202719 Procurement and Installation of Disinfection Wash Facility, Baguio City
Baguio City
Department of Social Welfare and Development - CAR 100% completion (60 hand washing facilities in 12 barangays of Baguio City)
(default)
Target: 100
Actual: 100
Expenditure:194909.5
Release:194909.5
Obligation:200000
0
2073288811 Sidewalk recovery and improvement at Hillside Rd towards Baguio City National High School, Hillside Annex
Baguio City
City Local Government of Baguio City Percentage of Accomplishment
(Cumulative)
Target: 0
Actual: 0
Expenditure:
Release:146576.38
Obligation:0
0
2114225975 Greenmuffler/Living Greenscreen Project and Landscape of Island at Magsaysay Flyover, abanao Extension, Happy Homes, Bokawkan
Baguio City
City Local Government of Baguio City percent completed
(Cumulative)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
48684397 Construction of Grouted Riprap at Purok 3, Banban, Banban, Conner
Apayao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
53081989 Upgrading of Facilities of Ferdinand Plameras for the production of UPVC
Apayao
Department of Science and Technology - CAR No. of firms assisted
(default)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
53401051 Cabaggaoan SIS
Apayao
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
57322595 Pangkabuhayang Paghahabi Para sa Mga IP - Provision of Loom Weaving Equipment and Supplies for Sipa IP Tribal Mutual Association, Inc of Sta. Marcela
Apayao
National Commission on Indigenous Peoples - CAR no of projects implemented
(default)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:267295
0
63274345 Tabbug CIS
Apayao
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
67007669 West Apayao Abulug Irrigation System (WAAIS)-04
Apayao
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
73652149 PARTNERSHIP ON SUSTAINABLE LIVING PROJECT
Apayao
Department of Social Welfare and Development - CAR No. of Households provided with livelihood modalities
(Cumulative)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
77052015 Upgrading of Facilities and Improvement of Packaging Material of Rosita Food Stand
Apayao
Department of Science and Technology - CAR No. of firms assisted
(default)
Target: 0
Actual: 1
Expenditure:
Release:0
Obligation:0
0
112192395 West Apayao Abulug IS
Apayao
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
163670670 West Apayao Abulug Irrigation System (WAAIS)-06
Apayao
National Irrigation Administration - CAR 100% completed, 1 unit of concrete structures
(Cumulative)
Target: 2.32
Actual: 4
Expenditure:51013898.6
Release:44075854
Obligation:80853983.15
72.413793103448
165982379 WAAIS POW CY 2023-006
Apayao
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
197624954 Construction of Balay Pagpaniyan Daya yApayao
Apayao
Provincial Local Government of Apayao 1 unit building constructed
(Cumulative)
Target: 100
Actual: 100
Expenditure:
Release:10000000
Obligation:9988275.41
0
201609011 Construction of Multi-purpose Drying Pavement at Sitio Bangko, Guinamgamman, Guinamgaman, Conner
Apayao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
228123898 Construction of Child development center
Apayao
Provincial Local Government of Apayao 1 unit CDC constructed
(Cumulative)
Target: 0
Actual: 0
Expenditure:
Release:3000000
Obligation:2990344.1
0
240181955 Construction of PCCP at Purok 2, Malama, Malama, Conner
Apayao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
244484521 Upgrading of Facilities for Concrete Hollowblock Production
Apayao
Department of Science and Technology - CAR Number of firms assisted
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
245882604 Construction of CDC, Panay, Sta. Marcela, Apayao
Apayao
Provincial Local Government of Apayao 1 unit of CDC facility constructed
(Cumulative)
Target: 1
Actual: 7.73
Expenditure:
Release:3000000
Obligation:2990344.1
673
246320393 Installation of Solar Powered Street Lights, Talifugo, Talifugo, Conner
Apayao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
298555999 Repair and Maintenance (Building & Other Structures-Apayao Justice Hall
Apayao
Provincial Local Government of Apayao 1 unit building repaired and maintained
(Cumulative)
Target: 0
Actual: 0
Expenditure:
Release:3000000
Obligation:2978040.65
0
299919386 CW-APAYAO-08-2022 / WAAIS
Apayao
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 15
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
326132457 West Apayao Abulug IS
Apayao
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
337736791 Improvement of Tanglagan E/S Access Road
Apayao
Provincial Local Government of Apayao access road improved
(Cumulative)
Target: 71.12
Actual: 88.84
Expenditure:
Release:3000000
Obligation:2984821.8
24.915635545557
363586152 Upgrading of Facilities of Villanueva Restaurant
Apayao
Department of Science and Technology - CAR Number of firms assisted
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
367849241 RIS TECH4ED Center Launching
Apayao
Department of Information and Communications Technology - CAR number of activities
(default)
Target: 1
Actual: 1
Expenditure:
Release:0
Obligation:0
0
428818883 SITIO PANAWAGAN SIP
Apayao
National Irrigation Administration - CAR 100% completed
(Cumulative)
Target: 0.72
Actual: 2
Expenditure:0
Release:3246373
Obligation:9340819
177.77777777778
430494179 Upgrading of the Facilities and Improvement of the Packaging Material of Real Delicacies for the Production of Fruit and Veggie-Enriched Cakes and other Bakery Products
Apayao
Department of Science and Technology - CAR No. of firms assisted
(default)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
435527383 Provision of Processing Equipment for Peanut Butter and Coco Jam. Nagbabalayan, Kabugao
Apayao
National Commission on Indigenous Peoples - CAR no of projects implemented
(default)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:218749
0
435921655 PARTNERSHIP ON SAAD (DA)
Apayao
Department of Social Welfare and Development - CAR No. of Households provided with livelihood modalities
(Cumulative)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
453007339 REPAIR/IMPROVEMENT/UPGRADING OF SAN ISIDRO NORTE BHS
Apayao
Department of Health - CAR Percent completed
(Cumulative)
Target: 100
Actual: 100
Expenditure:
Release:500000
Obligation:500000
0
460465008 Social Pension Program
Apayao
Department of Social Welfare and Development - CAR Number of indigent senior citizens provided with Social Pension
(Maintained)
Target: 11578
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
538885891 Upgrading of Facilities of Aela's Digital Printing and Online Shop for the Production of Printed Products
Apayao
Department of Science and Technology - CAR No. of firms assisted
(default)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
563627606 Continuing Improvement of the Production of Furniture Products, Building Components and Other Wood Products thru Science & Technology (Phase II)
Apayao
Department of Science and Technology - CAR Number of firms assisted
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
567729643 NABUANGAN RIVER CUPIZMANGIANGAT PIGOC PH 3
Apayao
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 15
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
573333370 Concreting of Drainage Canal at Purok 2, Guinaang, Guinaang, Conner
Apayao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
580751374 Upgrading of Facilities of GM’s Food Haus for the Production of Baked Products
Apayao
Department of Science and Technology - CAR No. of firms assisted
(default)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
594541306 Upgrading of Facilities of Martina for the Production of Fruit Wine
Apayao
Department of Science and Technology - CAR No. of firms assisted
(default)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
601603284 REPAIR/IMPROVEMENT/UPGRADING OF SAN JOSE BHS
Apayao
Department of Health - CAR Percent completed
(Cumulative)
Target: 100
Actual: 100
Expenditure:
Release:500000
Obligation:497946.12
0
611316299 Science & Technology Intervention for the Production of Furniture Products, Building Components and Novelty Items
Apayao
Department of Science and Technology - CAR No. of firms assisted
(default)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
615864351 RIS Tech4Ed Launching (PLGU)
Apayao
Department of Information and Communications Technology - CAR number of activities
(default)
Target: 0
Actual: 5
Expenditure:
Release:0
Obligation:0
0
616239634 Sustainable Livelihood Program
Apayao
Department of Social Welfare and Development - CAR Total number of households who received seed capital fund and total number of households trained (Seed Capital Funds, Skills Training, and CBLA)
(Maintained)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
624377204 West Apayao Abulug IS
Apayao
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
627984804 Construction of Four - Storey College of Teacher Education Building (Reprogrammed)
Apayao
Apayao State College 25% Completion of the Whole CTE Building
(Cumulative)
Target: 34
Actual: 33.74
Expenditure:
Release:0
Obligation:14540977.49
-0.76470588235294
680725727 REPAIR/IMPROVEMENT/UPGRADING OF LUCAB BHS
Apayao
Department of Health - CAR Percent completed
(Cumulative)
Target: 100
Actual: 100
Expenditure:
Release:500000
Obligation:489258.21
0
691041931 Science & Technology Intervention for the Production of Furniture Products, Building Components and Novelty Items
Apayao
Department of Science and Technology - CAR Number of firms assisted
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
699388678 Upgrading the facilities of JH Auto Parts and Accessories trading for the repair and maintenance services of vehicles
Apayao
Department of Science and Technology - CAR No. of firms assisted
(default)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
702363755 Completion of ASC Multipurpose Building (Gym)
Apayao
Apayao State College Percent Completed
(default)
Target: 80
Actual: 74
Expenditure:
Release:0
Obligation:12561923.74
-7.5
746680382 NABUANGAN RIVER CUPIZMANGIANGAT PIGOC PH 3
Apayao
National Irrigation Administration - CAR 100% completed
(Cumulative)
Target: 0.99
Actual: 2
Expenditure:8102090.96
Release:9354651
Obligation:14796519
102.0202020202
754304033 Family Transitory Support Package
Apayao
Department of Social Welfare and Development - CAR 100% payment of beneficiaries
(default)
Target: 4
Actual: 4
Expenditure:0
Release:0
Obligation:0
0
772545151 Construction of Four - Storey College of Business and Hospitality Managment Building (Reprogrammed)
Apayao
Apayao State College 25% of the whole structure of the CBHM Building
(default)
Target: 16.37
Actual: 16.37
Expenditure:
Release:0
Obligation:14559974.91
0
774781871 REPAIR/IMPROVEMENT/UPGRADING OF BULUAN BIRTHING CENTER
Apayao
Department of Health - CAR Percent completed
(Cumulative)
Target: 100
Actual: 100
Expenditure:
Release:500000
Obligation:499954.24
0
778775089 Livelihood for Enhanced Livestock related activities
Apayao
Department of Agriculture - CAR Number of Projects Completed, Number of Beneficiaries Serve, Number of Community Based Enterprise
(default)
Target: 22
Actual: 9
Expenditure:
Release:0
Obligation:0
-59.090909090909
813801320 Construction/Improvement of Upper Atok-Malibang farm to Market Road
Apayao
Provincial Local Government of Apayao 1,143.58 meters of farm to market road improved
(Cumulative)
Target: 100
Actual: 100
Expenditure:
Release:3000000
Obligation:2994454.52
0
854825549 Dangin CIS
Apayao
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
855224127 New Construction of Calanasan RHU
Apayao
Department of Health - CAR Percent Completed
(default)
Target: 50
Actual: 100
Expenditure:
Release:0
Obligation:0
100
862130567 Construction of MPB (Guinamgamman, Conner)
Apayao
Provincial Local Government of Apayao 1 unit of multi-purpose building constructed.
(Cumulative)
Target: 9.25
Actual: 0.53
Expenditure:
Release:5000000
Obligation:4977615.4
-94.27027027027
867607551 Upgrading of Facilities of Dumapayao Farms Corporation for the Production of Coconut Flour
Apayao
Department of Science and Technology - CAR Number of firms assisted
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
867717011 Social Pension Program
Apayao
Department of Social Welfare and Development - CAR Percentage of beneficiaries using social pension to augment daily living subsistence and medical needs
(default)
Target: 11921
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
887515764 Macalino Valley CIS (Sinigpit CIS)
Apayao
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
900466395 Construction of Multi-purpose Drying Pavement at Purok 5, Ili, Ili, Conner
Apayao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
928150308 SITIO PANAWAGAN SIP
Apayao
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
936806065 Improvement of Malekkeg-Panay-Consuelo-Baluyan Provincial Road
Apayao
Provincial Local Government of Apayao 100 meter of provincial road improved with 70 meters of pccp constructed.
(Cumulative)
Target: 100
Actual: 100
Expenditure:
Release:5000000
Obligation:4992153.77
0
948806626 Repair and Maintenance of the Finance Building
Apayao
Provincial Local Government of Apayao 1 unit building repaired and maintained
(Cumulative)
Target: 0
Actual: 0
Expenditure:
Release:3000000
Obligation:2980088.91
0
965865017 West Apayao Abulug Irrigation System (WAAIS)-04
Apayao
National Irrigation Administration - CAR 100% completed, 1 unit of concrete structures
(Cumulative)
Target: 1.96
Actual: 2
Expenditure:35149023.47
Release:68747286
Obligation:49469465.14
2.0408163265306
984605598 West Apayao Abulug Irrigation System (WAAIS)-06
Apayao
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
996342824 Malayugan SIP
Apayao
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
1012230335 Continuation of Four Storey Academic Building (Phase III)
Apayao
Apayao State College Percent Completed
(default)
Target: 100
Actual: 100
Expenditure:
Release:0
Obligation:0
0
1021564517 Improvement of Barangay Health Station, Allangigan, Allangigan, Conner
Apayao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1053521635 Construction of Banurbur Bridge (Phase II)
Apayao
Provincial Local Government of Apayao 24 linear meter of RCDG Bridge Constructed
(Cumulative)
Target: 54.98
Actual: 70.52
Expenditure:
Release:19600000
Obligation:19384920.47
28.264823572208
1071527645 West Apayao Abulug Irrigation System (WAAIS)-07 (MOOE)
Apayao
National Irrigation Administration - CAR 100% completed, 12.744 km of service road
(Cumulative)
Target: 15
Actual: 17
Expenditure:0
Release:46603975
Obligation:0
13.333333333333
1119943979 Construction/Improvement of Swan-Dona Loreta Road
Apayao
Provincial Local Government of Apayao 495 meters of road improved with 213 meters of portland cement concrete pavement
(Cumulative)
Target: 88.98
Actual: 79.71
Expenditure:
Release:3000000
Obligation:2984844.27
-10.418071476736
1124156054 Construction/Improvement of Malubibit Sur FMR
Apayao
Provincial Local Government of Apayao farm to market road improved.
(Cumulative)
Target: 70.75
Actual: 100
Expenditure:
Release:3000000
Obligation:2971573.71
41.342756183746
1130931346 Construction of Multi Purpose Center Phase II
Apayao
Provincial Local Government of Apayao 1-unit multi-Purpose center Constructed.
(Cumulative)
Target: 0
Actual: 0
Expenditure:
Release:3000000
Obligation:2970536.82
0
1138089775 Supplemental Feeding Program
Apayao
Department of Social Welfare and Development - CAR Number of beneficiaries served
(Maintained)
Target: 3385
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1159923864 West Apayao Abulug Irrigation System (WAAIS)-001
Apayao
National Irrigation Administration - CAR 100% completed, 1.2 km of gravel road
(Cumulative)
Target: 31.77
Actual: 33
Expenditure:86564341.96
Release:1376406
Obligation:99224036.75
3.8715769593957
1189027732 Anninipan Payanan SIP
Apayao
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
1191267433 Construction of Access Road to PPO New Site
Apayao
Provincial Local Government of Apayao 1.58 kilometers of access road constructed
(Cumulative)
Target: 0
Actual: 0
Expenditure:
Release:10000000
Obligation:9805218.48
0
1191751695 Purag CIS
Apayao
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
1211440936 Delineation of Zumigui Ancestral Domain
Apayao
National Commission on Indigenous Peoples - CAR number of stages of CADT application completed
(default)
Target: 1
Actual: 0
Expenditure:
Release:0
Obligation:20550
-100
1221363488 Smart Packaging of Rice for R.P. Manuel Rice Mill
Apayao
Department of Science and Technology - CAR Number of firms assisted
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
1224497163 Improvement of Karikitan-Allangigan FMR
Apayao
Provincial Local Government of Apayao .317 kilometer of farm to market roads improved
(Cumulative)
Target: 100
Actual: 100
Expenditure:
Release:5000000
Obligation:4970380.98
0
1254655499 Continuation of Four Storey Academic Building (Phase III)
Apayao
Apayao State College Percent Completed
(Cumulative)
Target: 30
Actual: 80.07
Expenditure:
Release:0
Obligation:0
166.9
1268499738 Improvement of Anninipan-Allig-Allacapan Provincial Road
Apayao
Provincial Local Government of Apayao 0.286 kilometers of provincial road improved
(Cumulative)
Target: 100
Actual: 100
Expenditure:
Release:5000000
Obligation:4991319.17
0
1290948638 Construction of Provincial Agriculture Office
Apayao
Provincial Local Government of Apayao 1 unit office constructed
(Cumulative)
Target: 0
Actual: 0
Expenditure:
Release:15000000
Obligation:14761387.81
0
1339123118 West Apayao Abulug Irrigation System (WAAIS)-03
Apayao
National Irrigation Administration - CAR 100% completed, 1.09 km of concrete lined canal, 3 units of concrete structures
(Cumulative)
Target: 0.22
Actual: 1
Expenditure:92820668.41
Release:35617063
Obligation:98887747.76
354.54545454545
1361118500 Sustainable Livelihood Program
Apayao
Department of Social Welfare and Development - CAR Total number of households who received seed capital fund and total number of households trained (Seed Capital Funds, Skills Training, and CBLA)
(Maintained)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
1370278063 Concreting of Barangay road at Purok 5, Daga, Daga, Conner
Apayao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1371055491 Upgrading of Facilities of Arlydz Catering Services for the Production of Native Delicacies and other bakery products
Apayao
Department of Science and Technology - CAR Number of firms assisted
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
1382823409 DAGA SIP
Apayao
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1400838408 Managed Internet Subscription for APAYAO
Apayao
Department of Information and Communications Technology - CAR Percent completed
(Cumulative)
Target: 81
Actual: 81
Expenditure:
Release:0
Obligation:0
0
1424904841 Construction/Improvement of OAS-ENR Access Road
Apayao
Provincial Local Government of Apayao 0.135 kilometers of access road improved
(Cumulative)
Target: 0
Actual: 0
Expenditure:
Release:3000000
Obligation:2609897.26
0
1427144974 Continuation of BSHRM Building, Phase III
Apayao
Apayao State College Percent Completed
(Cumulative)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
1440738522 Construction/Improvement of Hugo-Lupi-Kadikitan (Kabugao) FMR
Apayao
Provincial Local Government of Apayao 7.70 kms. FMR improved.
(Cumulative)
Target: 18.5
Actual: 4.81
Expenditure:
Release:15000000
Obligation:14775024.57
-74
1460448449 West Apayao Abulug Irrigation System (WAAIS)-03
Apayao
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1472347188 Construction of PCCP at Sitio Pugo, Paddaoan, Paddaoan, Conner
Apayao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1502501436 Marimay Small Reservoir Irrigation Project
Apayao
National Irrigation Administration - CAR 100% completed, 450 ha generated
(Cumulative)
Target: 0
Actual: 0
Expenditure:0
Release:6606070
Obligation:0
0
1538155167 West Apayao Abulug IS
Apayao
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
1570463490 Improvement of Sta.Maria - Mallig - Upper Atok Farm to Market Road
Apayao
Department of Agriculture - CAR number of kilometer constructed
(Cumulative)
Target: 10.4
Actual: 10.8
Expenditure:
Release:195952888
Obligation:195952888
3.8461538461538
1578866898 Construction of CDC, Tumog, Luna, Apayao
Apayao
Provincial Local Government of Apayao 1 unit of CDC facility constructed
(Cumulative)
Target: 1
Actual: 7.73
Expenditure:
Release:3000000
Obligation:2990344.1
673
1596731382 Regular and Frontloaded Livelihood Projects
Apayao
Department of Social Welfare and Development - CAR No. of Households provided with livelihood modalities
(Cumulative)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
1616236939 Improvement of Poblacion-Laco-Kumao-Baliwanan-Lagnao-Ferdinand Provincial Road
Apayao
Provincial Local Government of Apayao 26.25 kilometers of provincial road improved
(Cumulative)
Target: 0
Actual: 0
Expenditure:
Release:25000000
Obligation:24775359.85
0
1660357042 Livelihood for Enhancement High Value Crops Related activities
Apayao
Department of Agriculture - CAR Number of Projects Completed, Number of Beneficiaries Serve, Number of Community Based Enterprise
(default)
Target: 12
Actual: 6
Expenditure:
Release:0
Obligation:0
-50
1683799021 New Construction of Kabugao Super Health Center
Apayao
Department of Health - CAR Percent Completed
(default)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
1700565214 West Apayao Abulug Irrigation System (WAAIS)-07 (MOOE)
Apayao
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1718499418 Construction of PCCP at Sitio Paddig, Cagalayan, Caglayan (New Pob.), Conner
Apayao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1722303925 Concreting of Pathway at Sitio Simud-Nanawatan-Bugbog, Nabuangan, Nabuangan, Conner
Apayao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1743352466 Improvement of Barangay Health Station, Ripang, Ripang (Old Pob.), Conner
Apayao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1797295274 Science and Technology Intervention to Increase the Productivity of H.N.D. Motor Vehicle Parts and Accessories Shop
Apayao
Department of Science and Technology - CAR No. of firms assisted
(default)
Target: 0
Actual: 1
Expenditure:
Release:0
Obligation:0
0
1818628478 Improvement of Marag-Cadaclan-Eva Provincial Road (Cagandungan-Cadaclan Sec.)
Apayao
Provincial Local Government of Apayao 0.32 kilometers of Rrovincial Road
(Cumulative)
Target: 100
Actual: 100
Expenditure:
Release:15000000
Obligation:14556680.65
0
1838597150 REPAIR/IMPROVEMENT/UPGRADING OF ALEM BHS
Apayao
Department of Health - CAR Percent completed
(Cumulative)
Target: 100
Actual: 100
Expenditure:
Release:500000
Obligation:497642.77
0
1860931527 Completion of Karikitan Multi Purpose Building
Apayao
Provincial Local Government of Apayao 1 unit multi purpose building constructed
(Cumulative)
Target: 12.52
Actual: 19.6
Expenditure:
Release:3500000
Obligation:3476630.86
56.549520766773
1886502560 Construction of Eleazar-Ferdinand Farm to Market Road
Apayao
Provincial Local Government of Apayao 5.160 kilometer of farm to market road constructed..
(Cumulative)
Target: 0
Actual: 0
Expenditure:
Release:25000000
Obligation:24539352.55
0
1897050673 REPAIR/IMPROVEMENT/UPGRADING OF STA. MARCELA RHU
Apayao
Department of Health - CAR Percent completed
(Cumulative)
Target: 0
Actual: 100
Expenditure:
Release:1000000
Obligation:990428.78
0
1923196075 DAGA SIP
Apayao
National Irrigation Administration - CAR 100% completed, 5 HA Generated
(Cumulative)
Target: 1.5
Actual: 2
Expenditure:1700000
Release:2926811
Obligation:3944312
33.333333333333
1933199067 Installation of Solar Powered Street Lights, Sacpil, Sacpil, Conner
Apayao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1937520782 West Apayao Abulug IS (07)
Apayao
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
1947317627 Construction of Multi- Purposed Drying Pavement at Sitio Mehacan, Katablangan and Sitio Cuhoban, Manag, Katablangan, Conner
Apayao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1959318231 Installation of Solar Powered Street Lights, Karikitan, Karikitan, Conner
Apayao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1964516362 Continuing Iprovement of the Production of Furniture Products, Building Components and Other Wood Products thru Science & Technology (Phase II)
Apayao
Department of Science and Technology - CAR No. of firms assisted
(default)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
1965047060 Upgrading/Improvement of Guina ang-Buguit Road
Apayao
Provincial Local Government of Apayao 3.205 kms. Road improved
(Cumulative)
Target: 97.7
Actual: 100
Expenditure:
Release:3000000
Obligation:2937916.1
2.3541453428864
1981299995 West Apayao Abulug IS
Apayao
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
1987198982 West Apayao Abulug Irrigation System (WAAIS)-001
Apayao
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
2023394933 Improvement of Barangay Health Station, Mawigue, Mawegui, Conner
Apayao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
2030581469 Pega Len-ey CIS
Apayao
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
2039076790 Ground Improvement of PNP Payanan
Apayao
Provincial Local Government of Apayao PNP ground improved
(Cumulative)
Target: 0
Actual: 0
Expenditure:
Release:20000000
Obligation:19844407.75
0
2047332861 Construction/Improvement of Lagac-Pinsal FMR
Apayao
Provincial Local Government of Apayao 1.7 kilometer of farm to market road improved
(Cumulative)
Target: 20
Actual: 4.81
Expenditure:
Release:5000000
Obligation:4979662.14
-75.95
2058738664 Value-Adding of Rice thru Rice Milling
Apayao
Department of Science and Technology - CAR Number of firms assisted
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
2075604917 Continuation of BSHRM Building, Phase III
Apayao
Apayao State College Percent Completed
(Maintained)
Target: 100
Actual: 48.92
Expenditure:
Release:0
Obligation:9656748.4
-51.08
2087460606 Social Pension Program
Apayao
Department of Social Welfare and Development - CAR Number of beneficiaries served
(Maintained)
Target: 11921
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
2087776981 Provision of Cash Grants including the amount of Rice Subsidy
Apayao
Department of Social Welfare and Development - CAR Number of Household beneficiaries provided with Conditional Cash Grants
(Maintained)
Target: 7855
Actual: 6620
Expenditure:0
Release:0
Obligation:0
-15.722469764481
2091033243 Provision of Cash Grant to 4Ps beneficiaries including the amount of Rice Subsidy
Apayao
Department of Social Welfare and Development - CAR Number of Household beneficiaries provided with Conditional Cash Grants
(Maintained)
Target: 7019
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
2095577688 Continuation of Three Storey Livelihood and Food Technology Building, Phase II, Malama, Conner, Apayao
Apayao
Apayao State College 50% of the whole structure of the LFT Building
(default)
Target: 5.26
Actual: 5.26
Expenditure:
Release:0
Obligation:14577586.51
0
2099679972 Supplemental Feeding Program
Apayao
Department of Social Welfare and Development - CAR Number of Children Served
(Maintained)
Target: 3770
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
2101129901 Training on Mushroom Production in Calaoan and Barren AD
Apayao
National Commission on Indigenous Peoples - CAR no of projects implemented
(default)
Target: 0
Actual: 0
Expenditure:
Release:200000
Obligation:71634
0
2110423604 Upgrading of Facilities of Megabyte Printing Services for the Production of Printed Products
Apayao
Department of Science and Technology - CAR No. of firms assisted
(default)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
2128943334 Completion of ASC Multipurpose Building (Gym)
Apayao
Apayao State College Percent Completed
(Cumulative)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
2130301496 Construction of Concrete Footpath at Purok 4. Puguin, Puguin, Conner
Apayao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
2134715288 CW-APAYAO-08-2022 / WAAIS
Apayao
National Irrigation Administration - CAR 100% completed
(Cumulative)
Target: 0
Actual: 0
Expenditure:0
Release:8015070
Obligation:390480
0
562530 Wangwang Kakangas SIP Phase III
Mountain Province
National Irrigation Administration - CAR 100% Completed, 9 ha.
(Cumulative)
Target: 0
Actual: 2
Expenditure:37787.18
Release:1180842
Obligation:3430041.73
0
2110303 IMPROVEMENT/CONSTRUCTION OF BARANGAY ACCESS ROAD AT BARANGAY MAINIT, Bontoc
Mountain Province
Department of the Interior and Local Government - CAR percent completed
(Cumulative)
Target: 100
Actual: 0
Expenditure:
Release:0
Obligation:0
-100
2921098 Iwang Kareo SIP
Mountain Province
National Irrigation Administration - CAR 100% Completed, 18 hectares area generated
(Cumulative)
Target: 0
Actual: 2
Expenditure:19971.46
Release:1037080
Obligation:2325067.21
0
10282962 Bauyan CIS
Mountain Province
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
18368045 Improvement of Various Community Pathways, Sumadel, Tadian
Mountain Province
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
18556729 Charupang Chapinay SIP
Mountain Province
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
27268247 Patpatayan CIS
Mountain Province
National Irrigation Administration - CAR 100% completed, 0.23 Lined Canal, 2 units canal structures
(Cumulative)
Target: 2
Actual: 2
Expenditure:0
Release:1304338
Obligation:1534515.03
0
37651918 PARTNERSHIP ON SUSTAINABLE LIVING PROJECT
Mountain Province
Department of Social Welfare and Development - CAR No. of Households provided with livelihood modalities
(Cumulative)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
38728664 MAJOR REPAIR AND IMPROVEMENT OF MEMA LOCAL ACCESS FOOTBRIDGE
Mountain Province
Provincial Local Government of Mountain Province Percent Completed
(Cumulative)
Target: 14.48
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
38731365 Kanligan CIS
Mountain Province
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
46684034 Rehabilitation of Water Supply System, Poblacion
Mountain Province
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
53812078 CONSTRUCTION/UPGRADING OF ANKILENG-BALUGAN FARM-TO-MARKET ROAD at Barangay Ankileng, Sagada
Mountain Province
Department of the Interior and Local Government - CAR percent completed
(Cumulative)
Target: 77.54
Actual: 0
Expenditure:
Release:0
Obligation:0
-100
75919814 Lebdan Banguitan CIS
Mountain Province
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
80558814 Sustainable Livelihood Program
Mountain Province
Department of Social Welfare and Development - CAR Total number of households who received seed capital fund and total number of households trained (Seed Capital Funds, Skills Training, and CBLA)
(Maintained)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
88400020 Maracab CIS (Sadanga CIS, Ampawileng CIS)
Mountain Province
National Irrigation Administration - CAR 100% Completed
(Cumulative)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
88504596 Nacawang Paskok SIP
Mountain Province
National Irrigation Administration - CAR 100% Completed, 3 hectares area generated
(Cumulative)
Target: 0
Actual: 0
Expenditure:0
Release:776643
Obligation:862937.22
0
90253342 dulao SIP Ph. II
Mountain Province
National Irrigation Administration - CAR 100% completed, 4 ha area generated
(Cumulative)
Target: 2
Actual: 4
Expenditure:42623.33
Release:569181
Obligation:2532544.66
100
117498712 Sebang Anga-ang SIP
Mountain Province
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
128514756 Construction of Duagan Proper Daycare Center Slope Protection with Railings, Duagan, Tadian
Mountain Province
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
130279472 OPENING WITH CONCRETING OF CHUMAYAW-ABYOS FARM TO MARKET ROAD IN BARANGAY DALICAN, Bontoc
Mountain Province
Department of the Interior and Local Government - CAR percent completed
(Cumulative)
Target: 100
Actual: 0
Expenditure:
Release:0
Obligation:0
-100
133598539 Panabongen CIS
Mountain Province
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
137881796 PARTNERSHIP ON SAAD (DA)
Mountain Province
Department of Social Welfare and Development - CAR No. of Households provided with livelihood modalities
(Cumulative)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
146446428 Purchase and Installation of Solar Lights
Mountain Province
Department of the Interior and Local Government - CAR Percent Completed
(Cumulative)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
146575231 Construction of Abaan - Pungas Drainage and Abatan - Pua Drainage, Masla, Tadian
Mountain Province
Department of Social Welfare and Development - CAR Percent Completed
(default)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
148010035 CONSTRUCTION OF PIKONG SLOPE PROTECTION WITH DRAINAGE CANAL, Balaoa, Tadian
Mountain Province
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
152696225 Tampog Kao-ag SIP
Mountain Province
National Irrigation Administration - CAR 100% Completed, 10 hectares area generated
(Cumulative)
Target: 0
Actual: 0
Expenditure:44082.86
Release:683969
Obligation:1523941.35
0
157196643 Gueday SIP
Mountain Province
National Irrigation Administration - CAR 100% Completed, 12 hectares area generated
(Cumulative)
Target: 0
Actual: 10
Expenditure:733796.9
Release:1529146
Obligation:4538951.36
0
164503389 Construction of Sidewalk with Railings Along Libo, Napua
Mountain Province
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
164517360 Mog-ao CIS (Kontowor CIS)
Mountain Province
National Irrigation Administration - CAR 100% completed, 0.44 Lined Canal
(Cumulative)
Target: 2
Actual: 2
Expenditure:369492.71
Release:2023639
Obligation:2393131.53
0
170837476 Adcharan Porag CIS (Porag CIS)
Mountain Province
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
175911068 Construction of Drainage at Bulala, Lumnek, Eengan, Buag, Kayan East, Tadian
Mountain Province
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
189268438 Rehabilitation of Water Supply System, Losad
Mountain Province
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
200285858 Improvement of Amkabigat Spring with Access and Drainage System, Sacasacan
Mountain Province
Department of Social Welfare and Development - CAR 100% completion
(default)
Target: 0
Actual: 0
Expenditure:48341.29
Release:463242.39
Obligation:514714
0
209948131 Data Guilom CIS
Mountain Province
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
212968075 Lamagan Koob SIP
Mountain Province
National Irrigation Administration - CAR 100% Completed, 20 hectares area generated
(Cumulative)
Target: 0
Actual: 2
Expenditure:17000.28
Release:1159463
Obligation:3330434.09
0
241165290 Kelos CIS
Mountain Province
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
254649334 Bekes SIP
Mountain Province
National Irrigation Administration - CAR 100% Completed, 5 hectares area generated
(Cumulative)
Target: 0
Actual: 2
Expenditure:15897.92
Release:1312476
Obligation:1478212.52
0
269902996 Beswag SIP
Mountain Province
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
272392664 Fiangtin BHS
Mountain Province
Department of Health - CAR percent completed
(Cumulative)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
277915095 Patonggan SIP
Mountain Province
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
280568324 Bongiyet Kangaw SIP
Mountain Province
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
298980982 CONSTRUCTION/IMPROVEMENT OF SACLIT FARM-TO-MARKET ROAD OF BARANGAY SACLIT, Sadanga
Mountain Province
Department of the Interior and Local Government - CAR percent completed
(Cumulative)
Target: 36.88
Actual: 35.22
Expenditure:
Release:2524793
Obligation:599998.5
-4.5010845986985
303109416 Improvement of Cagubatan Batangan System (Riprapping and Fencing) Phase 1
Mountain Province
National Commission on Indigenous Peoples - CAR no of projects implemented
(default)
Target: 0
Actual: 0
Expenditure:
Release:300000
Obligation:273201
0
313272007 2-STOREY KITCHEN AND MESSHALL
Mountain Province
Department of Health - CAR Percent Completed
(default)
Target: 25
Actual: 5
Expenditure:
Release:0
Obligation:0
-80
314983951 soysoyok creek watten laeg sip ph II
Mountain Province
National Irrigation Administration - CAR 100% completed, 22 ha area generated
(Cumulative)
Target: 15
Actual: 16
Expenditure:380358.32
Release:1600020
Obligation:2094912.21
6.6666666666667
340205157 Kagkey SIP
Mountain Province
National Irrigation Administration - CAR 100% Completed, 16 hectares area generated
(Cumulative)
Target: 0
Actual: 2
Expenditure:33217.5
Release:914800
Obligation:924511.56
0
365931697 Wangwang Kakangas SIP Phase III
Mountain Province
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
368546701 Construction/Improvement of Dandanac-Madagem Access Road in Barangay Tamboan
Mountain Province
Department of the Interior and Local Government - CAR percent completed
(Cumulative)
Target: 92.02
Actual: 92.1
Expenditure:
Release:8000000
Obligation:7998914
0.086937622256029
373047412 Refurbishment of Multi-Purpose Building as Temporary Isolation Facility, Supang
Mountain Province
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
379195424 Okook SIP
Mountain Province
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
380876926 Dandanac SIP
Mountain Province
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
390689572 Improvement of Besao-Nacawang and Tadian-Mabalite Farm to Market Road (Repackaged Segment 2-Sta 413+180- 417+334)
Mountain Province
Department of Agriculture - CAR number of km constructed
(Cumulative)
Target: 1.3
Actual: 1.48
Expenditure:
Release:88136349.51
Obligation:88136349.51
13.846153846154
394418164 Livelihood for Enhanced Livestock related activities
Mountain Province
Department of Agriculture - CAR Number of Projects Completed, Number of Beneficiaries Serve, Number of Community Based Enterprise
(default)
Target: 0
Actual: 31
Expenditure:
Release:0
Obligation:0
0
402529068 Kimbongtit Payag-eo SIP
Mountain Province
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
410893987 Likyo Dawwan CIS
Mountain Province
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
424128458 Fiagtoy CIS
Mountain Province
National Irrigation Administration - CAR 100% completed, 0.30 Lined Canal
(Cumulative)
Target: 3
Actual: 5
Expenditure:862287.41
Release:887951
Obligation:909312.13
66.666666666667
444105392 IMPROVEMENT/REHABILITATION/UPGRADING OF BAGNEN ORIENTE-BAGNEN PROPER ROAD at Barangay Bagnen Oriente, Bauko
Mountain Province
Department of the Interior and Local Government - CAR percent completed
(Cumulative)
Target: 100
Actual: 0
Expenditure:
Release:0
Obligation:0
-100
450837595 Kanga SIP
Mountain Province
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
452592538 Cadad-anan Pandayan CIS
Mountain Province
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
458270591 Dektan SIP
Mountain Province
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
472546675 wangwang kakangas sip ph III
Mountain Province
National Irrigation Administration - CAR 100% completed, 9 ha area generated
(Cumulative)
Target: 3
Actual: 19
Expenditure:37787.18
Release:1012150
Obligation:3430041.73
533.33333333333
473701423 Fiagtoy CIS
Mountain Province
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
475011417 REHABILITATION/IMPROVEMENT OF LEVEL III WATER SYSTEM AT BARANGAY PIDE, Sagada
Mountain Province
Department of the Interior and Local Government - CAR percent completed
(Cumulative)
Target: 0
Actual: 14.74
Expenditure:
Release:0
Obligation:0
0
484039283 Machining Process Enhancement of KC Shop
Mountain Province
Department of Science and Technology - CAR No. of firms assisted
(default)
Target: 1
Actual: 1
Expenditure:
Release:0
Obligation:0
0
490016029 Bangyadan SIP
Mountain Province
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
500577527 Improvement of Ambagiw Access Road (Sawangan-Soybo Section)
Mountain Province
Department of Social Welfare and Development - CAR 100% completion (35 ln.m. PCCP, 118.05 cu.m. grouted riprap)
(default)
Target: 100
Actual: 100
Expenditure:0
Release:150000
Obligation:150000
0
504383712 Supplemental Feeding Program
Mountain Province
Department of Social Welfare and Development - CAR Number of Children Served
(Maintained)
Target: 5078
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
513546871 REPAIR/IMPROVEMENT/UPGRADING OF TALUBIN BHS
Mountain Province
Department of Health - CAR Percent completed
(Cumulative)
Target: 100
Actual: 100
Expenditure:
Release:500000
Obligation:500000
0
520856835 Nagka SIP
Mountain Province
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
537420452 Construction of PCCP with Curb and Gutter on one side along Sitio Batnong FMR
Mountain Province
Department of Social Welfare and Development - CAR 100% completion
(default)
Target: 100
Actual: 100
Expenditure:0
Release:0
Obligation:151591
0
551167503 Upgrading the Production Equipment and Capability of Engan Bread and Pastries through Science and Technology Intervention
Mountain Province
Department of Science and Technology - CAR Number of firms assisted
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
568724542 REPAIR AND MAINTENANCE OF ADMINISTRATIVE BUILDING (ROOF DECK)
Mountain Province
Department of Health - CAR Percent Completed
(default)
Target: 100
Actual: 100
Expenditure:
Release:0
Obligation:0
0
574377038 Pengeo SIP
Mountain Province
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
582775662 Agyo SIS
Mountain Province
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
591447594 Tayoktok Badona SIP
Mountain Province
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
598973784 NEW CONSTRUCTION OF BARLIG SUPER HEALTH CENTER
Mountain Province
Department of Health - CAR Percent completed
(Cumulative)
Target: 0
Actual: 73
Expenditure:
Release:10000000
Obligation:10000000
0
602193770 wangwang kakangas sip ph III
Mountain Province
National Irrigation Administration - CAR percent completed
(Cumulative)
Target: 100
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
604124723 Iyahan CIS
Mountain Province
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
618601837 CONSTRUCTION OF GROUTED RIPRAP AT SAYSAYAGAN TO KAMALIG FMR, Banguitan
Mountain Province
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
624348711 Supang Lintoco SIP
Mountain Province
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
628547726 EO70 CVAs Livelihood Project
Mountain Province
Department of Social Welfare and Development - CAR No. of Households provided with livelihood modalities
(Cumulative)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
629406552 REPAIR/IMPROVEMENT/UPGRADING OF BONTOC GENERAL HOSPITAL
Mountain Province
Department of Health - CAR Percent completed
(Cumulative)
Target: 0
Actual: 70
Expenditure:
Release:50000000
Obligation:50000000
0
633032688 Cabacongan CIS
Mountain Province
National Irrigation Administration - CAR percent completed
(Cumulative)
Target: 100
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
638051886 Talubin CIS (Demang Padgik CIS, Lukkat, Ganenggeng Pagang)
Mountain Province
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
672835492 Regular and Frontloaded Livelihood Projects
Mountain Province
Department of Social Welfare and Development - CAR No. of Households provided with livelihood modalities
(Cumulative)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
688793144 REHABILITATION OF AGAWA NHS GROUTED RIPRAP, Agawa
Mountain Province
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
702549765 Akiakong Naanam-am SIP
Mountain Province
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
707791206 Pingat Taliwaga CIS
Mountain Province
National Irrigation Administration - CAR 100% completed, 0.37 Lined Canal
(Cumulative)
Target: 2
Actual: 2
Expenditure:42555.81
Release:1400925
Obligation:1634516.23
0
711465555 Ongao CIS
Mountain Province
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
721057622 Improvement and Site Development of Multi-Purpose Building as Temporary Isolation Facility, Capinitan
Mountain Province
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
732577992 Upgrading the Production process of Sagada Tropical Fruit Farm
Mountain Province
Department of Science and Technology - CAR No. of firms assisted
(default)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
732690136 Pataim SIP
Mountain Province
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
735404798 REHABILITATION/IMPROVEMENT OF LEVEL III POTABLE WATER SYSTEM IN BARANGAY MADONGO, Sagada
Mountain Province
Department of the Interior and Local Government - CAR percent completed
(Cumulative)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
749379753 Iwang Kareo SIP
Mountain Province
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
750963586 Improvement of Drainage Canal, Busa
Mountain Province
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
752637109 Kadegwayan SIP
Mountain Province
National Irrigation Administration - CAR 100% Completed, 4 hectares area generated
(Cumulative)
Target: 0
Actual: 1
Expenditure:15849.2
Release:986227
Obligation:1185077.97
0
758181391 Maubo Lasangan SIP
Mountain Province
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
762179309 Enhancing the Production Capacity of Junction Food Corner thru S&T Interventions (2nd Assistance)
Mountain Province
Department of Science and Technology - CAR No. of firms assisted
(default)
Target: 1
Actual: 1
Expenditure:
Release:0
Obligation:0
0
764932912 Kaleo CIS
Mountain Province
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
777570326 Chanchaneg Foyfoy Mamokchang SIP
Mountain Province
National Irrigation Administration - CAR 100% Completed, 22 hectares area generated
(Cumulative)
Target: 0
Actual: 0
Expenditure:1287684.31
Release:2430000
Obligation:8123402.67
0
782568140 Balugan SIP
Mountain Province
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
814670572 Improvement of Multi-Purpose Hall as Temporary Isolation Facility, Bun-ayan
Mountain Province
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
826044410 Naweywey SIP
Mountain Province
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
831699233 Upgrading of JF Backyard Chicken Farm
Mountain Province
Department of Science and Technology - CAR No. of firms assisted
(default)
Target: 1
Actual: 1
Expenditure:
Release:0
Obligation:0
0
832495899 Construction of Am-am Sub-Barangay Health Station, Cadad-Anan, Tadian
Mountain Province
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
834442489 Social Pension Program
Mountain Province
Department of Social Welfare and Development - CAR Number of beneficiaries served
(Maintained)
Target: 11465
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
839772170 Improvement of Teb-Tefar to Takib Farm to Market Road, Saclit
Mountain Province
Department of Social Welfare and Development - CAR 100% completion
(default)
Target: 0
Actual: 0
Expenditure:88859.43
Release:799734.83
Obligation:888594
0
839996355 Improvement of Production Process of Pangaton's Bakeshop through Science and Technology Intervention
Mountain Province
Department of Science and Technology - CAR No. of firms assisted
(default)
Target: 1
Actual: 1
Expenditure:
Release:0
Obligation:0
0
851939656 Bauko PIS
Mountain Province
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
855872338 Kayayeo SIP
Mountain Province
National Irrigation Administration - CAR 100% Completed, 9 hectares area generated
(Cumulative)
Target: 0
Actual: 2
Expenditure:23481.5
Release:1341908
Obligation:3386651.62
0
871822847 Baccong Talikud CIS
Mountain Province
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
871837530 Pakang Chakiwatey CIS
Mountain Province
National Irrigation Administration - CAR 100% completed, 1.48 Lined Canal
(Cumulative)
Target: 1
Actual: 2
Expenditure:0
Release:2203696
Obligation:5246894.45
100
872695137 Buasao Tanulong CIS
Mountain Province
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
886166734 Sukeb SIP
Mountain Province
National Irrigation Administration - CAR 100% Completed, 5 hectares area generated
(Cumulative)
Target: 0
Actual: 10
Expenditure:290301.94
Release:1351941
Obligation:1760514.43
0
897013298 Dulao SIP Phase II
Mountain Province
National Irrigation Administration - CAR 100% Completed, 4 hectares area generated
(Cumulative)
Target: 0
Actual: 0
Expenditure:42623.33
Release:1484821
Obligation:2532544.66
0
905852961 Construction of Kamangyawan - Roadside Drainage, Batayan, Tadian
Mountain Province
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
912992068 Bekes SIP
Mountain Province
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
915376727 Amba SIP
Mountain Province
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
919318496 Provision of Cash Grant to 4Ps beneficiaries including the amount of Rice Subsidy
Mountain Province
Department of Social Welfare and Development - CAR Number of Household beneficiaries provided with Conditional Cash Grants
(Maintained)
Target: 6153
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
923698585 Enhancing the Production Process of Mountain Welds and Designs Metal Fabworks (2nd Assistance)
Mountain Province
Department of Science and Technology - CAR No. of firms assisted
(default)
Target: 1
Actual: 1
Expenditure:
Release:0
Obligation:0
0
925207023 Construction of 1-Unit Quarantine Facility, Laylaya
Mountain Province
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
930850143 Tap-ew SIP PH.II
Mountain Province
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
935238535 Rehabilitation of Water Supply System, Lagan
Mountain Province
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
935520861 soysoyok creek watten laeg sip ph II
Mountain Province
National Irrigation Administration - CAR percent completed
(Cumulative)
Target: 100
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
946217358 Mog-ao CIS (Kontowor CIS)
Mountain Province
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
946265050 CONSTRUCTION OF BARANGAY HEALTH CENTER IN BARANGAY PIDE, Sagada
Mountain Province
Department of the Interior and Local Government - CAR percent completed
(Cumulative)
Target: 100
Actual: 0
Expenditure:
Release:0
Obligation:0
-100
949287641 IMPROVEMENT/REHABILITATION/UPGRADING OF BAGNEN ORIENTE-BAGNEN PROPER-BALINTAUGAN-MARKET-AN ROAD at Barangay Balintaugan, Bauko
Mountain Province
Department of the Interior and Local Government - CAR percent completed
(Cumulative)
Target: 100
Actual: 0
Expenditure:
Release:0
Obligation:0
-100
951734351 Mapakawet Sapid SIP
Mountain Province
National Irrigation Administration - CAR 100% Completed, 7 hectares area generated
(Cumulative)
Target: 0
Actual: 0
Expenditure:46213.44
Release:1224684
Obligation:2471953.76
0
957947655 Data Guilom CIS
Mountain Province
National Irrigation Administration - CAR 100% completed, 0.56 Lined Canal, 3 units canal structures, .03 km HDPE Pipe
(Cumulative)
Target: 2
Actual: 2
Expenditure:50313.24
Release:1120957
Obligation:2541329.24
0
961862404 CONSTRUCTION OF MATERIALS RECOVERY FACILITY FOR BAUKO DATRC FACILITIES PHASE II
Mountain Province
Department of Health - CAR Percent Completed
(default)
Target: 25
Actual: 0
Expenditure:
Release:0
Obligation:0
-100
968644277 Provision of Cash Grants including the amount of Rice Subsidy
Mountain Province
Department of Social Welfare and Development - CAR Number of Household beneficiaries provided with Conditional Cash Grants
(Maintained)
Target: 6372
Actual: 5463
Expenditure:0
Release:0
Obligation:0
-14.265536723164
984152321 Construction of Purok Kalimban Drainage, Bantey, Tadian
Mountain Province
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
986698857 Pakang Chakiwatey CIS
Mountain Province
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
986761745 dulao SIP Ph. II
Mountain Province
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
987048806 Gued-ey Adlem SIP
Mountain Province
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
991772740 Macoling CIS
Mountain Province
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
994762839 Social Pension Program
Mountain Province
Department of Social Welfare and Development - CAR Number of indigent senior citizens provided with Social Pension
(Maintained)
Target: 11271
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
998244375 Mapakawet Sapid SIP
Mountain Province
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1010217302 Improvement of Dacudac - Tokod Barangay Road, Dacudac, Tadian
Mountain Province
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1025898766 Pengeo SIP
Mountain Province
National Irrigation Administration - CAR 100% Completed, 4 hectares area generated
(Cumulative)
Target: 0
Actual: 0
Expenditure:22641.01
Release:427514
Obligation:1091426.93
0
1029230126 Improvement of Dap-ay in Dandanac. Tamboan, Besao
Mountain Province
National Commission on Indigenous Peoples - CAR no of projects implemented
(default)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:273385
0
1030253013 Provision of Sugarcane Wine and Muscovado Production for Balangao
Mountain Province
National Commission on Indigenous Peoples - CAR no of projects implemented
(default)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:156047
0
1035445456 Amtagkid CIS
Mountain Province
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
1045088015 Sukeb SIP
Mountain Province
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1053759446 Beswag SIP
Mountain Province
National Irrigation Administration - CAR 100% Completed, 9 hectares area generated
(Cumulative)
Target: 0
Actual: 2
Expenditure:135714.63
Release:8735364
Obligation:2505699.07
0
1056339006 Panabongen CIS
Mountain Province
National Irrigation Administration - CAR 100% completed, 0.56 Lined Canal, 2 units canal structures
(Cumulative)
Target: 2
Actual: 4
Expenditure:0
Release:1465002
Obligation:2722398.09
100
1058064760 Fukung SIP
Mountain Province
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
1058476422 Nadatngan Lasangan SIP
Mountain Province
National Irrigation Administration - CAR Percent Completed
(default)
Target: 100
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1064172740 Cabacongan CIS
Mountain Province
National Irrigation Administration - CAR 100% completed, 3 units canal structures, 1.10 km HDPE Pipe
(Cumulative)
Target: 2
Actual: 4
Expenditure:384329.2
Release:2027358
Obligation:2107583.45
100
1088379750 Upgrading of Sichut Products
Mountain Province
Department of Science and Technology - CAR Number of firms assisted
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
1089349916 Kortan SIP
Mountain Province
National Irrigation Administration - CAR 100% Completed, 7 hectares area generated
(Cumulative)
Target: 0
Actual: 2
Expenditure:17049.18
Release:836084
Obligation:1062563.6
0
1090547246 Improvement of Health Center, Tambingan
Mountain Province
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1099560292 Rehabilitation of Data Various Footpath, Data
Mountain Province
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1120783776 Enhancement of Iglina's Farm Production Process
Mountain Province
Department of Science and Technology - CAR No. of firms assisted
(default)
Target: 0
Actual: 1
Expenditure:
Release:0
Obligation:0
0
1138323263 Kayayeo SIP
Mountain Province
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1161174025 REPAIR/ IMPROVEMENT/ UPGRADING OF BONTOC GEN. HOSPITAL
Mountain Province
Department of Health - CAR PERCENT COMPLETED
(default)
Target: 25
Actual: 0
Expenditure:
Release:0
Obligation:0
-100
1167990454 Kadegwayan SIP
Mountain Province
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1168887303 Patpatayan CIS
Mountain Province
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1171068686 Upgrading of H&S Restaurant
Mountain Province
Department of Science and Technology - CAR Number of firms assisted
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
1181490922 Antadao SIP
Mountain Province
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
1184155935 Kelos CIS
Mountain Province
National Irrigation Administration - CAR 100% completed, 0.26 Lined Canal, 1 unit canal structures
(Cumulative)
Target: 3
Actual: 4
Expenditure:0
Release:883035
Obligation:883034.99
33.333333333333
1188135116 sachar SIP
Mountain Province
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1193316820 Construction of Toktok Diversion Dam, Belwang
Mountain Province
Department of Social Welfare and Development - CAR 100% completion
(default)
Target: 0
Actual: 0
Expenditure:85596
Release:770363
Obligation:855959
0
1215338731 Tabbak SIP
Mountain Province
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
1222838012 Macalana BHS
Mountain Province
Department of Health - CAR percent completed
(Cumulative)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
1239766066 U-od Gusadan
Mountain Province
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
1240716213 Magayang Sibayan SIP
Mountain Province
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
1242858046 Soysoyok Creek Watten Laeg SIP Phase II
Mountain Province
National Irrigation Administration - CAR 100% Completed, 22 hectares area generated
(Cumulative)
Target: 0
Actual: 0
Expenditure:380358.32
Release:1000013
Obligation:2094912.21
0
1249156254 Construction of Nangannib Footbridge with Footpath, Betwagan
Mountain Province
Department of Social Welfare and Development - CAR 100% completion
(default)
Target: 0
Actual: 0
Expenditure:149333.92
Release:1897100.28
Obligation:2107889
0
1256722335 Ayosep SIP
Mountain Province
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
1257295026 Pega Len-ey CIS
Mountain Province
National Irrigation Administration - CAR 100% completed, Restored
(Cumulative)
Target: 0
Actual: 0
Expenditure:62641.92
Release:924387
Obligation:2121806.14
0
1259297406 REHABILITATION/IMPROVEMENT OF LEVEL III POTABLE WATER SYSTEM IN BARANGAY AGUID, Sagada
Mountain Province
Department of the Interior and Local Government - CAR percent completed
(Cumulative)
Target: 8.44
Actual: 0
Expenditure:
Release:0
Obligation:0
-100
1263579150 Ominyo CIS
Mountain Province
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
1280776733 Agadangan Maniniting SIP
Mountain Province
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1281941800 Upgrading the Production Capability of Makhway's Peanut Butter
Mountain Province
Department of Science and Technology - CAR No. of firms assisted
(default)
Target: 1
Actual: 1
Expenditure:
Release:0
Obligation:0
0
1296007960 Miyangaw Fetak SIP
Mountain Province
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
1303965010 Balugan SIP
Mountain Province
National Irrigation Administration - CAR 100% Completed, 6 hectares area generated
(Cumulative)
Target: 0
Actual: 3
Expenditure:15782.94
Release:1590401
Obligation:1618703.43
0
1323553195 Naubeng Suyo CIS
Mountain Province
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
1342767495 Aliwanang SIP
Mountain Province
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
1344117144 EXPANSION OF LEVEL II MAINIT POTABLE WATER SUPPLY AT BARANGAY MAINIT, Bontoc
Mountain Province
Department of the Interior and Local Government - CAR percent completed
(Cumulative)
Target: 94.82
Actual: 0
Expenditure:
Release:0
Obligation:0
-100
1348699804 Enhancement of Madararo Village Water System, Poblacion, Sadanga
Mountain Province
Department of Social Welfare and Development - CAR 100% completion
(default)
Target: 0
Actual: 0
Expenditure:121941.45
Release:1097473.03
Obligation:1219414
0
1350219829 awilan fiato sip ph 2
Mountain Province
National Irrigation Administration - CAR 100% completed, 25 ha area generated
(Cumulative)
Target: 3
Actual: 0
Expenditure:487018.68
Release:1053307
Obligation:4779315.62
-100
1352774124 CONCRETING OF BESAO WEST DRAINAGE CANAL, Besao West
Mountain Province
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1360904741 Dandanac SIP
Mountain Province
National Irrigation Administration - CAR 100% Completed, 12 hectares area generated
(Cumulative)
Target: 0
Actual: 0
Expenditure:79130.64
Release:1521292
Obligation:4443568.26
0
1366292921 Construction of 1 Unit Concrete Footbridge, Lacmaan
Mountain Province
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1369490697 Managed Internet Service - VSAT Network Services for Quarantine Centers and Medical Facilities - Paracelis RHU
Mountain Province
Department of Information and Communications Technology - CAR Percent Completed
(Cumulative)
Target: 38
Actual: 38
Expenditure:
Release:0
Obligation:0
0
1382647535 Masoan SIP
Mountain Province
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1383640836 Bongiyet Kangaw SIP
Mountain Province
National Irrigation Administration - CAR 100% Completed, 7 hectares area generated
(Cumulative)
Target: 0
Actual: 0
Expenditure:43985.42
Release:894793
Obligation:2600535.82
0
1386669765 CONSTRUCTION OF ELEMENTARY SCHOOL BUILDING IN BARANGAY FIDELISAN, SAGADA, MOUNTAIN PROVINCE
Mountain Province
Department of the Interior and Local Government - CAR percent completed
(Cumulative)
Target: 36.41
Actual: 0
Expenditure:
Release:0
Obligation:0
-100
1394100675 Improvement of Community Pathways, Kin-iway
Mountain Province
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1406425318 Design and Build of Sewage Treatment Plant (STP) using Advance Oxidation System for Bauko DATRC Phase II
Mountain Province
Department of Health - CAR Percent Completed
(default)
Target: 25
Actual: 29
Expenditure:
Release:0
Obligation:0
16
1409250952 Completion of Banaao Barangay Quarantine Facility, Banaao, Tadian
Mountain Province
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1414780048 Construction of Camutagtag SWIP
Mountain Province
Department of Agriculture - CAR number of Small Scale Irrigation Projects (SSIP) constructed, service area (ha) generated, number of groups
(Cumulative)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
1419267647 Construction of Grouted Riprap Along Ambagiw Access Road, Ambagiw
Mountain Province
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1422723537 Soysoyok Creek Watten Laeg SIP Phase II
Mountain Province
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1422803167 Construction of Various Drainage, Poblacion, Tadian
Mountain Province
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1427869893 Supang Lintoco SIP
Mountain Province
National Irrigation Administration - CAR 100% Completed, 6 hectares area generated
(Cumulative)
Target: 0
Actual: 2
Expenditure:781656.11
Release:903309
Obligation:1406902.69
0
1457256551 Malibo Catengan SIP
Mountain Province
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
1460039218 Data CIS
Mountain Province
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
1470043556 REPAIR/IMPROVEMENT/UPGRADING OF NATONIN RHU
Mountain Province
Department of Health - CAR Percent completed
(Cumulative)
Target: 0
Actual: 100
Expenditure:
Release:1000000
Obligation:1000000
0
1473559463 Installation of Solar Street Lights, Bunga, Tadian
Mountain Province
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1475959746 Awilan Fiato SIP Phase II
Mountain Province
National Irrigation Administration - CAR 100% Completed, 25 hectares area generated
(Cumulative)
Target: 0
Actual: 0
Expenditure:487018.68
Release:1602859
Obligation:4779315.62
0
1486694693 Tampog Kao-ag SIP
Mountain Province
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1496889869 Rehabilitation of Drainage Canal, Namatec
Mountain Province
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1505976267 Arapang SIP
Mountain Province
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
1517011806 Construction of Barangay Disaster Operations Center, Lenga, Tadian
Mountain Province
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1519014535 Refurbishing of BDRRMC Building into a Quarantine Facility, Besao East
Mountain Province
Department of Social Welfare and Development - CAR 100% completion
(Cumulative)
Target: 0
Actual: 0
Expenditure:0
Release:200478.1
Obligation:200478
0
1520188746 Construction of 1-Unit Box Culvert, Gueday
Mountain Province
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1520854911 Owikan Bakan SIP
Mountain Province
National Irrigation Administration - CAR 100% Completed, 7 hectares area generated
(Cumulative)
Target: 0
Actual: 0
Expenditure:60728.64
Release:943712
Obligation:1323374.88
0
1523139352 Latang CIS
Mountain Province
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1523161796 Improvement of Kreativ Ink Printing Services
Mountain Province
Department of Science and Technology - CAR No. of firms assisted
(default)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
1534012499 Pakil Labaan CIS
Mountain Province
National Irrigation Administration - CAR 100% completed, 0.37 Lined Canal
(Cumulative)
Target: 2
Actual: 4
Expenditure:0
Release:1005076
Obligation:5246894.45
100
1541001616 RECONSTRUCTION OF PUBLIC BUILDING
Mountain Province
Provincial Local Government of Mountain Province Percent Completed
(Cumulative)
Target: 55.69
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1575023618 Okook SIP
Mountain Province
National Irrigation Administration - CAR 100% Completed, 5 hectares area generated
(Cumulative)
Target: 0
Actual: 0
Expenditure:36252.78
Release:1084715
Obligation:1852200.59
0
1597754773 DIGITAL WORKFORCE - TRAINING ADMINISTRATION: ICT Executive Briefing for Digital Leaders Seminar
Mountain Province
Department of Information and Communications Technology - CAR # of Conducted ICT Executive Briefing for Digital Leaders Seminar
(default)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
1608422415 Maliten SIP
Mountain Province
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
1610056442 Finew Pawik CIS
Mountain Province
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
1610914712 Namogsor CIS
Mountain Province
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
1617251311 Cagubatan CIS
Mountain Province
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
1628823273 Construction of Slope Protection at Agadangan, Kayan West, Tadian
Mountain Province
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1633325134 Completion of Multi-Purpose Hall Building as Temporary Isolation Facility, Camatagan
Mountain Province
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1636905861 Dulao SIP Phase II
Mountain Province
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1639868770 Chagchag SIP
Mountain Province
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
1642583026 Mapway CIS
Mountain Province
National Irrigation Administration - CAR 100% completed, 2 units canal structures, .91 km HDPE Pipe
(Cumulative)
Target: 2
Actual: 3
Expenditure:31094.27
Release:640710
Obligation:842120.2
50
1642957707 Bananao PIS
Mountain Province
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
1645623851 Tap-ew SIP PH.II
Mountain Province
National Irrigation Administration - CAR 100% Completed, 7 hectares area generated
(Cumulative)
Target: 0
Actual: 0
Expenditure:774200.68
Release:9700650
Obligation:1635537.93
0
1648172107 Namsong Mobo CIS
Mountain Province
National Irrigation Administration - CAR 100% completed, 0.04 Lined Canal, 0.70 km HDPE Pipe
(Cumulative)
Target: 2
Actual: 2
Expenditure:0
Release:1097298
Obligation:1097297.92
0
1658918357 Kabaayan SIP
Mountain Province
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
1662875687 Rehabilitation of Subagan Drainage Canal, Bao-angan
Mountain Province
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1670808041 Masoan SIP
Mountain Province
National Irrigation Administration - CAR 100% Completed, 5 hectares area generated
(Cumulative)
Target: 0
Actual: 2
Expenditure:49662.42
Release:976366
Obligation:1029411.68
0
1674706973 Tekan SIP
Mountain Province
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
1681141027 Construction of Suquib-Banao FMR (Kinggasa Section), Suquib
Mountain Province
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1698026326 Nacawang Paskok SIP
Mountain Province
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1700809389 Construction of Mogao to Katungao River Pathway Drainage, Cagubatan, Tadian
Mountain Province
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1710024465 Construction of Isolation Facility Phase II, Tue, Tadian
Mountain Province
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1712601461 Completion of Multi-Purpose Building as Temporary Isolation Facility, Pingad
Mountain Province
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1721939333 Lebdan Banguitan CIS
Mountain Province
National Irrigation Administration - CAR 100% completed, Restored
(Cumulative)
Target: 2
Actual: 2
Expenditure:52551.62
Release:1344986
Obligation:1546980.02
0
1723437637 Upper Tokok SIP
Mountain Province
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
1726069720 Upgrading the Production Equipment and Capability of Log Cabin Restaurant and Homestay through Science and Technology Intervention
Mountain Province
Department of Science and Technology - CAR Number of firms assisted
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
1739591012 Togtog-Maaliwen SIP
Mountain Province
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
1739829825 Equipment Upgrading of Ambango Furniture Shop
Mountain Province
Department of Science and Technology - CAR Number of firms assisted
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
1777613949 Agadangan Maniniting SIP
Mountain Province
National Irrigation Administration - CAR 100% Completed, 16 hectares area generated
(Cumulative)
Target: 0
Actual: 0
Expenditure:2860033.83
Release:2096298
Obligation:6050987.31
0
1781069122 Aliwen Baang SIP
Mountain Province
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
1792696443 REHABILITATION OF MADONGO-NADATNGAN FARM-TO-MARKET ROAD AT BARANGAY MADONGO, Sagada
Mountain Province
Department of the Interior and Local Government - CAR percent completed
(Cumulative)
Target: 100
Actual: 0
Expenditure:
Release:0
Obligation:0
-100
1792699419 Lower Tamboan SIP
Mountain Province
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
1794259992 Construction of Epasan - Angkiap Pathway with Drainage, Pandayan, Tadian
Mountain Province
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1808066223 Refurbishment of Multi-Purpose Building as Temporary Isolation Facility, Supang
Mountain Province
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1818482242 Construction of Cam-or Drainage Canal, Anabel
Mountain Province
Department of Social Welfare and Development - CAR 100% completion
(default)
Target: 0
Actual: 0
Expenditure:53144.32
Release:647417.84
Obligation:719353
0
1819676752 Kagkey SIP
Mountain Province
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1822570741 Ambagiw SIP
Mountain Province
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
1833409625 Agawa SIP
Mountain Province
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
1840733599 Sustainable Livelihood Program
Mountain Province
Department of Social Welfare and Development - CAR Total number of households who received seed capital fund and total number of households trained (Seed Capital Funds, Skills Training, and CBLA)
(Maintained)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
1855366153 Dogo SIP
Mountain Province
National Irrigation Administration - CAR 100% Completed, 5 hectares area generated
(Cumulative)
Target: 0
Actual: 0
Expenditure:44977.99
Release:890000
Obligation:934977.99
0
1855761933 Concreting of Catengan Drainage Systems. Catengan
Mountain Province
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1862702917 Construction and Improvement of Various Drainage, Lubon, Tadian
Mountain Province
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1888152827 Upgrading of Rofline Wines Food Processing
Mountain Province
Department of Science and Technology - CAR No. of firms assisted
(default)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
1897693878 Equipment & Market Process Upgrading of Little Auto Shop
Mountain Province
Department of Science and Technology - CAR Number of firms assisted
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
1915084543 Livelihood for Enhanced High Value Crops related activities
Mountain Province
Department of Agriculture - CAR Number of Projects Completed, Number of Beneficiaries Serve, Number of Community Based Enterprise
(default)
Target: 10
Actual: 2
Expenditure:
Release:0
Obligation:0
-80
1922453140 Nadatngan Lasangan SIP
Mountain Province
National Irrigation Administration - CAR 100% Completed, 7 hectares area generated
(Cumulative)
Target: 0
Actual: 1
Expenditure:75122.12
Release:975976
Obligation:2264015.29
0
1931013230 Improvement of Barangay Demang Various Footpath, Demang
Mountain Province
Department of Social Welfare and Development - CAR 100% completion
(default)
Target: 0
Actual: 0
Expenditure:49724.24
Release:645032.24
Obligation:716702
0
1934150812 Kortan SIP
Mountain Province
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1936032009 Chanchaneg Foyfoy Mamokchang SIP
Mountain Province
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1943285446 IMPROVEMENT/REHABILITATION/UPGRADING OF BAGNEN ORIENTE-BAGNEN PROPER-BALINTAUGAN ROAD at Barangay Bagnen Proper, Bauko
Mountain Province
Department of the Interior and Local Government - CAR percent completed
(Cumulative)
Target: 100
Actual: 0
Expenditure:
Release:0
Obligation:0
-100
1944269013 awilan fiato sip ph 2
Mountain Province
National Irrigation Administration - CAR percent completed
(Cumulative)
Target: 100
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1947543259 Mapway CIS
Mountain Province
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1956865685 Depe CIS
Mountain Province
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
1959204430 NEW CONSTRUCTION OF BARLIG SUPER HEALTH CENTER
Mountain Province
Department of Health - CAR PERCENT COMPLETED
(default)
Target: 25
Actual: 0
Expenditure:
Release:0
Obligation:0
-100
1971903286 Pingat Taliwaga CIS
Mountain Province
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1972217365 Gueday SIP
Mountain Province
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1994916497 Dogo SIP
Mountain Province
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1998965246 Payew Tocucan SIP
Mountain Province
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
2004932938 Improvement of Community Drainage Canal, Payeo
Mountain Province
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
2015397652 Improvement of Footpath with Railings, Gayang
Mountain Province
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
2018016356 sachar SIP
Mountain Province
National Irrigation Administration - CAR 100% completed, 7 ha area generated
(Cumulative)
Target: 10
Actual: 0
Expenditure:350845.13
Release:1532374
Obligation:2241341.13
-100
2021881536 Karanag SIP
Mountain Province
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
2027195044 Sinmodata PIS
Mountain Province
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
2030169686 CONSTRUCTION OF POWER HOUSE FOR BAUKO DARTC FACILITIES PHASE II
Mountain Province
Department of Health - CAR Percent Completed
(default)
Target: 50
Actual: 89
Expenditure:
Release:0
Obligation:0
78
2034414300 Latang CIS
Mountain Province
National Irrigation Administration - CAR 100% completed, 0.44 Lined Canal
(Cumulative)
Target: 2
Actual: 4
Expenditure:0
Release:1145038
Obligation:1347103.66
100
2041710307 Pakil Labaan CIS
Mountain Province
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
2056371352 Biyogan Payas Natundo SIP
Mountain Province
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
2058910846 Sustainable Livelihood Program
Mountain Province
Department of Social Welfare and Development - CAR Total number of households who received seed capital fund and total number of households trained (Seed Capital Funds, Skills Training, and CBLA)
(Maintained)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
2070810190 Social Pension Program
Mountain Province
Department of Social Welfare and Development - CAR Percentage of beneficiaries using social pension to augment daily living subsistence and medical needs
(default)
Target: 11465
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
2072646345 Lamagan Koob SIP
Mountain Province
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
2088551574 Improvement of Padangaan Drainage System, Padangaan
Mountain Province
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
2092433940 Upgrading of Patty's Food Products
Mountain Province
Department of Science and Technology - CAR No. of firms assisted
(default)
Target: 0
Actual: 1
Expenditure:
Release:0
Obligation:0
0
2099099072 Supplemental Feeding Program
Mountain Province
Department of Social Welfare and Development - CAR Number of beneficiaries served
(Maintained)
Target: 4820
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
2112814942 Owikan Bakan SIP
Mountain Province
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
2122505667 Namsong Mobo CIS
Mountain Province
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
2125534986 Rehabilitation of Lipitan - Tabbaan Access Road, Mabalite, Tadian
Mountain Province
Department of Social Welfare and Development - CAR Percent Completed
(default)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
2147322062 Cadogen CIS
Mountain Province
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
1405432 Procure and implement Internet Connectivity Service in State Universities and Colleges (SUCs)
Regionwide
Department of Information and Communications Technology - CAR # of Free Wi-Fi AP sites in SUCs established/activated
(Cumulative)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
2206058 DIGITAL WORKFORCE - COMPETENCY STANDARDS: Conduct of ICT for User Assessment Exam
Regionwide
Department of Information and Communications Technology - CAR # of ICT for User Assessment takers
(default)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
14896761 SETUP Program Mobilization Budget
Regionwide
Department of Science and Technology - CAR N/A
(default)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
19620353 Adjudication Services
Regionwide
National Commission on Indigenous Peoples - CAR no of cases acted upon
(default)
Target: 10
Actual: 6
Expenditure:
Release:242000
Obligation:720656
-40
71032792 DIGITAL WORKFORCE - TRAINING ADMINISTRATION: Provide Digital Governance and Management trainings
Regionwide
Department of Information and Communications Technology - CAR Participants for the training on Digital Governance and Management (in %)
(default)
Target: 0
Actual: 40
Expenditure:
Release:0
Obligation:0
0
78175287 DIGITAL WORKFORCE - TRAINING ADMINISTRATION: Provide Training of Trainers for Subject Matter Experts on ICT specialized training programs
Regionwide
Department of Information and Communications Technology - CAR # of Participants for the ToT for Subject Matter Experts on ICT specialized training program
(default)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
99403301 DIGITAL WORKFORCE - RESEARCH AND EVALUATION: Conduct of Competency Needs Assessment (CNA)
Regionwide
Department of Information and Communications Technology - CAR # Training Needs Assessment Participants
(default)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
104926320 System Implementation and Maintenance Cloud Provisioning and System Implementation for LGUs Implementing the Integrated Processing of Barangay Clearance in Business Permit Module
Regionwide
Department of Information and Communications Technology - CAR Percent Completed
(Cumulative)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
105564478 Technical Consultancy Services
Regionwide
Department of Science and Technology - CAR No. of beneficiaries served
(default)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
112556696 DIGITAL WORKFORCE - COMPETENCY STANDARDS: Formulation of Curriculum Recognition Guidelines
Regionwide
Department of Information and Communications Technology - CAR Participation of regions in the FGDs conducted (%)
(default)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
122505306 Maintenance and Protection
Regionwide
Department of Environment and Natural Resources - CAR Area Maintained and Protected in Hectares
(Cumulative)
Target: 8287
Actual: 0
Expenditure:
Release:28154000
Obligation:28154000
-100
142924094 Conduct of DJPH interviews in preparation for the technical trainings
Regionwide
Department of Information and Communications Technology - CAR # of interviewed applicants
(default)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
143017646 Construction of Diversion Dam
Regionwide
Department of Agriculture - CAR number of diversion dam constructed, service area generated
(Cumulative)
Target: 0
Actual: 0
Expenditure:
Release:33386590
Obligation:31306595.93
0
144570130 Conduct of Planning and Monitoring and Evaluation Activities
Regionwide
Department of Information and Communications Technology - CAR # Advocacy Activities Conducted
(default)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
187054533 Provision of Cash Grants including the amount of Rice Subsidy
Regionwide
Department of Social Welfare and Development - CAR Number of Household beneficiaries provided with Conditional Cash Grants
(Maintained)
Target: 63896
Actual: 54145
Expenditure:0
Release:216249600
Obligation:240055200
-15.260736196319
198112739 DIGITAL WORKFORCE - TRAINING ADMINISTRATION: Conduct of external engagements with stakeholders for the implementation of target or or other related activities
Regionwide
Department of Information and Communications Technology - CAR # of external engagements conducted for the implementation of a target or other related activities
(default)
Target: 0
Actual: 2
Expenditure:
Release:0
Obligation:0
0
214260805 Regional Government Network (GovNet)
Regionwide
Department of Information and Communications Technology - CAR # of agencies connected to the Government Network
(Cumulative)
Target: 72
Actual: 73
Expenditure:
Release:274680
Obligation:274680
1.3888888888889
215610900 DIGITAL WORKFORCE - RESEARCH AND EVALUATION: Conduct of external engagement with stakeholders for the implementation of target or or other related activities
Regionwide
Department of Information and Communications Technology - CAR # of external engagements conducted for the implementation of a target or other related activities
(default)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
219795590 DIGITAL WORKFORCE - TRAINING ADMINISTRATION: ICT Executive Briefing for Digital Leaders Seminar
Regionwide
Department of Information and Communications Technology - CAR # of Participants for the ICT Executive Briefing for Digital Leaders Seminar
(default)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
226734077 DIGITAL WORKFORCE - TRAINING ADMINISTRATION: Provide training on Cybersecurity
Regionwide
Department of Information and Communications Technology - CAR # of Participants for the training on Cybersecurity
(default)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
253798018 DRRM events/meetings attended/participated
Regionwide
Department of Information and Communications Technology - CAR Number of DRRM events/meetings attended/participated
(default)
Target: 1
Actual: 6
Expenditure:
Release:250000
Obligation:71381.38
500
258861195 Operational Requirements and Internal Activities Conduct of Periodic Planning and Assessment
Regionwide
Department of Information and Communications Technology - CAR Percent Completed
(Cumulative)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
271511461 Seedling Production
Regionwide
Department of Environment and Natural Resources - CAR Number of Seedlings/Propagules Produced
(default)
Target: 63964
Actual: 71649
Expenditure:
Release:1667000
Obligation:0
12.014570696017
281827686 Construction of Diversion Dam
Regionwide
Department of Agriculture - CAR number of Small Scale Irrigation Projects (SSIP) constructed, service area (ha) generated, number of groups
(Cumulative)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
297680009 (Central Office) Procurement for the Provision of Mobile Solution for Internet Liberty (PMSIL)
Regionwide
Department of Information and Communications Technology - CAR # of Free Wi-Fi AP sites established/activated and accepted by Central Office
(Cumulative)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
371489553 Innovations for Filipinos Working Distantly from the Philippines (iFWD) and Industry Level Intervention
Regionwide
Department of Science and Technology - CAR N/A
(default)
Target: 0
Actual: 0
Expenditure:
Release:21000
Obligation:210000
0
374969703 DIGITAL WORKFORCE - RESEARCH AND EVALUATION: Conduct of Competency Needs Assessment (CNA)
Regionwide
Department of Information and Communications Technology - CAR # of Competency Needs Assessment Participants
(default)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
379852985 System Implementation and Maintenance Cloud Provisioning and System Implementation for LGUs Implementing the Certificate of Occupancy Module
Regionwide
Department of Information and Communications Technology - CAR Percent Completed
(Cumulative)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
393518527 Plantation Establishment
Regionwide
Department of Environment and Natural Resources - CAR Area Planted in Hectares
(Cumulative)
Target: 4427
Actual: 0
Expenditure:
Release:28775000
Obligation:28775000
-100
454502142 Conduct of Site Inspection and Testing
Regionwide
Department of Information and Communications Technology - CAR # of inspected and tested WiFi sites
(default)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
492040758 Operations management of DTCs
Regionwide
Department of Information and Communications Technology - CAR # of Center Managed
(default)
Target: 0
Actual: 2
Expenditure:
Release:0
Obligation:0
0
507611252 DIGITAL WORKFORCE - RESEARCH AND EVALUATION: Collaboration with other educational institutions both local and international, and other institutions
Regionwide
Department of Information and Communications Technology - CAR # of Activities conducted in collaboration with the educational institutions
(default)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
521824942 Scholarship Program-TWSP
Regionwide
Technical Education and Skills Development Authority - CAR number of enrolled, number of graduates
(default)
Target: 2530
Actual: 150
Expenditure:
Release:14369983.58
Obligation:26747629.26
-94.071146245059
540526726 JobStart Philippines
Regionwide
Department of Labor and Employment - CAR No. of JobStart Life Skills Training Enrollees
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
575036136 Conduct of Digital Literacy (DL) Training to Program stakeholders
Regionwide
Department of Information and Communications Technology - CAR # of Digital Literacy Training(s) Conducted
(Cumulative)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
586173211 Construction and Installation of SPIS
Regionwide
Department of Agriculture - CAR number of SPIS constructed/installed, service area (hectare) generated
(Cumulative)
Target: 0
Actual: 0
Expenditure:
Release:5000000
Obligation:4982572.8
0
587285372 Rehabilitation of Irrigation Canal
Regionwide
Department of Agriculture - CAR linear meter, service area restored
(Cumulative)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
591944112 Regional implementation of startup awareness activities (Mapping, Awareness/ Advocacy, Mentorship etc)
Regionwide
Department of Information and Communications Technology - CAR Number of DSDAP Activities Conducted
(default)
Target: 0
Actual: 3
Expenditure:
Release:94799.2
Obligation:0
0
598783319 Cordillera Month
Regionwide
National Economic and Development Authority - CAR Percentage completed
(default)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
639902016 DIGITAL WORKFORCE - TRAINING ADMINISTRATION: Review of Training Courses
Regionwide
Department of Information and Communications Technology - CAR # of conducted Review of Training Courses
(default)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
648895451 Regional Autonomy: What's in it for you and me?
Regionwide
National Economic and Development Authority - CAR Percentage completed
(default)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
659506423 Conduct of activities for Creative Upskilling Program for Development
Regionwide
Department of Information and Communications Technology - CAR Number of trained individuals for the Creative Upskilling Program for Development
(default)
Target: 0
Actual: 0
Expenditure:
Release:1080700
Obligation:0
0
662511845 Scholarship Programs-PESFA
Regionwide
Technical Education and Skills Development Authority - CAR number of enrolled, number of graduates
(default)
Target: 62
Actual: 62
Expenditure:
Release:0
Obligation:0
0
700348085 Scholarship Program
Regionwide
Technical Education and Skills Development Authority - CAR number of enrolled, number of graduates
(default)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:37149
0
707474834 DIGITAL WORKFORCE - RESEARCH AND EVALUATION: Stakeholder's Summit
Regionwide
Department of Information and Communications Technology - CAR # of Partner Summit conducted
(default)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
783600884 DIGITAL WORKFORCE - TRAINING ADMINISTRATION: Provide Digital Governance and Management trainings
Regionwide
Department of Information and Communications Technology - CAR # of Conducted training on Digital Governance and Management
(default)
Target: 0
Actual: 1
Expenditure:
Release:0
Obligation:0
0
807946876 Technology Trainings and Fora for MSMEs
Regionwide
Department of Science and Technology - CAR No. of trainings and fora conducted
(default)
Target: 7
Actual: 5
Expenditure:
Release:0
Obligation:0
-28.571428571429
816859282 Operations management of DTCs
Regionwide
Department of Information and Communications Technology - CAR # of Center users provided with training and non-training services
(default)
Target: 600
Actual: 1319
Expenditure:
Release:0
Obligation:0
119.83333333333
822097161 Scholarship Program
Regionwide
Technical Education and Skills Development Authority - CAR number of enrolled, number of graduates
(default)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:15605727
0
828704689 IP Month Celebration: Restoring and Fostering Cultural Growth in the Cordillera Regio
Regionwide
National Commission on Indigenous Peoples - CAR no of projects implemented
(default)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
842529138 (Central Office) Procurement of Universal Internet Subscription for Geographically Isolated and Disadvantaged Areas (UISG) - Phase 1
Regionwide
Department of Information and Communications Technology - CAR # of Free Wi-Fi AP sites in GIDAs established/activated and accepted by Central Office
(Cumulative)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
849268943 Conduct of Internet Media and Information Literacy (IMIL) Training to Program beneficiary users
Regionwide
Department of Information and Communications Technology - CAR # of IMIL Training(s) conducted
(Cumulative)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
880035390 DIGITAL WORKFORCE - COMPETENCY STANDARDS: Conduct of ICT for User Assessment Exam
Regionwide
Department of Information and Communications Technology - CAR # of ICT for User Assessment Exam Conducted
(default)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
902263507 DIGITAL WORKFORCE - TRAINING ADMINISTRATION: Review of Training Courses
Regionwide
Department of Information and Communications Technology - CAR # of Participants for the Review of Training Courses
(default)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
908501059 Digital Jobs PH
Regionwide
Department of Information and Communications Technology - CAR numbers of trained individuals, number of trainings conducted, numbers of employed graduates
(default)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
929868222 (Central office) Provision of Internet Connectivity Services (PICS) in Public Places (PICS-PP)
Regionwide
Department of Information and Communications Technology - CAR # of Free Wi-Fi AP sites in public places established/activated and accepted by Central Office
(Cumulative)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
937229953 DIGITAL WORKFORCE - TRAINING ADMINISTRATION: Provide trainings on Transformative Technologies
Regionwide
Department of Information and Communications Technology - CAR # of Conducted training on Transformative Technologies
(default)
Target: 0
Actual: 1
Expenditure:
Release:0
Obligation:0
0
949698156 DIGITAL WORKFORCE - COMPETENCY STANDARDS: Conduct of ICT Specialist Proficiency Certification Exam (Hands-on)
Regionwide
Department of Information and Communications Technology - CAR # of certification exams conducted
(default)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
974363261 DIGITAL WORKFORCE - TRAINING ADMINISTRATION: Provide trainings on Transformative Technologies
Regionwide
Department of Information and Communications Technology - CAR # of Participants for the training on Transformative Technologies
(default)
Target: 0
Actual: 29
Expenditure:
Release:0
Obligation:0
0
984495512 Rehabilitation of Diversion Dam
Regionwide
Department of Agriculture - CAR number of diversion dam rehabilitated, service area restored
(Cumulative)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
986897312 Scholarship Program
Regionwide
Technical Education and Skills Development Authority - CAR number of enrolled, number of graduates
(default)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:14410121
0
996385006 Workshops on Messaging on Peace and Autonomy
Regionwide
National Economic and Development Authority - CAR number of activities
(Cumulative)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
998050986 Scholarship Program-TWSP
Regionwide
Technical Education and Skills Development Authority - CAR Number of enrolled, Number of graduates
(default)
Target: 396
Actual: 0
Expenditure:
Release:0
Obligation:31441070.49
-100
1000896108 Regional Government Network (GovNet) - Operations and Maintenance
Regionwide
Department of Information and Communications Technology - CAR Percentage of Connections Operated and Maintained
(Maintained)
Target: 100
Actual: 100
Expenditure:
Release:4000000
Obligation:3912043.44
0
1015302348 DIGITAL WORKFORCE - TRAINING ADMINISTRATION: Provide Training of Trainers for Subject Matter Experts on ICT specialized training programs
Regionwide
Department of Information and Communications Technology - CAR Participants for the ToT for Subject Matter Experts on ICT specialized training program (in %)
(default)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
1015995932 Innovations for Filipinos Working Distantly from the Philippines (iFWD) and Industry Level Intervention
Regionwide
Department of Science and Technology - CAR Percent Completed
(default)
Target: 23.38
Actual: 11.48
Expenditure:
Release:113331
Obligation:113331
-50.898203592814
1061503954 DIGITAL WORKFORCE - RESEARCH AND EVALUATION: Implement the Apprenticeship Program
Regionwide
Department of Information and Communications Technology - CAR # of students completed the program
(default)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
1062382713 DIGITAL WORKFORCE - COMPETENCY STANDARDS: Conduct of ICT Specialist Proficiency Examination (Diagnostic)
Regionwide
Department of Information and Communications Technology - CAR # of diagnostic exam takers
(default)
Target: 30
Actual: 28
Expenditure:
Release:0
Obligation:0
-6.6666666666667
1064853965 DIGITAL WORKFORCE - TRAINING ADMINISTRATION: Conduct of regional-initiated activities not included in the list of regular courses of TMD
Regionwide
Department of Information and Communications Technology - CAR # of regional-initiated activities
(default)
Target: 0
Actual: 14
Expenditure:
Release:0
Obligation:0
0
1082414607 Digital Literacy and Education
Regionwide
Department of Information and Communications Technology - CAR number of trainings conducted
(default)
Target: 5
Actual: 9
Expenditure:
Release:0
Obligation:0
80
1098140150 DIGITAL WORKFORCE - TRAINING ADMINISTRATION: Provide Training of Trainers for Subject Matter Experts on ICT specialized training programs
Regionwide
Department of Information and Communications Technology - CAR # of Conducted ToT for Subject Matter Experts on ICT specialized training program
(default)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
1103927030 Family Transitory Support Package
Regionwide
Department of Social Welfare and Development - CAR 100% payment of beneficiaries
(Cumulative)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
1104492352 DIGITAL WORKFORCE - TRAINING ADMINISTRATION: Provide training on Cybersecurity
Regionwide
Department of Information and Communications Technology - CAR # of Conducted training on Cybersecurity
(default)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
1148444451 Educational Assistance Program
Regionwide
National Commission on Indigenous Peoples - CAR no of beneficiaries
(default)
Target: 0
Actual: 0
Expenditure:
Release:4354000
Obligation:16505659
0
1174836240 System Implementation and Maintenance Cloud Provisioning and System Implementation for LGUs Implementing the Building Permit Module
Regionwide
Department of Information and Communications Technology - CAR Percent Completed
(Cumulative)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
1186446125 Conduct of training activities
Regionwide
Department of Information and Communications Technology - CAR # of conducted training activities
(default)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
1192396821 System Implementation and Maintenance Cloud Provisioning and System Implementation for LGUs Implementing the Business Permit Module
Regionwide
Department of Information and Communications Technology - CAR Percent Completed
(Cumulative)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
1207023476 Conduct of DJPH interviews in preparation for the technical trainings
Regionwide
Department of Information and Communications Technology - CAR # of interviews conducted
(default)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
1215685736 Technical Consultancy Services
Regionwide
Department of Science and Technology - CAR N/A
(default)
Target: 0
Actual: 0
Expenditure:
Release:28556.2
Obligation:28556.2
0
1218424302 Philippine National Public Key Infrastructure (PNPKI)
Regionwide
Department of Information and Communications Technology - CAR # of orientation conducted
(Cumulative)
Target: 1
Actual: 5
Expenditure:
Release:996623.8
Obligation:0
400
1218609994 DIGITAL WORKFORCE - TRAINING ADMINISTRATION: Review of Training Courses
Regionwide
Department of Information and Communications Technology - CAR # of Reports submitted
(default)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
1226801759 (Central Office Procurement for) Provision of Internet Access via Low Earth Orbit Satellites (PIALEOS)
Regionwide
Department of Information and Communications Technology - CAR # of Free Wi-Fi AP sites established/activated and accepted by Central Office
(Cumulative)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
1228818977 DIGITAL WORKFORCE - TRAINING ADMINISTRATION: Provide Digital Governance and Management trainings
Regionwide
Department of Information and Communications Technology - CAR # of Participants for the training on Digital Governance and Management
(default)
Target: 0
Actual: 36
Expenditure:
Release:0
Obligation:0
0
1246752693 MANAGED INTERNET SERVICE OF VERY SMALL APERTURE TERMINAL (VSAT) FOR THE PROVISION OF EMERGENCY TELECOMMUNICATIONS SERVICE
Regionwide
Department of Information and Communications Technology - CAR number of sites
(default)
Target: 2
Actual: 2
Expenditure:
Release:0
Obligation:0
0
1248243394 System Implementation and Maintenance (ONLINE) Provision of technical assistance to LGUs during (1) data build-up, (2) pilot testing, (3) dry-run, and (4) operations, and (5) during data migration (if necessary)
Regionwide
Department of Information and Communications Technology - CAR # of technical assistance provided
(default)
Target: 27
Actual: 27
Expenditure:
Release:0
Obligation:0
0
1256345737 Conduct of Paralegal Trainings for IP Elders/Leaders/IPMRs
Regionwide
National Commission on Indigenous Peoples - CAR no of projects implemented
(default)
Target: 0
Actual: 0
Expenditure:
Release:90000
Obligation:221381
0
1289578183 Training and Retooling of Autonomy IEC speakers
Regionwide
National Economic and Development Authority - CAR Number of participants trained
(default)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
1294680013 Technical Consultancy Services (TCS), Trainings and Fora for MSMEs
Regionwide
Department of Science and Technology - CAR Number of firms assisted
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
1308557719 Rehabilitation of Irrigation Canal
Regionwide
Department of Agriculture - CAR linear meter, service area restored
(Cumulative)
Target: 0
Actual: 100
Expenditure:
Release:20580000
Obligation:19160930.69
0
1372821335 Conduct of training activities
Regionwide
Department of Information and Communications Technology - CAR Percentage of graduates (%)
(Cumulative)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
1379689913 Barangay-wide IECs on Cordillera Autonomy
Regionwide
National Economic and Development Authority - CAR Number of IECs conducted
(default)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
1385247598 Integrated Local Government Unit (iLGU)/ e- Local Government Unit (eLGU)
Regionwide
Department of Information and Communications Technology - CAR Regional Operations Cost and Project Team Regional Activities including technical support activities (site visits, validation, refresher training, internal planning and performance review and monitoring)
(default)
Target: 12
Actual: 38
Expenditure:
Release:0
Obligation:0
216.66666666667
1391755222 DIGITAL WORKFORCE - COMPETENCY STANDARDS: Conduct of ICT Specialist Proficiency Certification Exam (Hands-on)
Regionwide
Department of Information and Communications Technology - CAR #of certification exam takers
(default)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
1409563262 Multi-media IECs
Regionwide
National Economic and Development Authority - CAR Percent completed
(default)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
1428221584 Social Pension Program
Regionwide
Department of Social Welfare and Development - CAR number of beneficiaries served
(Maintained)
Target: 111239
Actual: 91790
Expenditure:0
Release:0
Obligation:0
-17.483975943689
1433173645 DIGITAL WORKFORCE - RESEARCH AND EVALUATION: Conduct of Evaluation of training programs
Regionwide
Department of Information and Communications Technology - CAR # of Trainings programs evaluated
(default)
Target: 1
Actual: 0
Expenditure:
Release:0
Obligation:0
-100
1439232084 Seedling Production
Regionwide
Department of Environment and Natural Resources - CAR Number of Seedling Produced
(Cumulative)
Target: 46591800
Actual: 0
Expenditure:
Release:54395000
Obligation:54395000
-100
1446649115 Scholarship Programs-TTSP
Regionwide
Technical Education and Skills Development Authority - CAR number of enrolled, number of graduates
(default)
Target: 0
Actual: 0
Expenditure:
Release:4007201.46
Obligation:29587900.76
0
1448952595 Establishment and Monitoring of Free WiFi Sites
Regionwide
Department of Information and Communications Technology - CAR # of Public Places with FWPPP presence
(Maintained)
Target: 35
Actual: 35
Expenditure:
Release:0
Obligation:0
0
1476518259 DIGITAL WORKFORCE - COMPETENCY STANDARDS: Conduct of ICT Specialist Proficiency Examination (Diagnostic)
Regionwide
Department of Information and Communications Technology - CAR # of diagnostic exam conducted
(default)
Target: 2
Actual: 2
Expenditure:
Release:0
Obligation:0
0
1486461173 SETUP Program Mobilization Budget
Regionwide
Department of Science and Technology - CAR Percent Completed
(default)
Target: 24.08
Actual: 14.92
Expenditure:
Release:837552
Obligation:837552
-38.039867109635
1496300468 Conduct of external engagements with stakeholders for the implementation of target or or other related activities
Regionwide
Department of Information and Communications Technology - CAR # of external engagements conducted for the implementation of a target or other related activities
(default)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
1534671586 Scholarship Program
Regionwide
Technical Education and Skills Development Authority - CAR number of enrolled, number of graduates
(default)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:5185037
0
1547081419 TECH4ED Center Census and Monitoring for CAR
Regionwide
Department of Information and Communications Technology - CAR number of centers
(default)
Target: 0
Actual: 1
Expenditure:
Release:0
Obligation:0
0
1553550386 Public Awareness and Engagement Conduct of Orientation
Regionwide
Department of Information and Communications Technology - CAR Percent Completed
(Cumulative)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
1562295461 Local candidates' forum
Regionwide
National Economic and Development Authority - CAR Number of participants
(default)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
1567592248 Industry-level Interventions Towards Industry 4.0
Regionwide
Department of Science and Technology - CAR Number of firms assisted
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
1580364115 Public Awareness and Engagement Conduct of Roadshows
Regionwide
Department of Information and Communications Technology - CAR Percent Completed
(default)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
1582894684 Philippine National Public Key Infrastructure (PNPKI)
Regionwide
Department of Information and Communications Technology - CAR # of processed Digital Certificate Application
(default)
Target: 0
Actual: 199
Expenditure:
Release:0
Obligation:0
0
1583016212 DIGITAL WORKFORCE - COMPETENCY STANDARDS: Conduct of external engagements with stakeholders for the implementation of target or or other related activities
Regionwide
Department of Information and Communications Technology - CAR # of external engagements conducted for the implementation of a target or other related activities
(default)
Target: 1
Actual: 1
Expenditure:
Release:0
Obligation:0
0
1597496921 Social Pension Program
Regionwide
Department of Social Welfare and Development - CAR Percentage of beneficiaries using social pension to augment daily living subsistence and medical needs
(default)
Target: 111239
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1614861421 Technical Training to LGUs Conduct of users training to (1) key system users and (2) endorsing offices; per iBPLS modules
Regionwide
Department of Information and Communications Technology - CAR Percent Completed
(Cumulative)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
1619559132 System Implementation and Maintenance Provision of technical assistance to LGUs during (1) data build-up, (2) pilot testing, (3) dry-run, and (4) operations, and (5) during data migration (if necessary)
Regionwide
Department of Information and Communications Technology - CAR Percent Completed
(Cumulative)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
1642495523 Operational Requirements and Internal Activities Maintenance of RCO-service vehicles; for use during official travels
Regionwide
Department of Information and Communications Technology - CAR Percent Completed
(default)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
1649348568 DIGITAL WORKFORCE - COMPETENCY STANDARDS: Conduct of Local Digital Challenge
Regionwide
Department of Information and Communications Technology - CAR # of Local Digital Challenges Conducted
(default)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
1650039482 Procure and Implement internet Connectivity Service in Municipalities (PICS-MUN)
Regionwide
Department of Information and Communications Technology - CAR # of Free Wi-Fi AP sites established/activated in Municipalites of CAR
(Cumulative)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
1651965302 Rehabilitation of Diversion Dam
Regionwide
Department of Agriculture - CAR number of diversion dam rehabilitated, service area restored
(Cumulative)
Target: 0
Actual: 100
Expenditure:
Release:15962410
Obligation:14604826.02
0
1666818973 Supplementary Feeding Program
Regionwide
Department of Social Welfare and Development - CAR 45055 Target Beneficiaries
(Maintained)
Target: 45055
Actual: 41800
Expenditure:0
Release:0
Obligation:0
-7.224503384752
1690348108 Scholarship-CACW
Regionwide
Technical Education and Skills Development Authority - CAR Number of Assessed
(default)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
1693523977 Meeting/Briefing with Upstream partners for Autonomy
Regionwide
National Economic and Development Authority - CAR Percent completed
(default)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
1701274456 Program Mobilization Budget
Regionwide
Department of Science and Technology - CAR Number of firms assisted
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
1707361226 Public Awareness and Engagement Conduct of Official System Launchings of LGUs with Operational System Modules
Regionwide
Department of Information and Communications Technology - CAR Percent Completed
(Cumulative)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
1713757110 Technology Trainings and Fora for MSMEs
Regionwide
Department of Science and Technology - CAR N/A
(default)
Target: 0
Actual: 0
Expenditure:
Release:62668
Obligation:22738
0
1745118166 Center Managers' Trainings
Regionwide
Department of Information and Communications Technology - CAR # of Center Managers trained
(default)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
1764587018 Digital Workforce
Regionwide
Department of Information and Communications Technology - CAR number of ICT Courses Conducted; Number of ICT Diagnostic/assessment Exam conducted
(default)
Target: 5
Actual: 5
Expenditure:
Release:0
Obligation:0
0
1791419973 Scholarship Programs
Regionwide
Technical Education and Skills Development Authority - CAR number of enrolled, number of graduates
(default)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:30150339
0
1805531875 Conduct of Cybersecurity Advocacy and Awareness Campaigns
Regionwide
Department of Information and Communications Technology - CAR Number of conducted Cybersecurity Advocacy and Awareness Campaigns
(default)
Target: 3
Actual: 11
Expenditure:
Release:0
Obligation:0
266.66666666667
1809230083 Other IECs in partnership with other agencies
Regionwide
National Economic and Development Authority - CAR Percentage completed
(default)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
1811833844 (Central Office) Procurement for the Subscription of Wi-Fi Internet Access in Tourist Spots (WITS)
Regionwide
Department of Information and Communications Technology - CAR # of new Free Wi-Fi AP sites established/activated and accepted by Central Office
(Cumulative)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
1834880776 (Central Office) Procurement of Subscription of Very Small Aperture Terminal Internet Services for Geographically Isolated and Disadvantaged Areas
Regionwide
Department of Information and Communications Technology - CAR # of Free Wi-Fi AP sites in GIDAs established/activated and accepted by Central Office
(Cumulative)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
1847502201 IEC Collaterals
Regionwide
National Economic and Development Authority - CAR Percentage completed
(Maintained)
Target: 100
Actual: 79.6
Expenditure:
Release:0
Obligation:0
-20.4
1865854056 Construction of Irrigation Canal
Regionwide
Department of Agriculture - CAR linear meter, service area restored
(Cumulative)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
1893075248 DIGITAL WORKFORCE - TRAINING ADMINISTRATION: Provide trainings on Transformative Technologies
Regionwide
Department of Information and Communications Technology - CAR Percentage of training completers for the Transformative Technologies training conducted (in %)
(default)
Target: 0
Actual: 100
Expenditure:
Release:0
Obligation:0
0
1934394273 Scholarship Programs-STEP
Regionwide
Technical Education and Skills Development Authority - CAR number of enrolled, number of graduates
(default)
Target: 890
Actual: 0
Expenditure:
Release:9944606.25
Obligation:24683849.45
-100
1936466901 Operational Requirements and Internal Activities Execution of Memorandum of Agreement with Data Sharing Agreement
Regionwide
Department of Information and Communications Technology - CAR Percent Completed
(Cumulative)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
1940509422 Plantation Establishment
Regionwide
Department of Environment and Natural Resources - CAR Area Planted in Hectares
(default)
Target: 0
Actual: 0
Expenditure:
Release:1503000
Obligation:0
0
1962159324 Philippine National Public Key Infrastructure (PNPKI)
Regionwide
Department of Information and Communications Technology - CAR # of issued digital certificates
(default)
Target: 0
Actual: 77
Expenditure:
Release:0
Obligation:0
0
1971366431 Scholarship Program
Regionwide
Technical Education and Skills Development Authority - CAR number of assessed, number of certified
(default)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:728170
0
1973772513 Maintenance and Protection
Regionwide
Department of Environment and Natural Resources - CAR Area Maintained and Protected in Hectares
(Cumulative)
Target: 7937
Actual: 7937
Expenditure:
Release:48315000
Obligation:41713000
0
1999067631 DRRM Emergency Telecommunications Cluster advocacy activities conducted/participated
Regionwide
Department of Information and Communications Technology - CAR # of advocacy activities conducted/participated
(default)
Target: 1
Actual: 1
Expenditure:
Release:0
Obligation:0
0
1999492944 Legal Assistance to the ICCs/IPs
Regionwide
National Commission on Indigenous Peoples - CAR no of beneficiaries
(default)
Target: 0
Actual: 255
Expenditure:
Release:0
Obligation:71618
0
2007021146 (Central Office) Procurement for the Subscription of Wi-Fi Internet Access in Tourist Spots (WITS)
Regionwide
Department of Information and Communications Technology - CAR # of new Free Wi-Fi AP sites in tourism areas established/activated and accepted by Central Office
(Cumulative)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
2032300285 Procure and implement Internet Connectivity Service in State Universities and Colleges (SUCs)
Regionwide
Department of Information and Communications Technology - CAR # of Free Wi-Fi live AP sites established in SUCs
(Cumulative)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
2039160599 Engagement of COS Program personnel
Regionwide
Department of Information and Communications Technology - CAR Number of men and women engaged for Program operations
(Maintained)
Target: 9
Actual: 9
Expenditure:
Release:1899680.92
Obligation:0
0
2046263667 Support to the RDC-CAR's development and autonomy agenda
Regionwide
National Economic and Development Authority - CAR Number of meetings conducted
(default)
Target: 1
Actual: 1
Expenditure:
Release:0
Obligation:0
0
2061573464 Sustainable Livelihood Program
Regionwide
Department of Social Welfare and Development - CAR Total number of households who received seed capital fund and total number of households trained (Seed Capital Funds, Skills Training, and CBLA)
(Maintained)
Target: 1
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
2088679552 BP2 Livelihood Settlement Grant
Regionwide
Department of Social Welfare and Development - CAR No. of Households provided with livelihood modalities
(Cumulative)
Target: 0
Actual: 0
Expenditure:0
Release:390000
Obligation:390000
0
2100877473 Conduct of external engagements with stakeholders for the implementation of target or or other related activities
Regionwide
Department of Information and Communications Technology - CAR # of external engagements conducted for the implementation of a target or other related activities
(default)
Target: 0
Actual: 2
Expenditure:
Release:0
Obligation:0
0
2122335159 CAPACITY DEVELOPMENT FOR FARMERS
Regionwide
Department of Social Welfare and Development - CAR No. of Households provided with livelihood modalities
(Cumulative)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
2145842138 Conduct of DJPH orientations in preparation for the technical trainings
Regionwide
Department of Information and Communications Technology - CAR # of orientations conducted
(default)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
25240127 Sustainable Livelihood Program
Abra
Department of Social Welfare and Development - CAR Total number of households who received seed capital fund and total number of households trained (Seed Capital Funds, Skills Training, and CBLA)
(Maintained)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
34561790 Managed Internet Service - VSAT Network Services for Quarantine Centers and Medical Facilities - Langiden Central School
Abra
Department of Information and Communications Technology - CAR Percent Completed
(default)
Target: 100
Actual: 100
Expenditure:
Release:0
Obligation:0
0
37700013 Repair/Improvement/Upgrading of Luba RHU
Abra
Department of Health - CAR Percent completed
(Cumulative)
Target: 100
Actual: 100
Expenditure:
Release:1000000
Obligation:987059.05
0
37724764 Balaoang SIP
Abra
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
42354610 Direct Internet Subscription for the IP Transport Municipal in Licuan-Baay
Abra
Department of Information and Communications Technology - CAR Percent Completed
(Cumulative)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
44777304 CONSTRUCTION OF HEALTH CENTER AT BARANGAY GAPANG, Pilar
Abra
Department of the Interior and Local Government - CAR percent completed
(Cumulative)
Target: 100
Actual: 0
Expenditure:
Release:0
Obligation:0
-100
46637750 Upgrading the Production Process and Efficiency of Equipment for Juno-Brad Antiques and Furniture
Abra
Department of Science and Technology - CAR No. of firms assisted
(default)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
54107646 Construction of River Control, Cogon, Tineg
Abra
Department of Social Welfare and Development - CAR 100% completion
(Cumulative)
Target: 100
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
62593478 Repair/Improvement/Upgrading of San Isidro RHU
Abra
Department of Health - CAR Percent completed
(Cumulative)
Target: 0
Actual: 100
Expenditure:
Release:1000000
Obligation:995648.66
0
72162459 Upgrading of Ningching Noodles Processing-extra
Abra
Department of Science and Technology - CAR no. of firms assisted
(default)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
79972148 Direct Internet Subscription for the IP Transport Municipal in Langiden
Abra
Department of Information and Communications Technology - CAR Percent Completed
(Cumulative)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
84632349 REPAIR/IMPROVEMENT OF TIEMPO BHS
Abra
Department of Health - CAR Percent Completed
(Cumulative)
Target: 0
Actual: 100
Expenditure:
Release:500000
Obligation:500000
0
97434138 Managed Internet Service - VSAT Network Services for Quarantine Centers and Medical Facilities - Tiempo National High School
Abra
Department of Information and Communications Technology - CAR Percent Completed
(Cumulative)
Target: 23.226
Actual: 23.226
Expenditure:
Release:0
Obligation:0
0
104696830 CLUSTER 05 - Construction of various solar PIP (LAGBEN SOLAR PIP, PAGANAO SOLAR PIP, BAYAAN SOLAR PIP, NAMIT-INGAN SOLAR PIP)
Abra
National Irrigation Administration - CAR percent completed
(Cumulative)
Target: 100
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
116187247 Construction of Barangay Lingey Isolation Facility
Abra
Department of Social Welfare and Development - CAR 100% completion
(default)
Target: 100
Actual: 100
Expenditure:0
Release:31167.43
Obligation:79360
0
124856175 Direct Internet Subscription for the IP Transport Municipal in Daguioman
Abra
Department of Information and Communications Technology - CAR Percent Completed
(Cumulative)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
125477198 Production Upgrade of 3J's Sweet Delights
Abra
Department of Science and Technology - CAR No. of firms assisted
(default)
Target: 0
Actual: 1
Expenditure:
Release:0
Obligation:0
0
130341462 Maguyepyep CIS
Abra
National Irrigation Administration - CAR 100 % Completed, 0.6 km lined canal
(Cumulative)
Target: 2
Actual: 2
Expenditure:0
Release:1140671
Obligation:1839791.19
0
133046815 Sustainability of Production Capacity and Quality of Handwoven Products
Abra
Department of Science and Technology - CAR No. of firm assisted
(default)
Target: 1
Actual: 1
Expenditure:
Release:0
Obligation:0
0
133215239 'Upgrading the Production Process and Efficiency of Equipment for M. Liagao's Furniture
Abra
Department of Science and Technology - CAR No. of firms assisted
(default)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
133913887 Construction of Level III Potable Water Supply System at Lugsong, Buanao, Malibcong, Abra
Abra
Department of the Interior and Local Government - CAR percent completed
(Cumulative)
Target: 18
Actual: 80.1
Expenditure:
Release:3000000
Obligation:2969454
345
138224333 IMPROVEMENT OF SLOPE PROTECTION ALONG SALAGPAT CREEK, POBLACION, Malibcong
Abra
Department of Social Welfare and Development - CAR 100% completion
(Cumulative)
Target: 84.69
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
162488110 Construction of COVID-19 Isolation Facility, Dugong
Abra
Department of Social Welfare and Development - CAR 100% completion
(default)
Target: 11.8
Actual: 11.8
Expenditure:41603.6
Release:674814.83
Obligation:749794
0
163739392 Upgrading the Production Process and Efficiency of Equipment for M. Liagao's Furniture
Abra
Department of Science and Technology - CAR Number of firms assisted
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
166938079 Installation of Solar-Powered Street Lights, Lat-ey, Lat-Ey, Malibcong
Abra
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
173062811 Manabo CIS
Abra
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
173930651 Provision of Cash Grant to 4Ps beneficiaries including the amount of Rice Subsidy
Abra
Department of Social Welfare and Development - CAR Number of Household beneficiaries provided with Conditional Cash Grants
(Maintained)
Target: 11907
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
175617729 Pacac Solar PIP
Abra
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
180717580 Upgrading of 348 Li. M. Road Access at Sitio Damulog, Caupasan
Abra
Department of Social Welfare and Development - CAR 100% completion
(default)
Target: 100
Actual: 100
Expenditure:0
Release:94668.35
Obligation:159221
0
184318572 Construction of Level II Potable Water System (So. Contang)
Abra
Department of the Interior and Local Government - CAR percent completed
(Cumulative)
Target: 14.97
Actual: 5.98
Expenditure:
Release:3000000
Obligation:2227509
-60.053440213761
189026965 Cagayungan Solar PIP
Abra
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
215514636 PARTNERSHIP ON SUSTAINABLE LIVING PROJECT
Abra
Department of Social Welfare and Development - CAR No. of Households provided with livelihood modalities
(Cumulative)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
224222763 New Construction of Boliney RHU
Abra
Department of Health - CAR Percent completed
(Cumulative)
Target: 100
Actual: 100
Expenditure:
Release:990000
Obligation:989384.95
0
226985089 Repair/Improvement of Dolores RHU
Abra
Department of Health - CAR Percent Completed
(default)
Target: 100
Actual: 100
Expenditure:
Release:0
Obligation:0
0
234069240 Liagan SIP
Abra
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
244335828 CONSTRUCTION OF HEALTH CENTER AT BARANGAY OCUP
Abra
Department of the Interior and Local Government - CAR percent completed
(Cumulative)
Target: 100
Actual: 0
Expenditure:
Release:0
Obligation:0
-100
245038192 Managed Internet Service - VSAT Network Services for Quarantine Centers and Medical Facilities - Danglas Municipal Isolation Unit
Abra
Department of Information and Communications Technology - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 100
Expenditure:
Release:0
Obligation:0
0
250030437 Direct Internet Subscription for the IP Transport Municipal in Peñarrubia
Abra
Department of Information and Communications Technology - CAR Percent Completed
(Cumulative)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
253718589 Productivity Enhancement of LIBAJI Integrated Farm's Heirloom Rice Production
Abra
Department of Science and Technology - CAR Number of firms assisted
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
254949419 Construction of Multi-purpose Building at Sitio Batayan, Alangtin, Tubo
Abra
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
263583802 Direct Internet Subscription for the IP Transport Municipal in Luba
Abra
Department of Information and Communications Technology - CAR Percent Completed
(Cumulative)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
274431769 Construction of Level II Potable Water System (So. Caniogan)
Abra
Department of the Interior and Local Government - CAR percent completed
(Cumulative)
Target: 42
Actual: 29.19
Expenditure:
Release:2500000
Obligation:2473226.42
-30.5
281924674 Installation of Solar Lights. Buneg Proper, Buneg, Lacub
Abra
National Commission on Indigenous Peoples - CAR no of projects implemented
(default)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:226970
0
307192922 Construction of COVID-19 Isolation Facility, Layugan
Abra
Department of Social Welfare and Development - CAR 100% completion
(default)
Target: 3
Actual: 3
Expenditure:31156.58
Release:370461.34
Obligation:411624
0
320121315 Construction of Reinforced Concrete Lined Drainage Canal, Caganayan, Tineg
Abra
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
320933360 Scholarship Program
Abra
Technical Education and Skills Development Authority - CAR number of enrolled, number of graduates
(default)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:13711002.4
0
343634515 Construction of COVID-19 Isolation Facility, Labon
Abra
Department of Social Welfare and Development - CAR 100% completion
(default)
Target: 84.87
Actual: 84.87
Expenditure:17426.43
Release:234083.49
Obligation:260093
0
344046240 Repair/Improvement/Upgrading of Ba-i BHS
Abra
Department of Health - CAR Percent completed
(Cumulative)
Target: 0
Actual: 100
Expenditure:
Release:500000
Obligation:499173.15
0
344579328 CLUSTER 02 - Construction of various PIP (LANGBABAN PIP, MANAYDAY-LAUD PIP, KADAKAD-BIOG-MAOAY-SAN ISIDRO PIP, DONGADONG PIP)
Abra
National Irrigation Administration - CAR percent completed
(Cumulative)
Target: 100
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
362017948 Lagayan-La Paz SIP
Abra
National Irrigation Administration - CAR percent completed
(Cumulative)
Target: 100
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
362962358 Vulnerability and Risk Assessment
Abra
Provincial Local Government of Abra Number of Vulnerability and Risk assessed
(default)
Target: 1
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
388605885 Forestry Seedling Production
Abra
Provincial Local Government of Abra Number of forestry seedlings produced
(default)
Target: 10000
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
390764045 CLUSTER 4 - Constrruction of various CIS (BAGATOY CIS, NAGUILLIAN CIS)
Abra
National Irrigation Administration - CAR percent completed
(Cumulative)
Target: 100
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
391272182 CONSTRUCTION OF HEALTH CENTER AT BARANGAY NAGCANASAN, Pilar
Abra
Department of the Interior and Local Government - CAR percent completed
(Cumulative)
Target: 100
Actual: 0
Expenditure:
Release:0
Obligation:0
-100
393533768 EO70 CVAs Livelihood Project
Abra
Department of Social Welfare and Development - CAR No. of Households provided with livelihood modalities
(Cumulative)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
397418314 REPAIR/IMPROVEMENT OF ABRA PROVINCIAL HOSPITAL
Abra
Department of Health - CAR Percent Completed
(Cumulative)
Target: 0
Actual: 96
Expenditure:
Release:7400000
Obligation:7400000
0
404124308 Road Upgrading of Bayabas Barangay Road
Abra
Department of the Interior and Local Government - CAR percent completed
(Cumulative)
Target: 84.99
Actual: 76.65
Expenditure:
Release:8000000
Obligation:7984741
-9.8129191669608
406836981 Construction of Level II Water Supply System at Barangay Duldulao
Abra
Department of the Interior and Local Government - CAR percent completed
(Cumulative)
Target: 16.35
Actual: 11.63
Expenditure:
Release:3000000
Obligation:2970134.2
-28.868501529052
413122541 Construction of Portland Cement Concrete Pavement (PCCP) Along Tabacda Primary School to Pita Access Road, Tabacda, Tubo
Abra
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
421276154 Construction of 21.8 m Cable Footbridge, Belaat, Tineg
Abra
Department of Social Welfare and Development - CAR 100% completion
(Cumulative)
Target: 12.87
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
435774543 Continuing Improvement of TM Digital Photography & Gen Mdse.
Abra
Department of Science and Technology - CAR Number of firms assisted
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
436311171 Lagangilang CIS
Abra
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
438336207 Direct Internet Subscription for the IP Transport Municipal in DICT-ABRA FO, Bangued
Abra
Department of Information and Communications Technology - CAR Percent Completed
(Cumulative)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
444799524 CONCRETING OF SABANGAN TO LUMANOS at Barangay Mataragan, Malibcong
Abra
Department of the Interior and Local Government - CAR percent completed
(Cumulative)
Target: 0
Actual: 1.76
Expenditure:
Release:0
Obligation:0
0
457552991 Direct Internet Subscription for the IP Transport Municipal in Manabo
Abra
Department of Information and Communications Technology - CAR Percent Completed
(Cumulative)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
458421816 CLUSTER 02 - Construction of various PIP (LANGBABAN PIP, MANAYDAY-LAUD PIP, KADAKAD-BIOG-MAOAY-SAN ISIDRO PIP, DONGADONG PIP)
Abra
National Irrigation Administration - CAR 100 % Completed, 57 ha total area generated
(Cumulative)
Target: 1
Actual: 2
Expenditure:0
Release:8633695
Obligation:23252931.48
100
463847694 Construction of Barangay Isolation Unit, Amtuagan, Tubo
Abra
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
476267678 REPAIR/IMPROVEMENT OF BUCLOC RHU
Abra
Department of Health - CAR Percent Completed
(Cumulative)
Target: 0
Actual: 100
Expenditure:
Release:1000000
Obligation:1000000
0
478687855 Managed Internet Service - VSAT Network Services for Quarantine Centers and Medical Facilities - Boliney National High School
Abra
Department of Information and Communications Technology - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 100
Expenditure:
Release:0
Obligation:0
0
486185713 Retrofitting of Old Barangay Hall as Temporary Isolation Facility, Bugbog
Abra
Department of Social Welfare and Development - CAR 100% completion
(default)
Target: 0
Actual: 0
Expenditure:14301.79
Release:280989.92
Obligation:312211
0
489163696 CLUSTER 06 - Construction of various solar PIP (DALIT SOLAR PIP, PANG-OT SOLAR PIP, LAYUGAN SOLAR PIP, CALLAO SOLAR PIP, LAGAOSIAN SOLAR PIP)
Abra
National Irrigation Administration - CAR 100 % Completed, 78 ha total area generated
(Cumulative)
Target: 2
Actual: 3
Expenditure:16814165.94
Release:29302231
Obligation:29491230.66
50
491523729 Direct Internet Subscription for the IP Transport Municipal in Pidigan
Abra
Department of Information and Communications Technology - CAR Percent Completed
(Cumulative)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
494353400 Construction of River Control (Linong to Polit), Poblacion (Agsimao), Tineg
Abra
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
500360668 Abra River Irrigation System
Abra
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
502309874 Direct Internet Subscription for the IP Transport Municipal in Tayum
Abra
Department of Information and Communications Technology - CAR Percent Completed
(Cumulative)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
508662236 Construction of COVID-19 Isolation Facility, Banglolao
Abra
Department of Social Welfare and Development - CAR 100% completion
(default)
Target: 5.51
Actual: 5.51
Expenditure:0
Release:188230.87
Obligation:209145
0
511310150 Construction of PCCP Along Sitio Lucgay
Abra
Department of Social Welfare and Development - CAR 100% completion (0.25 km road)
(default)
Target: 100
Actual: 100
Expenditure:0
Release:0
Obligation:129463
0
525400838 Direct Internet Subscription for the IP Transport Municipal in Sallapadan
Abra
Department of Information and Communications Technology - CAR Percent Completed
(Cumulative)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
558918416 Managed Internet Service - VSAT Network Services for Quarantine Centers and Medical Facilities - Luba Rural Health Unit
Abra
Department of Information and Communications Technology - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 100
Expenditure:
Release:0
Obligation:0
0
566138789 Managed Internet Service - VSAT Network Services for Quarantine Centers and Medical Facilities - Piddigan Rural Health Unit
Abra
Department of Information and Communications Technology - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 100
Expenditure:
Release:0
Obligation:0
0
575137782 CONSTRUCTION OF SCHOOL BUILDING AT BARANGAY UMNAP, Malibcong
Abra
Department of the Interior and Local Government - CAR percent completed
(Cumulative)
Target: 0
Actual: 37.45
Expenditure:
Release:0
Obligation:0
0
578768638 Increasing the Production Volume of Print Central thru Adoption of 3D Printing Technology
Abra
Department of Science and Technology - CAR Number of firms assisted
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
580478546 Improvement of Multi-purpose Building as Temporary COVID-19 Isolation Facility, Pakiling
Abra
Department of Social Welfare and Development - CAR 100% completion
(default)
Target: 30.4
Actual: 30.4
Expenditure:0
Release:0
Obligation:0
0
584923353 Construction of Reinforced Concrete Lined Drainage Canal, Lapat-Balantay
Abra
Department of Social Welfare and Development - CAR 100% completion
(Cumulative)
Target: 100
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
592364849 Construction of Barangay Isolation Unit, Wayangan, Tubo
Abra
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
592408190 Managed Internet Service - VSAT Network Services for Quarantine Centers and Medical Facilities - Licuan-Baay Municipal Quarantine Facility
Abra
Department of Information and Communications Technology - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 100
Expenditure:
Release:0
Obligation:0
0
599249682 Family Transitory Support Package
Abra
Department of Social Welfare and Development - CAR 100% payment of beneficiaries
(default)
Target: 1
Actual: 1
Expenditure:0
Release:0
Obligation:0
0
605904355 ABRA RIS
Abra
National Irrigation Administration - CAR percent completed
(Cumulative)
Target: 100
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
606742767 Managed Internet Service - VSAT Network Services for Quarantine Centers and Medical Facilities - San Isidro Gymnasium
Abra
Department of Information and Communications Technology - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 100
Expenditure:
Release:0
Obligation:0
0
628043874 Managed Internet Service - VSAT Network Services for Quarantine Centers and Medical Facilities - Tayum CRRC
Abra
Department of Information and Communications Technology - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 100
Expenditure:
Release:0
Obligation:0
0
628798669 Direct Internet Subscription for the IP Transport Municipal in San Quintin
Abra
Department of Information and Communications Technology - CAR Percent Completed
(Cumulative)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
636446706 Binolawan SIP
Abra
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
647334041 Abra River Irrigation System
Abra
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
654103496 CLUSTER 06 - Construction of various solar PIP (DALIT SOLAR PIP, PANG-OT SOLAR PIP, LAYUGAN SOLAR PIP, CALLAO SOLAR PIP, LAGAOSIAN SOLAR PIP)
Abra
National Irrigation Administration - CAR percent completed
(Cumulative)
Target: 100
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
658196850 CLUSTER 03 - Construction of various PIP (SAYAO GALU-OS PIP, TAGAYTAY PIP, BACOOC PIP, CALUMBAYA PIP)
Abra
National Irrigation Administration - CAR percent completed
(Cumulative)
Target: 100
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
669281139 Improvement of Day Care Center as Temporary Isolation Facility, Abang
Abra
Department of Social Welfare and Development - CAR 100% completion
(default)
Target: 35.87
Actual: 35.87
Expenditure:23245.15
Release:322851.27
Obligation:358724
0
673742790 Enhancement of Production Capacity and Production Quality of Pablo’s Bread and Pastries through Equipment Upgrading
Abra
Department of Science and Technology - CAR Number of firms assisted
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
674757799 Capacitating Lyros Agricultural Farm on the Production of Year-round Supply of Healthy Feed Ration for Small Ruminants through S&T Interventions
Abra
Department of Science and Technology - CAR Number of firms assisted
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
675044332 Repair/Improvement/Upgrading of Buneg BHS
Abra
Department of Health - CAR Percent completed
(Cumulative)
Target: 0
Actual: 0
Expenditure:
Release:500000
Obligation:499466.3
0
686722268 Managed Internet Service - VSAT Network Services for Quarantine Centers and Medical Facilities - Dilong Elementary School
Abra
Department of Information and Communications Technology - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 100
Expenditure:
Release:0
Obligation:0
0
699037727 Direct Internet Subscription for the IP Transport Municipal in Dolores
Abra
Department of Information and Communications Technology - CAR Percent Completed
(Cumulative)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
723542034 Technology Upgrading: A Road to Shaping the Future of Construction - Alijede Construction
Abra
Department of Science and Technology - CAR Number of firms assisted
(default)
Target: 1
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
724883448 CLUSTER 03 - Construction of various PIP (SAYAO GALU-OS PIP, TAGAYTAY PIP, BACOOC PIP, CALUMBAYA PIP)
Abra
National Irrigation Administration - CAR 100 % Completed, 45 ha Total area generated
(Cumulative)
Target: 1
Actual: 3
Expenditure:0
Release:6568193
Obligation:12878810
200
730830555 Construction of Brgy. Health Station in Barangay Buanao, Malibcong, Abra
Abra
Department of the Interior and Local Government - CAR percent completed
(Cumulative)
Target: 22.32
Actual: 0
Expenditure:
Release:4000000
Obligation:3935980.4
-100
737455336 Scholarship Program-UAQTEA
Abra
Technical Education and Skills Development Authority - CAR number of enrolled, number of graduates
(default)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:39648414
0
743214079 Waterworks Development Projects
Abra
Provincial Local Government of Abra number of systems constructed/rehabilitated/improved
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
756314554 CONCRETING OF GUINGUINABANG ACCESS ROAD at Barangay Guinguinabang, Lacub
Abra
Department of the Interior and Local Government - CAR percent completed
(Cumulative)
Target: 12.2
Actual: 12
Expenditure:
Release:3511471
Obligation:0
-1.6393442622951
758957109 Direct Internet Subscription for the IP Transport Municipal in Bucloc
Abra
Department of Information and Communications Technology - CAR Percent Completed
(Cumulative)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
762688345 Equipment Upgrading of TM Digital Photography and General Merchandise
Abra
Department of Science and Technology - CAR No. of firms assisted
(default)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
776934093 Construction of Barangay Isolation Unit, Supo, Tubo
Abra
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
777422684 Repair/Improvement/Upgrading of Talogtog BHS
Abra
Department of Health - CAR Percent completed
(Cumulative)
Target: 100
Actual: 100
Expenditure:
Release:500000
Obligation:491330.69
0
803298456 Sulvec Pidigan Solar PIP
Abra
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
817071326 Improvement of Alingganao-Taper Footpath with Railings, Bekigan
Abra
Department of Social Welfare and Development - CAR 100% completion
(default)
Target: 0
Actual: 0
Expenditure:40166.37
Release:429636.38
Obligation:477374
0
830146477 Construction of Brgy. Health Station at Barangay Bayabas.
Abra
Department of the Interior and Local Government - CAR percent completed
(Cumulative)
Target: 34.09
Actual: 5.52
Expenditure:
Release:2000000
Obligation:1969776.38
-83.807568201819
847273166 Opening of Access Road at Sitio Padpadsek, Binasaran, Malibcong
Abra
Department of Social Welfare and Development - CAR 100% completion
(Cumulative)
Target: 89.13
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
849674868 Retrofitting of Old Multi-Purpose Building as Temporary Isolation Facility, Madalipay
Abra
Department of Social Welfare and Development - CAR 100% completion
(default)
Target: 0
Actual: 0
Expenditure:0
Release:132238.42
Obligation:146932
0
857276863 Various Health Programs
Abra
Provincial Local Government of Abra Number of beneficiaries served
(default)
Target: 25000
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
865233636 Social Pension Program
Abra
Department of Social Welfare and Development - CAR Number of beneficiaries served
(Maintained)
Target: 25806
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
869691352 Improvement of Barangay Poblacion Drainage Canal From School Entrance to Wanasen Residence Along Barangay Road
Abra
Department of Social Welfare and Development - CAR 100% completion (120 ln.m drainage canal)
(default)
Target: 100
Actual: 100
Expenditure:0
Release:0
Obligation:38425
0
871362823 Direct Internet Subscription for the IP Transport Municipal in La Paz
Abra
Department of Information and Communications Technology - CAR Percent Completed
(Cumulative)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
877898959 Improvement of Barangay Poblacion Water System, Poblacion (Mayabo), Tubo
Abra
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
896821045 Packaging Technology Solutions for Retail Sales in Increasing the Productivity of D&C Enterprise Products (SETUP Phase II)
Abra
Department of Science and Technology - CAR Number of firms assisted
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
913996560 Abra RIS (Bangued)
Abra
National Irrigation Administration - CAR percent completed
(Cumulative)
Target: 100
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
916772888 Managed Internet Service - VSAT Network Services for Quarantine Centers and Medical Facilities - Tineg Rural Health Unit
Abra
Department of Information and Communications Technology - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 100
Expenditure:
Release:0
Obligation:0
0
922133975 Repair/Improvement/Upgrading of Manabo RHU
Abra
Department of Health - CAR Percent completed
(Cumulative)
Target: 100
Actual: 100
Expenditure:
Release:1000000
Obligation:1000000
0
924889199 Repair/Improvement/Upgrading of Villaviciosa MCH
Abra
Department of Health - CAR Percent completed
(Cumulative)
Target: 0
Actual: 100
Expenditure:
Release:3000000
Obligation:2991809.15
0
927980739 CONCRETING OF BUYATAN ACCESS ROAD at Barangay Pacoc, Lacub
Abra
Department of the Interior and Local Government - CAR percent completed
(Cumulative)
Target: 7.48
Actual: 7.48
Expenditure:
Release:3700780
Obligation:0
0
932232183 ABRA RIS
Abra
National Irrigation Administration - CAR 100 % Completed, 0.38 km road gravelling
(Cumulative)
Target: 2
Actual: 3
Expenditure:0
Release:722815
Obligation:722814.64
50
937603071 Pacqued SIP
Abra
National Irrigation Administration - CAR 100 % Completed, 7 ha area generated
(Cumulative)
Target: 2
Actual: 3
Expenditure:0
Release:2458631
Obligation:2458631.2
50
943459627 Improvement of Old Women's Center as COVID 19 Isolation Facility, Salnec
Abra
Department of Social Welfare and Development - CAR 100% completion
(default)
Target: 23.14
Actual: 23.14
Expenditure:0
Release:120267.1
Obligation:133630
0
949840830 UPGRADING OF AP-APOK TO TUMBEB FMR AT BARANGAY KILI, Tubo
Abra
Department of the Interior and Local Government - CAR percent completed
(Cumulative)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
950711230 CLUSTER 1 -Construction of Various SIP (REBID) (LOWER-BARIT SIP, NAPOLISAN-KOLLO-OY SIP)
Abra
National Irrigation Administration - CAR percent completed
(Cumulative)
Target: 100
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
954557729 Dalayap SIP
Abra
National Irrigation Administration - CAR 100 % Completed, 4 ha area generated
(Cumulative)
Target: 2
Actual: 2
Expenditure:15812.57
Release:1767920
Obligation:1813460.39
0
959031113 REPAIR/IMPROVEMENT OF DAGUIOMAN RHU
Abra
Department of Health - CAR PERCENT COMPLETED
(default)
Target: 100
Actual: 0
Expenditure:
Release:0
Obligation:0
-100
961862555 Direct Internet Subscription for the IP Transport Municipal in San Juan
Abra
Department of Information and Communications Technology - CAR Percent Completed
(Cumulative)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
988842020 CLUSTER 07 - Construction of various SIP (REBID) (MANGMANGABANG LUS-OD SIP, NAGUILLIAN MADALDAL SIP, SABSABAWIL-SUCOK SIP)
Abra
National Irrigation Administration - CAR 100 % Completed, 28 ha Total area generated
(Cumulative)
Target: 1
Actual: 2
Expenditure:0
Release:4798599
Obligation:9409017.11
100
993562870 Construction of Barangay Lenneng Isolation Facility
Abra
Department of Social Welfare and Development - CAR 100% completion (1 unit isolation facility)
(default)
Target: 100
Actual: 100
Expenditure:0
Release:36398.3
Obligation:42298
0
995075512 Direct Internet Subscription for the IP Transport Municipal in Lagayan
Abra
Department of Information and Communications Technology - CAR Percent Completed
(Cumulative)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
999845220 Managed Internet Service - VSAT Network Services for Quarantine Centers and Medical Facilities - Supo Elementary School
Abra
Department of Information and Communications Technology - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 100
Expenditure:
Release:0
Obligation:0
0
1022928952 Direct Internet Subscription for the IP Transport Municipal in Bucay
Abra
Department of Information and Communications Technology - CAR Percent Completed
(Cumulative)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
1024814166 Abra River Irrigation System
Abra
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
1040021832 Direct Internet Subscription for the IP Transport Municipal in Tubo
Abra
Department of Information and Communications Technology - CAR Percent Completed
(Cumulative)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
1050433224 Sallapadan CIS
Abra
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
1051164919 Construction of Reinforced Concrete Lined Drainage Canal, Alaoa, Tineg
Abra
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1051751599 Lagayan-La Paz SIP
Abra
National Irrigation Administration - CAR 100 % Completed, 302 ha area generated
(Cumulative)
Target: 2
Actual: 4
Expenditure:21866133.38
Release:27591479
Obligation:53060536.89
100
1055021942 Repair/Improvement of Bucay RHU
Abra
Department of Health - CAR Percent Completed
(default)
Target: 100
Actual: 35
Expenditure:
Release:0
Obligation:0
-65
1063133436 Upgrading the Production Process and Efficiency of Equipment for Window Tek Window Installation Services
Abra
Department of Science and Technology - CAR Number of firms assisted
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
1092632203 Enhancement of Production Capacity, Efficiency, and Precision for Fabrication and Machining of DUV Machine Shop
Abra
Department of Science and Technology - CAR No. of firms assisted
(default)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
1109414642 NEW CONSTRUCTION OF LA PAZ MH
Abra
Department of Health - CAR Percent Completed
(Cumulative)
Target: 0
Actual: 100
Expenditure:
Release:10000000
Obligation:10000000
0
1131643074 Construction of COVID-19 Isolation Facility, Bangcagan
Abra
Department of Social Welfare and Development - CAR 100% completion
(default)
Target: 2
Actual: 2
Expenditure:21412.91
Release:234032.99
Obligation:260037
0
1136540427 Supplemental Feeding Program
Abra
Department of Social Welfare and Development - CAR Number of Children Served
(Maintained)
Target: 9725
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1142434766 Improvement of Community Irrigation Canal at Sitio Putol, Mataragan, Mataragan, Malibcong
Abra
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1145288033 Improvement of Multi-purpose Building as Temporary COVID-19 Isolation Facility, San Miguel
Abra
Department of Social Welfare and Development - CAR 100% completion
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
1151694385 Science-based Assistance of S&G Agricultural Supply in Oyster Mushroom Production as an Alternative Source of Livelihood
Abra
Department of Science and Technology - CAR Number of firms assisted
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
1152526381 Construction Of Portland Cement Concrete Pavement (Pccp) Along Sitio Napatnay To Lamag Access Road, Dilong, Tubo
Abra
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1157752230 Regular and Frontloaded Livelihood Projects
Abra
Department of Social Welfare and Development - CAR No. of Households provided with livelihood modalities
(Cumulative)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
1161244056 Repair/Improvement/Upgrading of Bucay MH
Abra
Department of Health - CAR Percent completed
(Cumulative)
Target: 0
Actual: 100
Expenditure:
Release:2000000
Obligation:1975132.28
0
1172259633 Nagpawayan SIP
Abra
National Irrigation Administration - CAR 100 % Completed, 6 ha area generated
(Cumulative)
Target: 2
Actual: 3
Expenditure:0
Release:1209404
Obligation:1209404.26
50
1194814501 Construction of Concrete Pathway at Battong-Saal, Gacab, Gacab, Malibcong
Abra
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1205084543 CONCRETING OF BUNEG ACCESS ROAD at Barangay Buneg, Lacub
Abra
Department of the Interior and Local Government - CAR percent completed
(Cumulative)
Target: 5.21
Actual: 5.21
Expenditure:
Release:0
Obligation:0
0
1207605596 San Marcial Solar PIP
Abra
National Irrigation Administration - CAR 100% Completed
(Cumulative)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
1213698417 Enhancement of the Production Quality and Capacity of Tinguian Ethnic Arts Handloom Products through Upgrading of Equipment
Abra
Department of Science and Technology - CAR No. of firms assisted
(default)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
1225370013 Direct Internet Subscription for the IP Transport Municipal in Danglas
Abra
Department of Information and Communications Technology - CAR Percent Completed
(Cumulative)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
1248174067 Construction of Reinforced Concrete Lined Drainage Canal, Lapat-Balantay, Tineg
Abra
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1267654273 Construction of Irrigation System, Lanec, Tineg
Abra
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1273994889 Enhancement of production capacity and quality of metal works for fabrircation for Jerome Bejarin's Iron Works
Abra
Department of Science and Technology - CAR No. of firms assisted
(default)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
1278709788 Repair/Improvement/Upgrading of San Miguel BHS
Abra
Department of Health - CAR Percent completed
(Cumulative)
Target: 100
Actual: 100
Expenditure:
Release:500000
Obligation:495860.93
0
1281160318 CLUSTER 05 - Construction of various solar PIP (LAGBEN SOLAR PIP, PAGANAO SOLAR PIP, BAYAAN SOLAR PIP, NAMIT-INGAN SOLAR PIP)
Abra
National Irrigation Administration - CAR 100 % Completed, 80 ha total area generated
(Cumulative)
Target: 2
Actual: 5
Expenditure:3996929.06
Release:26646194
Obligation:26748193.7
150
1292416274 Purchase of One set Hand Tractor. Tangadan, San Quintin
Abra
National Commission on Indigenous Peoples - CAR no of projects implemented
(default)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:144500
0
1292870502 Gaang-Tagaytay SIP
Abra
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
1298694638 Construction of Day Care Center at Sitio Proper Tiempo, Tiempo, Tubo
Abra
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1301086617 Enhancement of Production and Productrion Quality of Pablo's Bread and Pastries through Equipment Upgrading
Abra
Department of Science and Technology - CAR No. of firms assisted
(default)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
1303591140 Construction of COVID-19 Isolation Facility, Tabiog
Abra
Department of Social Welfare and Development - CAR 100% completion
(default)
Target: 0
Actual: 0
Expenditure:15406.16
Release:454085.55
Obligation:504540
0
1337950971 Improvement and Refurbishment of Barangay Health Station as Temporary COVID-19 Isolation Facility, Patoc
Abra
Department of Social Welfare and Development - CAR 100% completion
(default)
Target: 0
Actual: 0
Expenditure:24292.86
Release:295972.8
Obligation:328859
0
1354315795 Upland Vegetable Production Project
Abra
Provincial Local Government of Abra Number of beneficiaries served
(default)
Target: 124
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1359147318 Pacqued SIP
Abra
National Irrigation Administration - CAR percent completed
(Cumulative)
Target: 100
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1376135140 Eco-friendly pre-processing and Value-Addition through sorting and compressed baling with acquisition of facility for Joker Junkshop
Abra
Department of Science and Technology - CAR No. of firms assisted
(default)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
1378122027 CLUSTER 4 - Constrruction of various CIS (BAGATOY CIS, NAGUILLIAN CIS)
Abra
National Irrigation Administration - CAR 100 % Completed, 2.29 km lined Canal and 13 units canal Structure
(Cumulative)
Target: 2
Actual: 2
Expenditure:11877125.66
Release:13523888
Obligation:21812723.32
0
1395675615 Construction of COVID-19 Isolation Facility, Calao
Abra
Department of Social Welfare and Development - CAR 100% completion
(default)
Target: 5.05
Actual: 5.05
Expenditure:22926.61
Release:328674.06
Obligation:365193
0
1398082026 Lat-ey SIP
Abra
National Irrigation Administration - CAR percent completed
(Cumulative)
Target: 100
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1398859628 Sustainable Livelihood Program
Abra
Department of Social Welfare and Development - CAR Total number of households who received seed capital fund and total number of households trained (Seed Capital Funds, Skills Training, and CBLA)
(Maintained)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
1406468480 Social Pension Program
Abra
Department of Social Welfare and Development - CAR Percentage of beneficiaries using social pension to augment daily living subsistence and medical needs
(default)
Target: 25806
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1411856118 Managed Internet Service - VSAT Network Services for Quarantine Centers and Medical Facilities - Luba Municipal Hall
Abra
Department of Information and Communications Technology - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 100
Expenditure:
Release:0
Obligation:0
0
1414684308 Improvement of Barangay Health Station as Temporary COVID-19 Isolation Facility, Palaquio
Abra
Department of Social Welfare and Development - CAR 100% completion
(default)
Target: 30.32
Actual: 30.32
Expenditure:0
Release:0
Obligation:0
0
1433286562 Lumaba Solar PIP
Abra
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
1440529985 Construction of COVID-19 Isolation Facility, Quimloong
Abra
Department of Social Welfare and Development - CAR 100% completion
(default)
Target: 27.87
Actual: 27.87
Expenditure:26009
Release:234081.81
Obligation:260091
0
1459639117 Bangtig Malanas CIS
Abra
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
1478387356 Direct Internet Subscription for the IP Transport Municipal in Pilar
Abra
Department of Information and Communications Technology - CAR Percent Completed
(default)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
1484866780 Road Upgrading of Brgy. Dulao Access Road
Abra
Department of the Interior and Local Government - CAR percent completed
(Cumulative)
Target: 84.171
Actual: 70.68
Expenditure:
Release:17000000
Obligation:16976352
-16.028085682717
1489333564 Repair/Improvement of Langiden RHU
Abra
Department of Health - CAR Percent Completed
(default)
Target: 50
Actual: 18
Expenditure:
Release:0
Obligation:0
-64
1495117035 Construction of Level III Potable Water System at Barangay Bayabas, Malibcong, Abra
Abra
Department of the Interior and Local Government - CAR percent completed
(Cumulative)
Target: 19
Actual: 80.34
Expenditure:
Release:4000000
Obligation:2386443.06
322.84210526316
1497876389 Road Upgrading of Duldulao Barangay Road
Abra
Department of the Interior and Local Government - CAR percent completed
(Cumulative)
Target: 100
Actual: 68.57
Expenditure:
Release:9000000
Obligation:8977687
-31.43
1505166941 Provision of Cash Grants including the amount of Rice Subsidy
Abra
Department of Social Welfare and Development - CAR Number of Household beneficiaries provided with Conditional Cash Grants
(Maintained)
Target: 12943
Actual: 10936
Expenditure:0
Release:0
Obligation:0
-15.506451363671
1545003498 Nagpawayan SIP
Abra
National Irrigation Administration - CAR percent completed
(Cumulative)
Target: 100
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1553754615 Improvement of Multi-purpose Building as Temporary COVID-19 Isolation Facility, South Poblacion
Abra
Department of Social Welfare and Development - CAR 100% completion
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
1577547661 Layugan Solar PIP
Abra
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
1580132345 Direct Internet Subscription for the IP Transport Municipal in Villaviciosa
Abra
Department of Information and Communications Technology - CAR Percent Completed
(Cumulative)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
1580799521 Nagcanasan Solar PIP
Abra
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
1592707931 Medical Mission and Provision of Basic Medical Equipment to the Inlaud ICCs/IPs of Abang, Bucay
Abra
National Commission on Indigenous Peoples - CAR no of projects implemented
(default)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:125390
0
1599114698 Abra RIS (Bangued)
Abra
National Irrigation Administration - CAR 100 % Completed, 110 ha area restored
(Cumulative)
Target: 2
Actual: 0
Expenditure:4603574.26
Release:15959057
Obligation:30690495.05
-100
1602533182 Construction of 2 Bedroom COVID 19 Isolation Facility, Bangbangcag
Abra
Department of Social Welfare and Development - CAR 100% completion
(default)
Target: 0
Actual: 0
Expenditure:39110.2
Release:477751.29
Obligation:530835
0
1619763469 CLUSTER 1 -Construction of Various SIP (REBID) (LOWER-BARIT SIP, NAPOLISAN-KOLLO-OY SIP)
Abra
National Irrigation Administration - CAR 100 % Completed, 31 ha total area generated
(Cumulative)
Target: 2
Actual: 3
Expenditure:0
Release:4137321
Obligation:5758279.64
50
1652369662 CONCRETING OF SABANGAN TO LAT-EY PROPER FARM TO MARKET ROAD at Barangay Lat-ey, Malibcong
Abra
Department of the Interior and Local Government - CAR percent completed
(Cumulative)
Target: 0
Actual: 1.76
Expenditure:
Release:0
Obligation:0
0
1659448387 Construction Of Portland Cement Concrete Pavement (Pccp) At Pilao Access Road, Tubtuba, Tubo
Abra
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1663779014 Cabaroan SIP
Abra
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
1671233698 CLUSTER 07 - Construction of various SIP (REBID) (MANGMANGABANG LUS-OD SIP, NAGUILLIAN MADALDAL SIP, SABSABAWIL-SUCOK SIP)
Abra
National Irrigation Administration - CAR percent completed
(Cumulative)
Target: 100
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1675939470 Production Upgrade of 3J's Sweet Delights
Abra
Department of Science and Technology - CAR Number of firms assisted
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
1676904930 Social Pension Program
Abra
Department of Social Welfare and Development - CAR Number of indigent senior citizens provided with Social Pension
(Maintained)
Target: 23837
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1682818862 Managed Internet Service - VSAT Network Services for Quarantine Centers and Medical Facilities - Alangtin Elementary School
Abra
Department of Information and Communications Technology - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 100
Expenditure:
Release:0
Obligation:0
0
1683804395 NEW CONSTRUCTION OF NAGLIBACAN BHS
Abra
Department of Health - CAR Percent Completed
(Cumulative)
Target: 0
Actual: 90
Expenditure:
Release:1000000
Obligation:1000000
0
1684819590 Repair/Improvement/Upgrading of Bangued RHU
Abra
Department of Health - CAR Percent completed
(Cumulative)
Target: 0
Actual: 45
Expenditure:
Release:1000000
Obligation:999104.93
0
1696428289 New Construction of Tayum Super Health Center
Abra
Department of Health - CAR Percent Completed
(default)
Target: 100
Actual: 100
Expenditure:
Release:0
Obligation:0
0
1700273966 Lat-ey SIP
Abra
National Irrigation Administration - CAR 100 % Completed, 4 ha area generated
(Cumulative)
Target: 2
Actual: 3
Expenditure:0
Release:1581781
Obligation:1613359.69
50
1700856371 Repair/Improvement of Lagayan RHU
Abra
Department of Health - CAR Percent Completed
(default)
Target: 100
Actual: 85
Expenditure:
Release:0
Obligation:0
-15
1708226898 Improvement of Barangay Labaan Water Supply System
Abra
Department of Social Welfare and Development - CAR 100% of 1 unit water system
(default)
Target: 100
Actual: 100
Expenditure:0
Release:38553.07
Obligation:116824
0
1717112372 Construction of 6m x 9m Barangay Isolation Facility
Abra
Department of Social Welfare and Development - CAR 100% completion (1 unit isolation facility)
(default)
Target: 100
Actual: 100
Expenditure:0
Release:167426.66
Obligation:213666
0
1749842425 REPAIR/IMPROVEMENT OF LAGANGILANG RHU
Abra
Department of Health - CAR PERCENT COMPLETED
(default)
Target: 50
Actual: 0
Expenditure:
Release:0
Obligation:0
-100
1783792197 Supplemental Feeding Program
Abra
Department of Social Welfare and Development - CAR Number of beneficiaries served
(Maintained)
Target: 9155
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1787643946 Direct Internet Subscription for the IP Transport Municipal in San Isidro
Abra
Department of Information and Communications Technology - CAR Percent Completed
(Cumulative)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
1796255403 Construction of COVID-19 Isolation Facility, Pagala
Abra
Department of Social Welfare and Development - CAR 100% completion
(default)
Target: 0
Actual: 0
Expenditure:36598.5
Release:451927.47
Obligation:502142
0
1805021938 Dalayap SIP
Abra
National Irrigation Administration - CAR percent completed
(Cumulative)
Target: 100
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1806184881 Maguyepyep CIS
Abra
National Irrigation Administration - CAR percent completed
(Cumulative)
Target: 100
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1807989062 Installation of Solar-Powered Street Light, Umnap, Umnap, Malibcong
Abra
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1817229778 Installation of Solar Streetlights, Caupasan
Abra
Department of Social Welfare and Development - CAR 100% (53 units solar streetlights)
(default)
Target: 100
Actual: 100
Expenditure:0
Release:142497.49
Obligation:150000
0
1820794103 Construction of Level II Potable Water System (So. Naguilian Lower)
Abra
Department of the Interior and Local Government - CAR percent completed
(Cumulative)
Target: 30.5
Actual: 16.93
Expenditure:
Release:3000000
Obligation:2970208.04
-44.491803278689
1839756699 Direct Internet Subscription for the IP Transport Municipal in Boliney
Abra
Department of Information and Communications Technology - CAR Percent Completed
(Cumulative)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
1844798672 Improvement of Cabaruan Village Water Supply System Level II
Abra
Department of Social Welfare and Development - CAR one unit water system
(default)
Target: 100
Actual: 100
Expenditure:0
Release:70595.61
Obligation:70813
0
1873450134 REPAIR/IMPROVEMENT OF LUMABA BHS
Abra
Department of Health - CAR Percent Completed
(Cumulative)
Target: 0
Actual: 100
Expenditure:
Release:500000
Obligation:500000
0
1875844410 Kagaloan SIP
Abra
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
1912579637 Construction of Slope Protection, Anayan, Tineg
Abra
Department of Social Welfare and Development - CAR 100% completion
(Cumulative)
Target: 100
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1924040284 Upgrading the Production Process and Efficiency of Equipment for C and L Furniture shop
Abra
Department of Science and Technology - CAR No. of firms assisted
(default)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
1935250976 Improving Productivity and efficiency of 7th GJ Bakery Through Equipment Upgrading
Abra
Department of Science and Technology - CAR No. of firms assisted
(default)
Target: 0
Actual: 0
Expenditure:
Release:320000
Obligation:320000
0
1966968416 REPAIR/IMPROVEMENT OF VILLAVICIOSA RHU
Abra
Department of Health - CAR Percent Completed
(Cumulative)
Target: 0
Actual: 100
Expenditure:
Release:1000000
Obligation:1000000
0
1986205985 REPAIR/IMPROVEMENT OF SALLAPADAN RHU
Abra
Department of Health - CAR Percent Completed
(Cumulative)
Target: 0
Actual: 100
Expenditure:
Release:1000000
Obligation:1000000
0
1987823831 Sustainable Livelihood Program
Abra
Department of Social Welfare and Development - CAR Total number of households who received seed capital fund and total number of households trained (Seed Capital Funds, Skills Training, and CBLA)
(Maintained)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
1999483153 Improvement and Upgrading of Farm-To-Market
Abra
Provincial Local Government of Abra number of kilometers of road constructed/rehabilitated/upgraded/improved
(default)
Target: 5
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
2005338407 Construction of Level II Potable Water System (So. Naguilian Upper)
Abra
Department of the Interior and Local Government - CAR percent completed
(Cumulative)
Target: 38
Actual: 24.86
Expenditure:
Release:3500000
Obligation:3469274
-34.578947368421
2028625927 Empowering Production Sustainability for Leila's Loomweaving
Abra
Department of Science and Technology - CAR No. of firms assisted
(default)
Target: 1
Actual: 1
Expenditure:
Release:0
Obligation:0
0
2033265135 Magmaguey CIS
Abra
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
2036555452 Construction of COVID-19 Isolation Facility, North Poblacion
Abra
Department of Social Welfare and Development - CAR 100% completion
(default)
Target: 15
Actual: 15
Expenditure:27515.06
Release:312538.91
Obligation:347265
0
2040201230 Dalit Proper Solar PIP
Abra
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
2058499172 Construction of 25 meters Cable Footbridge, Naglibacan, Tineg
Abra
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
2058625127 INSTALLATION OF SOLAR-POWERED STREET LIGHTS, PACGUED, Malibcong
Abra
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
2068991311 Repair/Improvement/Upgrading of Lat-ey BHS
Abra
Department of Health - CAR Percent completed
(Cumulative)
Target: 100
Actual: 100
Expenditure:
Release:500000
Obligation:499425.61
0
2085026544 Lengleng Solar PIP
Abra
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
2091129741 Direct Internet Subscription for the IP Transport Municipal in Malibcong
Abra
Department of Information and Communications Technology - CAR Percent Completed
(Cumulative)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
2092881641 Upgrading of Local Access Road in Barangay Ud-udiao
Abra
Department of the Interior and Local Government - CAR percent completed
(Cumulative)
Target: 87.02
Actual: 72.15
Expenditure:
Release:20000000
Obligation:19975030
-17.088025741209
2109316989 CONCRETING OF BUYATAN ACCESS ROAD at Barangay Gacab, Malibcong
Abra
Department of the Interior and Local Government - CAR percent completed
(Cumulative)
Target: 0
Actual: 17.22
Expenditure:
Release:0
Obligation:0
0
2115793252 San Marcial-Tumok SIP
Abra
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
2116357507 Construction of COVID-19 Isolation Facility, Siblong
Abra
Department of Social Welfare and Development - CAR 100% completion
(default)
Target: 0
Actual: 0
Expenditure:27892.6
Release:356834.41
Obligation:396483
0
2120728062 Construction of 48 m Cable Footbridge, Apao, Tineg
Abra
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
2123308187 Direct Internet Subscription for the IP Transport Municipal in Lagangilang
Abra
Department of Information and Communications Technology - CAR Percent Completed
(Cumulative)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
2127497588 Direct Internet Subscription for the IP Transport Municipal in Lacub
Abra
Department of Information and Communications Technology - CAR Percent Completed
(Cumulative)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
2127970435 IMPROVEMENT OF LEVEL II WATER SUPPLY SYSTEM, TARIPAN, Malibcong
Abra
Department of Social Welfare and Development - CAR 100% completion
(Cumulative)
Target: 15.42
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1810944 KOBOL KODOG KOBAIT CIS
Kalinga
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
10787830 Completion of 4 storey Academic Building Phase III-Bulanao Campus
Kalinga
Kalinga State University percentage of accomplishment
(Cumulative)
Target: 100
Actual: 97.55
Expenditure:
Release:0
Obligation:0
-2.45
24508742 CW-KALINGA-21-2022 / CANTONG CIS
Kalinga
National Irrigation Administration - CAR 100% Completed, (Length of Canal Lining and length of Protection Works)
(Cumulative)
Target: 15.77
Actual: 17
Expenditure:36759.6
Release:422159
Obligation:469850.61
7.7996195307546
28502901 DOLGADOG CIS
Kalinga
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
30971742 Construction of Livestock R&D-Native Animals Nucleus herd Center ( Native pig, Poultry Layer and Broiler)
Kalinga
Kalinga State University percentage of accomplishment
(Cumulative)
Target: 0
Actual: 0
Expenditure:
Release:6787950.59
Obligation:6787950.59
0
39502398 Completion of Motorpool-Bulanao Campus
Kalinga
Kalinga State University percentage of accomplishment
(Cumulative)
Target: 100
Actual: 100
Expenditure:
Release:0
Obligation:0
0
47787457 Bultot (Pulak) PIS
Kalinga
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
51079999 Alitukan-longpa SIP
Kalinga
National Irrigation Administration - CAR 100% Completed 1,050.00
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
55996544 DANGTALAN CIS
Kalinga
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
71730677 CW-KALINGA-27-2022 / MADAPDAPIG CIS
Kalinga
National Irrigation Administration - CAR 100% Completed, (Length of Canal Lining)
(Cumulative)
Target: 25.72
Actual: 0
Expenditure:818207.32
Release:868869
Obligation:943973
-100
81110010 BAKO SPIP
Kalinga
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
90624569 Repai/Improvement of Lower Uma BHS
Kalinga
Department of Health - CAR Percent completed
(Cumulative)
Target: 100
Actual: 100
Expenditure:
Release:500000
Obligation:500000
0
99271403 CW-KALINGA-35-2022 / SUYANG CIS
Kalinga
National Irrigation Administration - CAR 100% Completed, (Length of Canal Lining)
(Cumulative)
Target: 5
Actual: 6
Expenditure:57372.86
Release:1372658
Obligation:1476580.97
20
108161366 CW-KALINGA-20-2022 / CALLATI CIS
Kalinga
National Irrigation Administration - CAR 100% Completed, (Length of Canal Lining and length of Protection Works)
(Cumulative)
Target: 5
Actual: 6
Expenditure:22877.63
Release:621285
Obligation:679189.85
20
113307631 Upper Chico RIS
Kalinga
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
113976980 MADAPDAPIG CIS
Kalinga
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
133543140 Purchase of Medical Equipment. Mabaca, Balbalan
Kalinga
National Commission on Indigenous Peoples - CAR no of projects implemented
(default)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:127140
0
154037150 RIS TECH4ED Center Launching
Kalinga
Department of Information and Communications Technology - CAR number of activities
(default)
Target: 1
Actual: 1
Expenditure:
Release:0
Obligation:0
0
159697265 Delineation, Recognition and Titling of Mabongtot Ancestral Domain (Stage 1 and 2)
Kalinga
National Commission on Indigenous Peoples - CAR number of stages of CADT application completed
(Cumulative)
Target: 1
Actual: 0
Expenditure:
Release:0
Obligation:225150
-100
161055928 Construction of Bugnay Water Sysytem
Kalinga
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
161575688 Construction of Public Sanitary Toilet, Western Uma
Kalinga
Department of Social Welfare and Development - CAR 100% completion
(default)
Target: 100
Actual: 100
Expenditure:0
Release:54138.98
Obligation:66549
0
166385023 CW-KALINGA-08-2022 / NAAPAGAP SPIP
Kalinga
National Irrigation Administration - CAR 100% Completed, 7 hectares area generated
(Cumulative)
Target: 0
Actual: 0
Expenditure:0
Release:1933781
Obligation:3157110.53
0
175325476 BALONG NORTE CIS
Kalinga
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
191804399 CW-KALINGA-12-2022 / SAN FRANCISCO SIP PH. 2
Kalinga
National Irrigation Administration - CAR 100% Completed (Unit of Canal Structure and Length of Canal)
(Cumulative)
Target: 0
Actual: 0
Expenditure:0
Release:11261059
Obligation:4348506.96
0
196383116 Reconstruction of Picoc Child Development Center, Balbalan Proper, Balbalan
Kalinga
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
202859990 CW-KALINGA-13-2022 / UPPER CHICO RIVER IRRIGATION SYSTEM SPIP
Kalinga
National Irrigation Administration - CAR 100% Completed, 33.65 hectares area generated
(Cumulative)
Target: 0
Actual: 0
Expenditure:12078408.47
Release:8230148
Obligation:19830726.57
0
203285266 ALUTTIT PIP
Kalinga
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
217851620 BICONGCONG CIS
Kalinga
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
227327771 Concreting of Pat-ting, Sumadel 2 Pathway for Quicker Covid-19 Response, Sumadel 2
Kalinga
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
232300152 CW-KALINGA-06-2022 / UPPER CHICO RIVER IRRIGATION SYSTEM
Kalinga
National Irrigation Administration - CAR 100% Completed (Length of service road)
(Cumulative)
Target: 0
Actual: 2
Expenditure:4415823.57
Release:2736465
Obligation:5817267.38
0
235613180 Highschool building-electrical rewiring
Kalinga
Kalinga State University percentage of accomplishment
(Cumulative)
Target: 100
Actual: 100
Expenditure:
Release:0
Obligation:0
0
248991776 Construction of Additional Communal Latrine, Lower Lubo
Kalinga
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
255629629 CW-BLDG-QUEZON-01-2022 / CONSTRUCTION OF NIA - QUEZON BUILDING
Kalinga
National Irrigation Administration - CAR 100% Completed
(Cumulative)
Target: 0
Actual: 0
Expenditure:0
Release:6606070
Obligation:21962144.4
0
269765191 Upper Chico RIS (Quezon)
Kalinga
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
284884997 CW-KALINGA-16-2022 / AMBALI CIS
Kalinga
National Irrigation Administration - CAR 100% Completed, (Length of Canal Lining)
(Cumulative)
Target: 8
Actual: 9
Expenditure:18824.58
Release:704669
Obligation:754157.53
12.5
288374368 GALDANG CIS
Kalinga
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
298225586 New Construction of Tabuk Super Health Center
Kalinga
Department of Health - CAR Percent Completed
(default)
Target: 50
Actual: 51
Expenditure:
Release:0
Obligation:0
2
300629081 ZIPLA SPIP
Kalinga
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
316444526 Rehabilitation Of Upper Bangad Water System, Upper Bangad
Kalinga
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
320404269 Managed Internet Service - VSAT Network Services for Quarantine Centers and Medical Facilities - Kalinga District Hospital, Lubuagan
Kalinga
Department of Information and Communications Technology - CAR Percent completed
(Cumulative)
Target: 100
Actual: 100
Expenditure:
Release:0
Obligation:0
0
322320289 Perimeter Fencing of Provincial Government Facilities/Properties
Kalinga
Provincial Local Government of Kalinga length of fence
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
323954808 Installation of Solar-Powered Streetlight, Lower Uma
Kalinga
Department of Social Welfare and Development - CAR 100% completion
(default)
Target: 100
Actual: 100
Expenditure:0
Release:39236.68
Obligation:41174
0
341521006 CONSTRUCTION OF LEVEL II POTABLE WATER SUPPLY SYSTEM at Purok 3 and 4, Apatan
Kalinga
Department of the Interior and Local Government - CAR percent completed
(Cumulative)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
347140635 MABATO PIP
Kalinga
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
368991981 Rehabilitation of Layawan Irrigation System Intake, Lower Taloctoc
Kalinga
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
376806411 iFWD Project for Mr. Marston Russel Malabanan
Kalinga
Department of Science and Technology - CAR No. of firms assisted
(default)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
387770069 CW-KALINGA-41-2022 / UPPER CHICO RIVER IRRIGATION SYTEM (MALLIG)
Kalinga
National Irrigation Administration - CAR 100% Completed (Length of Canal & length of protection works)
(Cumulative)
Target: 0
Actual: 0
Expenditure:96380.23
Release:2588567
Obligation:5353593.79
0
390274266 Construction of waterline system at Bulanao campus
Kalinga
Kalinga State University percentage of accomplishment
(Cumulative)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
391145629 CONSTRUCTION OF BARANGAY HEALTH STATION AT BARANGAY LIMOS
Kalinga
Department of the Interior and Local Government - CAR percent completed
(Cumulative)
Target: 0
Actual: 0
Expenditure:
Release:2021949
Obligation:0
0
391962527 Kobol-Kodog-Kobait CIS
Kalinga
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
392420735 Repair/Improvement of Kalinga District Hospital
Kalinga
Department of Health - CAR Percent Completed
(default)
Target: 50
Actual: 26
Expenditure:
Release:0
Obligation:0
-48
395276211 CW-KALINGA-11-2022 / CODDOG NANENG CIS
Kalinga
National Irrigation Administration - CAR 100% Completed, (Length of Canal Lining)
(Cumulative)
Target: 0
Actual: 2
Expenditure:46434.69
Release:1351013
Obligation:1452621.31
0
406248593 UCRIS
Kalinga
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 67
Expenditure:0
Release:0
Obligation:0
168
407538879 Mallong Olosan Solar PIP
Kalinga
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
416702444 Rehabilitation of Bangad Centro Water System
Kalinga
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
418797404 UPPER CHICO RIVER IRRIGATION SYSTEM
Kalinga
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
420289925 Repair/Improvement of Western Kalinga District Hospital
Kalinga
Department of Health - CAR Percent Completed
(default)
Target: 100
Actual: 51
Expenditure:
Release:0
Obligation:0
-49
425315050 Gaogao CIS
Kalinga
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
428491528 Rehabilitation of Ngibat Water System, Ngibat
Kalinga
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
445336943 AMLAWANG CIS
Kalinga
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
447273993 CALLATI CIS
Kalinga
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
468353793 Completion of HRM Extension Building
Kalinga
Kalinga State University percentage of accomplishment
(Cumulative)
Target: 100
Actual: 100
Expenditure:
Release:0
Obligation:0
0
468949543 Upgrading/Improvement of Drainage Canal, De Jesus St., Bulanao Norte, Tabuk City
Kalinga
Provincial Local Government of Kalinga Length of Drainage Canal Improved
(Cumulative)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
472666020 Social Pension Program
Kalinga
Department of Social Welfare and Development - CAR Percentage of beneficiaries using social pension to augment daily living subsistence and medical needs
(default)
Target: 17552
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
474356079 Upgrading of Food Processing and Research Center
Kalinga
Kalinga State University percentage of accomplishment
(Cumulative)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
474375161 Repair of Ladies Dormitory-Bulanao Campus
Kalinga
Kalinga State University percentage of accomplishment
(Cumulative)
Target: 26.84
Actual: 32.1
Expenditure:
Release:2000000
Obligation:2000000
19.597615499255
477196008 CW-KALINGA-26-2022 / KOBOL KODOG KOBAIT CIS
Kalinga
National Irrigation Administration - CAR 100% Completed, (Length of Canal Lining and length of Protection Works)
(Cumulative)
Target: 5.44
Actual: 7
Expenditure:20395.29
Release:898590
Obligation:970680.02
28.676470588235
495687703 Upgrading of Aplag Casket Manufacturing
Kalinga
Department of Science and Technology - CAR Number of firms assisted
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
495752124 Improvement of Ambato-Legleg Water System
Kalinga
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
498105400 Improvement of Manufur to Arang-ang CIS, Luplupa
Kalinga
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
512857374 GUBONG MAGSILAY CIS
Kalinga
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
521868597 CW-KALINGA-09-2022 / MALLONG SULAY PIP
Kalinga
National Irrigation Administration - CAR 100% Completed, 12 hectares area generated
(Cumulative)
Target: 0
Actual: 0
Expenditure:10406.04
Release:917130
Obligation:984570.52
0
522887051 CW-KALINGA-51-2022 / UCRIS
Kalinga
National Irrigation Administration - CAR 100% Completed
(Cumulative)
Target: 0
Actual: 0
Expenditure:0
Release:6606070
Obligation:49975357.39
0
528261006 Juan M. Duyan Memorial Hospital
Kalinga
Department of Health - CAR percent completed
(Cumulative)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
536488001 Improvement of Bansar Communal Irrigation System, Upper Lubo
Kalinga
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
541594926 CW-KALINGA-49-2022 / UCRIS
Kalinga
National Irrigation Administration - CAR 100% Completed
(Cumulative)
Target: 0
Actual: 0
Expenditure:0
Release:6606070
Obligation:24940223.74
0
544501235 MANANIG-ELEB CIS
Kalinga
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
544989215 Chico Solar PIP
Kalinga
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
553662766 Repair/Improvement of Luplupa BHS
Kalinga
Department of Health - CAR Percent completed
(Cumulative)
Target: 100
Actual: 100
Expenditure:
Release:500000
Obligation:498660.41
0
556785847 Improvement of Baccong-Seet Farm to Market Road
Kalinga
Provincial Local Government of Kalinga Length of road improved
(Cumulative)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
557680422 CW-KALINGA-10-2022 / CALANAN PIP
Kalinga
National Irrigation Administration - CAR 100% Completed, 6 hectares area generated
(Cumulative)
Target: 0
Actual: 0
Expenditure:0
Release:917130
Obligation:983362.95
0
558603500 UCRIS
Kalinga
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
565589280 Provision of Cash Grant to 4Ps beneficiaries including the amount of Rice Subsidy
Kalinga
Department of Social Welfare and Development - CAR Number of Household beneficiaries provided with Conditional Cash Grants
(Maintained)
Target: 10640
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
576162856 OB-OB SPIP
Kalinga
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 85
Expenditure:0
Release:0
Obligation:0
240
583484384 Construction of Makilo Water System, Mabongtot
Kalinga
Department of Social Welfare and Development - CAR 100% completion
(default)
Target: 100
Actual: 100
Expenditure:0
Release:42128.71
Obligation:45677
0
588062068 UPPER CHICO RIVER IRRIGATION SYSTEM (TABUK CITY)
Kalinga
National Irrigation Administration - CAR 100% Completed (Unit of Canal Structure, Length of Canal and Length of Protection Works)
(Cumulative)
Target: 4
Actual: 10
Expenditure:58934077.3
Release:25360968
Obligation:135891744.9
150
594816755 CW-KALINGA-25-2022 / GUBONG MAGSILAY CIS
Kalinga
National Irrigation Administration - CAR 100% Completed, (Length of Canal Lining and length of Protection Works)
(Cumulative)
Target: 28.54
Actual: 30
Expenditure:414299.43
Release:439538
Obligation:491613.02
5.1156271899089
602486393 CW-KALINGA-24-2022 / GALDANG CIS
Kalinga
National Irrigation Administration - CAR 100% Completed, (Length of Canal Lining)
(Cumulative)
Target: 7.28
Actual: 10
Expenditure:850379.75
Release:886138
Obligation:957945.28
37.362637362637
602795415 BATO SADOL TAWILING CIS
Kalinga
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
602986485 (a) UPPER CHICO RIVER IRRIGATION SYSTEM
Kalinga
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
605524440 Upper Chico River Irrigation System
Kalinga
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
615841403 Sibil-Besong CIS
Kalinga
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
617832353 CW-KALINGA-10-2022 / UPPER CALANAN PIP
Kalinga
National Irrigation Administration - CAR 100% Completed, 4 hectares area generated
(Cumulative)
Target: 0
Actual: 0
Expenditure:0
Release:917130
Obligation:490010.24
0
619896982 SIWAC SPIP
Kalinga
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
625108663 CW-KALINGA-18-2022 / BATO SADOL TAWILING CIS
Kalinga
National Irrigation Administration - CAR 100% Completed (Unit of Canal Structure and Protection Works)
(Cumulative)
Target: 18
Actual: 25
Expenditure:18682.11
Release:911470
Obligation:982396.17
38.888888888889
627018946 CW-KALINGA-19-2022 / BICONGCONG CIS
Kalinga
National Irrigation Administration - CAR 100% Completed, (Length of Canal Lining)
(Cumulative)
Target: 26.54
Actual: 27
Expenditure:435266.13
Release:446546
Obligation:491227.4
1.7332328560663
636874110 Supplemental Feeding Program
Kalinga
Department of Social Welfare and Development - CAR Number of beneficiaries served
(Maintained)
Target: 7260
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
637584953 Renovation of ceiling and wall partitions at the ground floor of the high school building
Kalinga
Kalinga State University percentage of accomplishment
(Cumulative)
Target: 97.97
Actual: 100
Expenditure:
Release:0
Obligation:0
2.0720628763907
639385433 Construction of 4 storey Library Building at Bulanao Campus Phase I
Kalinga
Kalinga State University percentage of accomplishment
(Cumulative)
Target: 100
Actual: 72.13
Expenditure:
Release:45000000
Obligation:45000000
-27.87
651682749 CW-KALINGA-10-2022 / SAGPAT PASTO PIP
Kalinga
National Irrigation Administration - CAR 100% Completed, 6 hectares area generated
(Cumulative)
Target: 0
Actual: 0
Expenditure:14816.54
Release:917130
Obligation:986120.74
0
652229546 Battong SIS
Kalinga
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
673359702 CW-KALINGA-02-2022 / MAKILO SPIP
Kalinga
National Irrigation Administration - CAR 100% Completed, 7 hectares area generated
(Cumulative)
Target: 10.5
Actual: 11
Expenditure:28808.51
Release:2421065
Obligation:3120462.11
4.7619047619048
675394782 ESA and Cash for Work
Kalinga
Department of Social Welfare and Development - CAR number of beneficiaries served
(default)
Target: 1
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
678527365 AMBALI CIS
Kalinga
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
684735832 Repair/Improvement of Tinglayan RHU
Kalinga
Department of Health - CAR Percent Completed
(default)
Target: 100
Actual: 100
Expenditure:
Release:0
Obligation:0
0
697061145 S&T Intervention for Dry-On-Wow Food Processing and Preserving (iFWRD PH)
Kalinga
Department of Science and Technology - CAR Number of firms assisted
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
707389395 CW-KALINGA-34-2022 / NAMNAMA CIS
Kalinga
National Irrigation Administration - CAR 100% Completed, (Length of Canal Lining)
(Cumulative)
Target: 0
Actual: 0
Expenditure:1253594.94
Release:1379430
Obligation:1475661.55
0
713969647 CW-KALINGA-32-2022 / UPPER CHICO RIVER IRRIGATION SYSTEM
Kalinga
National Irrigation Administration - CAR 100% Completed (Length of service road)
(Cumulative)
Target: 10
Actual: 11
Expenditure:266320.35
Release:258627
Obligation:273261.13
10
721581479 Upper Chico River Irrigation System
Kalinga
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
725424994 Construction of Technology and Innovation Park-Bulanao Campus
Kalinga
Kalinga State University percentage of accomplishment
(Cumulative)
Target: 100
Actual: 100
Expenditure:
Release:0
Obligation:0
0
728522013 Establishment of Kalinga Cultural Heritage and Edu-Tourism Center
Kalinga
Kalinga State University percentage of accomplishment
(Cumulative)
Target: 18.13
Actual: 16.8
Expenditure:
Release:3935949.63
Obligation:3935949.63
-7.3359073359073
728713866 Improvement in the Kalinga Mountain Coffee Products
Kalinga
Department of Science and Technology - CAR No. of firms assisted
(default)
Target: 0
Actual: 1
Expenditure:
Release:0
Obligation:0
0
732192600 CW-KALINGA-10-2022 / AGAP PIP
Kalinga
National Irrigation Administration - CAR 100% Completed, 4 hectares area generated
(Cumulative)
Target: 0
Actual: 0
Expenditure:0
Release:446854
Obligation:491972.04
0
737700622 Supplemental Feeding Program
Kalinga
Department of Social Welfare and Development - CAR Number of Children Served
(Maintained)
Target: 7494
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
741190699 Upper Chico RIS
Kalinga
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
742291791 Improvement of Mabalusa Communal Irrigation System, Dao-angan, Balbalan
Kalinga
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
749313211 Repai/Improvement of Poswoy BHS
Kalinga
Department of Health - CAR Percent completed
(Cumulative)
Target: 100
Actual: 100
Expenditure:
Release:500000
Obligation:499870.88
0
754310735 CONSTRUCTION OF LEVEL II POTABLE WATER SUPPLY SYSTEM AT BARANGAY APATAN at Sitio Tappo, Apatan
Kalinga
Department of the Interior and Local Government - CAR percent completed
(Cumulative)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
757389814 Construction of Tulgao East Water System, Tulgao East
Kalinga
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
763093918 Balong Norte CIS
Kalinga
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
768406566 Social Pension Program
Kalinga
Department of Social Welfare and Development - CAR Number of indigent senior citizens provided with Social Pension
(Maintained)
Target: 17163
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
769245944 high school building repair ( roofing, ceiling and downspout)
Kalinga
Kalinga State University percentage of accomplishment
(Cumulative)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
815892305 CW-KALINGA-10-2022 / MABATO PIP
Kalinga
National Irrigation Administration - CAR 100% Completed, 10 hectares area generated
(Cumulative)
Target: 0
Actual: 0
Expenditure:0
Release:917130
Obligation:986120.74
0
824841572 CW-KALINGA-04-2022 / CUDAL SPIP
Kalinga
National Irrigation Administration - CAR 100% Completed, 7 hectares area generated
(Cumulative)
Target: 10
Actual: 10
Expenditure:487470.61
Release:2194355
Obligation:3120884.23
0
827006386 MANANING CREEK UPPER MANANING CIS
Kalinga
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
836233879 SAGPAT PASTO PIP
Kalinga
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
837141095 Marcela SPIP
Kalinga
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
837655872 Construction of Mabongtot Communal Irrigation System, Buaya, Balbalan
Kalinga
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
849622226 UPPER CHICO RIVER IRRIGATION SYSTEM (QUEZON)
Kalinga
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
855309450 Completion of Performing Arts Theater
Kalinga
Kalinga State University percentage of accomplishment
(Cumulative)
Target: 100
Actual: 100
Expenditure:
Release:0
Obligation:0
0
866878448 Electricity Primary Metering for KSU-Bulanao Campus
Kalinga
Kalinga State University percentage of accomplishment
(Cumulative)
Target: 100
Actual: 100
Expenditure:
Release:0
Obligation:0
0
870080049 Repair/Improvement of Lubuagan RHU
Kalinga
Department of Health - CAR Percent Completed
(default)
Target: 100
Actual: 89
Expenditure:
Release:0
Obligation:0
-11
872697436 PARTNERSHIP ON SAAD (DA)
Kalinga
Department of Social Welfare and Development - CAR No. of Households provided with livelihood modalities
(Cumulative)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
876583162 Upgrading Project of RIPPLES Soaps and Scents Trading
Kalinga
Department of Science and Technology - CAR No. of firms assisted
(default)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
879611072 NAMNAMA CIS
Kalinga
National Irrigation Administration - CAR 50
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
886773851 Magabbangon PIS
Kalinga
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
893018035 S&T Intervention of Parway's Handicrafts Manufacturing
Kalinga
Department of Science and Technology - CAR No. of firms assisted
(default)
Target: 0
Actual: 1
Expenditure:
Release:0
Obligation:0
0
906992192 SAN ISIDRO PIP
Kalinga
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
916202816 Rehabilitation of Water System at Sitio Lisbong, Poswoy, Balbalan
Kalinga
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
919220725 Improvement of Main Drainage Canal at Manggawa, Loccong
Kalinga
Department of Social Welfare and Development - CAR Percent Completed
(default)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
932123924 Improvement of Layawan Irrigation System, Lower Taloctoc
Kalinga
Department of Social Welfare and Development - CAR 100% completion (1 unit small scale irrigation (917.10 cu.m. unclassified excavation, 207.95 structure excavation, 84 li.,. RCPC with 7 manholes)
(default)
Target: 100
Actual: 100
Expenditure:0
Release:79582
Obligation:100000
0
948988736 Upper Chico RIS
Kalinga
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
952825546 CW-KALINGA-37-2022 / GAWIDAN CIS
Kalinga
National Irrigation Administration - CAR 100% Completed, (Length of Canal Lining, Diversion works and length of Protection Works)
(Cumulative)
Target: 0
Actual: 0
Expenditure:53972.86
Release:1474851
Obligation:1970382.95
0
957422268 Upgrading of Belong Credit Cooperative
Kalinga
Department of Science and Technology - CAR No. of firms assisted
(default)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
964278053 CW-KALINGA-03-2022 / CAFAYU SPIP
Kalinga
National Irrigation Administration - CAR 100% Completed, 7 hectares area generated
(Cumulative)
Target: 3
Actual: 3
Expenditure:0
Release:2155343
Obligation:3138063.41
0
969211981 Construction of Water System at Purok 3, Babalag East, Rizal
Kalinga
Department of the Interior and Local Government - CAR percent completed
(Cumulative)
Target: 43.11
Actual: 89.08
Expenditure:
Release:3000000
Obligation:2949189
106.63419160288
981049614 TIWONG SPIP
Kalinga
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
981365369 CW-KALINGA-07-2022 / NAYUD BALANI SPIP
Kalinga
National Irrigation Administration - CAR 100% Completed, 7 hectares area generated
(Cumulative)
Target: 0
Actual: 0
Expenditure:0
Release:1788030
Obligation:3155637.8
0
981691250 Construction of Technology and Innovation Park-Bulanao Campus
Kalinga
Kalinga State University percentage of accomplishment
(Cumulative)
Target: 67.19
Actual: 53.04
Expenditure:
Release:6695065.24
Obligation:6695065.24
-21.059681500223
989427798 Construction of Gannapi Bayowong Footpath, Mabaca, Balbalan
Kalinga
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
990378786 CW-KALINGA-UPPER CHICO RIVER IRRIGATION SYSTEM (PINUKPUK)
Kalinga
National Irrigation Administration - CAR 100% Completed, (Length of Canal Lining and length of Protection Works)
(Cumulative)
Target: 4
Actual: 4
Expenditure:0
Release:0
Obligation:0
0
994555484 Construction of Talalang Proper to Sitio Gukguk Footpath, Talalang, Balbalan
Kalinga
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1012635135 CONSTRUCTION OF NIA - QUEZON BUILDING
Kalinga
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 10
Actual: 49.29
Expenditure:0
Release:0
Obligation:0
392.9
1016012180 Lamagan SIP
Kalinga
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
1017341699 Social Pension Program
Kalinga
Department of Social Welfare and Development - CAR Number of beneficiaries served
(Maintained)
Target: 17553
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1019721440 LUBUAGAN PASIL SIP
Kalinga
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 0
Actual: 26
Expenditure:0
Release:0
Obligation:0
0
1021029359 Continuing S&T Improvement of JAC Farm's Coffee Processing
Kalinga
Department of Science and Technology - CAR No. of firms assisted
(default)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
1022879445 CW-KALINGA-42-2022 / UPPER CHICO RIVER IRRIGATION SYSTEM (QUEZON)
Kalinga
National Irrigation Administration - CAR 100% Completed (Length of Canal and Protection Works)
(Cumulative)
Target: 0
Actual: 0
Expenditure:304730.55
Release:3771090
Obligation:9855703.24
0
1032164117 Improvement of Barangay Open Conference Hall (Barangay Isolation Unit), Lay-asan
Kalinga
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1036588190 GAWIDAN CIS
Kalinga
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1044335408 MAKILO SPIP
Kalinga
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1045189059 Construction of Nursery-KSU Bulanao Campus
Kalinga
Kalinga State University percentage of accomplishment
(Cumulative)
Target: 100
Actual: 100
Expenditure:
Release:0
Obligation:0
0
1046710389 Dalutag Solar PIP
Kalinga
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
1047625747 Livelihood for Enhanced Livestock related activities
Kalinga
Department of Agriculture - CAR Number of Projects Completed, Number of Beneficiaries Serve, Number of Community Based Enterprise
(default)
Target: 23
Actual: 34
Expenditure:
Release:0
Obligation:0
47.826086956522
1048196463 Formulation of ADSDPP of Gaang AD
Kalinga
National Commission on Indigenous Peoples - CAR number of phases of ADSDPP formulation completed within the year
(default)
Target: 1
Actual: 0
Expenditure:
Release:0
Obligation:20800
-100
1053518914 Improvement of Bonong Water System, Tawang, Balbalan
Kalinga
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1055251892 Construction of Material Recovery Facility-KSU Bulanao Campus
Kalinga
Kalinga State University percentage of accomplishment
(Cumulative)
Target: 100
Actual: 100
Expenditure:
Release:0
Obligation:0
0
1079997581 CODDOG NANENG CIS
Kalinga
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1080806809 Construction and Improvement of Banagao to Cawi, Poblacion Farm to Market Road (Banagao-Mangali Road)
Kalinga
Department of the Interior and Local Government - CAR Percent Completed
(Cumulative)
Target: 34.5
Actual: 0
Expenditure:
Release:0
Obligation:0
-100
1093287021 MALLONG SULAY PIP
Kalinga
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1101316381 San Pacual Solar PIP
Kalinga
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
1105701015 CW-KALINGA-30-2022 / PAKAK CRK, BALATOC LIGOY CIS
Kalinga
National Irrigation Administration - CAR 100% Completed, (Length of Canal Lining)
(Cumulative)
Target: 10
Actual: 10
Expenditure:16603.38
Release:424642
Obligation:477732.26
0
1110462481 CW-KALINGA-09-2022 / CABUYAO PIP
Kalinga
National Irrigation Administration - CAR 100% Completed, 6 hectares area generated
(Cumulative)
Target: 0
Actual: 0
Expenditure:14064.47
Release:917130
Obligation:985576.28
0
1111282118 Improvement of School Perimeter Fencing - Anggacan Elementary School, Anggacan, Tanudan
Kalinga
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1111378462 Repair/Improvement/Upgrading of Rizal RHU
Kalinga
Department of Health - CAR Percent completed
(default)
Target: 0
Actual: 100
Expenditure:
Release:1000000
Obligation:1000000
0
1111749551 Angngalipan Solar PIP
Kalinga
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
1120132051 Procurement and Installation of Solar-Powered Streetlights, Poblacion
Kalinga
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1127753630 UPPER CALANAN PIP
Kalinga
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1128366942 Construction of Perimeter Fencing at Bulanao Campus Phase IV
Kalinga
Kalinga State University percentage of accomplishment
(Cumulative)
Target: 100
Actual: 100
Expenditure:
Release:0
Obligation:0
0
1133121560 CABUYAO PIP
Kalinga
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1137522029 Construction of Sumegcol to Brgy. Hall Footpath, Ababaan, Balbalan
Kalinga
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1138657262 Improvement of Barangay Open Conference Hall (Barangay Isolation Unit), Lay-asan
Kalinga
Department of Social Welfare and Development - CAR Percent Completed
(default)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1138911470 REPAIR OF FLOOR TILES,DOORS,CANOPY AND PLUMBING WORKS AT LAW BUILDING
Kalinga
Kalinga State University percentage of accomplishment
(Cumulative)
Target: 0
Actual: 0
Expenditure:
Release:514170.96
Obligation:514170.96
0
1144486439 CAFAYU SPIP
Kalinga
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1152083945 Repair and Maintenance of Research, Agriculture and Forestry laboratory Building's Ceiling and Flooring
Kalinga
Kalinga State University percentage of accomplishment
(Cumulative)
Target: 100
Actual: 62.17
Expenditure:
Release:0
Obligation:0
-37.83
1178859374 Livestock R & D- Native Animals Nucleus Herd Center ( Native Pig, Poultry-layer and broiler
Kalinga
Kalinga State University percentage of accomplishment
(Cumulative)
Target: 57.74
Actual: 51.13
Expenditure:
Release:32922000
Obligation:32922000
-11.447869760998
1182890833 Sustainable Livelihood Program
Kalinga
Department of Social Welfare and Development - CAR Total number of households who received seed capital fund and total number of households trained (Seed Capital Funds, Skills Training, and CBLA)
(Maintained)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
1183148669 Delineation, Recognition and Titling of Taloctoc Ancestral Domain (portion of Stage 3 to Stage 5)
Kalinga
National Commission on Indigenous Peoples - CAR number of stages of CADT application completed
(default)
Target: 0
Actual: 0
Expenditure:
Release:150000
Obligation:11587
0
1187014188 NAMANGGAAN PIP
Kalinga
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1196472381 Coddog Naneng CIS
Kalinga
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
1198856741 UPPER CHICO RIVER IRRIGATION SYSTEM (PINUKPUK)
Kalinga
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1202086141 CW-KALINGA-23-2022 / DOLGADOG CIS
Kalinga
National Irrigation Administration - CAR 100% Completed, (Length of Canal Lining)
(Cumulative)
Target: 0
Actual: 0
Expenditure:20462.06
Release:668634
Obligation:958196.99
0
1205619024 Repair/Improvement/Upgrading of Kalinga District Hospital
Kalinga
Department of Health - CAR Percent completed
(Cumulative)
Target: 100
Actual: 100
Expenditure:
Release:4000000
Obligation:4000000
0
1216944720 CW-KALINGA-08-2022 / SIWAC SPIP
Kalinga
National Irrigation Administration - CAR 100% Completed, 7 hectares area generated
(Cumulative)
Target: 0
Actual: 0
Expenditure:77932.89
Release:1774245
Obligation:3155646.4
0
1221151657 WATA SIP PH. 6
Kalinga
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1227034701 Improvement of Gatgat Communal Irrigation System, Gawaan, Balbalan
Kalinga
Department of Social Welfare and Development - CAR Percent Completed
(default)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1251814465 Construction of Technology and Innovation Park Savings -generator set and pump house
Kalinga
Kalinga State University percentage of accomplishment
(Cumulative)
Target: 100
Actual: 100
Expenditure:
Release:0
Obligation:0
0
1259841216 CW-KALINGA-09-2022 / SAN ISIDRO PIP
Kalinga
National Irrigation Administration - CAR 100% Completed, 10 hectares area generated
(Cumulative)
Target: 0
Actual: 0
Expenditure:14816.54
Release:917130
Obligation:986120.74
0
1265804000 SAN FRANCISCO SIP PH. 2
Kalinga
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 10
Actual: 44
Expenditure:0
Release:0
Obligation:0
340
1267532715 CW-KALINGA-14-2022 / UPPER CHICO RIVER IRRIGATION SYSTEM SPIP
Kalinga
National Irrigation Administration - CAR 100% Completed, 110 hectares area generated
(Cumulative)
Target: 0
Actual: 0
Expenditure:13364511.14
Release:9390135
Obligation:24707105.42
0
1279300398 Construction of 4 storey Library Building at Bulanao Campus Phase I
Kalinga
Kalinga State University percentage of accomplishment
(Cumulative)
Target: 74.57
Actual: 59.63
Expenditure:
Release:26026740.83
Obligation:26026740.83
-20.034866568325
1292896860 Improvement of Pitang Water Work System, Anggacan Sur, Tanudan
Kalinga
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1322556654 CALUMNAG PIP
Kalinga
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1324217478 Scholarship Program-RESP
Kalinga
Technical Education and Skills Development Authority - CAR number of enrolled, number of graduates
(default)
Target: 1425
Actual: 0
Expenditure:
Release:20103235
Obligation:408595
-100
1324281629 Sustainable Livelihood Program
Kalinga
Department of Social Welfare and Development - CAR Total number of households who received seed capital fund and total number of households trained (Seed Capital Funds, Skills Training, and CBLA)
(Maintained)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
1327478617 Upper Chico RIS
Kalinga
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
1327599067 Improvement of Guilguila-Licwotan Footpath, Mangali Centro
Kalinga
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1330233707 CW-KALINGA-29-2022 / MANANING CREEK UPPER MANANING CIS
Kalinga
National Irrigation Administration - CAR 100% Completed, (Length of Canal Lining)
(Cumulative)
Target: 0
Actual: 2
Expenditure:397635.53
Release:419123
Obligation:459194.73
0
1330997211 Upgrading of Benz furniture and woodcraft
Kalinga
Department of Science and Technology - CAR No. of firms assisted
(default)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
1332864626 Santor Rizal Solar PIP II
Kalinga
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
1354489108 Improvement of Calaocan Drainage Canal, Balantoy, Balbalan
Kalinga
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1365233594 Improvement of Tulgao West Water System, Tulgao West
Kalinga
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1369442840 Managed Internet Subscription for KALINGA
Kalinga
Department of Information and Communications Technology - CAR Percent completed
(default)
Target: 100
Actual: 100
Expenditure:
Release:0
Obligation:0
0
1373152996 CW-KALINGA-10-2022 / CALUMNAG PIP
Kalinga
National Irrigation Administration - CAR 100% Completed, 7 hectares area generated
(Cumulative)
Target: 0
Actual: 0
Expenditure:0
Release:917130
Obligation:985527.42
0
1386570805 CW-KALINGA-10-2022 / ALUTTIT PIP
Kalinga
National Irrigation Administration - CAR 100% Completed, 8 hectares area generated
(Cumulative)
Target: 0
Actual: 0
Expenditure:0
Release:917130
Obligation:986156.15
0
1391672112 Improvements of Water Work System, Mabaca
Kalinga
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1393860087 CUDAL SPIP
Kalinga
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1396325445 CONCRETING OF ROAD OF BULANAO CAMPUS
Kalinga
Kalinga State University percentage of accomplishment
(Cumulative)
Target: 0
Actual: 0
Expenditure:
Release:2108000
Obligation:2108000
0
1402596555 CW-KALINGA-09-2022 / BANNENG BACCAN PIP
Kalinga
National Irrigation Administration - CAR 100% Completed, 7 hectares area generated
(Cumulative)
Target: 0
Actual: 0
Expenditure:11085.68
Release:917129052
Obligation:983.58755
0
1413037497 Improvement of Barangay Isolation Unit, Babbanoy, Tanudan
Kalinga
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1419155184 TANAP WAGAYAN CIS
Kalinga
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1426404352 Improvement of Dacudak Communal Irrigation System, Dacalan, Tanudan
Kalinga
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1429849763 AGO-OWAN CIS
Kalinga
National Irrigation Administration - CAR percent completed
(Cumulative)
Target: 100
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1439464992 Construction of Generator set House for Button Mushroom Building-KSU Bulanao Campus
Kalinga
Kalinga State University percentage of accomplishment
(Cumulative)
Target: 100
Actual: 91.66
Expenditure:
Release:0
Obligation:0
-8.34
1440290254 Upgrading of Radio room, Server room of Rizal Campus, ICT computer and speech laboratory of all campus
Kalinga
Kalinga State University percentage of accomplishment
(Cumulative)
Target: 100
Actual: 100
Expenditure:
Release:0
Obligation:0
0
1450213072 Electrical repairs for additional loads at central laboratory
Kalinga
Kalinga State University percentage of accomplishment
(Cumulative)
Target: 0
Actual: 0
Expenditure:
Release:234911.16
Obligation:234911.16
0
1452542509 CONSTRUCTION OF LEVEL II WATER SYSTEM AT BARANGAY LIMOS
Kalinga
Department of the Interior and Local Government - CAR percent completed
(Cumulative)
Target: 0
Actual: 0
Expenditure:
Release:1489551
Obligation:0
0
1453654530 CW-KALINGA-33-2022 / CALAOCAN CHANUM PIP
Kalinga
National Irrigation Administration - CAR 100% Completed, 60 hectares area generated
(Cumulative)
Target: 6
Actual: 6
Expenditure:2396779.99
Release:5752272
Obligation:16808706.25
0
1455971513 CW-KALINGA-31-2022 / TANAP WAGAYAN CIS
Kalinga
National Irrigation Administration - CAR 100% Completed (Unit of Canal Structure and Length of Canal)
(Cumulative)
Target: 10
Actual: 10
Expenditure:30490.99
Release:405669
Obligation:463250.19
0
1463761743 (a) UPPER CHICO RIVER IRRIGATION SYSTEM (TABUK CITY)
Kalinga
National Irrigation Administration - CAR percent completed
(Cumulative)
Target: 100
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1472338445 CONSTRUCTION OF LEVEL II POTABLE WATER SYSTEM AT BARANGAY BA-AY
Kalinga
Department of the Interior and Local Government - CAR percent completed
(Cumulative)
Target: 0
Actual: 0
Expenditure:
Release:2989778
Obligation:0
0
1477235007 River Block/Control Along Bakungkong River Bank, Anggacan
Kalinga
Department of Social Welfare and Development - CAR 100% completion
(default)
Target: 35
Actual: 57.6
Expenditure:97000.25
Release:0
Obligation:100000
64.571428571429
1485174602 Construction of Alubaggan Child Development Center, Dupligan, Tanudan
Kalinga
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1489777993 UPPER CHICO RIVER IRRIGATION SYSTEM
Kalinga
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1496605020 CW-KALINGA-17-2022 AMLAWANG CIS
Kalinga
National Irrigation Administration - CAR 100% Completed, (Length of Canal Lining)
(Cumulative)
Target: 11.55
Actual: 12
Expenditure:18824.58
Release:452045
Obligation:981654.05
3.8961038961039
1498175282 CALANAN PIP
Kalinga
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1517660631 Managed Internet Service - VSAT Network Services for Quarantine Centers and Medical Facilities - Juan M. Duyan District Hospital, Rizal
Kalinga
Department of Information and Communications Technology - CAR Percent completed
(Cumulative)
Target: 100
Actual: 100
Expenditure:
Release:0
Obligation:0
0
1517784325 Construction of Dananao Motorpath for Quicker Covid-19 Response
Kalinga
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1519104664 Improvement of Banneng-Darulog-Bawac Farm to Market Road
Kalinga
Department of Agriculture - CAR number of kilometer constructed
(Cumulative)
Target: 2.1
Actual: 2.53
Expenditure:
Release:102551481.76
Obligation:102551481.76
20.47619047619
1523627078 SUYANG CIS
Kalinga
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1540098943 Rehabilitation of Kinama Small Water Impounding Project
Kalinga
Department of Agriculture - CAR number of Small Scale Irrigation Projects (SSIP) rehabilitated, service area (ha) restored, number of groups
(Cumulative)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
1551406094 CW-KALINGA-05-2022 / SALIGO BULANAO SPIP
Kalinga
National Irrigation Administration - CAR 100% Completed, 15 hectares area generated
(Cumulative)
Target: 6
Actual: 6
Expenditure:152430.43
Release:4664442
Obligation:4917522.16
0
1557364164 Rehabilitation of Layawan Irrigation System, Upper Taloctoc
Kalinga
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1568641855 Construction of Buscalan Communal Irrigation System (CIS)
Kalinga
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1575294703 Repair and Renovation of Forestry Building
Kalinga
Kalinga State University percentage of accomplishment
(Cumulative)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
1578522413 BANNENG BACCAN PIP
Kalinga
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1587376707 Pinukpuk DH
Kalinga
Department of Health - CAR percent completed
(Cumulative)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
1592994469 Facility Improvement of Dar-awan Poultry Farm
Kalinga
Department of Science and Technology - CAR Number of firms assisted
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
1595443493 NAYUD BALANI SPIP
Kalinga
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1597477994 S&T Interventions for FLQ Food and Panciteria
Kalinga
Department of Science and Technology - CAR No. of firms assisted
(default)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
1619016574 Construction of Toilet Piping, Gaang
Kalinga
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1624959763 Rehabilitation of Congot Communal Irrigation System, Maling, Balbalan
Kalinga
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1629998794 Rehabilitation of Lower Bangad Water System
Kalinga
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1639454511 CW-KALINGA-28-2022 / MANANIG-ELEB CIS
Kalinga
National Irrigation Administration - CAR 100% Completed, (Length of Canal Lining)
(Cumulative)
Target: 12.78
Actual: 13
Expenditure:414663.76
Release:437666
Obligation:472084.06
1.7214397496088
1659854182 Repair/Improvement/Upgrading of Taga-Pinukpuk RHU 1
Kalinga
Department of Health - CAR Percent completed
(Cumulative)
Target: 0
Actual: 100
Expenditure:
Release:1000000
Obligation:962593.77
0
1678442742 Family Transitory Support Package
Kalinga
Department of Social Welfare and Development - CAR 100% payment of beneficiaries
(default)
Target: 3
Actual: 3
Expenditure:0
Release:0
Obligation:0
0
1683086264 Improvement in the Processing of Bongngat's Food Products
Kalinga
Department of Science and Technology - CAR Number of firms assisted
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
1690068740 PAKAK CRK, BALATOC LIGOY CIS
Kalinga
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1703512815 Completion of Performing Arts Theater
Kalinga
Kalinga State University percentage of accomplishment
(Cumulative)
Target: 100
Actual: 72.62
Expenditure:
Release:5956906.24
Obligation:5956906.24
-27.38
1703539849 Construction of Multi-purpose Building, Pangol
Kalinga
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1704629762 Regular and Frontloaded Livelihood Projects
Kalinga
Department of Social Welfare and Development - CAR No. of Households provided with livelihood modalities
(Cumulative)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
1715673959 Construction of Drainage Canal at Proper Mallango
Kalinga
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1721939419 CW-KALINGA-39-2022 / LUBUAGAN PASIL SIP
Kalinga
National Irrigation Administration - CAR 100% Completed, 148 hectares area generated
(Cumulative)
Target: 0
Actual: 0
Expenditure:4631157.44
Release:9262315
Obligation:32593637.93
0
1722551837 Upper Chico RIS (Mallig)
Kalinga
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
1744000348 IMPROVEMENT OF HEALTH STATION AT BARANGAY BA-AY
Kalinga
Department of the Interior and Local Government - CAR percent completed
(Cumulative)
Target: 0
Actual: 0
Expenditure:
Release:999599
Obligation:0
0
1744704574 Repair/Improvement/Upgrading of Kalinga Provincial Hospital
Kalinga
Department of Health - CAR Percent completed
(Cumulative)
Target: 100
Actual: 100
Expenditure:
Release:10000000
Obligation:10000000
0
1748334625 CANTONG CIS
Kalinga
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1750134436 CW-KALINGA-08-2022 / OB-OB SPIP
Kalinga
National Irrigation Administration - CAR 100% Completed, 7 hectares area generated
(Cumulative)
Target: 0
Actual: 0
Expenditure:0
Release:1922166
Obligation:3153524.27
0
1772785955 Livelihood for Enhancement High Value Crops Related activities
Kalinga
Department of Agriculture - CAR Number of Projects Completed, Number of Beneficiaries Serve, Number of Community Based Enterprise
(default)
Target: 3
Actual: 1
Expenditure:
Release:0
Obligation:0
-66.666666666667
1773369427 Upgrading Project in the Processing and Packaging of Garcia's Food Products
Kalinga
Department of Science and Technology - CAR No. of firms assisted
(default)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
1781765569 SALIGO BULANAO SPIP
Kalinga
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1782534275 Electrification of KSU Mushroom Building-KSU Bulanao campus
Kalinga
Kalinga State University percentage of accomplishment
(Cumulative)
Target: 100
Actual: 100
Expenditure:
Release:0
Obligation:0
0
1783724230 Construction of Fin-ac Communal Irrigation System, Sumadel 1
Kalinga
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1784198056 Concreting of Amis Communal Irrigation System (CIS), Basao, Tinglayan
Kalinga
Department of Social Welfare and Development - CAR 100% completion
(Cumulative)
Target: 39.01
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1788611099 CW-KALINGA-38-2022 / WATA SIP PH. 6
Kalinga
National Irrigation Administration - CAR 100% Completed, 60 hectares area generated
(Cumulative)
Target: 4
Actual: 5
Expenditure:0
Release:9909351
Obligation:0
25
1799762456 CW-KALINGA-01-2022 / BAKO SPIP
Kalinga
National Irrigation Administration - CAR 100% Completed, 7 hectares area generated
(Cumulative)
Target: 5
Actual: 5
Expenditure:22933.1
Release:2364554
Obligation:3138477.77
0
1818014887 UPPER CHICO RIVER IRRIGATION SYSTEM SPIP
Kalinga
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1823485279 CW-KALINGA-10-2022 / AGAP PIP
Kalinga
National Irrigation Administration - CAR percent completed
(Cumulative)
Target: 100
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1834650452 S&T Innovation for Teckon Construction
Kalinga
Department of Science and Technology - CAR Number of firms assisted
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
1850818614 UPPER CHICO RIVER IRRIGATION SYSTEM SPIP
Kalinga
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1852551350 NAAPAGAP SPIP
Kalinga
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1867824008 CW-KALINGA-09-2022 / NAMANGGAAN PIP
Kalinga
National Irrigation Administration - CAR 100% Completed, 6 hectares area generated
(Cumulative)
Target: 0
Actual: 0
Expenditure:13764.49
Release:917130
Obligation:986156.15
0
1868359739 CW-KALINGA-36-2022 / BALONG NORTE CIS
Kalinga
National Irrigation Administration - CAR 100% Completed, (Length of Canal Lining)
(Cumulative)
Target: 0
Actual: 0
Expenditure:23015.45
Release:1850245
Obligation:1973884.72
0
1870774224 Improvement in the Packaging of EJ Food Products
Kalinga
Department of Science and Technology - CAR No. of firms assisted
(default)
Target: 0
Actual: 1
Expenditure:
Release:0
Obligation:0
0
1888377732 Rehabilitation of Belong-Manubal Pathway with Proposed Fencing for Quicker Covid-19 Response
Kalinga
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1907904943 Makutay Solar PIP
Kalinga
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
1911561021 Improvement of Pascua Farm Machineries and Welding Shop
Kalinga
Department of Science and Technology - CAR Number of firms assisted
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
1912690129 Improvement of Old Tinglayan Pathway for Quicker Covid-19 Response, Old Tinglayan
Kalinga
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1915054341 Improvement of Ullaga Water Work System, Lower Mangali
Kalinga
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1918549449 Improvement of Sagsagacat Water System, Balbalasang, Balbalan
Kalinga
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1923685859 CW-KALINGA-07-2022 / ZIPLA SPIP
Kalinga
National Irrigation Administration - CAR 100% Completed, 7 hectares area generated
(Cumulative)
Target: 0
Actual: 0
Expenditure:46411.24
Release:1784066
Obligation:3155953.41
0
1925053831 Managed Internet Service - VSAT Network Services for Quarantine Centers and Medical Facilities - Birthing Home Facility - Balinciagao Sur, Pasil
Kalinga
Department of Information and Communications Technology - CAR Percent completed
(Cumulative)
Target: 100
Actual: 100
Expenditure:
Release:0
Obligation:0
0
1938694082 Construction of Slope Protection, Butbut Proper
Kalinga
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1941766260 Sustainable Livelihood Program
Kalinga
Department of Social Welfare and Development - CAR Total number of households who received seed capital fund and total number of households trained (Seed Capital Funds, Skills Training, and CBLA)
(Maintained)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
1966106329 Upgrading of Skidmarks Tires and Auto Supplies
Kalinga
Department of Science and Technology - CAR No. of firms assisted
(default)
Target: 1
Actual: 1
Expenditure:
Release:0
Obligation:0
0
1971260417 Installation of Solar-Powered Streetlight to Enhance Disaster Response, Dangoy
Kalinga
Department of Social Welfare and Development - CAR 100% completion
(default)
Target: 100
Actual: 100
Expenditure:0
Release:50186.62
Obligation:74208
0
1972200016 Managed Internet Service - VSAT Network Services for Quarantine Centers and Medical Facilities - Pinupuk District Hospital
Kalinga
Department of Information and Communications Technology - CAR Percent completed
(Cumulative)
Target: 100
Actual: 100
Expenditure:
Release:0
Obligation:0
0
1973983530 Improvement of Drainage Canal to Enhance Disaster Response, Antonio Canao
Kalinga
Department of Social Welfare and Development - CAR 100% completion
(default)
Target: 100
Actual: 100
Expenditure:0
Release:42468.99
Obligation:55753
0
1976555788 CW-KALINGA-45-2022 / UPPER CHICO RIVER IRRIGATION SYSTEM
Kalinga
National Irrigation Administration - CAR 100% Completed, 190 hectares area generated
(Cumulative)
Target: 1
Actual: 0
Expenditure:38754608.06
Release:42550458
Obligation:49415862.28
-100
1981711015 AGO-OWAN CIS
Kalinga
National Irrigation Administration - CAR 100 % Completed, 0.25 km concrete canal
(Cumulative)
Target: 2
Actual: 40
Expenditure:487474.63
Release:439333
Obligation:487474.63
1900
1985539661 Installation of Roofing at central Laboratory at KSU Bulanao Campus
Kalinga
Kalinga State University percentage of accomplishment
(Cumulative)
Target: 100
Actual: 91.25
Expenditure:
Release:0
Obligation:0
-8.75
1986680558 CW-KALINGA-07-2022 / TIWONG SPIP
Kalinga
National Irrigation Administration - CAR 100% Completed, 15 hectares area generated
(Cumulative)
Target: 0
Actual: 2
Expenditure:152430.43
Release:3495905
Obligation:4933801.48
0
1999789321 S&T Upgrading Facilities of Challengers Agriculture Cooperative
Kalinga
Department of Science and Technology - CAR No. of firms assisted
(default)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
2032587041 TICAN SPIP
Kalinga
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
2059064443 Improvement of Bullalayao Water System, Pantikian, Balbalan
Kalinga
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
2068605252 Improvement for the Coffee and Wine Products of Elju's Food Products (Phase II)
Kalinga
Department of Science and Technology - CAR No. of firms assisted
(default)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
2073710869 UPPER CHICO RIVER IRRIGATION SYTEM (MALLIG)
Kalinga
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
2074421222 CW-KALINGA-08-2022 / TICAN SPIP
Kalinga
National Irrigation Administration - CAR 100% Completed, 7 hectares area generated
(Cumulative)
Target: 0
Actual: 0
Expenditure:0
Release:1786372
Obligation:3157805.56
0
2077780083 Improvement of Water Work System, Poblacion
Kalinga
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
2087598631 CW-KALINGA-22-2022 / DANGTALAN CIS
Kalinga
National Irrigation Administration - CAR 100% Completed (Unit of Canal Structure and Length of Canal)
(Cumulative)
Target: 25.24
Actual: 27
Expenditure:866229.38
Release:91777252
Obligation:979630.92
6.973058637084
2088177470 CALAOCAN CHANUM PIP
Kalinga
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
2097293288 Improvement of Poblacion Water System, Poblacion, Balbalan
Kalinga
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
2104632624 iFWRD Assistance to Enhance the Quality and Production of Chuchay Cakes and Pastries Shop
Kalinga
Department of Science and Technology - CAR Number of firms assisted
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
2115216174 Pagtayan Dampog SIP
Kalinga
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
2116695166 Wata SIP
Kalinga
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
2117627461 Repair/Improvement of Tanudan Rural Health Unit
Kalinga
Department of Health - CAR Percent Completed
(default)
Target: 100
Actual: 100
Expenditure:
Release:0
Obligation:0
0
2118058231 Provision of Cash Grants including the amount of Rice Subsidy
Kalinga
Department of Social Welfare and Development - CAR Number of Household beneficiaries provided with Conditional Cash Grants
(Maintained)
Target: 11602
Actual: 9955
Expenditure:0
Release:0
Obligation:0
-14.195828305465
2128392200 Completion of Technology and Innovation Park-Bulanao Campus
Kalinga
Kalinga State University percentage of accomplishment
(Cumulative)
Target: 5.68
Actual: 41.32
Expenditure:
Release:25000000
Obligation:25000000
627.46478873239
2142741689 Uno Spring Solar PIP
Kalinga
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
2143547823 Calaocan BHS
Kalinga
Department of Health - CAR percent completed
(default)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
5370586 Kanawalan Pitican SIP
Ifugao
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
7175265 REPAIR/IMPROVEMENT/UPGRADING OF AGUINALDO PEOPLE'S HOSPITAL
Ifugao
Department of Health - CAR Percent completed
(Cumulative)
Target: 100
Actual: 100
Expenditure:
Release:4000000
Obligation:3817849.27
0
16602138 Tigtigangan SIP
Ifugao
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
30335842 Nunhapang SIP
Ifugao
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
39280509 CONSTRUCTION OF GAHA-BAGIMBING-LAB-ONG FMR at Barangay Danggo, Tinoc
Ifugao
Department of the Interior and Local Government - CAR percent completed
(Cumulative)
Target: 100
Actual: 0
Expenditure:
Release:0
Obligation:0
-100
43064339 Technology Upgrading of Production Process and Facilities of A & I Bakery
Ifugao
Department of Science and Technology - CAR No. of firms assisted
(default)
Target: 1
Actual: 1
Expenditure:
Release:0
Obligation:0
0
53008968 CONSTRUCTION OF BALINGAW TO CHUMMANGNA PATHWAY, Magulon, Mayoyao
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
57220974 Improvement/Concreting Of Halag-Itab-Buwag Fmr, Itab, Aguinaldo
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
61991500 IMPROVEMENT OF BONGAN VARIOUS CIS, Bongan, Mayoyao
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
63498785 Technology Upgrading for the Hollow Blocks Production of 3J's Hardware & Construction Supplies
Ifugao
Department of Science and Technology - CAR Number of firms assisted
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
71537218 Direct Internet Subscription for the IP Transport Municipal in Alfonso Lista
Ifugao
Department of Information and Communications Technology - CAR Percent Completed
(Cumulative)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
72519115 Improvement of Mabulon-Pitawan Farm to Market Road, Cababuyan South
Ifugao
Department of Social Welfare and Development - CAR 100% completion
(Cumulative)
Target: 0
Actual: 0
Expenditure:0
Release:411882.08
Obligation:411882
0
82001172 Improvement of Pula- Balacbac FMR
Ifugao
Department of Social Welfare and Development - CAR 100% completion
(default)
Target: 100
Actual: 100
Expenditure:0
Release:51366.66
Obligation:82995
0
83796918 Installation Of Damag Solar Street Lights, Damag, Aguinaldo
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
89789323 Improvement of Junction-Alimit-Nattum Farm to Market Road
Ifugao
Department of Agriculture - CAR number of kilometer constructed
(Cumulative)
Target: 4.6
Actual: 4.4
Expenditure:
Release:140528029
Obligation:140528029
-4.3478260869565
92812616 REPAIR/IMPROVEMENT/UPGRADING OF PANOPDOPAN DISTRICT HOSPITAL
Ifugao
Department of Health - CAR Percent completed
(Cumulative)
Target: 80
Actual: 100
Expenditure:
Release:5000000
Obligation:4999038.16
25
115799572 HUMALOPHOP SIP
Ifugao
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 20
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
118585867 Managed Internet Service - VSAT Network Services for Quarantine Centers and Medical Facilities - Mompolia Brgy Hall, Hingyon
Ifugao
Department of Information and Communications Technology - CAR Percent completed
(Cumulative)
Target: 100
Actual: 100
Expenditure:
Release:0
Obligation:0
0
145240330 REPAIR/IMPROVEMENT/UPGRADING OF KIANGAN RHU
Ifugao
Department of Health - CAR Percent completed
(Cumulative)
Target: 100
Actual: 100
Expenditure:
Release:1000000
Obligation:995168.79
0
150157539 Completion of Right and Left Wing of Engineering Building
Ifugao
Ifugao State University Percentage Completion
(default)
Target: 25
Actual: 85
Expenditure:
Release:0
Obligation:0
240
152350704 Balawis CIS
Ifugao
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
181745229 New Construction of Lagawe Super Health Center
Ifugao
Department of Health - CAR Percent Completed
(default)
Target: 25
Actual: 31
Expenditure:
Release:0
Obligation:0
24
182025571 REPAIR/IMPROVEMENT/UPGRADING OF IFUGAO GENERAL HOSPITAL (PHASE VI)
Ifugao
Department of Health - CAR Percent completed
(Cumulative)
Target: 10.3
Actual: 93
Expenditure:
Release:44654651.85
Obligation:44526057.64
802.91262135922
183071809 Construction of Multipurpose Pavement at Sitio Halingat, Northern Cababuyan
Ifugao
Department of Social Welfare and Development - CAR 100% completion
(Cumulative)
Target: 0
Actual: 0
Expenditure:0
Release:455429.01
Obligation:455429
0
200733758 IMPROVEMENT OF SITIO NATIMLAN-SITIO PROPER PATHWAY, Mongol, Mayoyao
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
233225911 HAPID IS (SERVICE ROAD ADDT'L)
Ifugao
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
234044329 Enhancement of Drainage System
Ifugao
Ifugao State University 2000 meters drainage system within the school campus
(Cumulative)
Target: 25
Actual: 25
Expenditure:
Release:9259939.79
Obligation:13228485.41
0
240378650 Construction of FMR at Sitio Ang-angan to Sitio Higib, Mungayang, Kiangan
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
245039507 IMPROVEMENT OF AYANGAN BARANGAY HEALTH STATION, Ayangan, Mayoyao
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
263664508 Health Care and Culture Approach Reaching the Barangays through Free Health Kits
Ifugao
National Commission on Indigenous Peoples - CAR no of projects implemented
(default)
Target: 0
Actual: 0
Expenditure:
Release:207000
Obligation:108000
0
266680441 Sustainable Livelihood Program
Ifugao
Department of Social Welfare and Development - CAR Total number of households who received seed capital fund and total number of households trained (Seed Capital Funds, Skills Training, and CBLA)
(Maintained)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
276513493 Construction Of Chalalo Isolation Facility, Chalalo, Aguinaldo
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
286675291 HUHLUCAN SIP
Ifugao
National Irrigation Administration - CAR 100% completed, 60 has area generated
(Cumulative)
Target: 12
Actual: 14
Expenditure:169358.67
Release:4699295
Obligation:6696156.58
16.666666666667
287199768 Supplemental Feeding Program
Ifugao
Department of Social Welfare and Development - CAR Number of beneficiaries served
(Maintained)
Target: 6560
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
307862169 IMPROVEMENT OF HOLANG FOOTBRIDGE, Liwo, Mayoyao
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
310559284 Direct Internet Subscription for the IP Transport Municipal in Tinoc
Ifugao
Department of Information and Communications Technology - CAR Percent Completed
(Cumulative)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
314163312 Improvement of Balangbang FMR along Sitio Proper, Balangbang, Mayoyao
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
322853948 BANGTINON SIP
Ifugao
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
326883996 CONSTRUCTION OF PULITANG-MUTUK FMR at Barangay Wangwang
Ifugao
Department of the Interior and Local Government - CAR percent completed
(Cumulative)
Target: 100
Actual: 0
Expenditure:
Release:0
Obligation:0
-100
327600208 Amduntog Attaban CIS
Ifugao
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
346720589 Hapid IS
Ifugao
National Irrigation Administration - CAR 100% completed
(Cumulative)
Target: 6
Actual: 8
Expenditure:0
Release:6360104
Obligation:46568851.94
33.333333333333
351914908 Tiger Grass Broom Making Business for the Ayangan IPs/ICCs of Eastern Lagawe
Ifugao
National Commission on Indigenous Peoples - CAR no of projects implemented
(Cumulative)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:216000
0
356430475 IMPROVEMENT OF PATHWAY AT SITIO LINOG, Mayoyao Proper, Mayoyao
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
374300008 TAMMANGAN PAH-DUAN SIP
Ifugao
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
387260460 BANGHALLAN HAGUD SIP
Ifugao
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
399572822 Rehabilitation/ Enhancement of Library Building
Ifugao
Ifugao State University 100 % completion
(Cumulative)
Target: 100
Actual: 100
Expenditure:
Release:15985167.51
Obligation:15985167.51
0
419543176 Managed Internet Service - VSAT Network Services for Quarantine Centers and Medical Facilities - Hapao Brgy Hall, Hungduan
Ifugao
Department of Information and Communications Technology - CAR Percent completed
(Cumulative)
Target: 100
Actual: 100
Expenditure:
Release:0
Obligation:0
0
430766473 Regular and Frontloaded Livelihood Projects
Ifugao
Department of Social Welfare and Development - CAR No. of Households provided with livelihood modalities
(Cumulative)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:1170000
0
451770486 Chalog Alinog SIP
Ifugao
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
458920962 Constructions of Level II Water System at Talabing, Sitio Babalak, Tawangan, Kabayan, Benguet to Sitio Dua-an, Poblacion, Tinoc
Ifugao
Department of Social Welfare and Development - CAR 100% completion
(default)
Target: 100
Actual: 100
Expenditure:0
Release:0
Obligation:0
0
460278163 Hapid IS
Ifugao
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
473497690 REPAIR/IMPROVEMENT OF MAYOYAO RHU
Ifugao
Department of Health - CAR Percent completed
(Cumulative)
Target: 40
Actual: 100
Expenditure:
Release:1000000
Obligation:998887.15
150
476700050 S&T Intervention for Improved Market Competitiveness of Zairiz Bakery & Mini Store
Ifugao
Department of Science and Technology - CAR No. of firms assisted
(default)
Target: 1
Actual: 1
Expenditure:
Release:0
Obligation:0
0
482287184 Hapid IS
Ifugao
National Irrigation Administration - CAR 100% completed, 250 has area Restored
(Cumulative)
Target: 1
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
482508028 IMPROVEMENT ABABBA-TUMMINGEB ROAD at Barangay Tukukan,Tinoc
Ifugao
Department of the Interior and Local Government - CAR percent completed
(Cumulative)
Target: 100
Actual: 0
Expenditure:
Release:0
Obligation:0
-100
485444884 Technology Upgrading of Production Process and Facility of BMK Bakery (Phase II)
Ifugao
Department of Science and Technology - CAR Number of firms assisted
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
501800976 Managed Internet Service - VSAT Network Services for Quarantine Centers and Medical Facilities - Talboc Brgy Hall, Mayoyao
Ifugao
Department of Information and Communications Technology - CAR Percent completed
(Cumulative)
Target: 100
Actual: 100
Expenditure:
Release:0
Obligation:0
0
509907762 INSTALLATION OF SOLAR STREETLIGHTS, Poblacion, Mayoyao
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
515080961 Social Pension Program
Ifugao
Department of Social Welfare and Development - CAR Percentage of beneficiaries using social pension to augment daily living subsistence and medical needs
(default)
Target: 17289
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
526050579 Improvement of Makalawag to Hingalan Community Drainage Canal, Amduntog
Ifugao
Department of Social Welfare and Development - CAR 100% completion
(default)
Target: 100
Actual: 100
Expenditure:0
Release:105897.08
Obligation:106176
0
532441356 IMPROVEMENT OF ADUYONGAN FMR ALONG SITIO PIDLAN, Aduyongan, Mayoyao
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
539495758 NATTUM TUBOG SIP PH. III
Ifugao
National Irrigation Administration - CAR 100% completed, 12 has area generated
(Cumulative)
Target: 2
Actual: 2
Expenditure:5863.82
Release:6509232
Obligation:6515095.63
0
555938712 Damag River Munggayang Manaot SIP
Ifugao
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
566448088 Sitio's Tikidan to Saddle Single Phase Line Extension, Ubuag, Hingyon
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
575971704 Improvement/Widening Of Majlong Access Road, Majlong, Aguinaldo
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
577133014 Hapid IS
Ifugao
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
578519920 Continuation of CIS at Guliwad, Bokiawan, Kiangan
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
583924289 Improvement of Langayan FMR Along Sitio Awayan, Langayan, Mayoyao
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
592082471 Baley Uleg Uyok SIP
Ifugao
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
623685365 CONSTRUCTION OF PULITANG-ACAK-BINGBING FMR at Barangay Binablayan, Tinoc
Ifugao
Department of the Interior and Local Government - CAR percent completed
(Cumulative)
Target: 100
Actual: 0
Expenditure:
Release:0
Obligation:0
-100
629623490 Improvement of Sitio Alatbang Pathway, Bato-Alatbang, Mayoyao
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
638772759 Managed Internet Service - VSAT Network Services for Quarantine Centers and Medical Facilities - Caba Brgy Hall, Lagawe
Ifugao
Department of Information and Communications Technology - CAR Percent completed
(Cumulative)
Target: 73.51
Actual: 73.51
Expenditure:
Release:0
Obligation:0
0
643349155 ALFONSO LISTA PIP
Ifugao
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 20
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
650696604 Completion Of Tuayong Day Care Center, Butac, Aguinaldo
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
664192442 Establishment of Technology Based Enterprise for Iron Works & Variety Shop
Ifugao
Department of Science and Technology - CAR No. of firms assisted
(default)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
667035194 REPAIR/IMPROVEMENT/UPGRADING OF IFUGAO GENERAL HOSPITAL
Ifugao
Department of Health - CAR Percent completed
(Cumulative)
Target: 100
Actual: 100
Expenditure:
Release:4000000
Obligation:3257095.22
0
676884408 Installation of Solar Street Lights at Namulditan, Hingyon
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
684486880 Concreting of Barangay Road at Sitio Kiluguwan, Lingay, Kiangan
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
694708435 DAMAG RIVER MUNGGAYANG MANAOT SIP PH. IV (REBID)
Ifugao
National Irrigation Administration - CAR 100% completed, 50 has area Restored
(Cumulative)
Target: 1
Actual: 2
Expenditure:13907.66
Release:16573391
Obligation:46191684.52
100
728303917 Direct Internet Subscription for the IP Transport Municipal in HINGYON
Ifugao
Department of Information and Communications Technology - CAR Percent completed
(Cumulative)
Target: 67
Actual: 67
Expenditure:
Release:0
Obligation:0
0
736781801 Construction of Slope Protection along Brgy. Hall Play Ground at Sitio Molong, Alimit, Mayoyao
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
749840706 Upgrading of Production Facility of Tonton's Iron Works and Welding Shop (Phase II)
Ifugao
Department of Science and Technology - CAR No. of firms assisted
(default)
Target: 1
Actual: 1
Expenditure:
Release:0
Obligation:0
0
750178313 Improvement of Sitio Tagguiyang - Sitio Banao Pathway, Banhal, Mayoyao
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
752049693 PUGO CIS
Ifugao
National Irrigation Administration - CAR 100% completed, 8 has area Restored
(Cumulative)
Target: 2
Actual: 5
Expenditure:0
Release:759071
Obligation:1331702.95
150
778131514 Picdot Hapao CIS
Ifugao
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
800680660 Upgrading of Production Facility of Regidor's Tailoring
Ifugao
Department of Science and Technology - CAR No. of firms assisted
(default)
Target: 1
Actual: 1
Expenditure:
Release:0
Obligation:0
0
803709874 Rehabilitation of Sitio Bannao-Maalig to Sitio Proper Bolog Level 1 Water Pipelines and Construction of Water Tank, Bolog, Kiangan
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
814151568 Managed Internet Service - VSAT Network Services for Quarantine Centers and Medical Facilities - Eheb Brgy Hall, Tinoc
Ifugao
Department of Information and Communications Technology - CAR Percent completed
(Cumulative)
Target: 100
Actual: 100
Expenditure:
Release:0
Obligation:0
0
818764983 Concreting of Barangay Road from Sitio Anapawon to Sitio Imbay-o, Dalligan, Kiangan
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
820741368 Improvement of Gumhang Mushroom Production Building (2nd Floor) to be utilized as Isolation Facility
Ifugao
Department of Social Welfare and Development - CAR 100% completion
(default)
Target: 100
Actual: 100
Expenditure:0
Release:86829.91
Obligation:87271
0
827680943 Hapid IS (Additional)
Ifugao
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
848168917 Social Pension Program
Ifugao
Department of Social Welfare and Development - CAR Number of beneficiaries served
(Maintained)
Target: 17288
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
848647351 IMPROVEMENT OF CHAYA LEVEL II WATER SYSTEM, Chaya, Mayoyao
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
869231195 Construction of Community Learning Center
Ifugao
Ifugao State University 100 % completion
(Cumulative)
Target: 100
Actual: 100
Expenditure:
Release:2197593
Obligation:2197593
0
877946404 Improvement of Viewpoint-San Fernando Farm to Market Road
Ifugao
Department of Agriculture - CAR km constructed
(Cumulative)
Target: 4.6
Actual: 4.5
Expenditure:
Release:112444200
Obligation:112444200
-2.1739130434783
886849194 Scholarship Program-RESP
Ifugao
Technical Education and Skills Development Authority - CAR number of enrolled, number of graduates
(default)
Target: 600
Actual: 0
Expenditure:
Release:2073120
Obligation:0
-100
890402152 Direct Internet Subscription for the IP Transport Municipal in KIANGAN
Ifugao
Department of Information and Communications Technology - CAR Percent completed
(Cumulative)
Target: 67
Actual: 67
Expenditure:
Release:0
Obligation:0
0
912941319 Upgrading of BS Nursing Laboratory
Ifugao
Ifugao State University 100 % completion
(Cumulative)
Target: 100
Actual: 100
Expenditure:
Release:4689952
Obligation:4689952
0
957930751 Improvement of Upper Haliap to Dinucao FMR
Ifugao
Department of Social Welfare and Development - CAR 100% completion
(default)
Target: 100
Actual: 100
Expenditure:0
Release:82312.32
Obligation:85615
0
962032836 UPGRADING OF NANHABTAN TO BANGA at Barangay Pula, Asipulo
Ifugao
Department of the Interior and Local Government - CAR percent completed
(Cumulative)
Target: 100
Actual: 0
Expenditure:
Release:0
Obligation:0
-100
970588244 Construction of Slope Protection at Sitio Awwa, Bangtinon
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
983842737 REPAIR/IMPROVEMENT/UPGRADING OF MAYOYAO DISTRICT HOSPITAL
Ifugao
Department of Health - CAR Percent completed
(Cumulative)
Target: 100
Actual: 100
Expenditure:
Release:4000000
Obligation:3984391.66
0
999423213 IMPROVEMENT OF PAH-IGAN LUBBAN-TUHDAW FMR at Barangay Gumhang, Tinoc
Ifugao
Department of the Interior and Local Government - CAR percent completed
(Cumulative)
Target: 100
Actual: 0
Expenditure:
Release:0
Obligation:0
-100
1014065883 Improvement of Witig- Panuupan FMR (Intukil Section), Nungawa
Ifugao
Department of Social Welfare and Development - CAR 100% completion
(default)
Target: 100
Actual: 100
Expenditure:0
Release:0
Obligation:38076
0
1019064071 REPAIR/IMPROVEMENT/UPGRADING OF IBAYONG BHS
Ifugao
Department of Health - CAR Percent completed
(Cumulative)
Target: 75
Actual: 100
Expenditure:
Release:500000
Obligation:478828.39
33.333333333333
1026827604 IMPROVEMENT OF BUNINAN FMR ALONG SITIO HUJU, Buninan, Mayoyao
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1037580517 Managed Internet Service - VSAT Network Services for Quarantine Centers and Medical Facilities - Panopdopan District Hospital, Lamut
Ifugao
Department of Information and Communications Technology - CAR Percent completed
(Cumulative)
Target: 42.36
Actual: 42.36
Expenditure:
Release:0
Obligation:0
0
1041081220 Improvement of Level II Water System at Sitio Palabayan and Proper Ap-apid
Ifugao
Department of Social Welfare and Development - CAR 100% completion
(default)
Target: 100
Actual: 100
Expenditure:0
Release:64811.94
Obligation:69704
0
1042399179 Managed Internet Service - VSAT Network Services for Quarantine Centers and Medical Facilities - Asipulo NHS
Ifugao
Department of Information and Communications Technology - CAR Percent completed
(Cumulative)
Target: 100
Actual: 100
Expenditure:
Release:0
Obligation:0
0
1045229498 Supplemental Feeding Program
Ifugao
Department of Social Welfare and Development - CAR Number of Children Served
(Maintained)
Target: 6721
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1063266270 Pantal Health Center Improvement (2nd floor to serve as Isolation/Quarantine Facility)
Ifugao
Department of Social Welfare and Development - CAR 100% completion
(default)
Target: 100
Actual: 100
Expenditure:0
Release:83576.88
Obligation:88808
0
1063508193 Upgrading of the Production Facilities of Hannies Cut & Sew for Improved Quality and Productivity
Ifugao
Department of Science and Technology - CAR Number of firms assisted
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
1076461184 HAPID IS
Ifugao
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
1097788283 Sustainable Livelihood Program
Ifugao
Department of Social Welfare and Development - CAR Total number of households who received seed capital fund and total number of households trained (Seed Capital Funds, Skills Training, and CBLA)
(Maintained)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
1099053219 PARTNERSHIP ON SUSTAINABLE LIVING PROJECT
Ifugao
Department of Social Welfare and Development - CAR No. of Households provided with livelihood modalities
(Cumulative)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
1101733279 Equipment Upgrading of Balubal Sash and Furniture Shop (Phase II)
Ifugao
Department of Science and Technology - CAR No. of firms assisted
(default)
Target: 1
Actual: 1
Expenditure:
Release:0
Obligation:0
0
1121929205 Direct Internet Subscription for the IP Transport Municipal in Banaue
Ifugao
Department of Information and Communications Technology - CAR Percent Completed
(Cumulative)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
1126517273 Improvement of Barangay Anao Drainage Canal at Sitio Mangabat, Anao
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1128222195 REPAIR/IMPROVEMENT/UPGRADING OF BANAUE RHU
Ifugao
Department of Health - CAR Percent completed
(Cumulative)
Target: 80
Actual: 100
Expenditure:
Release:1000000
Obligation:966933.43
25
1128835265 CONSTRUCTION OF DRAINAGE CANAL ALONG THE BARANGAY HEALTH STATION, Tulaed, Mayoyao
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1136785014 Continuation of Sitio Balunglung FMR, Hucab, Kiangan
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1150626597 IMPROVEMENT OF 3 UNITS MAPAWOY CIS, Mapawoy, Mayoyao
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1150667491 Improvement of BHS- Habangan Access Road
Ifugao
Department of Social Welfare and Development - CAR 100% completion
(default)
Target: 100
Actual: 100
Expenditure:0
Release:20028.28
Obligation:36108
0
1154277694 Improvement/Concreting Of Namnama-Halag-Itab Fmr, Halag, Aguinaldo
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1157969736 IMPROVEMENT OF LIGO-KHOHANG CIS, Chumang, Mayoyao
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1161519802 Puhing Ilat CIS (Fhukig CIS)
Ifugao
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
1172776380 Improvement of Sitio Ambuwaya to Sitio Bae FMR, Ambabag, Kiangan
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1191013879 Construction of Sitio Nangpilan Hanging Bridge, Baguinge, Kiangan
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1198058975 Construction Of Awayan Isolation Facility, Awayan, Aguinaldo
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1203238044 Managed Internet Service - VSAT Network Services for Quarantine Centers and Medical Facilities - Julongan Brgy Hall, Kiangan
Ifugao
Department of Information and Communications Technology - CAR Percent completed
(Cumulative)
Target: 100
Actual: 100
Expenditure:
Release:0
Obligation:0
0
1218677836 UPGRADING OF NAMAL PROPER TO BUDU FMR at Barangay Namal, Asipulo
Ifugao
Department of the Interior and Local Government - CAR percent completed
(default)
Target: 71.36
Actual: 0
Expenditure:
Release:0
Obligation:0
-100
1248218953 Pole CIS
Ifugao
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
1252396179 Upgrading of Production Facilities and Product Quality Improvement of 2D's Mini Bakery
Ifugao
Department of Science and Technology - CAR No. of firms assisted
(default)
Target: 1
Actual: 1
Expenditure:
Release:0
Obligation:0
0
1256477797 Construction of Level II Water System at Proper Tulludan
Ifugao
Department of Social Welfare and Development - CAR 100% completion
(default)
Target: 100
Actual: 100
Expenditure:0
Release:20651.98
Obligation:60322
0
1266922172 PUGO CIS
Ifugao
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1282709143 Provision of Cash Grant to 4Ps beneficiaries including the amount of Rice Subsidy
Ifugao
Department of Social Welfare and Development - CAR Number of Household beneficiaries provided with Conditional Cash Grants
(Maintained)
Target: 9433
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1299707874 Improvement/Opening Of Posnaan Access Road, Posnaan, Aguinaldo
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1313520997 Installation of Solar Street Lights at Piwong, Hingyon
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1326048369 TAMMANGAN PAH-DUAN SIP
Ifugao
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1329708173 Direct Internet Subscription for the IP Transport Municipal in HUNGDUAN
Ifugao
Department of Information and Communications Technology - CAR Percent completed
(default)
Target: 71
Actual: 71
Expenditure:
Release:0
Obligation:0
0
1341154330 Refurbishing of BHS for Effective and Efficient Delivery of Health Services, Oong
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1347233383 Direct Internet Subscription for the IP Transport Municipal in Lagawe
Ifugao
Department of Information and Communications Technology - CAR Percent Completed
(Cumulative)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
1358247763 Construction of Lacdag Road Box Culvert, Julongan, Kiangan
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1361635012 Upgrading of H&H Aluminum and Welding Fabrication Services
Ifugao
Department of Science and Technology - CAR No. of firms assisted
(default)
Target: 1
Actual: 1
Expenditure:
Release:0
Obligation:0
0
1369381364 Construction of PCCP at Sitio Naghudcha, Halag, Aguinaldo
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1371416262 HUMALOPHOP SIP
Ifugao
National Irrigation Administration - CAR 100% completed, 9 has area Restored
(Cumulative)
Target: 1
Actual: 2
Expenditure:421975.45
Release:928346
Obligation:2813169.64
100
1398509864 Widening of Nalbu FMR at Sitio Gulon, Nalbu, Mayoyao
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1410405341 Direct Internet Subscription for the IP Transport Municipal in LAMUT
Ifugao
Department of Information and Communications Technology - CAR Percent completed
(Cumulative)
Target: 67
Actual: 67
Expenditure:
Release:0
Obligation:0
0
1419948774 REPAIR/IMPROVEMENT OF TINOC RHU
Ifugao
Department of Health - CAR Percent completed
(Cumulative)
Target: 0
Actual: 100
Expenditure:
Release:1000000
Obligation:998368.46
0
1422749447 Direct Internet Subscription for the IP Transport Municipal in Lamut
Ifugao
Department of Information and Communications Technology - CAR Percent Completed
(Cumulative)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
1427101429 Improvement of Ubao - Manaot FMR
Ifugao
Department of Agriculture - CAR number of kilometer constructed
(Cumulative)
Target: 0.93
Actual: 0.5
Expenditure:
Release:163579111.98
Obligation:163579111.98
-46.236559139785
1428082233 Managed Internet Subscription for IFUGAO
Ifugao
Department of Information and Communications Technology - CAR Percent completed
(Cumulative)
Target: 69
Actual: 69
Expenditure:
Release:0
Obligation:0
0
1442814866 UPGRADING OF CAMANDAG TO CAWAYAN FMR at Barangay Camandag, Asipulo
Ifugao
Department of the Interior and Local Government - CAR percent completed
(Cumulative)
Target: 100
Actual: 0
Expenditure:
Release:0
Obligation:0
-100
1454105690 Uud SIP
Ifugao
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
1455722295 Improvement of Banao Pathway along Sitio Proper, Banao, Mayoyao
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1466613553 REPAIR/IMPROVEMENT/UPGRADING OF BANHAL BHS
Ifugao
Department of Health - CAR Percent completed
(Cumulative)
Target: 100
Actual: 100
Expenditure:
Release:500000
Obligation:499390.7
0
1505421882 DAMAG RIVER MUNGGAYANG MANAOT SIP PH. IV (REBID)
Ifugao
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 15
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1506774590 Construction/Completion of Slope Protection
Ifugao
Department of the Interior and Local Government - CAR percent completed
(Cumulative)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
1508199886 BUYO SIP
Ifugao
National Irrigation Administration - CAR 100% completed, 12 has area generated
(Cumulative)
Target: 1
Actual: 2
Expenditure:12231.8
Release:788253
Obligation:810313.38
100
1511833810 Extension of Lohob and Dotal CIS, Tuplac, Kiangan
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1512971696 NATTUM TUBOG SIP PH. III
Ifugao
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1519846446 Construction of PCCP at Sitio Chayag, Majlong, Aguinaldo
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1528630069 Pulitang Tang-il CIS
Ifugao
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
1532966502 Direct Internet Subscription for the IP Transport Municipal in ASIPULO
Ifugao
Department of Information and Communications Technology - CAR Percent completed
(Cumulative)
Target: 67
Actual: 67
Expenditure:
Release:0
Obligation:0
0
1534212333 Completion Of Hinalong Day Care Center, Talite, Aguinaldo
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1536395283 Completion of Quarantine Facility
Ifugao
Department of Social Welfare and Development - CAR 100% completion
(default)
Target: 100
Actual: 100
Expenditure:0
Release:71310.82
Obligation:72729
0
1541270177 Social Pension Program
Ifugao
Department of Social Welfare and Development - CAR Number of indigent senior citizens provided with Social Pension
(Maintained)
Target: 16320
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1561107045 UPGRADING OF MALOY TO NUNHAPANG FMR at Barangay Cawayan, Asipulo
Ifugao
Department of the Interior and Local Government - CAR percent completed
(Cumulative)
Target: 100
Actual: 0
Expenditure:
Release:0
Obligation:0
-100
1562420726 Road Opening at Sitio Anuling to Sitio Nabhingan, Bitu
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1578655176 Installation Of Ubao Solar Street Lights, Ubao, Aguinaldo
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1583244007 Upgrading of Bros Welding Shop (Phase II)
Ifugao
Department of Science and Technology - CAR No. of firms assisted
(default)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
1586790287 Ticom Buy-o CIS
Ifugao
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
1588819550 Improvement of Antipolo- Pengsiwan Access Road
Ifugao
Department of Social Welfare and Development - CAR 100% completion
(default)
Target: 100
Actual: 100
Expenditure:0
Release:19121.25
Obligation:82309
0
1598686564 CONSTRUCTION OF SITIO ABAGONG PATHWAY, Nattum Mayoyao
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1613780973 BANGTINON SIP
Ifugao
National Irrigation Administration - CAR 100% completed, 4 has area Restored
(Cumulative)
Target: 4
Actual: 5
Expenditure:385880.19
Release:2572535
Obligation:2572534.61
25
1634713617 Lomanag Banawol CIS
Ifugao
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
1638530344 TAMMANGAN PAH-DUAN SIP
Ifugao
National Irrigation Administration - CAR 100% completed, 6 has area generated
(Cumulative)
Target: 2
Actual: 3
Expenditure:13902.36
Release:1404138
Obligation:1418040.3
50
1646845574 TAMMANGAN PAH-DUAN SIP
Ifugao
National Irrigation Administration - CAR 100% completed, 6 has area Restored
(Cumulative)
Target: 2
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1694382958 REPAIR/IMPROVEMENT/UPGRADING OF UHAJ BHS
Ifugao
Department of Health - CAR Percent completed
(Cumulative)
Target: 80
Actual: 100
Expenditure:
Release:500000
Obligation:478786.69
25
1696672138 Improvement/Concreting Of Ta-Ang Access Road, Ta-Ang, Aguinaldo
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1708657431 Construction of Anaba-Ducligan-Banao Farm to Market Road
Ifugao
Department of Agriculture - CAR number of kilometer constructed
(Cumulative)
Target: 7.7
Actual: 7.5
Expenditure:
Release:221400900
Obligation:221400900
-2.5974025974026
1716714545 ALFONSO LISTA PIP
Ifugao
National Irrigation Administration - CAR 100% completed, 1500 has area generated
(Cumulative)
Target: 1
Actual: 2
Expenditure:27644272.89
Release:94402041
Obligation:171640074.6
100
1717548232 CONSTRUCTION OF SLEDGE TRAIL ALONG SITIO CHONGLA, Inwaloy, Mayoyao
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1726881894 Improvement of Pinnang-Pigku and Lichu CIS, Guinihon, Mayoyao
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1729951750 Improvement of FMR at Sitio Bocoh, Mompolia
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1765103857 CONCRETING OF MANAAN TO LAB-ONG FMR at Barangay Luhong, Tinoc
Ifugao
Department of the Interior and Local Government - CAR percent completed
(Cumulative)
Target: 100
Actual: 0
Expenditure:
Release:0
Obligation:0
-100
1768384763 Upgrading of Production Facilities & Equipment of Nesalyn Bakery (Phase II)
Ifugao
Department of Science and Technology - CAR Number of firms assisted
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
1770315683 IMPROVEMENT OF CURB AND GUTTER ALONG SITIO PROPER, Palaad, Mayoyao
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1774182475 Construction of Drainage Canal From Sitio Iyagan to Sitio Boble, Poblacion, Hingyon
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1787482994 Site Development
Ifugao
Department of Environment and Natural Resources - CAR No. of Assisting Professionals Hired
(default)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
1788725605 Rerouting and Re-construction of Sitio Linda Drainage System, Poblacion, Kiangan
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1799261575 Provision of Cash Grants including the amount of Rice Subsidy
Ifugao
Department of Social Welfare and Development - CAR Number of Household beneficiaries provided with Conditional Cash Grants
(Maintained)
Target: 10096
Actual: 8668
Expenditure:0
Release:0
Obligation:0
-14.144215530903
1823373064 Improvement Of Naumog-Lupao-Lower Jacmal Potable Water System, Jacmal, Aguinaldo
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1840559928 Wanitan SIP
Ifugao
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
1842164910 Extension of Lohob and Dotal CIS, Pindongan, Kiangan
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1857309857 Construction of Academic Building-Phase II
Ifugao
Ifugao State University Percentage Completion
(default)
Target: 15
Actual: 15
Expenditure:
Release:0
Obligation:0
0
1872212676 Installation of Solar Streetlights in Various Barangays, Posnaan, Aguinaldo
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1875523870 Repair/Improvement of Ifugao General Hospital (Phase VII)
Ifugao
Department of Health - CAR Percent Completed
(default)
Target: 25
Actual: 24
Expenditure:
Release:0
Obligation:0
-4
1883502554 Installation Of Bunhian Solar Street Lights, Bunhian, Aguinaldo
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1892677790 Continuation of PCCP at Sitio Bayninan, Nagacadan, Kiangan
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1895999024 Hahlin CIS
Ifugao
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
1896692583 Aliguyon CIS
Ifugao
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
1933425472 HAPID IS
Ifugao
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
1951081952 Construction of Level II Water System at Sitio Tongolan and Kay-ang
Ifugao
Department of Social Welfare and Development - CAR 100% completion
(default)
Target: 100
Actual: 100
Expenditure:0
Release:24554.71
Obligation:39905
0
1955301381 Tugaw- Naliwhan SIP
Ifugao
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
1956529303 HAPID IS
Ifugao
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
1969580825 Improvement/Concreting Of Majlong-Buwag-Itab Fmr, Buwag, Aguinaldo
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1975743320 Sustainable Livelihood Program
Ifugao
Department of Social Welfare and Development - CAR Total number of households who received seed capital fund and total number of households trained (Seed Capital Funds, Skills Training, and CBLA)
(Maintained)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
1977850935 Pula (Banghalan) SIP
Ifugao
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
1989306874 Road Improvement at Sitio Boco-Liyang-Ikidul, Umalbong
Ifugao
Department of Social Welfare and Development - CAR 100% completion
(Cumulative)
Target: 0
Actual: 0
Expenditure:0
Release:386242.19
Obligation:386242
0
1996269468 BUYO SIP
Ifugao
National Irrigation Administration - CAR Percent Completed
(Cumulative)
Target: 100
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
1998991256 BANGHALLAN HAGUD SIP
Ifugao
National Irrigation Administration - CAR 100% completed, 5 has area Restored
(Cumulative)
Target: 2
Actual: 4
Expenditure:3016.91
Release:1349249
Obligation:1352265.78
100
2019949872 Improvement of Access Road Along Mompolia Elementary School, Mompolia
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
2039248478 Tatawang CIS
Ifugao
National Irrigation Administration - CAR 100% Completed
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
2044400249 S&T Intervention on Corn Processing for Poultry of MJM Grains for market competitiveness
Ifugao
Department of Science and Technology - CAR No. of firms assisted
(default)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
2074840192 IMPROVEMENT OF SITIO MAPIPIWONG TO MAUGAW COMMUNAL IRRIGATION SYSTEM, Talboc, Mayoyao
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
2092142798 Improvement of the Product Quality and Productivity through Upgrading of the Production Equipment of Tri-Star Enterprises (Phase II)
Ifugao
Department of Science and Technology - CAR Number of firms assisted
(default)
Target: 0
Actual: 0
Expenditure:0
Release:0
Obligation:0
0
2092717976 Construction of Duit Elementary School Slope Protection, Duit, Kiangan
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
2094316839 Construction of Crime Laboratory Building
Ifugao
Ifugao State University 100 % completion
(default)
Target: 0
Actual: 0
Expenditure:
Release:0
Obligation:0
0
2116260447 IMPROVEMENT OF SITIO UPAG CIS, Epeng, Mayoyao
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
2119104317 Direct Internet Subscription for the IP Transport Municipal in MAYOYAO
Ifugao
Department of Information and Communications Technology - CAR Percent completed
(Cumulative)
Target: 73
Actual: 73
Expenditure:
Release:0
Obligation:0
0
2121642607 Widening of Maga Sledge Trail, Maga, Mayoyao
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
2123766682 DAMAG RIVER MUNGGAYANG MANAOT SIP PH. IV (REBID)
Ifugao
National Irrigation Administration - CAR 100% completed, 50 has area generated
(Cumulative)
Target: 1
Actual: 2
Expenditure:0
Release:0
Obligation:0
100
2130474217 Construction/Opening Of Saddle-Paguid-Id-Lutupan-Hegwang Fmr, Galonogon, Aguinaldo
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
2138830701 Improvement/Concreting Of Monggayang-Pinto Fmr, Mongayang, Aguinaldo
Ifugao
Department of Social Welfare and Development - CAR Percent Completed
(Cumulative)
Target: 25
Actual: 0
Expenditure:0
Release:0
Obligation:0
-100
2139511120 Policy Initiative for Watershed Management
Ifugao
Department of Environment and Natural Resources - CAR No. of Meetings/ Workshops Conducted
(default)
Target: 1
Actual: 2
Expenditure:
Release:0
Obligation:0
100