Project ID | Project Name | Agency | Ouput Indicator | Physical Performance | Slippage(%) |
---|---|---|---|---|---|
2276966 | Construction of Rainwater Collection System (RWCS). Laya Barangay Health Station, Alfonso lista, Ifugao Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
11921994 | Completion of Multipurpose Building in Brgy. Monggayang, Aguinaldo, Ifugao Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 100 Actual: 100 Expenditure: Release:5000000 Obligation:4950000 |
21.870530439649 |
23262171 | Construction of Rain Water Collection System (RWCS), Jacmal Barangay Health Station,, Aguinaldo, Ifugao Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
78463125 | Construction of Multipurpose Building in Brgy. Little Tadian, Alfonso Lista, Ifugao Ifugao | DPWH Ifugao 2nd | (default) |
Target: 100 Actual: 100 Expenditure: Release:5000000 Obligation:4950000 |
0 |
79030827 | "Banaue-Mayoyao-A Lista-Isabela Bdry Rd - K0393 + 029 - K0393 + 047, K0393 + 154 - K0393 + 174, K0397 + 318 - K0397 + 378, K0401 + 581 - K0401 + 601, K0403 + 635 - K0403 + 691, K0406 + 335 - K0406 + 360, K0406 + 845 - K0406 + 880" Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 74.36 Actual: 84.41 Expenditure: Release:9972000 Obligation:9772560 |
17.045892788276 |
111932038 | Construction of Flood Mitigation Structures along Magat River, Sta. 39 + 563 - Sta. 40 + 975, San Juan, Alfonso Lista, Ifugao Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
129731190 | Construction of Rain Water Collection System (RWCS), Calupaan Barangay Health Station,, Alfonso Lista, Ifugao Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
135531814 | Construction f Multipurpose Building, Brgy. Mapawoy, Mayoyao, Ifugao Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 100 Actual: 100 Expenditure: Release:5000000 Obligation:4950000 |
17.621839181031 |
136060202 | Construction of Rain Water Collection System (RWCS), Little Tadian Barangay Health Station,, Alfonso Lista, Ifugao. Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
136538059 | Access Road leading to Mun-Alaja Waterfalls, Brgy. Liwo, Mayoyao, Ifugao Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 100 Actual: 83.36 Expenditure: Release:15540000 Obligation:14416410.41 |
-15.34441247284 |
152447191 | Construction of Rain Water Collection System (RWCS), Eastern Potia National High School, Alfonso Lista, Ifugao Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
155059021 | Banaue - Barlig - Tanudan - Tabuk Road, Banaue, Ifugao Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
158559151 | Nueva Vizcaya-Ifugao-Mt Province Rd - K0343 + 694 - K0343 + 727, K0346 + 173 - K0346 + 221, K0351 + 523 - K0351 + 547 Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 75 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-97.576675501704 |
211877467 | Construction of Access Road in Brgy. Buninan, Mayoyao, Ifugao Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
240693865 | Banaue-Mayoyao-A Lista-Isabela Bdry Rd - K0341 + 240 - K0341 + 270 Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
260832469 | Banaue-Mayoyao-A Lista-Isabela Bdry Rd - K0342 + 424, K0342 + 535, K0405 + 030 - K0405 + 520 Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
262096893 | Aguinaldo-Toboy-Natonin Road, Ifugao Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 75 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-59.039934354486 |
279017089 | Construction of Rain Water Collection System (RWCS), Majlong Primary School, Aguinaldo, Ifugao Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
301471341 | Construction of Local Bridge, Inwaloy-Epeng-Magulon, Mayoyao, Ifugao Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
316560596 | Construction of Rain Water Collection System (RWCS), San Marcos Barangay Health Station, Alfonso Lista, Ifugao Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
336681941 | Completion of Multipurpose Building in Brgy. Guinihon, Mayoyao, Ifugao Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 100 Actual: 100 Expenditure: Release:2000000 Obligation:1941112.31 |
33.717926640262 |
340082269 | onstruction of Rainwater Collection System (RWCS). Butac Barangay Health Station, Aguinaldo, Ifugao. Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
363861374 | Nueva Vizcaya-Ifugao-Mt Province Rd - K0337 + 334 - K0339 + 162 Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
392601946 | "Ubao-Taang Road - K0409 + 650 - K0409 + 716, K0410 + 249 - K0410 + 330, K0410 + 353 - K0410 + 395, K0413 + 243 - K0413 + 262, K0419 + 155 - K0419 + 181" Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 100 Actual: 100 Expenditure: Release:8190000 Obligation:8026200 |
2.1272800249743 |
418722534 | Construction of Sitio Rosenda Access Road in Brgy. Sta. Maria, Alfonso Lista, Ifugao Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
436709736 | Reconstruction of Damaged Paved Road along Jct Potia-Mt Province Bdry Rd - K0436 + 700 - K0453 + 500 (Intermittent Sections) Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
457679940 | Banaue-Mayoyao-A Lista-Isabela Bdry Rd - K0367 + 226 - K0367 + 268, K0368 +798 - K0368 + 813, K0369 + 609 - K0369 + 625, K0370 + 330 - K0370 + 366, K0377 + 325 - K0377 + 366, K0382 + 014 - K0382 + 037, K0383 + 277 - K0383 + 457, K0388 + 484 - K0388 + 502, K0390 + 449 - K0390 + 467 Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
471212820 | Access Road leading to Calipcip Waterfalls, Alfonso Lista, Ifugao Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 84.25 Actual: 85.15 Expenditure: Release:31750000 Obligation:30480923.99 |
14.187062937063 |
506089311 | Construction of Access Road in Brgy. Buninan, Mayoyao, Ifugao Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 100 Actual: 100 Expenditure: Release:5000000 Obligation:4866363.1 |
32.380755159798 |
525970112 | "Alfonso Lista - Aurora Bdry. Rd - K0442 + 402 - K0444 + 622, K0444 + 811 - K0445 + 000" Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 100 Actual: 100 Expenditure: Release:31833000 Obligation:31196340 |
6.2584449084879 |
576744474 | Butac-Monggayang Road connecting to Ubao-Taang Road in support of Coffee, Banana and Corn Production and Processing, Monggayang, Aguinaldo, Ifugao Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 100 Actual: 100 Expenditure: Release:20023000 Obligation:19140687.11 |
24.990619136961 |
598213742 | Construction of Multi-Purpose Building, Barangay Majlong, Aguinaldo, Ifugao Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 75 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-84.919713016741 |
613173434 | Completion of Multipurpose Building in Brgy. Itab, Aguinaldo, Ifugao Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
620083160 | Construction of Multi-Purpose Building, Barangay Talite, Aguinaldo, Ifugao Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 75 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-86.038788522848 |
625338645 | Completion of Sitio Mana-ot Multipurpose Building in Brgy. Monggayang, Aguinaldo, Ifugao Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
625344216 | Banaue-Mayoyao-A Lista-Isabela Bdry Rd - K0350 + 775 - K0350 + 867 Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 75 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
628530516 | Construction of Local Bridge, Inwaloy-Epeng-Magulon, Mayoyao, Ifugao Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 93.64 Actual: 100 Expenditure: Release:36600000 Obligation:34650000 |
-1.5627839360349 |
634596951 | Construction of Flood Mitigation Structure - Construction of Flood Control Structure, Sta. 27+140 - Sta. 27+490, Busilac, Alfonso Lista, Ifugao Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 40.75 Actual: 38 Expenditure: Release:24500000 Obligation:23806239.43 |
-12.703882379968 |
639291250 | "Banaue-Mayoyao-A Lista-Isabela Bdry Rd - K0342 + 424, K0342 + 535, K0405 + 030 - K0405 + 520" Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 99.52 Actual: 100 Expenditure: Release:15597000 Obligation:15084316.71 |
17.891826274616 |
646172207 | Nueva Vizcaya-Ifugao-Mt Province Rd - K0336 + 1002 - K0337 + 000, K0337 + 727 - K0337 + 746, K0338 + 755 - K0338 + 775 Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
654089938 | Construction of Multipurpose Building in Brgy. Damag, Aguinaldo, Ifugao Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
668901767 | Access Road leading to Ammung Festival, Yao Jia Xi Dragon Fruit Farm, Domingo's Integrated Organic Farm, Municipal Forest Library (Magat dam Wetlands, Maris Dam Wetlands, BFAR-Aqua Park), Brgy. Santo Domingo, Alfonso Lista, Ifugao Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 75 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-76.272886882368 |
674200171 | Construction of Rainwater Collection System (RWCS). Monggayang Barangay Health Station, Aguinaldo, Ifugao. Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 75 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
684907737 | Construction of Flood Mitigation Structure - Construction of Mapacopaco Flood Control Structure, Sta. 41+000 - Sta. 41+510, Posnaan, Aguinaldo, Ifugao Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
689148523 | Construction of Flood Mitigation Structure - Construction of Flood Control Structure, Sta. 27+140 - Sta. 27+490, Busilac, Alfonso Lista, Ifugao Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
690201036 | Construction of Rainwater Collection System (RWCS). Liwo Primary School , Mayoyao, Ifugao Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 75 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
709840314 | Construction of Rainwater Collection System (RWCS). Laya Barangay Health Station, Alfonso lista, Ifugao. Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 75 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
712707470 | Construction of Chapay Bridge, Inwaloy, Mayoyao, Ifugao Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 75 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-89.534518005976 |
722557882 | Construction of Multipurpose Building, Brgy. Viewpoint, Banaue, Ifugao Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 40.33 Actual: 48.82 Expenditure: Release:5000000 Obligation:4945042.92 |
21.051326555914 |
767091274 | Construction of Ayangan Barangay Road, Barangay Ayangan, Mayoyao, Ifugao Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 100 Actual: 88.3 Expenditure: Release:10000000 Obligation:9607884.34 |
29.925164547832 |
776596530 | Completion of Multipurpose Building in Brgy. Ngileb, Alfonso Lista, Ifugao Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 100 Actual: 100 Expenditure: Release:2000000 Obligation:1980000 |
25.383959044369 |
788115540 | "Completion of Sitio Mana-ot Multipurpose Building in Brgy. Monggayang, Aguinaldo, Ifugao" Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 100 Actual: 100 Expenditure: Release:2000000 Obligation:1980000 |
3.7561127874311 |
791747867 | onstruction of Rainwater Collection System (RWCS). Malalupa Barangay Health Station, Alfonso lista, Ifugao Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 75 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
826674099 | Construction f Multipurpose Building, Brgy. Mapawoy, Mayoyao, Ifugao Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
859766943 | Ubao-Taang Road - K0409 + 650 - K0409 + 716, K0410 + 249 - K0410 + 330, K0410 + 353 - K0410 + 395, K0413 + 243 - K0413 + 262, K0419 + 155 - K0419 + 181 Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
864036872 | Completion of Multipurpose Building in Brgy. Alimit, Mayoyao, Ifugao Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
884320100 | Construction of Rain Water Collection System (RWCS), Tulaed National High School, Mayoyao, Ifugao Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
894091129 | "Banaue-Hungduan-Benguet Bdry Rd - K0343 + 1097 - K0343 + 1165, K0350 + 700 - K0350 + 812, K0351 + 425 - K0351 + 474, K0351 + 528 - K0352 + 000" Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 100 Actual: 100 Expenditure: Release:3282000 Obligation:3216360 |
1.5113855035279 |
917276805 | Construction of Rainwater Collection System (RWCS). Mongol Barangay Health Station , Mayoyao, Ifugao Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 75 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
931691313 | Completion of Multipurpose Building in Brgy. Guinihon, Mayoyao, Ifugao Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
940906808 | Alfonso Lista - Aurora Bdry. Rd - K0449 + 270 - K0450 + 050 Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 75 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-43.351602973196 |
941729293 | Construction of Rainwater Collection System (RWCS). Malalupa Barangay Health Station, Alfonso lista, Ifugao Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
944161960 | "Ubao-Taang Road - K0402 + 314, K0404 + 781, K0415 + 926" Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 100 Actual: 100 Expenditure: Release:21000000 Obligation:20580000 |
26.661410227529 |
971147972 | Completion of Multipurpose Building in Brgy. Calupaan, Alfonso Lista, Ifugao Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
971293523 | Construction of Rainwater Collection System (RWCS). Liwo Primary School , Mayoyao, Ifugao Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
992850985 | Construction and Improvement of DPWH Ifugao 2nd DEO Building, Aguinaldo, Ifugao Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 100 Actual: 95.4 Expenditure: Release:10000000 Obligation:9455071.11 |
17.700121901666 |
1009809902 | "Completion of Sitio Malalupa Multipurpose Building in Brgy. Caragsan, Alfonso Lista, Ifugao" Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 100 Actual: 100 Expenditure: Release:2000000 Obligation:1980000 |
11.042944785276 |
1011581594 | Construction of Rainwater Collection System (RWCS). Santa Maria Senior High School, Alfonso lista, Ifugao. Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 75 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
1017861873 | "Nueva Vizcaya-Ifugao-Mt Province Rd - K0340 + 000 - K0341 + 000" Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 63.85 Actual: 79.39 Expenditure: Release:42091000 Obligation:40818445.75 |
69.474713607153 |
1065177607 | Completion of Multipurpose Building in Brgy. Dolowog, Alfonso Lista, Ifugao Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
1068275362 | Construction of Rainwater Collection System (RWCS). Monggayang Barangay Health Station, Aguinaldo, Ifugao Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
1069968673 | Construction of Multi-Purpose Building, Barangay Namillangan, Alfonso Lista, Ifugao Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 75 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
1070332352 | Alfonso Lista - Aurora Bdry. Rd - K0442 + 402 - K0444 + 622, K0444 + 811 - K0445 + 000 Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
1080584956 | Construction of Ayangan Barangay Road, Barangay Ayangan, Mayoyao, Ifugao Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
1097312011 | Construction and Improvement of Support Facilities of DPWH Ifugao 2nd DEO Building,Aguinaldo, Ifugao Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 100 Actual: 100 Expenditure: Release:38000000 Obligation:37543126.73 |
-4.4766666666667 |
1102711912 | Construction of Rainwater Collection System (RWCS). Mongol Barangay Health Station , Mayoyao, Ifugao Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
1108973526 | "Banaue-Mayoyao-A Lista-Isabela Bdry Rd - K0367 + 226 - K0367 + 268, K0368 +798 - K0368 + 813, K0369 + 609 - K0369 + 625, K0370 + 330 - K0370 + 366, K0377 + 325 - K0377 + 366, K0382 + 014 - K0382 + 037, K0383 + 277 - K0383 + 457, K0388 + 484 - K0388 + 502, K0390 + 449 - K0390 + 467" Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 96.04 Actual: 100 Expenditure: Release:13674000 Obligation:13400520 |
9.8680075424262 |
1116587863 | Banaue-Mayoyao-A Lista-Isabela Bdry Rd K0359 + 047 - K0359 + 105 Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 75 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
1151394900 | Construction of Multi-Purpose Building, Barangay San Jose, Alfonso Lista, Ifugao Ifugao | DPWH Ifugao 2nd | (default) |
Target: 75 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
1156304968 | Butac-Monggayang Road connecting to Ubao-Taang Road in support of Coffee, Banana and Corn Production and Processing, Monggayang, Aguinaldo, Ifugao Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
1159908679 | Construction of Rainwater Collection System (RWCS). Butac Barangay Health Station, Aguinaldo, Ifugao Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 75 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
1174563286 | Construction and Improvement of DPWH Ifugao 2nd DEO Building, Aguinaldo, Ifugao Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
1185053072 | "Banaue-Hungduan-Benguet Bdry Rd - K0345 + 800 - K0345 + 860, K0350 + 493 - K0350 + 526" Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 92.71 Actual: 92.71 Expenditure: Release:3150000 Obligation:3074805.33 |
1.9967064635653 |
1186287938 | Construction of Namillangan Flood Control Sta. 43+700 - Sta. 44+217.50 (R/S) Namillangan, Alfonso Lista, Ifugao Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
1205902826 | Construction of Flood Mitigation Structure - Construction of Mapacopaco Flood Control Structure, Sta. 42+555 - Sta. 42+913.6, Posnaan, Aguinaldo, Ifugao Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
1213186222 | "Nueva Vizcaya-Ifugao-Mt Province Rd - K0337 + 973, K0338 + 009, K0339 + 514, K0339 + 807, K0339 + 958, K0343 + 285, K0343 + 520, K0343 + 946" Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 100 Actual: 90.15 Expenditure: Release:1529000 Obligation:1486601.54 |
2.9435592762625 |
1219701864 | Construction of Multipurpose Building in Brgy. Damag, Aguinaldo, Ifugao Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 100 Actual: 100 Expenditure: Release:5000000 Obligation:4950000 |
40.705882352941 |
1225783723 | Completion of Multipurpose Building in Brgy. Monggayang, Aguinaldo, Ifugao Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
1233094856 | Ubao-Taang Road - K0402 + 314, K0404 + 781, K0415 + 926 Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
1263484056 | Completion of Sitio Malalupa Multipurpose Building in Brgy. Caragsan, Alfonso Lista, Ifugao Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
1270514390 | Construction (Completion) of Ifugao 2nd District Engineering Office Employee's Quarter, Ifugao Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 75 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-72.381635581062 |
1311266696 | Construction of Multipurpose Building in Kiling, Alfonso Lista, Ifugao Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
1335512162 | Construction of Namillangan Flood Control Sta. 43+700 - Sta. 44+217.50 (R/S) Namillangan, Alfonso Lista, Ifugao Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 50.79 Actual: 52.78 Expenditure: Release:50000000 Obligation:49000000 |
7.6278063294563 |
1343146135 | Reconstruction of Damaged Paved Road along Jct Potia-Mt Province Bdry Rd - K0436 + 700 - K0453 + 500 (Intermittent Sections) Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 100 Actual: 100 Expenditure: Release:4625000 Obligation:4532500 |
0 |
1348889250 | Construction of Multi-Purpose Building, Caragasan, Alfonso Lista, Ifugao Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 75 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-76.235873476861 |
1355472903 | Completion of Multipurpose Building in Brgy. Dolowog, Alfonso Lista, Ifugao Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 100 Actual: 100 Expenditure: Release:2000000 Obligation:1980000 |
0.13351134846462 |
1383675843 | Construction of Rain Water Collection System (RWCS), Ngileb Barangay Health Station,, Alfonso Lista, Ifugao. Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
1446637493 | Construction of Rain Water Collection System (RWCS), Habbang Field Office, Banaue, Ifugao Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
1454319929 | Construction of Rainwater Collection System (RWCS). Caragasan Barangay Health Station, Alfonso lista, Ifugao Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
1460734924 | "Nueva Vizcaya-Ifugao-Mt Province Rd - K0337 + 334 - K0339 + 162" Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 99.26 Actual: 89.1 Expenditure: Release:19139000 Obligation:18662083.88 |
4.7855440826052 |
1506756447 | Construction of Level III Water Supply System, Mayoyao, Ifugao Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 90 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-72.319841237028 |
1508768738 | Construction of Rainwater Collection System (RWCS). Caragasan Barangay Health Station, Alfonso lista, Ifugao Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 75 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
1511986761 | Construction of Flood Mitigation Structure - Construction of Mapacopaco Flood Control Structure, Sta. 42+555 - Sta. 42+913.6, Posnaan, Aguinaldo, Ifugao Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 40.75 Actual: 38 Expenditure: Release:21217000 Obligation:20914465.8 |
-12.703882379968 |
1513840543 | "Banaue-Mayoyao-A Lista-Isabela Bdry Rd - K0341 + 240 - K0341 + 270" Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 100 Actual: 100 Expenditure: Release:7016000 Obligation:6875680 |
21.991300144998 |
1551922654 | Banaue-Hungduan-Benguet Bdry Rd - K0345 + 800 - K0345 + 860, K0350 + 493 - K0350 + 526 Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
1554228675 | Banaue - Barlig - Tanudan - Tabuk Road, Banaue, Ifugao Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 100 Actual: 100 Expenditure: Release:50000000 Obligation:49000000 |
-3.4758196584339 |
1591305467 | Construction of Sitio Rosenda Access Road in Brgy. Sta. Maria, Alfonso Lista, Ifugao Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 100 Actual: 100 Expenditure: Release:5000000 Obligation:4950000 |
0 |
1653499180 | Construction of Multipurpose Building in Brgy. Little Tadian, Alfonso Lista, Ifugao Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
1720586815 | Ubao-Taang Road - K0423 + 447 - K0424 + 084, K0425 + 385 - K0425 + 498, K0425 + 536 - K0425 + 553 Kalinga | DPWH Ifugao 2nd | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
1721435086 | Construction of Flood Mitigation Structure - Construction of Mapacopaco Flood Control Structure, Sta. 41+000 - Sta. 41+510, Posnaan, Aguinaldo, Ifugao Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 40.75 Actual: 38 Expenditure: Release:32467000 Obligation:31492114.09 |
-12.703882379968 |
1754278339 | Alfonso Lista-San Manuel Diversion Rd, Ifugao Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 75 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-49.398923224427 |
1761449498 | Construction of Rainwater Collection System (RWCS). Santa Maria Senior High School, Alfonso lista, Ifugao Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
1761799402 | Banaue-Mayoyao-A Lista-Isabela Bdry Rd - K0394 + 455 - K0395 + 643, K0395 + 801 - K0396 + 070, K0397 + 000 - K0397 + 865, K0398 + 000 - K0398 + 500 Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
1769765796 | Construction of Rain Water Collection System (RWCS), CENRO ALFONSO LISTA OFFICE1, Alfonso Lista, Ifugao Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
1790667100 | Completion of Multipurpose Building in Brgy. Ngileb, Alfonso Lista, Ifugao Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
1797121086 | Construction of Alimit-Magatawa Barangay Road, Alimit, Mayoyao, Ifugao Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 96.44 Actual: 86.5 Expenditure: Release:25000000 Obligation:24009064.26 |
-6.0250988005269 |
1800787981 | Construction of Level III Water Supply System, Mayoyao, Ifugao Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 12.38 Actual: 12.38 Expenditure: Release:34000000 Obligation:33314910.98 |
0 |
1804638089 | Nueva Vizcaya-Ifugao-Mt Province Rd - K0340 + 000 - K0341 + 000 Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
1820342599 | Construction of Rain Water Collection System (RWCS), Talite Day Care and Evacuation Center, Aguinaldo, Ifugao Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
1821222992 | Construction and Improvement of Support Facilities of DPWH Ifugao 2nd DEO Building,Aguinaldo, Ifugao Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
1833193710 | Construction of Aduyungan to Ayangan Access Road, Aduyungan, Mayoyao, Ifugao Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-73.764809902741 |
1850649225 | "Ubao-Taang Road - K0423 + 447 - K0424 + 084, K0425 + 385 - K0425 + 498, K0425 + 536 - K0425 + 553" Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 100 Actual: 100 Expenditure: Release:8041000 Obligation:7880180 |
24.80096397986 |
1873708767 | Access Road leading to Ammung Festival, Yao Jia Xi Dragon Fruit Farm, Domingo's Integrated Organic Farm, Municipal Forest Library (Magat dam Wetlands, Maris Dam Wetlands, BFAR-Aqua Park), Brgy. Santo Domingo, Alfonso Lista, Ifugao Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
1909330201 | Banaue-Hungduan-Benguet Bdry Rd - K0343 + 1097 - K0343 + 1165, K0350 + 700 - K0350 + 812, K0351 + 425 - K0351 + 474, K0351 + 528 - K0352 + 000 Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
1931549019 | Construction of Evacuation Centers/ Quarantine Facilities - CAR - Construction of Evacuation Center at Ubao, Aguinaldo, Ifugao Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 100 Actual: 69.63 Expenditure: Release:36500000 Obligation:35222500 |
-4.2607728393868 |
1932673153 | Completion of Multipurpose Building in Brgy. Alimit, Mayoyao, Ifugao Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 100 Actual: 100 Expenditure: Release:3000000 Obligation:2970000 |
23.786042624321 |
1934600592 | Access Road leading to Calipcip Waterfalls, Alfonso Lista, Ifugao Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
1948392666 | Construction of Rain Water Collection System (RWCS), Banaue Satellite Office, Banaue Ifugao Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
1967659888 | Nueva Vizcaya-Ifugao-Mt Province Rd - K0342 + 101 - K0342 + 302, K0342 + 193 - K0342 + 201, K0342 + 240 - K0342 + 255, K0342 + 302 - K0345 + 000, K0344 + 730, K0345 + 000 - K0346 + 240 Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
1970750945 | Lupao-Naumag Road leading to Naumag Waterfalls, Aguinaldo, Ifugao Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 100 Actual: 69.56 Expenditure: Release:15000000 Obligation:14436000.21 |
-7.1063535911602 |
1974035522 | Access Road leading to Ammung Festival, Yao Jia Xi Dragon Fruit Farm, Domingo's Integrated Organic Farm, Municipal Forest Library (Magat dam Wetlands, Maris Dam Wetlands, BFAR-Aqua Park), Brgy. Santo Domingo, Alfonso Lista, Ifugao Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 100 Actual: 100 Expenditure: Release:31331000 Obligation:30704380 |
0.74278343637416 |
1976549532 | Completion of Multipurpose Building in Brgy. Calupaan, Alfonso Lista, Ifugao Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 100 Actual: 100 Expenditure: Release:2000000 Obligation:1980000 |
9.797894413279 |
1980886162 | Construction of Alimit-Magatawa Barangay Road, Alimit, Mayoyao, Ifugao Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
1985943292 | Nueva Vizcaya-Ifugao-Mt Province Rd - K0337 + 973, K0338 + 009, K0339 + 514, K0339 + 807, K0339 + 958, K0343 + 285, K0343 + 520, K0343 + 946 Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
1992443764 | Completion of Multipurpose Building in Brgy. Itab, Aguinaldo, Ifugao Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 100 Actual: 100 Expenditure: Release:2000000 Obligation:1980000 |
21.180555555556 |
2004559645 | Construction of Rainwater Collection System (RWCS). Catubangan Barangay Health Station, Alfonso lista, Ifugao Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 75 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
2029746105 | Nueva Vizcaya-Ifugao-Mt Province Rd - K0342 + 101 - K0342 + 302, K0342 + 193 - K0342 + 201, K0342 + 240 - K0342 + 255, K0342 + 302 - K0345 + 000, K0344 + 730, K0345 + 000 - K0346 + 240 Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 100 Actual: 100 Expenditure: Release:72390000 Obligation:69856547.12 |
-0.56666666666666 |
2057369722 | Construction of Evacuation Centers/ Quarantine Facilities - CAR - Construction of Evacuation Center at Ubao, Aguinaldo, Ifugao Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
2057754134 | Construction of Flood Mitigation Structures along Magat River, Sta. 39 + 563 - Sta. 40 + 975, San Juan, Alfonso Lista, Ifugao Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 61.42 Actual: 74.02 Expenditure: Release:50000000 Obligation:49000000 |
39.148321102958 |
2061602352 | Construction of Multipurpose Building, Brgy. Viewpoint, Banaue, Ifugao Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
2075709040 | Access Road leading to Mun-Alaja Waterfalls, Brgy. Liwo, Mayoyao, Ifugao Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
2076174272 | Construction of Rainwater Collection System (RWCS). Catubangan Barangay Health Station, Alfonso lista, Ifugao Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
2077709843 | Construction of Multipurpose Building in Kiling, Alfonso Lista, Ifugao Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 100 Actual: 100 Expenditure: Release:5000000 Obligation:4924366.14 |
1.0747185261003 |
2080589818 | Construction of Mongol to Talboc Access Road, Mongol, Mayoyao, Ifugao Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 75 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-74.795680964028 |
2109315940 | "Nueva Vizcaya-Ifugao-Mt Province Rd - K0336 + 1002 - K0337 + 000, K0337 + 727 - K0337 + 746, K0338 + 755 - K0338 + 775" Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 37.01 Actual: 43.73 Expenditure: Release:2054000 Obligation:2006124.07 |
18.157254796001 |
2119665261 | Lupao-Naumag Road leading to Naumag Waterfalls, Aguinaldo, Ifugao Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
2124686389 | "Banaue-Mayoyao-A Lista-Isabela Bdry Rd - K0394 + 455 - K0395 + 643, K0395 + 801 - K0396 + 070, K0397 + 000 - K0397 + 865, K0398 + 000 - K0398 + 500" Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 98.61 Actual: 86.7 Expenditure: Release:23309000 Obligation:22657480.51 |
6.8833380641499 |
2130223872 | Banaue-Mayoyao-A Lista-Isabela Bdry Rd - K0411 + 400 - K0411 + 498, K0411 + 630 - K0415 + 000 Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 75 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-84.798909338787 |
2133766102 | Banaue-Mayoyao-A Lista-Isabela Bdry Rd - K0393 + 029 - K0393 + 047, K0393 + 154 - K0393 + 174, K0397 + 318 - K0397 + 378, K0401 + 581 - K0401 + 601, K0403 + 635 - K0403 + 691, K0406 + 335 - K0406 + 360, K0406 + 845 - K0406 + 880 Ifugao | DPWH Ifugao 2nd | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
19824817 | Balatoc Rd - K0248 + 000 - K0248 + 200 Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:10065019.57 Release:12337913.9 Obligation:12990880 |
-34.766674810652 |
28275327 | Major Mane to Kennon Road Bypass Road, Baguio City Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:31343064.59 Release:39200000 Obligation:49000000 |
-25.741679437306 |
57479116 | Concreting of Road with covered canal from Purok 2 to Purok 4, Barangay Holy Ghost Extension, Baguio City Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:3061086.69 Release:4950000 Obligation:4950000 |
-35.507107184018 |
59239400 | Harrison Rd No 1 - (S04713LZ) Chainage 0 - Chainage 22, Chainage 212 - Chainage 414, Chainage 22 - Chainage 212, Chainage 414 - Chainage 807, (S04714LZ) Chainage 0 - Chainage 414 Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 75 Actual: 94.36 Expenditure:15884433.29 Release:16549260 Obligation:16549260 |
16.420454545455 |
78052985 | Gov Pack Rd - (S00408LZ) Chainage 0 - Chainage 36, (s00521LZ) Chainage 0-Chainage 100, (S04724LZ) Chainage 176-Chainage 627 Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:10716300 Release:10716300 Obligation:10716300 |
-32.023958768631 |
114590354 | Abanao Road (S04676LZ)- Chainage 21- Chainage 270 Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:2293200 Release:2548000 Obligation:2548000 |
-33.841891133558 |
120188290 | Magsaysay Ave. (Trinidad Rd) - K0251 + (-463) - K0251 + 492 - K0251 + 554, K0251 + 764 - K0252 + 444 Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:8792354.19 Release:9800000 Obligation:9800000 |
-33.955857385399 |
128122230 | Abad Santos Drive- K0250+(-017) - K0250+514 Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:5725077.08 Release:5725077.08 Obligation:6370000 |
-34.188034188034 |
137680988 | Quezon Hill Drive - (S00526LZ) Chainage 514 - Chainage 773 Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:7962087.57 Release:8857396.17 Obligation:9310000 |
-34.041095890411 |
172928298 | Construction of Road at Barangay Padre Zamora, Baguio City, Benguet Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:4052378.33 Release:4950000 Obligation:4950000 |
-34.051522248244 |
175778190 | Construction (Completion) of Multi-Purpose Building at Barangays Honeymoon and Holy Ghost, Baguio City, Benguet Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 40 Actual: 0 Expenditure:0 Release:1973260.25 Obligation:1980000 |
-100 |
186307962 | Construction of Multi-Purpose Building (Health Center) at Barangay San Luis Village, Baguio City, Benguet Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 100 Actual: 73.03 Expenditure:2108848.01 Release:4680373.85 Obligation:4950000 |
-52.709090909091 |
244016207 | Construction of PMA Museum, Philippine Military Academy, Fort Del Pilar, Baguio City, Benguet Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 65 Actual: 67 Expenditure:13411294.55 Release:48010017.02 Obligation:49000000 |
-26.542605288932 |
250327747 | Construction/ Rehabilitation of Multi-purpose Building in Purok 1, Barangay Honeymoon-Holyghost, Baguio City Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 30 Actual: 64.86 Expenditure:436589.985 Release:2910599.9 Obligation:2940000 |
62.15 |
276683625 | Construction of Road and slope protection at Barangay Dontogan, Baguio City Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 50 Actual: 100 Expenditure:3688087.4 Release:4950000 Obligation:4950000 |
42.857142857143 |
280877474 | Construction/ Rehabilitation/ Improvement of Multi-purpose Building and Athletic Bowl Oval, Burnham Park, Baguio City Rehabilitation/ Improvement Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:19746213.41 Release:19746213.41 Obligation:20580000 |
-33.132841328413 |
287531981 | Continuation of the construction of road at Purok 4A, Barangay Lucnab, Baguio City Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:2742854.97 Release:4381552.62 Obligation:4950000 |
-39.11688959043 |
290210356 | Construction of Road, Purok Bubon, Barangay Loakan Proper, Baguio City Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 40 Actual: 92 Expenditure:1622782.59 Release:4573244.83 Obligation:4950000 |
84 |
342113586 | Construction of PMA Rainwater Harvesting Facilities, Philippine Military Academy, Fort Del Pilar, Baguio City Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 30 Actual: 93 Expenditure:54448960.85 Release:72375000 Obligation:72375000 |
132.5 |
349594055 | Zandueta Street- Chainage 007- Chainage 071 Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:1940400 Release:2156000 Obligation:2156000 |
-34.290657439446 |
372912349 | Repair/ Rehabilitation of the Road leading to DPWH Secretary's Cottage and other Government Offices Cottage Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:2345349.87 Release:2940000 Obligation:2940000 |
-50 |
384037181 | Construction of Multi-Purpose Building, Wright Park, Baguio City Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
386286941 | Construction (Completion) of Day Care Center, Brgy. Fairview, Baguio City Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 40 Actual: 90 Expenditure:2092032.46 Release:3960000 Obligation:3960000 |
80 |
386909688 | Rehabilitation of Multi-Purpose Building, PFVR including MLQ Building, Baguio Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 75 Actual: 35 Expenditure:8128341.93 Release:24500000 Obligation:24500000 |
-65.123376057198 |
406249389 | Construction (Completion) of Multi-Purpose Building at Barangay Aurora Hill Proper, Baguio City, Benguet Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:1621324.98 Release:1920600 Obligation:1980000 |
-32.1 |
422601689 | Rehabilitation of Road at Barangay Camp 8, Baguio City, Benguet Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:4035014.22 Release:4950000 Obligation:4950000 |
-28.633048388362 |
464813262 | Construction (Completion) of Multi-Purpose Building (FBASECA Senior Citizen's Building) at Barangay Salud Mitra, Baguio City, Benguet Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:1588970.51 Release:1980000 Obligation:1980000 |
-30.492791047988 |
476742460 | Quirino H-way (Baguio-Bauang Road) to Quezon Hill Road 1 By-Pass Road, Baguio City Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 55 Actual: 72 Expenditure:13392870.11 Release:39200000 Obligation:39200000 |
-0.73839662447258 |
480416557 | Construction (Completion) of Multi-Purpose Building at Barangay Asin Road, Baguio City, Benguet Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:2058748.15 Release:2970000 Obligation:2970000 |
-32.97619047619 |
483338901 | Abanao Ext - (S00429LZ) Chainage 0 - Chainage 29, Chainage 156 - Chainage 275, Chainage 29 - Chainage 156, (S05052LZ) Chainage 111 - Chainage 232 Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 75 Actual: 89.23 Expenditure:3755060.6 Release:5042100 Obligation:5042100 |
16.018084934604 |
492109387 | Construction of Road and Drainage Canal at Barangay Upper Quezon Hill , Baguio City Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 40 Actual: 80 Expenditure:2714643.76 Release:4950000 Obligation:4950000 |
60 |
530621249 | Chanum St (S04681LZ) - Chainage 0 + Chainage 80 Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 20 Actual: 64.71 Expenditure:0 Release:1176000 Obligation:1176000 |
115.7 |
544622893 | Leonard Wood Rd (S00411LZ) - K0250 + (-711) - K0250 + 575, K0250 + 627 - K0251 + 416 Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 20 Actual: 64.71 Expenditure:0 Release:30135000 Obligation:30135000 |
115.7 |
546674076 | Construction (Completion) of Multi-Purpose Building at SK Ground, Barangay Poliwes, Baguio City, Benguet Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:1503522.32 Release:1859694.94 Obligation:1980000 |
-25.531914893617 |
549696060 | Kayang Street Street (S05050LZ)- Chainage 4- Chainage 298 Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:3528000 Release:3920000 Obligation:3920000 |
-34.290657439446 |
562651396 | Construction of PMA Access Road from Post Engineer Company (PEC) to Fort del Pilar Elementary School, Philippine Military Academy, Fort del Pilar, Baguio City Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:36079619.19 Release:47043194.14 Obligation:49000000 |
-38.488576449912 |
574736262 | Magsaysay Ave. (Trinidad Rd) - K0251 + (-463) - K0251 + 479 Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 75 Actual: 94.36 Expenditure:16302185.22 Release:17879120 Obligation:17879120 |
16.420454545455 |
582946790 | Rehabilitation of National Bureau of Investigation (NBI) Building, Baguio City Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 30 Actual: 41.43 Expenditure:8172227.19 Release:19600000 Obligation:19600000 |
3.575 |
592608335 | Legarda Rd - K0251 + (-298) - K0251 + 000, K0251 + (-339) - K0251 + (-298), K0251 + (-360) - K0251 + (-339), K0251 + 000 - K0251 + 890 Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
604557345 | Construction of Road and bridge at Barangay Irisan, Baguio City, Benguet Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 100 Actual: 90.58 Expenditure:6121473.42 Release:7579440 Obligation:7920000 |
-38.67619047619 |
628477542 | Construction (Completion) of Kill House, Philippine Military Academy, Baguio City Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 30 Actual: 54.53 Expenditure:5757487.8 Release:14014000 Obligation:14014000 |
36.325 |
657858456 | Session Rd #2 - K0251 + (-127) - K0252 + 000 Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
681506040 | Quirino H-Way (Baguio-Bauang) - K0301 + 700 - K0301 + 800 Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:4208197.17 Release:4208197.17 Obligation:4704000 |
-32.586046511628 |
709316578 | Ferguson Rd - K0307 + 244 - K0307 + 305 Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:6364034.32 Release:9800000 Obligation:14700000 |
-37.982832618026 |
723772812 | Magsaysay Ave. (Trinidad Rd) - K0251 + (-463) - K0251 + 479 Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
746664049 | Marcos Hi-way - K0280 + 445 - K0281 + 695 Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:68956970 Release:68956970 Obligation:68956970 |
-32.068965517241 |
768222224 | Construction of Flood Mitigation Facilities/ Drainage System along Lake Drive 1 to Juan Luna Drive, Sta 0+000- Sta 0+335 (LS), Baguio City Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 30 Actual: 100 Expenditure:41464693.53 Release:51660310 Obligation:51660310 |
150 |
779305461 | Abanao Rd - Chainage 21 - Chainage 270, Chainage 120 - Chainage 352 Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:4586400 Release:5096000 Obligation:5096000 |
-33.841891133558 |
784326225 | Quezon Hill Drive - (S00526LZ) Chainage 514 - Chainage 773 Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
784794838 | General Luna Road K0251+(-846)- K0251+300 Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:7475365.82 Release:9800000 Obligation:9800000 |
-35.714285714286 |
789273904 | Layby - Leonard Wood Rd - K0250 + (-404) - K0250 + (-344), K0250 + (-196) - K0250 + (-116), K0250 + 110 - K0250 + 170 Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:7596541.458 Release:8440601.62 Obligation:9800000 |
-36.032388663968 |
789630339 | Marcos Hi-Way to Kennon Rd Diversion Road, Baguio City Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 75 Actual: 97 Expenditure:9932033.59 Release:12264351.46 Obligation:12740000 |
-0.65937250923846 |
811582181 | Govt Ctr Cut-Off Rd - K0249 + (-011) - K0249 + 000, K0249 + (-280) - K0249 + (-011), K0249 + 000 - K0249 + 280 Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 75 Actual: 89.23 Expenditure:6482966.25 Release:7565600 Obligation:7565600 |
16.018084934604 |
836937360 | Leonard Wood Rd - K0252 + 019 - K0252 + 929 Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
840896089 | Chuntug #1 - (S00427LZ) Chainage 0 - Chainage 218 Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
841546022 | Sto Tomas-Mt Cabuyo Rd - K0252 + 291 - K0253 + 049 Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 30 Actual: 55 Expenditure:8584732.34 Release:23850749.14 Obligation:24500000 |
22.222222222222 |
850048189 | Lake Drive 2 - Chainage 0 - Chainage 68, Chainage 0 - Chainage 335 Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:5663530.54 Release:5663530.54 Obligation:7350000 |
-34.228991956187 |
852603649 | Construction of Road at Benin Road, Barangay Pinsao Proper, Baguio City Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:3845501.68 Release:4759251 Obligation:4950000 |
-33.244070390207 |
858504152 | Legarda Rd - K0251 + (-298) - K0251 + 000, K0251 + (-339) - K0251 + (-298), K0251 + (-360) - K0251 + (-339), K0251 + 000 - K0251 + 890 Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 75 Actual: 89.23 Expenditure:13751538.02 Release:15680000 Obligation:15680000 |
16.018084934604 |
860739138 | Pacdal Rd - K0252 + (-131) - K0252 + 000, K0252 + (-180) - K0252 + (-137), K0252 + 000 - K0253 + 601 Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
862146715 | Construction of PMA Access Road from Globe Tower to SAO Area, Philippine Military Academy, Fort del Pilar, Baguio City Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:72375000 Release:72375000 Obligation:72375000 |
-28.952787174584 |
880420835 | Construction of Concrete Road from TMC to Tower 66 Area, Philippine Military Academy, Fort Del Pilar, Baguio City Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 75 Actual: 67 Expenditure:11565440.67 Release:19600000 Obligation:19600000 |
-25.355019815059 |
897750407 | Construction of Road from Scout Barrio Main Road to Barangay Upper Dagsian, Baguio City, Benguet Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:3274397 Release:4741401.5 Obligation:4950000 |
-41.314285714286 |
914640181 | Loakan Rd - K0246 + 323 - K0247 + 000 Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
926731106 | Construction/ Rehabilitation of Multi-purpose Building in Pinsao Pilot Barangay , Baguio City Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 80 Actual: 100 Expenditure:1424282.63 Release:1768800 Obligation:1980000 |
11.111111111111 |
927554183 | Leonard Wood Rd (S00411LZ) - K0250+170 - K0251 + 416, (S00482LZ) - Chainage 000 - Chainage 169, (S00412LZ) - K0252+019 - K0252+213 Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:15272250.32 Release:18999411.33 Obligation:21805000 |
-36.760893200636 |
936179318 | Session Rd #2 - K0251 + (-127) - K0252 + 000 Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 75 Actual: 94.36 Expenditure:9807855.08 Release:10526180 Obligation:10526180 |
16.420454545455 |
939620567 | Construction of Multi-Purpose Building, Brgy. Lualhati (Wright Park), Baguio City, Benguet Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
961112432 | Kayang St - Chainage 0 - Chainage 74, Chainage 0 - Chainage 302 Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:6173999.99 Release:6860000 Obligation:6860000 |
-34.290657439446 |
965138780 | Construction of Flood Mitigation Facility/Drainage System along Bued River (Tributaries), Sta. 0+030 - Sta. 0+530, Baguio City Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 75 Actual: 77.2 Expenditure:27385896.88 Release:49000000 Obligation:49000000 |
-27.211546976003 |
1003967376 | Construction of Road located at Purok 4, Monticello, Barangay Camp 7, Baguio City Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 40 Actual: 64.98 Expenditure:2090409.23 Release:4728982.5 Obligation:4950000 |
29.96 |
1015228334 | Kayang Street (S00538LZ)- Chainage 4 - Chainage 74 Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:2593999.368 Release:2882221.52 Obligation:2940000 |
-34.290657439446 |
1036991892 | Harrison Rd No 1 - (S04713LZ) Chainage 0 - Chainage 22, Chainage 212 - Chainage 414, Chainage 22 - Chainage 212, Chainage 414 - Chainage 807, (S04714LZ) Chainage 0 - Chainage 414 Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
1042635762 | Govt Ctr Cut-Off Rd - K0249 + (-011) - K0249 + 000, K0249 + (-280) - K0249 + (-011), K0249 + 000 - K0249 + 280 Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
1046854709 | Construction (Completion) of Multi-Purpose Building at Barangay Middle Quirino Hill, Baguio City, Benguet Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:2105318.47 Release:2876678.88 Obligation:2970000 |
-33.095238095238 |
1057394915 | Construction/Improvement/ Rehabilitation of Multipurpose Buildings including Facilities at Irisan Barangay Complex, Barangay Irisan, Baguio City Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 50 Actual: 37 Expenditure:25000000 Release:50000000 Obligation:50000000 |
-40.901175446234 |
1060114974 | Construction of Flood Mitigation Facility/Drainage System along Loakan Airport, Sta. 0+000 - Sta. 0+815, Baguio City Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 75 Actual: 91.68 Expenditure:13251788.74 Release:16673974.44 Obligation:17640000 |
-15.930434782609 |
1101641539 | Chanum St (S04682LZ) - Chainage 0 + Chainage 81 Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 20 Actual: 64.71 Expenditure:0 Release:1176000 Obligation:1176000 |
115.7 |
1108497614 | Leonard Wood Rd (S00412LZ) - K0252 + (-525) - K0252 + (-163), K0253 + 133 - K0253 + 327 Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 20 Actual: 64.71 Expenditure:0 Release:8173200 Obligation:8173200 |
115.7 |
1114364979 | Construction of Multi-Purpose Brgy. Hall, Baguio City, Benguet (West Quirino Hill) Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:32137000 Release:32137000 Obligation:32137000 |
-34.232507188827 |
1117058586 | Lt Tacay Rd - K0308 + 000 - K0308 + 616 Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 75 Actual: 89.23 Expenditure:5188379.81 Release:6205360 Obligation:6205360 |
16.018084934604 |
1147489365 | Abad Santos Drive- K0250 + (-023) - K0250 + 514 Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:4964572.04 Release:4964572.04 Obligation:6370000 |
-34.228991956187 |
1169873811 | Construction (Completion) of Multi-Purpose Building, Barangay Balsigan, Baguio City, Benguet Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 50 Actual: 100 Expenditure:2394749.57 Release:2963830.85 Obligation:2970000 |
42.857142857143 |
1174803658 | A. Bonifacio Rd- K0251+(-651)-K0251+596 Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:7226307.85 Release:10780000 Obligation:10780000 |
-34.079812034216 |
1193633363 | Construction (Completion) of Multi-Purpose Building at Barangay Lourdes Subdivision Extension, Baguio City, Benguet Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:1564326.76 Release:1868724 Obligation:1980000 |
-28.705868932869 |
1196359158 | Preventive Maintenance along Kennon Rd - K0241 + (-110) - K0248 + 147 Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:22191120 Release:24656800 Obligation:24656800 |
-40.256045519203 |
1214184204 | Kisad Rd - K0249 + (-759) - K0249 + 377 Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 20 Actual: 64.71 Expenditure:0 Release:18620000 Obligation:18620000 |
115.7 |
1218286112 | Construction (Completion) of Multi-Purpose Building at Barangay Brookspoint, Baguio City, Benguet Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 60 Actual: 100 Expenditure:2194018.31 Release:2941328.61 Obligation:2970000 |
11.111111111111 |
1234378118 | Pacdal Rd - K0252 + (-131) - K0252 + 000, K0252 + (-180) - K0252 + (-137), K0252 + 000 - K0253 + 601 Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 75 Actual: 94.36 Expenditure:15359795.74 Release:19724460 Obligation:19724460 |
16.420454545455 |
1236380889 | Zandueta Street- Chainage 007- Chainage 080 Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:1940400 Release:2156000 Obligation:2156000 |
-34.290657439446 |
1237806008 | Construction (Completion) of Multi-Purpose Building at Barangay Bakakeng Norte, Baguio City, Benguet Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:1779616.28 Release:1980000 Obligation:1980000 |
-23.098591549296 |
1243422756 | Rehabilitation of 2-Storey 6-Classroom School Building at Dona Nicasio J. Puyat Elementary School, Barangay East Modernsite, Baguio City, Benguet Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 40 Actual: 100 Expenditure:3878574.58 Release:4923169.44 Obligation:4950000 |
100 |
1356005725 | Harrison Rd No 2 - (S00453LZ) Chainage 0 - Chainage 235 Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 75 Actual: 89.23 Expenditure:2118816.47 Release:4900000 Obligation:4900000 |
16.018084934604 |
1363336126 | Construction of Road at Barangay Upper Market, Baguio City, Benguet Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:3766433.22 Release:4697035.09 Obligation:4950000 |
-41.340782122905 |
1365686599 | Loakan Rd - K0246 + 323 - K0247 + 000 Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 75 Actual: 94.36 Expenditure:11048328.85 Release:12269600 Obligation:12269600 |
16.420454545455 |
1373724846 | Construction (Completion) of Multi-Purpose Building at Barangay Middle Rock Quarry, Baguio City, Benguet Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:2046823.63 Release:2732400 Obligation:2970000 |
-31.998915597325 |
1385336972 | Construction of PMA Security Road, Philippine Military Academy, Fort Del Pilar, Baguio City Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 75 Actual: 67 Expenditure:8878144.79 Release:29400000 Obligation:29400000 |
-25.355019815059 |
1398597173 | Lt Tacay Rd - K0308 + 000 - K0308 + 616 Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
1415167989 | Construction of Brgy. Building/ Hall Bakakeng Central Brgy., Baguio City Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:47600000 Release:47600000 Obligation:47600000 |
-33.972789115646 |
1427809913 | Rehabilitation of 3-Storey School Building at Rizal National High School, Barangay Gibraltar, Baguio City, Benguet Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 75 Actual: 100 Expenditure:2832977.68 Release:4737150 Obligation:4950000 |
-7.563025210084 |
1431202463 | South Drive - K0251 + (-295) - K0252 + 755 Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 75 Actual: 89.23 Expenditure:17741699.1 Release:19600000 Obligation:19600000 |
16.018084934604 |
1464341371 | Gov Pack Rd - (S00408LZ) Chainage 0 - Chainage 36, (S004724LZ) Chainage 0 - Chainage 50, Chainage 176 - Chainage 276, (S00409LZ) Chainage 0 - Chainage 200 Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:44100000 Release:44100000 Obligation:44100000 |
-32.023958768631 |
1468231202 | Lake Drive 2 - Chainage 0 - Chainage 68 Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:2218627.51 Release:2218627.51 Obligation:2450000 |
-34.864406779661 |
1482662875 | Installation of Road Safety Devices along Chanum St. (S04681LZ, S04682LZ), Military Cut-Off Road (S00440LZ), Chuntug No. 1 (S00427LZ), Kayang Extension (S05043LZ), Yandok St. (S00445LZ), Magsaysay Ave. (Trinidad Rd.) (S00522LZ, S00525LZ), Baguio City Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 40 Actual: 63.59 Expenditure:0 Release:31360000 Obligation:31360000 |
27.18 |
1483760646 | Abanao Road (S04677LZ)- Chainage 120- Chainage 352 Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:2293200 Release:2548000 Obligation:2548000 |
-33.841891133558 |
1485060320 | Marcos Hi-way - K0280 + 217 - K0280 + 506, K0280 + 515 - K0283 + 000 Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 75 Actual: 94.36 Expenditure:9007274.24 Release:12318600 Obligation:12318600 |
16.420454545455 |
1510269115 | Magsaysay Ave. (Trinidad Rd) West Service Rd to Bokawkan Rd Diversion Rd, Baguio City Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:7932676.59 Release:9800000 Obligation:9800000 |
-31.442925462538 |
1555480275 | Chanum Street - Chainage 128 - Chainage 194 Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:1896300 Release:2107000 Obligation:2107000 |
-33.841891133558 |
1566208551 | Rehabilitation (Completion) of Multi-Purpose Building at Baguio City, Benguet National High School Flavier Building, Governor Pack - Barangay Session Road Area, Baguio City, Benguet Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:1622489.84 Release:1980000 Obligation:1980000 |
-33.333333333333 |
1586523237 | Construction (Completion) of Headquarters Support Group Building, Philippine Military Academy, Baguio City Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 30 Actual: 54.53 Expenditure:3969068.02 Release:6272000 Obligation:6272000 |
36.325 |
1596992651 | Western Link Circumferential Rd - K0246 + (-504) - K0246 + (-184) Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:3416373.59 Release:3416373.59 Obligation:3430000 |
-34.782608695652 |
1604379912 | South Drive - K0251 + (-295) - K0252 + 755 Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
1632574416 | (a)Abanao Ext - (S00429LZ) Chainage 0 - Chainage 29, Chainage 156 - Chainage 275, Chainage 29 - Chainage 156, (S05052LZ) Chainage 111 - Chainage 232 Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
1645350338 | Construction of Flood Mitigation Facility/Drainage System along Bued River (Tributaries) Sta. 0+190 - Sta. 0+640, Baguio City Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 30 Actual: 73 Expenditure:29697703.36 Release:49000000 Obligation:49000000 |
82.5 |
1670056236 | Asin Rd - K0308 + 917 - K0308 + 940, K0309 + 465 - K0309 + 525 Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:30789349.57 Release:33124000 Obligation:33124000 |
-21.275820802331 |
1675362630 | Construction of Road at Laubauch and Sumulong Street, Barangay Holy Ghost Proper, Baguio City Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:4032355.5 Release:4950000 Obligation:4950000 |
-34.323243860651 |
1710552750 | Construction of Road from Springhills Loakan Apugan Barangay to Happy Hallow Barangay, Baguio City Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 40 Actual: 63.25 Expenditure:3120527.07 Release:5636325.18 Obligation:5940000 |
26.5 |
1725834596 | Marcos Hi-way - K0280 + 720 - K0281 + 134, K0281 + 800 - K0282 + 090 Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:12762982.8 Release:16660000 Obligation:16660000 |
-31.629268292683 |
1738986462 | Construction (Completion) of Multi-Purpose Building at Purok 1, Barangay Pinget, Baguio City, Benguet Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:1423412.02 Release:1775475.65 Obligation:1980000 |
-23.809523809524 |
1740791886 | Major Mane to Kennon Road Bypass Road, Baguio City Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 15 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
1761263375 | Kennon Road to Military Cut-off Road And Loakan Road Bypass Road, Baguio City Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 15 Actual: 45.31 Expenditure:1253322 Release:9191028 Obligation:9800000 |
81.24 |
1778142751 | Construction of Flood Mitigation Facility/Drainage System along Kisad Road to Lake Drive 1 to Abad Santos Drive, Sta. 0+000 - Sta. 0+463, Baguio City Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 75 Actual: 80 Expenditure:16496018.12 Release:49000000 Obligation:49000000 |
0.84603786228849 |
1784349306 | Major Mane Rd - K0247 + 510 - K0248 + 000 Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:9513683.7 Release:18849590.98 Obligation:19040420 |
-36.546341463415 |
1789688129 | Marcos Hi-way - K0280 + 217 - K0280 + 506, K0280 + 515 - K0283 + 000 Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
1796871572 | Rehabilitation of Multi-Purpose Building (Barangay Hall), Brgy. Pinsao, Baguio City, Benguet Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 30 Actual: 37.24 Expenditure:1622351.85 Release:4814186.64 Obligation:4950000 |
-6.9 |
1848380227 | Harrison Rd No 2 - (S00453LZ) Chainage 0 - Chainage 235 Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
1883184248 | Improvement/Upgrading of Roadsa including Drainage Facilities along Wright Park Area, Baguio City Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 40 Actual: 34.04 Expenditure:2642393.71 Release:19377553.89 Obligation:19600000 |
-31.92 |
1916734990 | Chuntug #1 - (S00427LZ) Chainage 0 - Chainage 218 Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 75 Actual: 89.23 Expenditure:3733645.24 Release:4392360 Obligation:4392360 |
16.018084934604 |
1931997555 | Construction of Multi-purpose Building, Athletic Bowl Oval, Burnham Park, Baguio City Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 80 Actual: 57.27 Expenditure:25000000 Release:49000000 Obligation:49000000 |
-52.275 |
1945674345 | Chanum Street - Chainage 128 - Chainage 194 Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-68.914842873176 |
1959902600 | Rehabilitation of Multi-Purpose Building, Barangay Brookside, Baguio City, Benguet Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:2116774.59 Release:2757021.3 Obligation:2970000 |
-38.429428645969 |
2013039936 | Quirino H-Way (Baguio-Bauang) - K0304 + 884 - K0305 + 286 Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 100 Actual: 80 Expenditure:45247795.88 Release:67550000 Obligation:67550000 |
-30.908458057779 |
2055680917 | Construction of Multi-Purpose Building, Brgy. Asin, Baguio City Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 30 Actual: 56 Expenditure:2113706.15 Release:4950000 Obligation:4950000 |
40 |
2066480906 | Leonard Wood Rd - K0252 + 019 - K0252 + 929 Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 75 Actual: 89.23 Expenditure:7313890.63 Release:9165940 Obligation:9165940 |
16.018084934604 |
2072606127 | Rehabilitation (Completion) of Three Classrooms School Building at Happy Hollow National High School located at Purok 4, Barangay Happy Hollow, Baguio City, Benguet Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:3753642.04 Release:4669634.05 Obligation:4950000 |
-31.935061006353 |
2112513994 | Chanum St (S00447LZ) - Chainage 0 + Chainage 490 Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 20 Actual: 64.71 Expenditure:0 Release:7203000 Obligation:7350000 |
115.7 |
2115497157 | Construction (Completion) of Multi-Purpose Building at Barangay DPS Compound, Baguio City, Benguet Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:1452982.69 Release:1764738.41 Obligation:1980000 |
-27.677078153957 |
2120549398 | PMA Cut Off Rd 1 - K0252 + (-556) - K0252 + (-492) Baguio City | DPWH Baguio City DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:6647432.58 Release:10290000 Obligation:10290000 |
-21.275820802331 |
1956431 | Construction (Completion) of Road near Marzo Residence to Paltingan Area at Zone 3, Betag, La Trinidad, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
7417871 | Construction (Completion) of Water Supply System with Intake Tank at Amakgang, Pito, Bokod, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 60 Actual: 73.6 Expenditure:333316.54 Release:0 Obligation:1995443.6 |
5.1428571428571 |
8153345 | Construction of Flood Control Structure along Ambalanga River (Below Vital Fianza Jr Residence), Supang, Poblacion, Itogon, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
11334842 | Replacement of Pines Park Vehicular Bridge, La Trinidad, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 60 Actual: 0 Expenditure:0 Release:0 Obligation:77164995.36 |
-100 |
22645561 | Rehabilitation (Completion) of Balangbang-Labney-Keyte Langen, Tabaan Norte, Tuba, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 60 Actual: 0 Expenditure:0 Release:0 Obligation:2937207.3 |
-100 |
24625033 | Construction of Water Supply System at Ampucao, Itogon, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
30319332 | Construction (Completion) of Domestic Water Supply at Tadiangan, Tuba, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
32521998 | Construction of Banao Cantina Water Supply System, Ambuklao, Bokod, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
47204255 | Construction (Completion) of Bowing To Bengkagan-Divang Water Supply System, Baluay, Sablan, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 60 Actual: 44.63 Expenditure:40000 Release:0 Obligation:1996042.26 |
-36.242857142857 |
47684101 | Replacement of Pines Park Bridge from Temporary to Permanent - Pines Park Vehicular Bridge, La Trinidad, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
62114132 | Construction (Completion) of Bila Multi-Purpose Building, Binado, Bila, Bokod, Benguet Benguet | DPWH Benguet 1st DEO | (default) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:2939279.74 |
0 |
63462643 | Construction of Shekdan-Bemetao Road, Camp 4, Tuba, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
69920353 | Construction (Completion) of Balangbang Beckel Road, Beckel, La Trinidad, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
85049368 | Construction of Road, Bua-Gumatdang-Pacalso Road, Itogon, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 60 Actual: 24.77 Expenditure:36565472.05 Release:0 Obligation:79165258.17 |
-64.614285714286 |
95487829 | Rehabilitation (Completion) of Road along Sitio Lucbuban to Manit-Tokok Footpath, Poblacion, Itogon, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 60 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
95974892 | Shilan-Beckel Rd -K0261 + 892 - K0262 + 890, K0264 + 908 - K0265 + 943 Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
148629051 | Construction of Road via Drainage Canal near Mendoza Residence towards Velasco Residence at Lubok, Balili, La Trinidad, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
151064218 | Camp 3 Torre-Antamok-Mangga-Belis-Piminggan-Ansagan Proper Road in support of Cacao and Coffee Industry, Tuba, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 60 Actual: 96.04 Expenditure:5136618.25 Release:0 Obligation:9984397.78 |
123.81428571429 |
160569533 | Construction (Completion) of Road at Aduyon Sadjatan, Wangal, La Trinidad, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
161671348 | Construction of Road, Baay to Crossing Apanberang, Pacso, Kabayan, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 60 Actual: 20.21 Expenditure:17479777.08 Release:0 Obligation:49749998.88 |
-71.128571428571 |
166117499 | Rehabilitation of Drainage Canal with Sidewalk and Steel Railings near Tiongan Residence towards Alip Residence at Sadiad, Balili, La Trinidad, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
181237291 | Construction of Bakong - Asapa Poblacion Road, Kabayan, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 60 Actual: 22.74 Expenditure:1446675.16 Release:0 Obligation:9644501.07 |
-67.514285714286 |
187139931 | Construction of Pathway from Sitio Baskey - Otso to Loacan Elementary School, Barangay Loacan, Itogon, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 60 Actual: 4.82 Expenditure:0 Release:0 Obligation:2935000.44 |
-93.114285714286 |
188355984 | Construction (Completion) of Road at Bangao Elementary School, Barangay Ambuklao, Bokod, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
214900788 | Construction (Completion) of Road from Antamok Norte to Purok II, Camp 3, Tuba, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 60 Actual: 96.04 Expenditure:0 Release:0 Obligation:2935706.22 |
37.2 |
216665544 | Rehabilitation (Completion) of Tuel-Kalashagad Road, San Pascual, Tuba, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 60 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
224319782 | Construction (Completion) of Road at Dalabi, Twin Peaks, Tuba, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 60 Actual: 0 Expenditure:0 Release:0 Obligation:2934759.56 |
-100 |
226719928 | Construction (Completion) of Road, Camangaan to Tikey, Bokod, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
228514143 | Camp Br. 1 (B02168LZ) along Kennon Rd Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 60 Actual: 99.43 Expenditure:14303656.08 Release:0 Obligation:18300000 |
85.442857142857 |
232591127 | Rehabilitation (Completion) of Domestic Water Supply at Banengbeng, Sablan, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
238524799 | Dungon Br. (B02190LZ) along Kennon-Agat Rd Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
243139966 | Construction of Bridge at Baloy, Tinongdan, Itogon, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 60 Actual: 0 Expenditure:0 Release:0 Obligation:4899000.01 |
-100 |
247165050 | Construction of Bukas to Asin Water Supply System Nangalisan, Tuba, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
252792818 | Cawayan-Calew-Balococ-Cashet Road to San Manuel, Pangasinan in support to Coffee, Cacao, Bamboo, Banana, Livestock, Heirloom Rice, Gold, High Value Vegetables, Loom Weaving, Sewing, Dress Making, Honey, Food Processing and Services, Itogon, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
256383195 | Rehabilitation (Completion) of NRJ-Soysoyan-Ballay-Tawangan-Lusod Proper Road (Minac-Turdan-Tongotong-Tabayo-Bantoning Section), Kabayan, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
264319917 | Baguio-Itogon Rd - K0254+(-651) - K0255+839 K0256+321 - K0257+146 Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 60 Actual: 56.44 Expenditure:10976085.98 Release:0 Obligation:31962556.33 |
-19.171428571429 |
273465977 | Construction (Completion) of Flood Control Structure at Colong, Batan, Kabayan, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 60 Actual: 3.53 Expenditure:0 Release:0 Obligation:2919512.6 |
-94.957142857143 |
277412849 | Construction of Water Supply System, Bekes-Beleng to Balang Eddet, Kabayan, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
283145567 | Construction of Road via Drainage Canal near Mendoza Residence towards Velasco Residence at Lubok, Balili, La Trinidad, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 60 Actual: 0 Expenditure:0 Release:0 Obligation:4898859.26 |
-100 |
285532203 | Construction of Sitios Ambacuag, Ampeta and Paswek Domestic Water Supply, Banangan, Sablan, Benguet Benguet | DPWH Benguet 1st DEO | (default) |
Target: 60 Actual: 54.35 Expenditure:583188.9906 Release:0 Obligation:1990088.37 |
-9.4166666666667 |
319386458 | Rehabilitation (Completion) of Domestic Water System Assn., Central Bineng, La Trinidad, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 60 Actual: 0.62 Expenditure:22343.67 Release:0 Obligation:2978734.02 |
-99.114285714286 |
321563152 | Construction of Road, Sitio Coog to Sitio Petican, Tinongdan, Itogon, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
332561066 | Construction of Balinsawang-Sampaguey Water Supply System at Palina, Taloy Sur, Tuba, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
343238226 | Construction/ Rehabilitation of Flood Mitigation Structure, Drainage Canal at Strawberry Fields, La Trinidad, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 75 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
352263948 | Construction (Completion) of Road, Kawal to Bisal, Brgy. Bobok Bisal, Bokod, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 60 Actual: 100 Expenditure:59400 Release:0 Obligation:2994999.57 |
42.857142857143 |
369771118 | Timbak Caves Road leading to Timbak Caves and Mummy of Apo Anno, Atok/Kabayan, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 60 Actual: 95.05 Expenditure:7176911.85 Release:0 Obligation:9989747.39 |
91.957142857143 |
370989907 | Construction of Hanging Bridge Connecting Sitio Picket and Sitio Naybaliw, Poblacion, Itogon, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
371104006 | Construction of Banao Cantina Water Supply System, Ambuklao, Bokod, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 60 Actual: 80.06 Expenditure:100000 Release:0 Obligation:4939225.61 |
14.371428571429 |
371988105 | Construction of Flood Mitigation Structure within Aringay River Basin: along Aringay River Main Stream (Kagaling) and Section 10 (Hydro No. 2), Tuba, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 75 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
399165339 | Baguio-Bontoc Road Jct. to Guiweng-Nawal-Tickey-Daclan Road in support of Coffee, and Processed Food Meat Industries, Bokod, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 60 Actual: 67.67 Expenditure:1664805.069 Release:0 Obligation:9974386.5 |
9.3571428571429 |
409703898 | Construction of Cacuduran Flood Control, Nawal, Bokod, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
416196691 | Construction (Completion) of Access Road from Upper Kesbeng (Berato-Rapuso Area to Lower Kesbeng Bugtong Area), Poblacion, La Trinidad, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
417624408 | Ballay-Tabio-Tonoman-Bulalacao-Tawangan-Lusod Road leading to Bulalacao Lakes and Mt. Tabeo, Kabayan, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
432812281 | Construction (Completion) of Road, Kawal to Bisal, Brgy. Bobok Bisal, Bokod, Benguet Benguet | DPWH Benguet 1st DEO | (default) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
432841932 | Replacement of Stonehill Bridge, Barangay Balili, La Trinidad, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 60 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
439640261 | Rehabilitation of Minac Water Supply System, Ambuklao, Bokod, Benguet Benguet | DPWH Benguet 1st DEO | (default) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
450285609 | Construction of Road, Ambacuan - Orign - La Trinidad Road, Sablan, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
451050955 | Replacement of Pines Park Bridge from Temporary to Permanent - Pines Park Vehicular Bridge, La Trinidad, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 60 Actual: 0 Expenditure:0 Release:0 Obligation:77177507.92 |
-100 |
452289325 | Construction of Pet-Okan Naybaliw Creek Flood Control, Duacan, Kabayan, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 0 Actual: 21.35 Expenditure:1469019.05 Release:0 Obligation:9793460.31 |
0 |
452907477 | Rehabilitation (Completion) of Taroy Ligay Road, Camp 1, Tuba, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 60 Actual: 3.4 Expenditure:0 Release:0 Obligation:2931972.73 |
-95.142857142857 |
473237213 | Rehabilitation (Completion) of Balangabang Waterwork System at Tabaan Norte, Tuba, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
485042732 | Improvement of Aguyad-Lebbeng Road, Tadiangan, Tuba, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
489350422 | Replacement of Pines Park Vehicular Bridge, La Trinidad, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
494842634 | Construction (Completion) of Flood Control Structure at Oncasan to Riverside Alno, La Trinidad, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
515058168 | Construction of Regional Crime Laboratory Office (RCLO-COR) Building, Camp Major Bado Dangwa, La Trinidad, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 75 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
516942083 | Construction of Water Supply System, Bekes-Beleng to Balang Eddet, Kabayan, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 60 Actual: 5.83 Expenditure:40000 Release:0 Obligation:1979965.34 |
-91.671428571429 |
534241967 | Construction of Balinsawang-Sampaguey Water Supply System at Palina, Taloy Sur, Tuba, Benguet Benguet | DPWH Benguet 1st DEO | (default) |
Target: 60 Actual: 22.1 Expenditure:118800 Release:0 Obligation:5993631.26 |
-63.166666666667 |
546693547 | Construction of Flood Mitigation Structure within Agno River Basin: along Agno River Section 20 (Ekip), Bokod, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
561261623 | Construction of Road at Barangay Balili, La Trinidad, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 60 Actual: 0 Expenditure:0 Release:0 Obligation:9785013.41 |
-100 |
565424246 | Construction of Cacuduran Flood Control, Nawal, Bokod, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 0 Actual: 66.37 Expenditure:3185891 Release:0 Obligation:19910507.33 |
0 |
585425204 | Tawang-Ambiong Rd - K0260+(-193), K0260+018, K0260+250, K0260+497, K0260+518, K0260+918, K0261+042, K0261+409, K0261+958, K0262+710, K0262+900, , K0263+090K0264+250, K0264+620 Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
587591296 | Itogon-Dalupirip-Sn Manuel Bdry Rd - K0270 + 225 - K0270 + 238 K0272 + 112 - K0272 + 128 K0275 + 199 - K0275 + 228 Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 60 Actual: 83.25 Expenditure:4846279.01 Release:0 Obligation:6300000 |
70.928571428571 |
600466653 | Rehabilitation of Drainage Canal with Sidewalk and Steel Railings near Tiongan Residence towards Alip Residence at Sadiad, Balili, La Trinidad, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:2934796.4 |
0 |
604282027 | Construction of CDA Office Building, Longlong Puguis, La Trinidad, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 0 Actual: 19.23 Expenditure:3872659.11 Release:0 Obligation:24996816.59 |
0 |
610480836 | Camp Br. 1 (B02168LZ) along Kennon Rd Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
611748759 | Construction of Road, Sitio Coog to Sitio Petican, Tinongdan, Itogon, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 60 Actual: 4.18 Expenditure:140000 Release:0 Obligation:6968196.15 |
-94.028571428571 |
623419084 | Construction of Slope Protection and Drainage Structure, Brgy Duacan, Kabayan, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 0 Actual: 21.35 Expenditure:0 Release:0 Obligation:2937836 |
0 |
627126071 | Cong. Andres Acop Cosalan Rd - K0312 + 700 - K0312 + 730 K0313 + 340 - K0313 + 370 K0314 + 200 - K0314 + 210 K0316 + 987 - K0317 + 000 K0319 + 140 - K0319 + 200 K0319 + 266 - K0319 + 300 K0319 + 1252 - K0319 + 1265 K0319 + 1850 - K0319 + 1855 K0322 + 690 - K0322 + 7053 K0338 + 1060 - K0338 + 1115 Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
641681416 | Construction (Completion) of Kingking Water Supply System at Brgy. Gusaran, Kabayan, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 60 Actual: 53.28 Expenditure:40000 Release:0 Obligation:1998199.23 |
-23.885714285714 |
646619166 | Construction of Turning Point to Sitio Sayo Road, Dalupirip, Itogon, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 60 Actual: 0 Expenditure:0 Release:0 Obligation:5874777.36 |
-100 |
651572547 | Guisset-Binga-Baloy-Tinongdan Road leading to Binga Dam and Mt. Ugo, Site for the International Sky Running Event, Itogon, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 60 Actual: 72.08 Expenditure:4479055.01 Release:0 Obligation:9958221.61 |
7.9714285714286 |
652177846 | Construction of Road, Baay to Crossing Apanberang, Pacso, Kabayan, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
666036779 | Construction of Water Supply System at Sitio Camp 6, Camp 4, Tuba, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 60 Actual: 2.09 Expenditure:0 Release:0 Obligation:4994829.41 |
-97.014285714286 |
666205193 | Construction of Pines Park to Lubas-Ambiong Road, La Trinidad, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 60 Actual: 1.8 Expenditure:0 Release:0 Obligation:13691959.18 |
-97.428571428571 |
667738843 | Construction (Completion) of Multi-Purpose Building (Barangay Hall) at Upper Loacan, Itogon, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
671292335 | Rehabilitation (Completion) of Don-Oy Bridge, Anchukey, Kabayan, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 60 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
671864346 | Construction of Road, Ambacuan - Orign - La Trinidad Road, Sablan, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 60 Actual: 46.81 Expenditure:32170281.18 Release:0 Obligation:69288988 |
-33.128571428571 |
676620399 | Improvement of Toybongan-Talnag Road, Tabaan Norte, Tuba, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
690799005 | Construction of Regional Crime Laboratory Office (RCLO-COR) Building, Camp Major Bado Dangwa, La Trinidad, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 70 Actual: 79.95 Expenditure:25314232.03 Release:0 Obligation:39975328.03 |
4.8215035699286 |
692940704 | Construction (Completion) of Slope Protection Wall Along Sitio Anuvang Tourism Road, Tinongdan, Itogon, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 0 Actual: 4.32 Expenditure:0 Release:0 Obligation:2936230.11 |
0 |
698822354 | Construction (Completion) of Batallion Water System at Bagong, Sablan, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 60 Actual: 0 Expenditure:0 Release:0 Obligation:2935170.19 |
-100 |
702136471 | Construction of Road, Disay Shelpi, Wangal, La Trinidad, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
706140486 | Construction of Flood Control Structure at Sitio Sokong, Kabayan, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 0 Actual: 53.58 Expenditure:1451978.65 Release:0 Obligation:9679857.68 |
0 |
706773072 | Construction (Completion) of Road from Baliti to Pes-Igan, Pacso, Kabayan, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
722202568 | Construction of Flood Mitigation Structure within Agno River Basin: along Agno River Section 3 (Balococ River) and Section 4 (Salud River), Dalupirip, Itogon, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
726414374 | Construction of Water Supply System at Sitio Camp 6, Camp 4, Tuba, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
738151517 | Construction (Completion) of Road at Purok 2 and Purok 4, Banig Tawang towards Tawang-Lubas-Ambiong National Road, Tawang, La Trinidad, Benguet Benguet | DPWH Benguet 1st DEO | (default) |
Target: 60 Actual: 38.29 Expenditure:0 Release:0 Obligation:2934584.57 |
-36.183333333333 |
740770867 | Timbak Caves Road leading to Timbak Caves and Mummy of Apo Anno, Atok/Kabayan, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
745566850 | Construction (Completion) of Flood Control Structure at Gumatdang River (Near Abanes Residence), Itogon, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 60 Actual: 100 Expenditure:333603.51 Release:0 Obligation:1997356.76 |
42.857142857143 |
746187491 | Construction of Paswek-Lexber Water System at Banangan, Sablan, Benguet Benguet | DPWH Benguet 1st DEO | (default) |
Target: 60 Actual: 23.82 Expenditure:40000 Release:0 Obligation:1998665.1 |
-60.3 |
751397589 | Rehabilitation of The Ambugao Waterwork System at Ambiong, La Trinidad, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
759214988 | Baguio-Bauang Rd - K0284 + 500 - K0284 + 507,K0290 + 410 - K0290 + 420,K0291 + 170 - K0291 + 270 Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 60 Actual: 86.68 Expenditure:8590761.2 Release:0 Obligation:14067565.55 |
44.828571428571 |
780590969 | Construction of Flood Mitigation Structure within Aringay River Basin: along Aringay River Main Stream (Coplo and Nangalisan Proper), Tuba, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:22227131.27 Release:0 Obligation:24613608.31 |
-7.5073286918285 |
781320602 | Kennon Rd - K0226 + 700 - K0226 + 760 Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
790474972 | Construction (Completion) of Sombrero Ambuklao Water Supply System, Ambuklao, Bokod, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 60 Actual: 5.71 Expenditure:0 Release:0 Obligation:1950050 |
-91.842857142857 |
794220848 | Construction of Flood Mitigation Structure within Agno River Basin: along Agno River Section 3 (Balococ River) and Section 4 (Salud River), Dalupirip, Itogon, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 60 Actual: 68.98 Expenditure:16359283.03 Release:0 Obligation:24264943.06 |
19.971428571429 |
798789418 | Construction of Flood Mitigation Structure within Agno River Basin: along Agno River Section 11b (Batuang), Virac, Itogon, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:22477976.61 Release:0 Obligation:25000000 |
-4.1485769416305 |
799622196 | Baguio-Itogon Rd - K0259+050 - K0259+150 K0259+204 - K0259+480 K0259+534 - K0260+690 K0260+735 - K0261+000 Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 60 Actual: 15.85 Expenditure:13114050 Release:0 Obligation:87426999.98 |
-79.8875 |
806061854 | Construction of Slope Protection at Yabyabuan Multi-Grade School, Barangay Bagong, Sablan, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
806865413 | Camp 4 Br. 4 (B02179LZ) along Kennon Rd Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
811992322 | Construction (Completion) of Domestic Water Supply at Tadiangan, Tuba, Benguet Benguet | DPWH Benguet 1st DEO | (default) |
Target: 60 Actual: 100 Expenditure:40000 Release:0 Obligation:1997634.14 |
66.666666666667 |
820932541 | Construction of Flood Control Structure along Ambalanga River (Below Vital Fianza Jr Residence), Supang, Poblacion, Itogon, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 0 Actual: 49.76 Expenditure:903436.76 Release:0 Obligation:5399578.4 |
0 |
832939422 | Rehabilitation (Completion) of Balangabang Waterwork System at Tabaan Norte, Tuba, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 60 Actual: 0 Expenditure:40000 Release:0 Obligation:1998000.37 |
-100 |
848490663 | Construction of Paswek-Lexber Water System at Banangan, Sablan, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
860316478 | Benguet-Nueva Vizcaya Rd - K0257 + 590 - K0257 + 600 Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 60 Actual: 100 Expenditure:1050614.45 Release:0 Obligation:1164682.72 |
185.71428571429 |
864030693 | Construction (Completion) of Flood Control Structure at Colong, Batan, Kabayan, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
865146948 | Construction of Water Supply System at Ampucao, Itogon, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 60 Actual: 6.92 Expenditure:3137223.47 Release:0 Obligation:19794823.1 |
-89.642857142857 |
866297194 | Rehabilitation of Minac Water Supply System, Ambuklao, Bokod, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 60 Actual: 100 Expenditure:1258390.96 Release:0 Obligation:1994948.28 |
42.857142857143 |
889289336 | Construction of Bukas to Asin Water Supply System Nangalisan, Tuba, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 60 Actual: 2.87 Expenditure:40000 Release:0 Obligation:1994997.01 |
-95.9 |
908909291 | Construction (Completion) of Road at Aduyon Sadjatan, Wangal, La Trinidad, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 60 Actual: 100 Expenditure:57909.5 Release:0 Obligation:2994824.52 |
42.857142857143 |
911713148 | Construction (Completion) of Payacpac Water Supply System at San Pascual, Tuba, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 60 Actual: 100 Expenditure:2643549.57 Release:0 Obligation:2998543.97 |
45.214285714286 |
914933964 | Construction of Water Supply System at Upper Kesbeng, Poblacion, La Trinidad, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 60 Actual: 42.55 Expenditure:100000 Release:0 Obligation:4978856.53 |
-39.214285714286 |
929708288 | Construction (Completion) of Batallion Water System at Bagong, Sablan, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
929740589 | Rehabilitation (Completion) of Road along Sitio Lucbuban to Manit-Tokok Footpath, Poblacion, Itogon, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
930443488 | Construction of Road, Disay Shelpi, Wangal, La Trinidad, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 60 Actual: 3.5 Expenditure:0 Release:0 Obligation:4849760.97 |
-95 |
938956995 | Construction of Turning Point to Sitio Sayo Road, Dalupirip, Itogon, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
950262887 | Construction of Bakong - Asapa Poblacion Road, Kabayan, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
951760428 | Ballay-Tabio-Tonoman-Bulalacao-Tawangan-Lusod Road leading to Bulalacao Lakes and Mt. Tabeo, Kabayan, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 60 Actual: 100 Expenditure:1669034.61 Release:0 Obligation:9993564.04 |
137.41428571429 |
956011103 | Construction (Completion) of Water Supply System at Shilan, La Trinidad, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
957804367 | Rehabilitation (Completion) of NRJ-Soysoyan-Ballay-Tawangan-Lusod Proper Road (Minac-Turdan-Tongotong-Tabayo-Bantoning Section), Kabayan, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 60 Actual: 8.76 Expenditure:0 Release:0 Obligation:2937412.4 |
-87.485714285714 |
967211367 | Construction of Bektey- Ampasit Diversion Road, Barangay Puguis, La Trinidad, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:15016660.13 Release:0 Obligation:20814481.38 |
-17.371991994924 |
1004199281 | Construction (Completion) of Flood Control Structure at Oncasan to Riverside Alno, La Trinidad, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 60 Actual: 9.84 Expenditure:60000 Release:0 Obligation:2990210.39 |
-85.942857142857 |
1024728178 | Baguio-Bontoc Road Jct. to Batan-Adaoay, Kabayan Road in support of Vegetable, Processed Tea and Coffee Industry, Kabayan, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
1025024904 | Construction of CDA Office Building, Longlong Puguis, La Trinidad, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
1026782586 | Construction of Flood Mitigation Structure within Agno River Basin: along Agno River Section 11 (Mambolo Bridge), Poblacion, Itogon, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
1029506303 | Construction of Poblacion Flood Control, Bokod, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 0 Actual: 84.93 Expenditure:1666468.57 Release:0 Obligation:9989790.48 |
0 |
1036051963 | Dungon Br. (B02190LZ) along Kennon-Agat Rd Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 60 Actual: 100 Expenditure:7542597.14 Release:0 Obligation:9118826.74 |
113.85714285714 |
1036136252 | Construction (Completion) of Magtilay-Absay Water Supply System at Taloy Norte, Tuba, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 60 Actual: 95.04 Expenditure:60000 Release:0 Obligation:2997627.01 |
35.771428571429 |
1038328412 | Construction (Completion) of Road, Sitio Lab-Ang to Sitio Bitnong, Barangay Ampucao, Itogon, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
1041576458 | Construction (Completion) of Sombrero Ambuklao Water Supply System, Ambuklao, Bokod, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
1049799324 | Construction of Flood Mitigation Structure within Agno River Basin: along Agno River Main Stream (Mangkew-Nabneng, LS), Kabayan, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 75 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
1061793548 | Construction of Water Supply System at Barangay Dalupirip, Itogon, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 60 Actual: 20.82 Expenditure:1914180.67 Release:0 Obligation:5981095.38 |
-70.257142857143 |
1079628546 | Construction of Flood Mitigation Structure within Agno River Basin: along Agno River Main Stream (Pacso Section), Kabayan, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 60 Actual: 87.52 Expenditure:12658811.97 Release:0 Obligation:24445135.58 |
43.971428571429 |
1097919637 | Construction/ Rehabilitation of Flood Mitigation Structure, Drainage Canal at Strawberry Fields, La Trinidad, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:24983143.8 Release:0 Obligation:24989189.7 |
-3.4822634712563 |
1099960710 | Rehabilitation (Completion) of Teytey-Tongshol Road, Bayabaas, Sablan, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 60 Actual: 4.12 Expenditure:440261.8 Release:0 Obligation:2935078.69 |
-94.114285714286 |
1104089264 | Construction of Water Supply System at Sabkil, Loacan, Itogon, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
1112024649 | Rehabilitation of Water Supply System at Fatima, Ucab, Itogon, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
1112207911 | Baguio-Bontoc Road Jct. to Batan-Adaoay, Kabayan Road in support of Vegetable, Processed Tea and Coffee Industry, Kabayan, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 60 Actual: 96.12 Expenditure:13719527.12 Release:0 Obligation:17768413 |
108.91428571429 |
1118357163 | Construction of Road, Bua-Gumatdang-Pacalso Road, Itogon, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
1122264315 | Improvement of Aguyad-Lebbeng Road, Tadiangan, Tuba, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 60 Actual: 1.5 Expenditure:0 Release:0 Obligation:9990000 |
-97.857142857143 |
1126640288 | Construction (Completion) of Additional Potable Water System of Alno Rural Community Development Cooperative (Arcdc), Alno, La Trinidad, Benguet Benguet | DPWH Benguet 1st DEO | (default) |
Target: 60 Actual: 0 Expenditure:0 Release:0 Obligation:1955000 |
-100 |
1129223493 | Construction of Flood Mitigation Structure within Agno River Basin: along Agno River Main Stream (Pacso Section), Kabayan, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
1151309938 | Construction (Completion) of Legleg to Wacalan Access Road at Lusod, Kabayan, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
1162193985 | Construction (Completion) of Balangbang Beckel Road, Beckel, La Trinidad, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 60 Actual: 0 Expenditure:60000 Release:0 Obligation:2994806.2 |
-100 |
1162653096 | Poblacion-Karao-Ekip Access Road leading to Mount Purgatory, Bokod, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
1179182736 | Construction (Completion) of Legleg to Wacalan Access Road at Lusod, Kabayan, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 60 Actual: 15.44 Expenditure:0 Release:0 Obligation:2937255.2 |
-77.942857142857 |
1191299333 | Construction (Completion) of Bridge at Balisong Creek, Ampucao, Itogon, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 60 Actual: 0 Expenditure:0 Release:0 Obligation:2937114.63 |
-100 |
1199475799 | Construction (Completion) of Daclan Multi-Purpose Hall, Phase 1, Daclan, Bokod, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
1202318177 | Construction (Completion) of Road from Antamok Norte to Purok II, Camp 3, Tuba, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
1208971482 | Baguio-Bauang Rd - K0284 + 500 - K0284 + 507,K0290 + 410 - K0290 + 420,K0291 + 170 - K0291 + 270 Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
1223972057 | Itogon Br. (B02165LZ) along Baguio-Itogon Rd Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
1226110631 | Construction (Completion) of Bridge at Balisong Creek, Ampucao, Itogon, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
1240615930 | Rehabilitation (Completion) of Tuel-Kalashagad Road, San Pascual, Tuba, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
1242362534 | Improvement of Road, Bagto, Samoyao, Alapang, La Trinidad, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
1246121628 | Cong. Andres Acop Cosalan Rd - K0312 + 700 - K0312 + 730 K0313 + 340 - K0313 + 370 K0314 + 200 - K0314 + 210 K0316 + 987 - K0317 + 000 K0319 + 140 - K0319 + 200 K0319 + 266 - K0319 + 300 K0319 + 1252 - K0319 + 1265 K0319 + 1850 - K0319 + 1855 K0322 + 690 - K0322 + 7053 K0338 + 1060 - K0338 + 1115 Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 60 Actual: 95.41 Expenditure:11389542.52 Release:0 Obligation:15648408.27 |
69.4 |
1246231245 | Construction (Completion) of Road, Pilpiloy, Pito, Bokod Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 60 Actual: 100 Expenditure:0 Release:0 Obligation:2936502.45 |
42.857142857143 |
1249706648 | Construction of Flood Mitigation Structure within Naguilian River Basin: along Naguilian River Section 2 (Bolo Creek), La Trinidad, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 100 Actual: 90.75 Expenditure:10742778.66 Release:0 Obligation:24987767.7 |
-16.821119375686 |
1249855012 | Construction of Flood Mitigation Structure within Agno River Basin: along Agno River Section 11 (Mambolo Bridge), Poblacion, Itogon, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 60 Actual: 55.63 Expenditure:13692380.01 Release:0 Obligation:24274995.33 |
-13.528571428571 |
1251003942 | Replacement of Stonehill Bridge, Barangay Balili, La Trinidad, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
1266168557 | Rehabilitation (Completion) of Balangbang-Labney-Keyte Langen, Tabaan Norte, Tuba, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
1267425030 | Bila Access Road leading to Abiang Hot Spring, Bokod, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
1271398111 | Benguet-Nueva Vizcaya Rd - K0310+500 - K0316+094 K0316+110 - K0319+726 Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 60 Actual: 15.81 Expenditure:11763733.4 Release:0 Obligation:72450809.32 |
-77.414285714286 |
1275196182 | Construction of Road, Sabdang Balukas Barangay Shilan, La Trinidad, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 60 Actual: 2.42 Expenditure:1516550.8 Release:0 Obligation:9991274.27 |
-96.542857142857 |
1294477328 | Construction (Completion) of Road leading to Spanish and Japanese Historical Site, Banangan, Sablan, Benguet Benguet | DPWH Benguet 1st DEO | (default) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
1297089324 | Construction (Completion) of Water Supply System at Shilan, La Trinidad, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 60 Actual: 3.21 Expenditure:0 Release:0 Obligation:2937584.36 |
-95.414285714286 |
1299342956 | Construction of Pathway from Sitio Baskey - Otso to Loacan Elementary School, Barangay Loacan, Itogon, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
1304482482 | Construction of Hanging Bridge Connecting Sitio Goldfield and Sitio Liang of Barangay Poblacion and Loacan, Itogon, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
1305253238 | Construction of Pet-Okan Naybaliw Creek Flood Control, Duacan, Kabayan, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
1310333223 | Construction of Hanging Bridge Connecting Sitio Picket and Sitio Naybaliw, Poblacion, Itogon, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 60 Actual: 0 Expenditure:0 Release:0 Obligation:2929656.6 |
-100 |
1318350612 | Construction of Pines Park to Lubas-Ambiong Road, La Trinidad, Benguet Benguet | DPWH Benguet 1st DEO | (default) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
1344578716 | Construction/Rehabilitation of Flood Mitigation Structure within Bued River Basin: along Bued River Main Stream (Canubas Section), Tuba, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 75 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
1344717996 | Construction (Completion) of Road at Dalabi, Twin Peaks, Tuba, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
1347772767 | Construction (Completion) of Kingking Water Supply System at Brgy. Gusaran, Kabayan, Benguet Benguet | DPWH Benguet 1st DEO | (default) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
1368386644 | Construction (Completion) of Road at Purok 2 and Purok 4, Banig Tawang towards Tawang-Lubas-Ambiong National Road, Tawang, La Trinidad, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
1373210467 | Beckes-Bulala Road in support to Coffee, Cacao, Bamboo, Cutflower, Tiger Grass, Fruit Trees, Heirloom Rice, Livestock, High Value vegetables and Services, Sablan, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
1395037823 | Bila Access Road leading to Abiang Hot Spring, Bokod, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 60 Actual: 95.15 Expenditure:6080832.54 Release:0 Obligation:9994645.42 |
100.35714285714 |
1399003291 | Construction of Water Supply System at Sabkil, Loacan, Itogon, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 60 Actual: 58.22 Expenditure:4605183.93 Release:0 Obligation:7979673.31 |
-16.828571428571 |
1400099874 | Rehabilitation (Completion) of Domestic Water System Assn., Central Bineng, La Trinidad, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
1409965252 | Construction (Completion) of Daclan Multi-Purpose Hall, Phase 1, Daclan, Bokod, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:2939280.44 |
0 |
1412025477 | Rehabilitation (Completion) of Domestic Water Supply at Banengbeng, Sablan, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 60 Actual: 0 Expenditure:0 Release:0 Obligation:2938428 |
-100 |
1427258694 | Camp 3 Torre-Antamok-Mangga-Belis-Piminggan-Ansagan Proper Road in support of Cacao and Coffee Industry, Tuba, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
1429180876 | Construction of Bektey- Ampasit Diversion Road, Barangay Puguis, La Trinidad, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 75 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
1438038872 | Construction of Flood Mitigation Structure within Agno River Basin: along Agno River Main Stream (Mangkew-Nabneng, LS), Kabayan, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:22502521.12 Release:0 Obligation:24947245.69 |
-4.9277326106594 |
1439981013 | Construction of Shekdan-Bemetao Road, Camp 4, Tuba, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 60 Actual: 90.66 Expenditure:1666893.09 Release:0 Obligation:9979287.24 |
29.514285714286 |
1440148664 | Rehabilitation (Completion) of Don-Oy Bridge, Anchukey, Kabayan, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
1449767547 | Construction of Flood Mitigation Structure within Aringay River Basin: along Aringay River Main Stream (Kagaling) and Section 10 (Hydro No. 2), Tuba, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 100 Actual: 96.37 Expenditure:8759026.27 Release:0 Obligation:12783558.95 |
-14.360929557008 |
1450008623 | Kaling Bridge-Lower Bashoy-Upper Babadak Road leading to Mt. Pulag, Kabayan, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
1452818233 | Rehabilitation of Water Supply System at Fatima, Ucab, Itogon, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 60 Actual: 8.31 Expenditure:40000 Release:0 Obligation:1997611.81 |
-88.128571428571 |
1455800869 | Construction of Water Supply System at Pakak, Pito, Bokod, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
1465264410 | Construction (Completion) of Magtilay-Absay Water Supply System at Taloy Norte, Tuba, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
1473262148 | Construction (Completion) of Payacpac Water Supply System at San Pascual, Tuba, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
1495134715 | Construction (Completion) of Road, Camangaan to Tikey, Bokod, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 60 Actual: 100 Expenditure:60000 Release:0 Obligation:2996773.05 |
42.857142857143 |
1507350015 | Itogon Br. (B02165LZ) along Baguio-Itogon Rd Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 60 Actual: 100 Expenditure:9017934.78 Release:0 Obligation:9997038.65 |
90.4 |
1507857366 | Construction of Road, Mongol - Bolok Road, Batan, Kabayan, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 60 Actual: 31.36 Expenditure:11816612.9 Release:0 Obligation:29994333.22 |
-55.2 |
1516865896 | Construction (Completion) of Bila Multi-Purpose Building, Binado, Bila, Bokod, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
1558558863 | Benguet-Nueva Vizcaya Rd - K0257 + 590 - K0257 + 600 Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
1562562385 | Construction of Slope Protection and Drainage Structure, Brgy Duacan, Kabayan, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
1565161328 | Construction of Flood Control Structure at Sitio Sokong, Kabayan, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
1578120745 | Construction (Completion) of Access Road from Upper Kesbeng (Berato-Rapuso Area to Lower Kesbeng Bugtong Area), Poblacion, La Trinidad, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 60 Actual: 1.8 Expenditure:60000 Release:0 Obligation:2995414.63 |
-97.428571428571 |
1588206817 | Kaling Bridge-Lower Bashoy-Upper Babadak Road leading to Mt. Pulag, Kabayan, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 60 Actual: 75.43 Expenditure:4731644.4 Release:0 Obligation:9983923 |
48.542857142857 |
1595937609 | Cawayan-Calew-Balococ-Cashet Road to San Manuel, Pangasinan in support to Coffee, Cacao, Bamboo, Banana, Livestock, Heirloom Rice, Gold, High Value Vegetables, Loom Weaving, Sewing, Dress Making, Honey, Food Processing and Services, Itogon, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 60 Actual: 63.13 Expenditure:6143379.04 Release:0 Obligation:9931303.2 |
-2.6571428571429 |
1601914281 | Construction of Flood Mitigation Structure within Naguilian River Basin: along Naguilian River Section 2 (Bolo Creek), La Trinidad, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 75 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
1615875709 | Rehabilitation (Completion) of Teytey-Tongshol Road, Bayabaas, Sablan, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
1626902708 | Baguio-Itogon Rd - K0254+(-651) - K0255+839 K0256+321 - K0257+146 Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
1646467727 | Construction (Completion) of Flood Control Structure at Gumatdang River (Near Abanes Residence), Itogon, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
1672975226 | Improvement of Road, Bagto, Samoyao, Alapang, La Trinidad, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 60 Actual: 11.72 Expenditure:58085.83 Release:0 Obligation:2993925.45 |
-83.257142857143 |
1680932883 | Construction (Completion) of Water Supply System in Baley ni Angdap-Apunan-Abucot Elementary School and High School, Eddet, Kabayan, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
1691316101 | Rehabilitation (Completion) of Water Supply System at Bayabas, Sablan, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 60 Actual: 44.47 Expenditure:499499.32 Release:0 Obligation:2989995.46 |
-36.471428571429 |
1691850593 | Construction (Completion) of Additional Potable Water System of Alno Rural Community Development Cooperative (Arcdc), Alno, La Trinidad, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
1705932152 | Construction of Road at Barangay Balili, La Trinidad, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
1713684382 | Construction of Water Supply System at Pakak, Pito, Bokod, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 60 Actual: 72.65 Expenditure:329441.12 Release:0 Obligation:1996274.12 |
3.7857142857143 |
1716954848 | Shilan-Beckel Rd -K0261 + 892 - K0262 + 890, K0264 + 908 - K0265 + 943 Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 50 Actual: 62.42 Expenditure:38950915.97 Release:0 Obligation:63540368.91 |
-2.52 |
1739417172 | Benguet-Nueva Vizcaya Rd - K0310+500 - K0316+094 K0316+110 - K0319+726 Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
1750549404 | Tawang-Ambiong Rd - K0260+(-193), K0260+018, K0260+250, K0260+497, K0260+518, K0260+918, K0261+042, K0261+409, K0261+958, K0262+710, K0262+900, , K0263+090K0264+250, K0264+620 Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 60 Actual: 84.4 Expenditure:10516924.68 Release:0 Obligation:19900067.7 |
30.9 |
1753026042 | Itogon-Dalupirip-Sn Manuel Bdry Rd - K0270 + 225 - K0270 + 238 K0272 + 112 - K0272 + 128 K0275 + 199 - K0275 + 228 Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
1755164402 | Construction of Flood Mitigation Structure within Agno River Basin: along Agno River Section 11b (Batuang), Virac, Itogon, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 75 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
1763566025 | Construction of Poblacion Flood Control, Bokod, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
1766735735 | Construction of Road, Sabdang Balukas Barangay Shilan, La Trinidad, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
1774225412 | Construction of Water Supply System at Upper Kesbeng, Poblacion, La Trinidad, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
1783886502 | Baguio-Bontoc Road Jct. to Guiweng-Nawal-Tickey-Daclan Road in support of Coffee, and Processed Food Meat Industries, Bokod, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
1799610699 | Construction of Hanging Bridge Connecting Sitio Goldfield and Sitio Liang of Barangay Poblacion and Loacan, Itogon, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 60 Actual: 0 Expenditure:80000 Release:0 Obligation:3992745.91 |
-100 |
1831943326 | Poblacion-Karao-Ekip Access Road leading to Mount Purgatory, Bokod, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 60 Actual: 94.08 Expenditure:5122201.2 Release:0 Obligation:9994474.62 |
101.55714285714 |
1834995658 | Construction of Water Supply System at Barangay Dalupirip, Itogon, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
1847810374 | Construction (Completion) of Water Supply System with Intake Tank at Amakgang, Pito, Bokod, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
1856818169 | Construction (Completion) of Road leading to Spanish and Japanese Historical Site, Banangan, Sablan, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 60 Actual: 67.89 Expenditure:500833.95 Release:0 Obligation:2998893 |
-3.0142857142857 |
1893234042 | Camp 4 Br. 4 (B02179LZ) along Kennon Rd Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 60 Actual: 100 Expenditure:3939605.44 Release:0 Obligation:4367339.38 |
141.05714285714 |
1908399973 | Construction (Completion) of Road at Bangao Elementary School, Barangay Ambuklao, Bokod, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 60 Actual: 0 Expenditure:0 Release:0 Obligation:2934593.4 |
-100 |
1913159718 | Improvement of Toybongan-Talnag Road, Tabaan Norte, Tuba, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 60 Actual: 80.67 Expenditure:1666950.92 Release:0 Obligation:9979672.81 |
15.242857142857 |
1921683499 | Guisset-Binga-Baloy-Tinongdan Road leading to Binga Dam and Mt. Ugo, Site for the International Sky Running Event, Itogon, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
1930881577 | Rehabilitation (Completion) of Taroy Ligay Road, Camp 1, Tuba, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
1947061493 | Construction (Completion) of Slope Protection Wall Along Sitio Anuvang Tourism Road, Tinongdan, Itogon, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
1956645846 | Kennon Rd - K0226 + 700 - K0226 + 760 Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 60 Actual: 0 Expenditure:0 Release:0 Obligation:1901200 |
-100 |
1957198968 | Construction (Completion) of Road, Pilpiloy, Pito, Bokod Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
1979946744 | Construction (Completion) of Bowing To Bengkagan-Divang Water Supply System, Baluay, Sablan, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
2004217628 | Construction of Sitios Ambacuag, Ampeta and Paswek Domestic Water Supply, Banangan, Sablan, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
2004470178 | Construction/Rehabilitation of Flood Mitigation Structure within Bued River Basin: along Bued River Main Stream (Canubas Section), Tuba, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:11651289.75 Release:0 Obligation:11651289.75 |
0 |
2013460376 | Beckes-Bulala Road in support to Coffee, Cacao, Bamboo, Cutflower, Tiger Grass, Fruit Trees, Heirloom Rice, Livestock, High Value vegetables and Services, Sablan, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 60 Actual: 100 Expenditure:8820000 Release:0 Obligation:10000000 |
146.24285714286 |
2019440868 | Rehabilitation (Completion) of Water Supply System at Bayabas, Sablan, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
2055916553 | Construction of Bridge at Baloy, Tinongdan, Itogon, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
2059707862 | Construction (Completion) of Road, Sitio Lab-Ang to Sitio Bitnong, Barangay Ampucao, Itogon, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 60 Actual: 100 Expenditure:2068392.43 Release:0 Obligation:2911676.24 |
42.857142857143 |
2065718931 | Rehabilitation of The Ambugao Waterwork System at Ambiong, La Trinidad, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 60 Actual: 100 Expenditure:1802753.81 Release:0 Obligation:1998615.35 |
42.857142857143 |
2070887255 | Construction of Road, Mongol - Bolok Road, Batan, Kabayan, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
2071698843 | Baguio-Itogon Rd - K0259+050 - K0259+150 K0259+204 - K0259+480 K0259+534 - K0260+690 K0260+735 - K0261+000 Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
2085283696 | Construction of Flood Mitigation Structure within Agno River Basin: along Agno River Section 20 (Ekip), Bokod, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 60 Actual: 86.18 Expenditure:16167320.16 Release:0 Obligation:24250055.99 |
49 |
2091915232 | Construction (Completion) of Water Supply System in Baley ni Angdap-Apunan-Abucot Elementary School and High School, Eddet, Kabayan, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 60 Actual: 5.88 Expenditure:40000 Release:0 Obligation:1979298.8 |
-91.6 |
2092411353 | Construction (Completion) of Road near Marzo Residence to Paltingan Area at Zone 3, Betag, La Trinidad, Benguet Benguet | DPWH Benguet 1st DEO | (default) |
Target: 60 Actual: 0 Expenditure:0 Release:0 Obligation:2934857.72 |
-100 |
2098275664 | Construction of Flood Mitigation Structure within Aringay River Basin: along Aringay River Main Stream (Coplo and Nangalisan Proper), Tuba, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 75 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
2102077681 | Construction (Completion) of Multi-Purpose Building (Barangay Hall) at Upper Loacan, Itogon, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
2111970822 | Construction (Completion) of Road from Baliti to Pes-Igan, Pacso, Kabayan, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 60 Actual: 93.43 Expenditure:60000 Release:0 Obligation:2993419.28 |
33.471428571429 |
2120476409 | Construction of Slope Protection at Yabyabuan Multi-Grade School, Barangay Bagong, Sablan, Benguet Benguet | DPWH Benguet 1st DEO | (Cumulative) |
Target: 0 Actual: 2.7 Expenditure:229765.92 Release:0 Obligation:14972143.7 |
0 |
6562347 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities, Construction of Supiil-Bacooc Road (Phase II), Sta. 0+000 - Sta. 2+500, Langilang and San Juan, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 73.67 Actual: 80.2 Expenditure:33582654.67 Release:49000000 Obligation:46524724.44 |
8.8638523143749 |
19805035 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Basic Infrastructure Program (BIP), Flood Mitigation Structures protecting Public Infrastructures/ Facilities, Construction of Pulot Flood Control Structure (Phase 2), Barangay Pulot, Lagayan, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 100 Actual: 95.64 Expenditure:0 Release:49500000 Obligation:46550000 |
-42.220119133775 |
38802866 | ORGANIZATIONAL OUTCOME 2 : Protect Lives and Properties Against Major Floods, Flood Management Program, Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems, Construction of Malabbaga Flood Control Structure (Phase III), Sta. 6 + 820 - Sta. 7 + 820, La Paz, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:96500000 Obligation:0 |
0 |
39516808 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Construction/ Improvement of Access Roads leading to Trades, Industries and Economic Zones (Roads Leveraging Linkages for Industry and Trade Infrastructure Program - ROLL-IT), Lamunan-Ableg Road in support of Coffee, Fruit, and Homestyles Industry, Daguioman, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 100 Actual: 96.54 Expenditure:0 Release:2940000 Obligation:2794728.44 |
-3.46 |
50446904 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities, Construction of Dolores-Cardona Bridge and Approaches, Dolores, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 10.59 Actual: 12.04 Expenditure:0 Release:94570000 Obligation:89814351.06 |
13.692162417375 |
62175394 | ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System, Asset Preservation Program, Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads,Abra-Ilocos Norte Rd - K0449 + 550 - K0449 + 700 Abra | DPWH Abra DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:93600760.35 Obligation:93600760.35 |
0 |
68201825 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Flood Mitigation Structures protecting Public Infrastructures/ Facilities, Construction of Bañacao Flood Control, Bangued, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
77587264 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities, Rehabilitation of Sta Rosa I Layugan Road, Sta Rosa & Layugan, Peñarrubia & Bucay, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 19.48 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
91575487 | ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System, Asset Preservation Program, Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads, Abra-Kalinga Rd - K0437 + 665 - K0437 + 720 Abra | DPWH Abra DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:31941355.68 Release:49000000 Obligation:46877604.4 |
2.62492474413 |
97691634 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Basic Infrastructure Program (BIP), Multi-Purpose Buildings/ Facilities to support Social Services, Construction of Multi-Purpose Building, Barangay Labon, Bucay, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 40.17 Actual: 38.92 Expenditure:0 Release:4950000 Obligation:4678057.03 |
-3.1117749564352 |
106584541 | ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System, Asset Preservation Program, Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads,Abra-Ilocos Norte Rd - K0422 + 900 - K0429 + 000 Abra | DPWH Abra DEO | (Cumulative) |
Target: 69.86 Actual: 86.59 Expenditure:0 Release:49000000 Obligation:47040591.18 |
23.947895791583 |
117743880 | ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System, Asset Preservation Program, Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads, Abra-Kalinga Rd - K0441 + 260 - K0441 + 380 Abra | DPWH Abra DEO | (Cumulative) |
Target: 47.33 Actual: 86.21 Expenditure:70973465.31 Release:96500000 Obligation:91680543.11 |
65.27990797546 |
118443465 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Multi-Purpose Buildings/ Facilities to support Social Services, Construction of Multi-Purpose Building, Government Center, Barangay Labon, Bucay, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 10.98 Actual: 8.66 Expenditure:0 Release:29400000 Obligation:28087275.23 |
-21.129326047359 |
131012453 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities, Construction of Abang - Tabiog Bridge, Abang & Tabiog, Bucay, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 15.54 Actual: 12.04 Expenditure:0 Release:49000000 Obligation:46522810.79 |
-22.522522522523 |
138508798 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Multi-Purpose Buildings/ Facilities to support Social Services, Construction of University of Abra, Security Facilities/Perimeter Fence, Lagangilang Campus, Lagangilang Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 13.98 Actual: 15 Expenditure:0 Release:49000000 Obligation:47374148.02 |
7.2961373390558 |
139018451 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities, Construction of Apao - Lan - ag Road, Tineg/Lacub, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 25.5 Actual: 69.72 Expenditure:0 Release:49000000 Obligation:46474245.05 |
173.41176470588 |
148521400 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities, Construction of Dolores Bridge, Cardona & Poblacion, Dolores, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 10.98 Actual: 82.77 Expenditure:68325644.5 Release:96500000 Obligation:91722954.91 |
653.82513661202 |
152785089 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Interjurisdictional Roads and/or Bridges (or roads that traverse multiple LGU jurisdictions), Construction of Road, Sidongan - Damolog Road, Barangay Liguis and Caupasan, La Paz and Danglas, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 26.88 Actual: 26.93 Expenditure:18000734.52 Release:96500000 Obligation:91689260.07 |
0.18601190476191 |
153644945 | ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System, Asset Preservation Program, Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads, Abra-Kalinga Rd - K0450 + 700 - K0450 + 810 Abra | DPWH Abra DEO | (Cumulative) |
Target: 32.03 Actual: 31 Expenditure:0 Release:96500000 Obligation:91701199.59 |
-4.4389642416769 |
170734417 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Flood Mitigation Structures protecting Public Infrastructures/ Facilities, Construction of Flood Control Structure along Poblacion, Sta. 11 + 100 - Sta. 11 + 600, Lagayan, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:49000000 Obligation:0 |
0 |
171106220 | ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System, Asset Preservation Program, Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads, Abra-Kalinga Rd - K0454 + 700 - K0454 + 820 Abra | DPWH Abra DEO | (Cumulative) |
Target: 32.03 Actual: 100 Expenditure:0 Release:96500000 Obligation:91679957.33 |
208.26140567201 |
178123405 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities, Construction of Road, Barangay Bañacao, Bangued, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 48.12 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
180824068 | ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System, Asset Preservation Program, Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads, Abra-Kalinga Rd - K0440 + 400 - K0440 + 510 Abra | DPWH Abra DEO | (Cumulative) |
Target: 47.33 Actual: 86.44 Expenditure:71716802.75 Release:96500000 Obligation:92186108.26 |
65.720858895706 |
184867691 | ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System, Asset Preservation Program, Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads, Abra-Ilocos Norte Rd - K0446 + 837 - K0446 + 920 Abra | DPWH Abra DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:96500000 Obligation:93558640.21 |
0 |
185077110 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Basic Infrastructure Program (BIP), Multi-Purpose Buildings/ Facilities to support Social Services, Construction (Completion) of Multi-Purpose Building, Barangay Pagala, Bucay, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 99.33 Actual: 95.36 Expenditure:0 Release:2970000 Obligation:2792484.27 |
-8.5626618084188 |
196348228 | ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System, Asset Preservation Program, Preventive Maintenance - Tertiary Roads,Abra-Ilocos Norte Rd - K0442 + 000 - K0451 + 000 Abra | DPWH Abra DEO | (Cumulative) |
Target: 14.42 Actual: 27.54 Expenditure:0 Release:96500000 Obligation:92608382.37 |
90.984743411928 |
204032816 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Flood Mitigation Structures protecting Public Infrastructures/ Facilities, Construction of Caribot Flood Control Structure, Barangay Mudeng, La Paz, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:49000000 Obligation:0 |
0 |
207226241 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Basic Infrastructure Program (BIP), Flood Mitigation Structures protecting Public Infrastructures/ Facilities, Construction of Mudeng Flood Control Structure (Phase 3), Barangay Mudeng, La Paz, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 39.71 Actual: 36.91 Expenditure:0 Release:49500000 Obligation:46680508.36 |
-8.0009970089731 |
207557880 | ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System, Asset Preservation Program, Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads, Abra-Kalinga Rd - K0446 + 400 - K0446 + 590 Abra | DPWH Abra DEO | (Cumulative) |
Target: 47.33 Actual: 85.4 Expenditure:70513140.87 Release:96500000 Obligation:91737752.31 |
63.726993865031 |
214761860 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Construction/ Improvement of Access Roads leading to Trades, Industries and Economic Zones (Roads Leveraging Linkages for Industry and Trade Infrastructure Program - ROLL-IT), Sto. Tomas-Luba Road Connecting Sto. Tomas Manabo to Luba in support to the Processed Food, Loomweaving and Furniture Industries, Luba and Manabo, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:0 Release:0 Obligation:0 |
-10.458452722063 |
227669047 | ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System, Asset Preservation Program, Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads, Abra-Ilocos Norte Rd - K0443 + 750 - K0443 + 850 Abra | DPWH Abra DEO | (Cumulative) |
Target: 83.3 Actual: 100 Expenditure:86847793.5 Release:96500000 Obligation:96497548.33 |
47.346834145091 |
228889115 | ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System, Asset Preservation Program, Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads, Abra-Kalinga Rd - K0443 + 450 - K0443 + 600 Abra | DPWH Abra DEO | (Cumulative) |
Target: 47.33 Actual: 86.04 Expenditure:70250445.21 Release:96500000 Obligation:91677145.23 |
64.953987730061 |
231706045 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Interjurisdictional Roads and/or Bridges (or roads that traverse multiple LGU jurisdictions), Construction of Supiil-Namit-ingan Road, San Juan and Dolores, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 40.63 Actual: 40.71 Expenditure:0 Release:49000000 Obligation:47003805.51 |
0.19689884321929 |
238913753 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239, Preventive Maintenance (Asphalt Overlay) along Abra-Kalinga Rd - K0474 + 100 - K0474 + 397, K0474 + 421 - K0475 + 703, K0477 + 187 - K0477 + 752 Abra | DPWH Abra DEO | (Cumulative) |
Target: 70.58 Actual: 67.44 Expenditure:0 Release:29400000 Obligation:28223389.33 |
-4.4488523661094 |
243871822 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239, Preventive Maintenance (Asphalt Overlay) along Abra-Kalinga Rd - K0422 + 500 - K0426 + 356 Abra | DPWH Abra DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:34300000 Obligation:32923229.72 |
0 |
247966586 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Multi-Purpose Buildings/ Facilities to support Social Services, Construction (Completion) of Convention Center, La Paz, Abra Abra | DPWH Abra DEO | (default) |
Target: 3.81 Actual: 2 Expenditure:0 Release:96500000 Obligation:91604397.4 |
-47.50656167979 |
253908832 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Basic Infrastructure Program (BIP), Multi-Purpose Buildings/ Facilities to support Social Services, Construction (Completion) of Multi-Purpose Building, Barangay Zone 6, Bangued, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 73.67 Actual: 80.57 Expenditure:1494230.94 Release:2970000 Obligation:2827680.87 |
7.6563335114912 |
265654475 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities, Construction of Mabaka Road, Malibcong, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 26.05 Actual: 30.02 Expenditure:14935808.27 Release:49000000 Obligation:47517261.95 |
15.239923224568 |
277598748 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities, Rehabilitation of San Gregorio - Bulbulala Road, La Paz, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 39.55 Actual: 37.46 Expenditure:0 Release:49000000 Obligation:47539865.32 |
-5.2844500632111 |
281082904 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Construction/ Improvement of Access Roads leading to Trades, Industries and Economic Zones (Roads Leveraging Linkages for Industry and Trade Infrastructure Program - ROLL-IT), Abra-Cervantes Road-Palaquio Road in support of Cacao Industry, Bucay, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:2799811.11 Release:2940000 Obligation:2799811.11 |
-33.619816231702 |
285743739 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities, Rehabilitation of Quirsodan-Baquero Road, Baay-Licuan, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 21.64 Actual: 18.59 Expenditure:0 Release:96500000 Obligation:93592911.48 |
-14.09426987061 |
295112342 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Basic Infrastructure Program (BIP), Flood Mitigation Structures protecting Public Infrastructures/ Facilities, Construction of Cardona - Isit Flood Control, Barangay Cardona, Dolores, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 100 Actual: 95.81 Expenditure:0 Release:49500000 Obligation:46544559.78 |
-45.881443298969 |
302139166 | ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System, Asset Preservation Program, Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads, Abra-Kalinga Rd - K0448 + 000 - K0448 + 100 Abra | DPWH Abra DEO | (Cumulative) |
Target: 34.25 Actual: 100 Expenditure:0 Release:96500000 Obligation:91737926.5 |
185.55111364934 |
310441706 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Basic Infrastructure Program (BIP), Flood Mitigation Structures protecting Public Infrastructures/ Facilities, Construction of Gucab Flood Control, Barangay Poblacion, La Paz, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 99.36 Actual: 96.36 Expenditure:29201998.72 Release:49500000 Obligation:46352378.91 |
-34.126333059885 |
319927180 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities, Construction of Liguis-Bucao-Golon Road, Barangay Liguis, La Paz, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 26.05 Actual: 24.08 Expenditure:20670174.6 Release:96500000 Obligation:91633013.87 |
-7.5623800383877 |
320289096 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Basic Infrastructure Program (BIP), Flood Mitigation Structures protecting Public Infrastructures/ Facilities, Construction of Sabangan Flood Control, Buli, La Paz, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 96.37 Actual: 92.54 Expenditure:26320245.39 Release:49500000 Obligation:46561171.68 |
-35.785164110749 |
320398332 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Basic Infrastructure Program (BIP), Multi-Purpose Buildings/ Facilities to support Social Services, Construction (Completion) of Multi-Purpose Building, Barangay Lap-lapog, Villaviciosa, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 39.09 Actual: 36.87 Expenditure:0 Release:3960000 Obligation:3801832.77 |
-9.4103194103194 |
323578964 | ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System, Asset Preservation Program, Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads, Abra-Kalinga Rd - K0447 + 200 - K0447 + 350 Abra | DPWH Abra DEO | (Cumulative) |
Target: 26.19 Actual: 100 Expenditure:0 Release:96500000 Obligation:91677145.23 |
270.91988130564 |
343646169 | "Asset Preservation - Preventive Maintenance - Tertiary Road, Abra-Cervantes Rd - K0433 + 042 - K0438 + 182" Abra | DPWH Abra DEO | (Cumulative) |
Target: 100 Actual: 84 Expenditure:47763246 Release:50000000 Obligation:47763246 |
-31.807297374082 |
351150060 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Multi-Purpose Buildings/ Facilities to support Social Services, Construction of Multi-Purpose Building, Government Center, Barangay Poblacion, La Paz, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 13.66 Actual: 14.03 Expenditure:0 Release:49000000 Obligation:46636248.08 |
2.7086383601757 |
352081488 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Basic Infrastructure Program (BIP), Flood Mitigation Structures protecting Public Infrastructures/ Facilities, Construction of Dalimag Flood Control, Barangay Dalimag, San Isidro, Abra Abra | DPWH Abra DEO | (default) |
Target: 100 Actual: 100 Expenditure:44547300 Release:49500000 Obligation:49497000 |
0 |
357281831 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Basic Infrastructure Program (BIP), Multi-Purpose Buildings/ Facilities to support Social Services, Construction (Completion) of Multi-Purpose Building, Barangay Macray, Bangued, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 100 Actual: 95.67 Expenditure:0 Release:2970000 Obligation:2821800.66 |
-6.9810403500243 |
370906324 | ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System, Asset Preservation Program, Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads, Abra-Ilocos Norte Rd - K0445 + 250 - K0445 + 350 Abra | DPWH Abra DEO | (Cumulative) |
Target: 99.43 Actual: 100 Expenditure:40914206.64 Release:57900000 Obligation:56589644.63 |
13.529372980814 |
377807245 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities, Construction of Bucao-Tagayon Road, Danglas Section, Danglas, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 3.06 Actual: 10 Expenditure:0 Release:96500000 Obligation:91633013.83 |
226.79738562092 |
379730019 | ORGANIZATIONAL OUTCOME 2 : Protect Lives and Properties Against Major Floods, Flood Management Program, Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers, Construction of Flood Control Structure along Abra River, Sta. 0+000 - Sta. 0+500, Patoc, Bucay, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 100 Actual: 97.91 Expenditure:0 Release:30178120 Obligation:28669031.91 |
-44.952841596131 |
387097631 | ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System, Asset Preservation Program, Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads, Abra-Kalinga Rd - K0439 + 500 - K0439 + 560 Abra | DPWH Abra DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:31058689.12 Release:49000000 Obligation:47044578.68 |
2.7453341360626 |
388262317 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Basic Infrastructure Program (BIP), Flood Mitigation Structures protecting Public Infrastructures/ Facilities, Construction of Abang Flood Control Structure (Phase 2), Barangay Abang, Bucay, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 57.98 Actual: 80.11 Expenditure:33736209.98 Release:49500000 Obligation:47030190.02 |
34.345128291129 |
395070145 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Basic Infrastructure Program (BIP), Flood Mitigation Structures protecting Public Infrastructures/ Facilities, Construction of Poblacion Flood Control Structure (Phase 2), Barangay Poblacion, La Paz, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 0 Actual: 87.51 Expenditure:0 Release:49500000 Obligation:46550846.02 |
0 |
406459296 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Basic Infrastructure Program (BIP), Multi-Purpose Buildings/ Facilities to support Social Services, Rehabilitation/ Construction of Municipal Hall Building, La Paz, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 9.37 Actual: 7.09 Expenditure:0 Release:49500000 Obligation:46565848.02 |
-24.332977588047 |
407996949 | ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System, Asset Preservation Program, Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads, Abra-Ilocos Norte Rd - K0423 + 360 - K0423 + 500 Abra | DPWH Abra DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:57900000 Obligation:56164023.05 |
0 |
419138808 | ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System, Asset Preservation Program, Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads, Abra-Kalinga Rd - K0455 + 280 - K0455 + 400 Abra | DPWH Abra DEO | (Cumulative) |
Target: 32.03 Actual: 85.07 Expenditure:0 Release:96500000 Obligation:92080379.6 |
162.23797780518 |
420452156 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Basic Infrastructure Program (BIP), Multi-Purpose Buildings/ Facilities to support Social Services, Construction (Completion) of Multi- Purpose Building, Danac Elementary School, Barangays Danac West and Danac East, Boliney, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 94.04 Actual: 90.14 Expenditure:0 Release:2970000 Obligation:2828464.66 |
-16.637380930362 |
420621128 | ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System, Network Development Program, Construction of Missing Links/ New Roads, Abra - Cervantes Road, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 0 Actual: 96.24 Expenditure:6056204.39 Release:19600000 Obligation:18682967.05 |
0 |
432882998 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities, Rehabilitation of Talogtog-Libtec-Cayapa Road, Dolores/Lagangilang, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 44.05 Actual: 80.26 Expenditure:0 Release:95535000 Obligation:90725341.43 |
82.202043132804 |
435501928 | "Asset Preservation - Preventive Maintenance - Tertiary Road, Abra-Cervantes Rd - K0446+000 - K0450+114" Abra | DPWH Abra DEO | (Cumulative) |
Target: 100 Actual: 43.1 Expenditure:47762113 Release:50000000 Obligation:47762113 |
-64.686066804659 |
439574293 | ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System, Asset Preservation Program, Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads, Abra-Kalinga Rd - K0442 + 000 - K0442 + 100 Abra | DPWH Abra DEO | (Cumulative) |
Target: 47.33 Actual: 85.37 Expenditure:0 Release:96500000 Obligation:92185932.11 |
63.669478527607 |
440557828 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Basic Infrastructure Program (BIP), Flood Mitigation Structures protecting Public Infrastructures/ Facilities, Construction of Deet Flood Control Structure (Phase 2), Barangay Deet, Tayum, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:49498544 Release:49500000 Obligation:49498544 |
4.1971247563353 |
442972939 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Flood Mitigation Structures protecting Public Infrastructures/ Facilities, Construction of Patoc Flood Control Structure, Bucay, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 92.47 Actual: 80 Expenditure:49842055.22 Release:96500000 Obligation:91674674.94 |
-37.50190287715 |
452811296 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Flood Mitigation Structures protecting Public Infrastructures/ Facilities, Construction of Flood Control Structure, Canan-Poblacion, Barangay Canan and Poblacion, La Paz, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 44.98 Actual: 70.16 Expenditure:0 Release:0 Obligation:0 |
41.622930964877 |
455855019 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities, Rehabilitation of Pidigan Road, Pidigan, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 69.86 Actual: 66.41 Expenditure:0 Release:49000000 Obligation:47035015.38 |
-4.9384483252219 |
490996012 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities, Construction of Salnec-Madalipay-Dugong Bridge, Salnec & Dugong, Bucay, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 10.59 Actual: 10.88 Expenditure:0 Release:96500000 Obligation:91711189.93 |
2.738432483475 |
492921395 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Basic Infrastructure Program (BIP), Multi-Purpose Buildings/ Facilities to support Social Services, Construction (Completion) of Multi-Purpose Building, Barangay Mudeng, La Paz, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 7.04 Actual: 86.31 Expenditure:0 Release:2970000 Obligation:2816785.35 |
1125.9943181818 |
495200955 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities, Construction of Abang Bridge Phase 2, Abang, Bucay, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 26.33 Actual: 24.11 Expenditure:0 Release:29400000 Obligation:27907480.65 |
-8.4314470186099 |
501610822 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities, Construction of Malanas Bridge Phase 3, Badas & Poblacion, San Juan, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 10.3 Actual: 7 Expenditure:0 Release:96500000 Obligation:91642834.95 |
-32.038834951456 |
506111460 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities, Construction of Buli Bridge, Buli, La Paz, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 16 Actual: 14.55 Expenditure:0 Release:49000000 Obligation:46524041.79 |
-9.0625 |
512158579 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities, Construction of Karkariskis - Ganao Bridge and Approaches, La Paz, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 15.54 Actual: 13.66 Expenditure:0 Release:49000000 Obligation:46609698.52 |
-12.097812097812 |
518088059 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities, Construction of Malanas Bridge, Badas & Poblacion, San Juan, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 0 Actual: 84 Expenditure:69119024.94 Release:96500000 Obligation:91626359.42 |
0 |
518099470 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Basic Infrastructure Program (BIP), Flood Mitigation Structures protecting Public Infrastructures/ Facilities, Construction of Salip Flood Control, Barangay Poblacion, La Paz, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 100 Actual: 96.45 Expenditure:29647837.55 Release:49500000 Obligation:47056175.7 |
-39.282341831917 |
522765694 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Basic Infrastructure Program (BIP), Multi-Purpose Buildings/ Facilities to support Social Services, Construction (Completion) of Multi-Purpose Building, Barangay Malapaao, Langiden, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:2175237.58 Release:2970000 Obligation:2794359.42 |
-5.6247640619101 |
528157322 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Flood Mitigation Structures protecting Public Infrastructures/ Facilities, Construction of Flood Control Structure at Barangay Poblacion, Baay-Licuan, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 52.04 Actual: 65.69 Expenditure:0 Release:49000000 Obligation:46548594.7 |
26.229823212913 |
528652289 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Flood Mitigation Structures protecting Public Infrastructures/ Facilities, Construction of Poblacion East Flood Control, Pidigan, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:49000000 Obligation:0 |
0 |
531759905 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Construction/ Improvement of Access Roads leading to Trades, Industries and Economic Zones (Roads Leveraging Linkages for Industry and Trade Infrastructure Program - ROLL-IT), Poblacion Tubo to Quirino Road Connecting Poblacion, Tubo to Qurino, Ilocos Sur in support to the Loomweaving Industry, Tubo, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 100 Actual: 97.08 Expenditure:0 Release:0 Obligation:0 |
-4.5333857803127 |
546795454 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Flood Mitigation Structures protecting Public Infrastructures/ Facilities, Construction of Flood Control Structure, Coribot, Barangay Mudeng, La Paz, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
555243440 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Construction/ Improvement of Access Roads leading to Declared Tourism Destinations (Tourism Road Infrastructure Program - TRIP), Quirsodan-Baquero Road leading to Panaclisan River and Rock Formation, Licuan-Baay, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 100 Actual: 96.52 Expenditure:2790032.6 Release:2940000 Obligation:2790032.6 |
-35.653333333333 |
557048491 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities, Construction of Dolores Bridge Phase 3, Cardona & Poblacion, Dolores, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 10.98 Actual: 8.94 Expenditure:0 Release:96500000 Obligation:91651212.88 |
-18.579234972678 |
564501181 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Interjurisdictional Roads and/or Bridges (or roads that traverse multiple LGU jurisdictions), Construction of Road, Bug-bog - Sta. Rosa Road, Barangay Bugbog and Sta. Rosa, Bucay and Peñarrubia, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 22.55 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
568167691 | ORGANIZATIONAL OUTCOME 2 : Protect Lives and Properties Against Major Floods, Flood Management Program, Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers, Construction of Buli Flood Mitigation Facilities along Major River Basin (Phase III), Sta. 5 + 400 - Sta. 5 + 700, La Paz, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 0 Actual: 51.22 Expenditure:0 Release:49000000 Obligation:46552014.35 |
0 |
569489182 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Flood Mitigation Structures protecting Public Infrastructures/ Facilities, Construction of Flood Control Structure, Barangay Banbancag, Bucay, Abra Abra | DPWH Abra DEO | (default) |
Target: 0 Actual: 0 Expenditure:0 Release:29400000 Obligation:0 |
0 |
571306757 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities, Construction of Pagala-Dardaraoas Road, Barangay Pagala, Bucay, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 24.55 Actual: 20.55 Expenditure:0 Release:96500000 Obligation:92594453.11 |
-16.293279022403 |
572056513 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Access Roads and/or Bridges from the National Roads connecting to Indigenous People (IP) Communities, Rehabilitation of Lamunan-Ableg Road (Phase II), Daguiomon, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 3.45 Actual: 5 Expenditure:0 Release:29400000 Obligation:27921483.41 |
44.927536231884 |
574553224 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Flood Mitigation Structures protecting Public Infrastructures/ Facilities, Construction of Flood Control Structure, Barangay Isit, Dolores, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:96500000 Obligation:0 |
0 |
619767459 | ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System, Asset Preservation Program, Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads, Abra-Ilocos Norte Rd - K0449 + 900 - K0450 + 000 Abra | DPWH Abra DEO | (Cumulative) |
Target: 99.98 Actual: 100 Expenditure:33909452.14 Release:49000000 Obligation:47044358.17 |
6.3652848121053 |
620010405 | ORGANIZATIONAL OUTCOME 2 : Protect Lives and Properties Against Major Floods, Flood Management Program, Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers, Rechanneling of Baay River, Lagangilang Section, Lagangilang, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 0 Actual: 18.56 Expenditure:0 Release:96500000 Obligation:92188509.08 |
0 |
621662729 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Construction/ Improvement of Access Roads leading to Trades, Industries and Economic Zones (Roads Leveraging Linkages for Industry and Trade Infrastructure Program - ROLL-IT), Nagpaoyan-Mapisla Road in support of Coffee Industry, Licuan-Baay, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 100 Actual: 97.12 Expenditure:2064022.6 Release:3430000 Obligation:3258628.27 |
-35.253333333333 |
635502038 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Basic Infrastructure Program (BIP), Multi-Purpose Buildings/ Facilities to support Social Services, Construction (Completion) of Multi-Purpose Building (Public Attorney's Office Building), Lagangilang, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 73.67 Actual: 71.07 Expenditure:0 Release:2970000 Obligation:2793521.72 |
-5.0374131480492 |
635800562 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Basic Infrastructure Program (BIP), Multi-Purpose Buildings/ Facilities to support Social Services, Construction (Completion) of Multi-Purpose Building, Barangay Poblacion, Lacub, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 73.67 Actual: 70.15 Expenditure:0 Release:2970000 Obligation:2791617.15 |
-6.2667022982362 |
637223315 | ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System, Asset Preservation Program, Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads, Abra-Kalinga Rd - K0442 + 700 - K0442 + 850 Abra | DPWH Abra DEO | (Cumulative) |
Target: 47.33 Actual: 85.95 Expenditure:72336152.04 Release:96500000 Obligation:93513702.34 |
64.781441717791 |
640319835 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Basic Infrastructure Program (BIP), Multi-Purpose Buildings/ Facilities to support Social Services, Construction (Completion) of Multi-Purpose Building, Barangay Malabbaga, La Paz, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 97.41 Actual: 95.26 Expenditure:0 Release:2970000 Obligation:2793826.04 |
-15.661797255423 |
640339837 | ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System, Asset Preservation Program, Preventive Maintenance - Tertiary Roads, Abra-Cervantes Rd - K0450 + 114 - K0456 + (-004.84) Abra | DPWH Abra DEO | (Cumulative) |
Target: 36.5 Actual: 34.15 Expenditure:0 Release:77200000 Obligation:74103313.77 |
-6.4383561643836 |
657460142 | "Preventive Maintenance along Abra-Ilocos Sur Rd - K0387 + (-957) - K0400 + 210" Abra | DPWH Abra DEO | (Cumulative) |
Target: 44.98 Actual: 42.23 Expenditure:0 Release:144750000 Obligation:138884728.1 |
-6.1138283681636 |
662145110 | "Asset Preservation - Preventive Maintenance - Tertiary Road, Abra-Cervantes Rd - K0453 + 769 - K0459 + 000, K0462 + 260 - K0463 + 000, K0475 + 703 - K477 + 500" Abra | DPWH Abra DEO | (Cumulative) |
Target: 100 Actual: 42.9 Expenditure:48011837 Release:50000000 Obligation:48011837 |
-65.177158163887 |
676516103 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities, Rehabilitation of Junction National Road - Dolores - San Juan Provincial Road, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 30 Actual: 28.56 Expenditure:0 Release:49000000 Obligation:46544722.93 |
-4.8 |
692215538 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities, Construction of Bucay North Road, Bucay, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 33.21 Actual: 30 Expenditure:0 Release:67550000 Obligation:64865357.33 |
-9.6657633242999 |
720426600 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Basic Infrastructure Program (BIP), Flood Mitigation Structures protecting Public Infrastructures/ Facilities, Construction of Lusuac Flood Control Structure, Barangay Poblacion, Lagayan, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 54.55 Actual: 100 Expenditure:44400888 Release:49500000 Obligation:49498000 |
72.562553925798 |
722774510 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities, Construction of Lamunan - Gacab - Duldulao Road, Malibcong, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 26.05 Actual: 22.65 Expenditure:0 Release:48020000 Obligation:46520124.56 |
-13.051823416507 |
724060443 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities, Rehabilitation of Malamsit - Sta. Rosa Road, Peñarrubia, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 18.86 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
731136186 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Flood Mitigation Structures protecting Public Infrastructures/ Facilities, Construction of Mapisla-Madao Flood Control, Licauan-Baay, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 0 Actual: 88.71 Expenditure:0 Release:49000000 Obligation:46547990.93 |
0 |
740359872 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239, Preventive Maintenance along Abra-Cervantes Rd - K0456 + (-004.84) - K0456 + 185, K0456 + (-005) - K0456 + (-004.84), K0456 + 185 - K0457 + 460 Abra | DPWH Abra DEO | (Cumulative) |
Target: 100 Actual: 96.42 Expenditure:0 Release:14700000 Obligation:14110416.56 |
-3.58 |
742955821 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities, Construction of Aninipil-Tabiog-Lulubnak-Abang Road (Phase III), Sta. 0+000 - Sta. 3+000, Bucay, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 40.63 Actual: 38.06 Expenditure:0 Release:49000000 Obligation:47020159.46 |
-6.3253753384199 |
757895890 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Construction/ Improvement of Access Roads leading to Declared Tourism Destinations (Tourism Road Infrastructure Program - TRIP), Manabo-Luba-Tubo Road leading to Kili Falls and Hotspring, Tubo, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 100 Actual: 96.56 Expenditure:0 Release:2940000 Obligation:2792616.24 |
-66.264891870174 |
790646878 | ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System, Asset Preservation Program, Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads, Abra-Kalinga Rd - K0439 + 100 - K0439 + 170 Abra | DPWH Abra DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:29947487.47 Release:49000000 Obligation:47044420.25 |
2.576760987357 |
801229386 | ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System, Asset Preservation Program, Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads, Abra-Kalinga Rd - K0450 + 100 - K0450 + 200 Abra | DPWH Abra DEO | (Cumulative) |
Target: 32.03 Actual: 30.22 Expenditure:0 Release:53075000 Obligation:50426593.21 |
-6.8434032059186 |
802916619 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Flood Mitigation Structures protecting Public Infrastructures/ Facilities, Construction of Isit Flood Control, Dolores, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:49000000 Obligation:0 |
0 |
829172991 | ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System, Asset Preservation Program, Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads, Abra-Kalinga Rd - K0439 + 900 - K0440 + 100 Abra | DPWH Abra DEO | (Cumulative) |
Target: 96.66 Actual: 100 Expenditure:50030316.94 Release:67550000 Obligation:65857510.6 |
-9.0991683555804 |
829460336 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Access Roads and/or Bridges from the National Roads connecting to Indigenous People (IP) Communities, Rehabilitation of Villaviciosa-Luba-Tubo Road, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 87.71 Actual: 85 Expenditure:0 Release:32340000 Obligation:30723167.01 |
-5.5240635767478 |
830564910 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Basic Infrastructure Program (BIP), Flood Mitigation Structures protecting Public Infrastructures/ Facilities, Construction of Bangcagan Flood Control Structure, Barangay Bangcagan, Bucay, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 51.26 Actual: 48.61 Expenditure:0 Release:49500000 Obligation:46555218.13 |
-8.4039947239495 |
835137443 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Interjurisdictional Roads and/or Bridges (or roads that traverse multiple LGU jurisdictions), Construction of San Gregorio-Toon-Pangal Road, Barangay San Gregorio, Toon and Pangal, Municipalities of La Paz and Danglas, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 39.55 Actual: 37.64 Expenditure:0 Release:49000000 Obligation:47528748.96 |
-4.8293299620733 |
848274605 | ORGANIZATIONAL OUTCOME 2 : Protect Lives and Properties Against Major Floods, Flood Management Program, Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers, Construction of Flood Control Structure along Abra River, Sta. 2+400 - Sta. 3+100, Canan, La Paz, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 99.08 Actual: 95.26 Expenditure:26780718.92 Release:49000000 Obligation:46549162.88 |
-39.682137655924 |
848437187 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Flood Mitigation Structures protecting Public Infrastructures/ Facilities, Construction of Colabaoan Flood Control, Malanas River, Barangay Colabaoan, San Juan, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 58.75 Actual: 100 Expenditure:0 Release:31690269.72 Obligation:46557062.22 |
64.98927569708 |
849017217 | ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System, Asset Preservation Program, Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads, Abra-Kalinga Rd - K0436 + 615 - K0436 + 700 Abra | DPWH Abra DEO | (Cumulative) |
Target: 99.98 Actual: 100 Expenditure:33747503.44 Release:49000000 Obligation:47031891.66 |
6.4340649033952 |
849227576 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Flood Mitigation Structures protecting Public Infrastructures/ Facilities, Construction of Coribot Flood Control Phase 2, Mudeng, La Paz, Abra Abra | DPWH Abra DEO | (default) |
Target: 0 Actual: 0 Expenditure:0 Release:49000000 Obligation:0 |
0 |
876629369 | ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System, Asset Preservation Program, Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads, Abra-Kalinga Rd - K0440 + 200 - K0440 + 300 Abra | DPWH Abra DEO | (Cumulative) |
Target: 0 Actual: 100 Expenditure:70986249.42 Release:96500000 Obligation:91742612.8 |
0 |
882098647 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities, Rehabilitation of Poblacion La Paz Road, Brgy. Poblacion, La Paz, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 97.843 Actual: 95.27 Expenditure:0 Release:49000000 Obligation:47035780.75 |
-2.6297231278681 |
884473120 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities, Rehabilitation of Sta. Rosa-Bugbog Road (Phase II), Sta. 0+000 - Sta. 3+500, Peñarrubia and Bucay, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 69.86 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
886395958 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Flood Mitigation Structures protecting Public Infrastructures/ Facilities, Construction of Soot Flood Control Structure, La Paz, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
887954342 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Basic Infrastructure Program (BIP), Multi-Purpose Buildings/ Facilities to support Social Services, Construction (Completion) of Multi-Purpose Building, Barangay Laang, Lagangilang, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 73.67 Actual: 69.48 Expenditure:0 Release:2970000 Obligation:2802638.11 |
-7.1619454836986 |
888234403 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Basic Infrastructure Program (BIP), Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities, Retrofitting of Don Mariano Bridge along Abra-Kalinga Road, Dolores, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 35.75 Actual: 32.83 Expenditure:13032433.16 Release:49500000 Obligation:48260568.7 |
-8.1678321678322 |
901178803 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities, Construction of Manabo Road, Manabo, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 98.51 Actual: 95.43 Expenditure:0 Release:49000000 Obligation:47035126.3 |
-3.1265861333875 |
912419561 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities, Construction of Boliney Bridge, Poblacion, Boliney, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 15.54 Actual: 12.94 Expenditure:0 Release:49000000 Obligation:46534671.93 |
-16.731016731017 |
920531905 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Basic Infrastructure Program (BIP), Flood Mitigation Structures protecting Public Infrastructures/ Facilities, Construction of Soot Flood Control Structure (Phase 2), Barangay Mudeng, La Paz, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 81.14 Actual: 82.71 Expenditure:33515053.63 Release:49500000 Obligation:46548685.59 |
-20.851674641148 |
925776364 | ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System, Asset Preservation Program, Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads, Abra-Ilocos Norte Rd - K0449 + 310 - K0449 + 450 Abra | DPWH Abra DEO | (Cumulative) |
Target: 83.3 Actual: 100 Expenditure:71235680.69 Release:96500000 Obligation:92653319.66 |
47.338289327523 |
928458805 | ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System, Asset Preservation Program, Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads, Abra-Ilocos Norte Rd - K0445 + 450 - K0445 + 650 Abra | DPWH Abra DEO | (Cumulative) |
Target: 99.43 Actual: 100 Expenditure:41975086.39 Release:57900000 Obligation:56141833.75 |
15.263400804378 |
930107112 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Flood Mitigation Structures protecting Public Infrastructures/ Facilities, Construction of Barbarsik Creek Flood Control, Buli, La Paz, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 30.43 Actual: 42.95 Expenditure:0 Release:49000000 Obligation:46570433.84 |
41.143608281301 |
937765284 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Basic Infrastructure Program (BIP), Multi-Purpose Buildings/ Facilities to support Social Services, Construction (Completion) of Multi-Purpose Building, Barangay Gayaman, Luba, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 67.53 Actual: 65 Expenditure:0 Release:2970000 Obligation:2824726.79 |
-11.553795702875 |
945353737 | ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System, Asset Preservation Program, Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads, Abra-Kalinga Rd - K0447 + 400 - K0447 + 500 Abra | DPWH Abra DEO | (Cumulative) |
Target: 34.25 Actual: 100 Expenditure:91737886.27 Release:96500000 Obligation:91737886.27 |
185.55111364934 |
952675228 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Basic Infrastructure Program (BIP), Public Water Supply System (Level II or III), Construction of Water Supply (Level III), Barangay Poblacion, La Paz, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 56.58 Actual: 54.06 Expenditure:0 Release:9900000 Obligation:9309466.93 |
-8.6361331755957 |
953536288 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Flood Mitigation Structures protecting Public Infrastructures/ Facilities, Construction of Malanas Flood Control Structure, Guimba and Daoidao, San Juan, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 43.73 Actual: 100 Expenditure:73931571.72 Release:96500000 Obligation:91633702.03 |
109.29259104228 |
959622200 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239, Preventive Maintenance along Abra-Ilocos Sur Rd - K0400 + 210 - K0408 + 190 Abra | DPWH Abra DEO | (Cumulative) |
Target: 18.98 Actual: 15 Expenditure:0 Release:84920000 Obligation:82788617.02 |
-20.969441517387 |
960839526 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities, Construction of Lamunan-Gacab Road, Barangay Gacab, Malibcong, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 14.09 Actual: 37.67 Expenditure:31925800.6 Release:96500000 Obligation:94232532.86 |
167.35273243435 |
968558874 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Flood Mitigation Structures protecting Public Infrastructures/ Facilities, Construction of Sidongan Flood Control Structure, Barangay Luis, La Paz, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 91.18 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
971348054 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities, Rehabilitation of Peñarrubia - Bucay Road (Bucay Section), Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 39.55 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
973412433 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities, Construction of Road, Bulig - Caganayan Road, Barangay Caganayan, Tineg, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 44.2 Actual: 42.15 Expenditure:0 Release:0 Obligation:0 |
-4.6380090497738 |
976143068 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities, Construction of Road, Caoaya - Mogao - Domenglay Road, Baay-Licuan, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:49000000 Obligation:47486164.04 |
0 |
978566834 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Flood Mitigation Structures protecting Public Infrastructures/ Facilities, Construction of Toon-San Gregorio Flood Control, La Paz, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 46.55 Actual: 45 Expenditure:34815782.88 Release:96500000 Obligation:91694281.01 |
-13.110639119521 |
988247019 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Basic Infrastructure Program (BIP), Multi-Purpose Buildings/ Facilities to support Social Services, Construction (Completion) of Multi-Purpose Building (Liga ng mga Barangay Building), Lagangilang, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 4.56 Actual: 0 Expenditure:0 Release:2970000 Obligation:2820687.74 |
-100 |
988517655 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Basic Infrastructure Program (BIP), Flood Mitigation Structures protecting Public Infrastructures/ Facilities, Construction of Poblacion-Nalnas Flood Control, Barangay Poblacion, Langiden, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 99.98 Actual: 100 Expenditure:44547299.99 Release:49500000 Obligation:49497000 |
-25.271297680161 |
992740633 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities, Construction of Demet - Noro Bridge and Approaches, La Paz, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 15.54 Actual: 13.11 Expenditure:0 Release:49000000 Obligation:46594636.25 |
-15.637065637066 |
994038198 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Flood Mitigation Structures protecting Public Infrastructures/ Facilities, Construction of Paga Flood Control Structure, Dolores, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
995078980 | LOCAL PROGRAM, National Building Program, Buildings and Other Structures, Multipurpose/ Facilities, Construction of University of Abra School Building, La Paz Campus, La Paz, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 13.66 Actual: 10 Expenditure:0 Release:96500000 Obligation:93585648.26 |
-26.793557833089 |
1003058599 | ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System, Asset Preservation Program, Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads, Abra-Kalinga Rd - K0438 + 000 - K0438 + 060 Abra | DPWH Abra DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:32312616.09 Release:49000000 Obligation:46574992.18 |
2.739313666466 |
1007172073 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Basic Infrastructure Program (BIP), Multi-Purpose Buildings/ Facilities to support Social Services, Construction of Multi-Purpose Facility (Covered Court), Brgy. Pangal, Danglas, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:2623095.11 Release:4950000 Obligation:4752695.62 |
0 |
1007379709 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities, Construction of Namarabar Bridge, Namarabar, Peñarrubia, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 15.54 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
1019499201 | ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System, Asset Preservation Program, Preventive Maintenance - Tertiary Roads,Abra-Ilocos Norte Rd - K0422 + 900 - K0427 + 000, K0427 + 000 - K0432 + 000 Abra | DPWH Abra DEO | (Cumulative) |
Target: 25.77 Actual: 23.15 Expenditure:0 Release:96500000 Obligation:92642353.02 |
-10.166860690726 |
1042293674 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Flood Mitigation Structures protecting Public Infrastructures/ Facilities, Construction of Barbarsik Flood Control (Phase II), San Juan, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 58.75 Actual: 100 Expenditure:0 Release:49000000 Obligation:45837758.69 |
64.98927569708 |
1044829424 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Multi-Purpose Buildings/ Facilities to support Social Services, Construction of Government Center, La Paz, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 8.73 Actual: 5.68 Expenditure:0 Release:96500000 Obligation:91778258.86 |
-34.936998854525 |
1051754627 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Basic Infrastructure Program (BIP), Flood Mitigation Structures protecting Public Infrastructures/ Facilities, Construction of Pagala Flood Control Structure (Phase 2), Barangay Pagala, Bucay, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 57.98 Actual: 55 Expenditure:0 Release:49500000 Obligation:46556689.54 |
-6.5261726716519 |
1057640423 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Flood Mitigation Structures protecting Public Infrastructures/ Facilities, Construction of Malanas Flood Control Structure, Culliong, San Juan, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 33.36 Actual: 100 Expenditure:73548190.99 Release:96500000 Obligation:91675580.06 |
191.71528588098 |
1074165533 | ORGANIZATIONAL OUTCOME 2 : Protect Lives and Properties Against Major Floods, Flood Management Program, Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers, Construction of Flood Control Structure along Abra River, Brgy. Cabaroan, Tayum, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:48997100 Release:49000000 Obligation:48997100 |
-18.668668668669 |
1087707757 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Construction/ Improvement of Access Roads leading to Trades, Industries and Economic Zones (Roads Leveraging Linkages for Industry and Trade Infrastructure Program - ROLL-IT), Daguioman-Bucay Road, in support of Coffee, Fruit, Cacao and Homestyles Industries, Daguioman, Bucloc, Sallapadan and Bucay, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 0 Actual: 96.35 Expenditure:0 Release:3430000 Obligation:3276533.79 |
0 |
1088538303 | ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System, Asset Preservation Program, Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads, Abra-Ilocos Norte Rd - K0444 + 400 - K0444 + 550 Abra | DPWH Abra DEO | (Cumulative) |
Target: 83.3 Actual: 100 Expenditure:72090881.23 Release:96500000 Obligation:94165449.5 |
49.730838246603 |
1088892228 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities, Rehabilitation of La Paz Road, La Paz, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 26.88 Actual: 25.61 Expenditure:0 Release:96500000 Obligation:92371796.9 |
-4.7247023809524 |
1094621741 | ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System, Asset Preservation Program, Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads,Abra-Ilocos Norte Rd - K0447 + 820 - K0447 + 963 Abra | DPWH Abra DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:96500000 Obligation:91730539.79 |
0 |
1095097590 | ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System, Asset Preservation Program, Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads, Abra-Kalinga Rd - K0484 + 000 - K0484 + 200 Abra | DPWH Abra DEO | (Cumulative) |
Target: 83.3 Actual: 85.01 Expenditure:71963150.88 Release:96500000 Obligation:94061537.82 |
-27.3605058532 |
1097776409 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Basic Infrastructure Program (BIP), Flood Mitigation Structures protecting Public Infrastructures/ Facilities, Construction of Lingay Flood Control Structure, Barangay Lingey, Bucloc, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 100 Actual: 96.34 Expenditure:27248194.13 Release:49500000 Obligation:46551120.67 |
-29.234611429411 |
1103220745 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities, Construction of Road, Bangued, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 97.84 Actual: 95.23 Expenditure:0 Release:49000000 Obligation:47032915.21 |
-2.6676206050695 |
1108108695 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Basic Infrastructure Program (BIP), Multi-Purpose Buildings/ Facilities to support Social Services, Construction (Completion) of Multi-Purpose Building, Barangay Poblacion, Luba, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 92.96 Actual: 90 Expenditure:0 Release:2970000 Obligation:2794355.96 |
-9.0173877881116 |
1114375989 | ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System, Asset Preservation Program, Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads, Abra-Kalinga Rd - K0475 + 700 - K0476 + 250 Abra | DPWH Abra DEO | (Cumulative) |
Target: 83.3 Actual: 85.04 Expenditure:94083407.85 Release:96500000 Obligation:94083407.85 |
32.675382380586 |
1147259080 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities, Construction of Malita Bridge, Malita, Bangued, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 15.54 Actual: 12.09 Expenditure:0 Release:49000000 Obligation:46651446.85 |
-22.200772200772 |
1163656860 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Flood Mitigation Structures protecting Public Infrastructures/ Facilities, Rechanneling/Dredging of Soot River, Liguis and San Gregorio Section Phase 2, Sta. 6 + 000 - Sta. 8 + 000, La Paz, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 21.12 Actual: 50.17 Expenditure:0 Release:49000000 Obligation:46886579.21 |
137.54734848485 |
1171769185 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Basic Infrastructure Program (BIP), Multi-Purpose Buildings/ Facilities to support Social Services, Construction (Completion) of Multi-Purpose Building, Barangay Dalimag, San Isidro, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 85.69 Actual: 82.64 Expenditure:0 Release:2970000 Obligation:2793651.38 |
-8.8361831218974 |
1172663862 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities, Rehabilitation of Ababeng - Caupasan Road, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 41.87 Actual: 38.27 Expenditure:0 Release:49000000 Obligation:47497603.27 |
-8.5980415572008 |
1178496967 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities, Construction of Quirsodan Bridge, San Isidro, Lagangilang, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 15.54 Actual: 14.05 Expenditure:0 Release:49000000 Obligation:46570220.98 |
-9.5881595881596 |
1179138497 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Basic Infrastructure Program (BIP), Multi-Purpose Buildings/ Facilities to support Social Services, Construction (Completion) of Multi- Purpose Building, Barangay Tamac, Villaviciosa, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 73.67 Actual: 70.46 Expenditure:0 Release:2970000 Obligation:2849128.53 |
-5.8524853019776 |
1183144084 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities, Construction of Bacag - Lana - ag Road, Lacub, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 26.05 Actual: 69.71 Expenditure:0 Release:49000000 Obligation:47464478.82 |
167.60076775432 |
1204579915 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Flood Mitigation Structures protecting Public Infrastructures/ Facilities, Construction of Flood Control/Drainage Canal along South-North-Labon-San Miguel-Bangcagan, Bucay, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 51.26 Actual: 48.55 Expenditure:0 Release:49000000 Obligation:46847578.09 |
-5.2867733125244 |
1218918400 | ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System, Asset Preservation Program, Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads, Abra-Kalinga Rd - K0436 + 770 - K0436 + 830 Abra | DPWH Abra DEO | (Cumulative) |
Target: 99.98 Actual: 100 Expenditure:33798132.64 Release:49000000 Obligation:46959625.95 |
6.3590320765335 |
1219105483 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities, Construction of AKR-Daguioman Road, Daquiman, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:96500000 Obligation:91634464.85 |
0 |
1222958159 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities, Rehabilitation of Manabo - Dumagas Road, Boliney & Manabo, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 26.88 Actual: 25.33 Expenditure:0 Release:49000000 Obligation:47527179.7 |
-5.7663690476191 |
1224059920 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities, Construction of Madegnak Bridge Phase 2, Alaoa, Tineg, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 19.11 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
1228719720 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Flood Mitigation Structures protecting Public Infrastructures/ Facilities, Construction of Isit Flood Control, Dolores, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
1240370467 | ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System, Asset Preservation Program, Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads, Abra-Kalinga Rd - K0448 + 500 - K0448 + 650 Abra | DPWH Abra DEO | (default) |
Target: 0 Actual: 30 Expenditure:0 Release:96500000 Obligation:93275112.44 |
0 |
1243474669 | ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System, Asset Preservation Program, Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads, Abra-Kalinga Rd - K0438 + 110 - K0438 + 174 Abra | DPWH Abra DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:31891431.65 Release:49000000 Obligation:47044243.2 |
2.7152317880795 |
1266657965 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239, Preventive Maintenance (Asphalt Overlay) along Abra-Kalinga Rd - K0431 + 500 - K0437 + 000 Abra | DPWH Abra DEO | (Cumulative) |
Target: 0 Actual: 8 Expenditure:0 Release:49000000 Obligation:47033002.17 |
0 |
1294136123 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities, Construction of Abang - Tabiong Bridge, Abang & Tabiog, Bucay, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 15.54 Actual: 12.05 Expenditure:0 Release:49000000 Obligation:46568873.92 |
-22.458172458172 |
1302884013 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities, Rehabilitation of Bucay Road, Bucay, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 39.55 Actual: 37.47 Expenditure:0 Release:49000000 Obligation:46925560.64 |
-5.2591656131479 |
1311237210 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Basic Infrastructure Program (BIP), Multi-Purpose Buildings/ Facilities to support Social Services, Construction (Completion) of Multi- Purpose Building, Barangay Madalipay, Bucay, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 92.96 Actual: 88.95 Expenditure:0 Release:2970000 Obligation:2827666.48 |
-10.07885159725 |
1315502387 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Basic Infrastructure Program (BIP), Flood Mitigation Structures protecting Public Infrastructures/ Facilities, Construction of Duldulao Flood Control Structure, Barangay Duldulao, Malibcong, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 100 Actual: 95.27 Expenditure:0 Release:49500000 Obligation:46544691.43 |
-41.368368312643 |
1315771847 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Multi-Purpose Buildings/ Facilities to support Social Services, Construction of Multi-Purpose Building, Government Center, Barangay Poblacion, Villaviciosa, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 22.55 Actual: 20 Expenditure:0 Release:19600000 Obligation:18618738.14 |
-11.308203991131 |
1317977101 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Flood Mitigation Structures protecting Public Infrastructures/ Facilities, Construction of Flood Control Structure, Malabbaga, La Paz, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
1318224942 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities, Construction of Abaquid-Danglas-Nagaparan Road, Barangays Abaquid, Danglas and Nagaparan, Municipality of Danglas, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 39.55 Actual: 37.03 Expenditure:0 Release:45525126.23 Obligation:45525126.23 |
-6.3716814159292 |
1326701570 | ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System, Asset Preservation Program, Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads,Abra-Ilocos Norte Rd - K0446 + 200 - K0446 + 350 Abra | DPWH Abra DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:96500000 Obligation:93606750.37 |
0 |
1327804916 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Basic Infrastructure Program (BIP), Multi-Purpose Buildings/ Facilities to support Social Services, Construction (Completion) of Multi-Purpose Building, Barangay Padangitan, Danglas, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:2172330.18 Release:2970000 Obligation:2816313.96 |
-19.276719405877 |
1336283037 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Multi-Purpose Buildings/ Facilities to support Social Services, Construction (Completion) of Multi-Purpose Building, Barangay Zone 3, Bangued, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 9.92 Actual: 6.68 Expenditure:0 Release:29400000 Obligation:27945758.49 |
-32.661290322581 |
1337089984 | ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System, Asset Preservation Program, Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads, Abra-Kalinga Rd - K0451 + 000 - K0451 + 150 Abra | DPWH Abra DEO | (Cumulative) |
Target: 32.03 Actual: 31.5 Expenditure:0 Release:96500000 Obligation:91680319.05 |
-2.8976572133169 |
1350968553 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities, Construction of Salnec-Madalipay-Dugong Bridge Phase 2, Salnec & Dugong, Bucay, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 10.59 Actual: 8 Expenditure:0 Release:96500000 Obligation:91716233.56 |
-24.457034938621 |
1351436596 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239, Preventive Maintenance (Asphalt Overlay) along Abra-Kalinga Rd - K0463 + 200 - K0467 + 000 Abra | DPWH Abra DEO | (Cumulative) |
Target: 0 Actual: 12.05 Expenditure:0 Release:31360000 Obligation:30097519.45 |
0 |
1353348971 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Flood Mitigation Structures protecting Public Infrastructures/ Facilities, Construction of Flood Control Structure, Coribot, Barangay Mudeng, La Paz, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
1354816596 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Basic Infrastructure Program (BIP), Flood Mitigation Structures protecting Public Infrastructures/ Facilities, Construction of Madao - Bulbulala Flood Control, Barangay Bulbulala, Licuan-Baay, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 100 Actual: 98.5 Expenditure:21031554.76 Release:49500000 Obligation:46795537.59 |
-28.588791357191 |
1365556588 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities, Rehabilitation of Villaviciosa Road, Phase 2, Villaviciosa, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 31.3 Actual: 74.57 Expenditure:20172877.49 Release:49000000 Obligation:46544251.4 |
138.2428115016 |
1367201943 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities, Rehabilitation of Poblacion - Ud-udiao Road, Poblacion, Basar, Sallapadan-Bariio, Ud-udiao, Sallapadan, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 26.05 Actual: 25.91 Expenditure:0 Release:49000000 Obligation:47526218.11 |
-0.53742802303263 |
1384086860 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Construction/ Improvement of Access Roads leading to Trades, Industries and Economic Zones (Roads Leveraging Linkages for Industry and Trade Infrastructure Program - ROLL-IT), Alaoa to Lapat Balantay Road in support to Coffee Industry, Tineg, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 100 Actual: 96.16 Expenditure:0 Release:2940000 Obligation:2812879 |
-36.702318570095 |
1391242654 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities, Construction of Namarabar Bridge Phase 2, Namarabar, Peñarrubia, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 15.54 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
1395093220 | ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System, Asset Preservation Program, Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads, Abra-Kalinga Rd - K0456 + 100 - K0456 + 200 Abra | DPWH Abra DEO | (Cumulative) |
Target: 32.03 Actual: 51.21 Expenditure:0 Release:96500000 Obligation:92080413.73 |
57.860665844636 |
1398401308 | ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System, Asset Preservation Program, Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads, Abra-Ilocos Norte Rd - K0446 + 100 - K0446 + 200 Abra | DPWH Abra DEO | (Cumulative) |
Target: 96.66 Actual: 100 Expenditure:47998696.13 Release:67550000 Obligation:65855914.42 |
29.792438325529 |
1405021420 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Basic Infrastructure Program (BIP), Flood Mitigation Structures protecting Public Infrastructures/ Facilities, Construction of Deet - Balingasa Flood Control, Barangay Deet, Tayum, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 69.57 Actual: 100 Expenditure:44547750 Release:49500000 Obligation:49497500 |
32.275132275132 |
1406050028 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Flood Mitigation Structures protecting Public Infrastructures/ Facilities, Construction of Patoc Flood Control Structure (Phase III), Sta. 0+600 - Sta. 1+100, Bucay, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 100 Actual: 95.38 Expenditure:0 Release:29400000 Obligation:27937373.09 |
-47.975122938964 |
1416876244 | LOCAL PROGRAM, National Building Program, Buildings and Other Structures, Multipurpose/ Facilities, Construction of University of Abra School Building, Barangay Zone 3, Bangued, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 6.41 Actual: 5 Expenditure:0 Release:29400000 Obligation:28000173.34 |
-21.996879875195 |
1428020480 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities, Rehabilitation of Bonglo Road, Bonglo, Baay-Licuan, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 0 Actual: 24.66 Expenditure:0 Release:49000000 Obligation:47527596.86 |
0 |
1431100949 | ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System, Asset Preservation Program, Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads, Abra-Kalinga Rd - K0439 + 600 - K0439 + 650 Abra | DPWH Abra DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:32260618.09 Release:49000000 Obligation:47032873.86 |
2.5707405177604 |
1431105767 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Construction/ Rehabilitation of Water Supply/ Septage and Sewerage/ Rainwater Collector System, Water Supply System, Construction of La Paz Water System, La Paz, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 37.11 Actual: 35 Expenditure:0 Release:96500000 Obligation:92057285.35 |
-5.6857989760172 |
1437547850 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Basic Infrastructure Program (BIP), Multi-Purpose Buildings/ Facilities to support Social Services, Construction (Completion) of Multi-Purpose Building, Barangay Libtec, Dolores, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 92.96 Actual: 90 Expenditure:0 Release:2970000 Obligation:2792900.9 |
-9.0173877881116 |
1455098517 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities, Construction of Road, Poblacion - Malapaao (Phase II), Sta. 0+000 - Sta. 3+000, Langiden, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 39.55 Actual: 74.29 Expenditure:31118188.15 Release:49000000 Obligation:46542679.13 |
87.838179519595 |
1457810376 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Access Roads and/or Bridges from the National Roads connecting to Indigenous People (IP) Communities, Rehabilitation of Peñarrubia-Villaviciosa Road, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 18.86 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
1459914700 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities, Rehabilitation of Dolores - San Juan Road, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 30 Actual: 28.44 Expenditure:0 Release:49000000 Obligation:46544967.26 |
-5.2 |
1462993055 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Basic Infrastructure Program (BIP), Flood Mitigation Structures protecting Public Infrastructures/ Facilities, Construction of Bayaan Flood Control, Barangay Bayaan, Dolores, Abra Abra | DPWH Abra DEO | (default) |
Target: 100 Actual: 96.33 Expenditure:12868018.65 Release:49500000 Obligation:46552297.08 |
-3.67 |
1477825047 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Flood Mitigation Structures protecting Public Infrastructures/ Facilities, Construction of Sto. Tomas Flood Control, Manabo, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:44005450 Release:49000000 Obligation:49000000 |
-37.974226804124 |
1483812320 | ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System, Asset Preservation Program, Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads, Abra-Kalinga Rd - K0436 + 460 - K0436 + 520 Abra | DPWH Abra DEO | (Cumulative) |
Target: 99.98 Actual: 100 Expenditure:33114656.78 Release:49000000 Obligation:46995995.79 |
6.5028449946852 |
1491154183 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Basic Infrastructure Program (BIP), Multi-Purpose Buildings/ Facilities to support Social Services, Construction (Completion) of Multi-Purpose Building, Barangay Poblacion, Dolores, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 73.67 Actual: 70 Expenditure:0 Release:2970000 Obligation:2808858.93 |
-6.4671298770711 |
1495918622 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Basic Infrastructure Program (BIP), Multi-Purpose Buildings/ Facilities to support Social Services, Construction (Completion) of Multi-Purpose Building, Barangay Dumagas, Boliney, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 85.69 Actual: 83.55 Expenditure:0 Release:2970000 Obligation:2792482.87 |
-7.8323221180364 |
1518112608 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities, Construction of Kirsodan Bridge and Approaches, Lagangilang, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 0 Actual: 8.56 Expenditure:0 Release:95535000 Obligation:90769917.62 |
0 |
1520977833 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Multi-Purpose Buildings/ Facilities to support Social Services, Construction (Completion) of Multi-Purpose Building, Abra Central Market, Barangay Mudeng, La Paz, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 9.09 Actual: 6.39 Expenditure:0 Release:49000000 Obligation:46499358.94 |
-29.70297029703 |
1523681196 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239, Preventive Maintenance (Asphalt Overlay) along Abra-Kalinga Rd - K0456 + 000 - K0456 + 600, K0458 + 100 - K0463 + 200 Abra | DPWH Abra DEO | (Cumulative) |
Target: 0 Actual: 8.12 Expenditure:0 Release:49000000 Obligation:47036955.22 |
0 |
1546186168 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Flood Mitigation Structures protecting Public Infrastructures/ Facilities, Construction of Bancagan-Pagala Flood Control, Bucay, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 21.9 Actual: 19.5 Expenditure:0 Release:49000000 Obligation:46646042.04 |
-10.958904109589 |
1548780090 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Basic Infrastructure Program (BIP), Flood Mitigation Structures protecting Public Infrastructures/ Facilities, Construction of Sinalang Flood Control, Barangays Namarabar & Riang, Peñarrubia, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 55.49 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
1553689246 | "Asset Preservation - Preventive Maintenance - Tertiary Road, Abra-Kalinga Rd - K0420 + 654 - K0421 + 600" Abra | DPWH Abra DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
1557434731 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities, Construction of Road, Bucay North Road, Pagala Section, Barangay Pagala, Bucay, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 0 Actual: 21.08 Expenditure:0 Release:96500000 Obligation:91669343.43 |
0 |
1562049836 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Basic Infrastructure Program (BIP), Multi-Purpose Buildings/ Facilities to support Social Services, Construction (Completion) of Multi-Purpose Building, Barangay Angad, Bangued, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 85.69 Actual: 82.51 Expenditure:0 Release:2970000 Obligation:2793420.28 |
-8.9795918367347 |
1571806128 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239, Preventive Maintenance (Asphalt Overlay) along Abra-Kalinga Rd - K0415 + 000 - K0419 + 484, K0421 + 600 - K0422 + 500 Abra | DPWH Abra DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:49000000 Obligation:47030473.48 |
0 |
1572003045 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Basic Infrastructure Program (BIP), Multi-Purpose Buildings/ Facilities to support Social Services, Construction (Completion) of Multi-Purpose Building, Barangay Tagodtod, Lagangilang, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 92.96 Actual: 89.55 Expenditure:0 Release:2970000 Obligation:2792897.32 |
-9.472300849171 |
1580523332 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities, Construction of Langiden Bridge Phase 2, Nalnas-Dalayap & Suyo, Langiden& Pidigan, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 10.98 Actual: 9.15 Expenditure:0 Release:96500000 Obligation:91681599.46 |
-16.666666666667 |
1604856229 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Interjurisdictional Roads and/or Bridges (or roads that traverse multiple LGU jurisdictions), Construction of Road, Domenglay-Binasaran Road, Baay-Licuan and Malibcong, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 26.05 Actual: 23.81 Expenditure:0 Release:49000000 Obligation:47520636.63 |
-8.5988483685221 |
1606229845 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities, Construction of Demet Bridge, Barangay Poblacion, La Paz, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 15.54 Actual: 12.69 Expenditure:0 Release:49000000 Obligation:46594636.23 |
-18.339768339768 |
1613834376 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities, Rehabilitation of Lower Tineg Road, Tineg, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 44.2 Actual: 42.05 Expenditure:0 Release:49000000 Obligation:46502115.47 |
-4.8642533936652 |
1617559270 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities, Rehabilitation of Licuan Road, Baay-Licuan, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 26.05 Actual: 23.51 Expenditure:0 Release:49000000 Obligation:47522789.55 |
-9.7504798464491 |
1619188421 | Asset Preservation - Preventive Maintenance - Tertiary Road, Abra-Ilocos Norte Rd - K0418 + 830 - K0422 + 900 Abra | DPWH Abra DEO | (Cumulative) |
Target: 100 Actual: 47.23 Expenditure:47767155 Release:50000000 Obligation:47767155 |
-62.545598731166 |
1626209036 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities, Construction of Malanas Bridge Phase 2, Badas & Poblacion, San Juan, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 10.3 Actual: 7.33 Expenditure:0 Release:96500000 Obligation:91626359.42 |
-28.834951456311 |
1637210449 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Flood Mitigation Structures protecting Public Infrastructures/ Facilities, Construction of Cardona Flood Control Structure, Barangay Cardona, Dolores, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 0 Actual: 30 Expenditure:0 Release:0 Obligation:0 |
0 |
1645598617 | ORGANIZATIONAL OUTCOME 2 : Protect Lives and Properties Against Major Floods, Flood Management Program, Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers, Construction of Flood Control Structure along Abra River, Brgy. Deet, Tayum, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:48997100 Release:49000000 Obligation:48997100 |
-39.229077439518 |
1647621306 | ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System, Asset Preservation Program, Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads, Abra-Kalinga Rd - K0449 + 100 - K0449 + 250 Abra | DPWH Abra DEO | (Cumulative) |
Target: 32.03 Actual: 30.42 Expenditure:0 Release:96500000 Obligation:91694119.26 |
-6.2268803945746 |
1652187912 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities, Construction of Boliney Bridge Phase 2, Poblacion, Boliney, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 22.42 Actual: 20.03 Expenditure:0 Release:29400000 Obligation:28094166.58 |
-10.660124888492 |
1658345479 | ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System, Asset Preservation Program, Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads, Abra-Ilocos Norte Rd - K0445 + 750 - K0445 + 905 Abra | DPWH Abra DEO | (Cumulative) |
Target: 99.98 Actual: 100 Expenditure:33814809 Release:49000000 Obligation:46778122.18 |
6.3965484899644 |
1668777367 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities, Construction of Madegnak Bridge Phase 2, Alaoa, Tineg, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
1671379074 | ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System, Asset Preservation Program, Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads,Abra-Ilocos Norte Rd - K0447 + 400 - K0447 + 470 Abra | DPWH Abra DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:96500000 Obligation:93549218.34 |
0 |
1681578213 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Flood Mitigation Structures protecting Public Infrastructures/ Facilities, Construction of Banglolao-Labon Flood Control Structure, Bucay, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:0 Release:41160000 Obligation:39103217.75 |
-38.955054162427 |
1681910284 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities, Construction of Langiden Bridge, Suyo & Nalnas-Dalayap, Langiden & Pidigan, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 10.98 Actual: 11.55 Expenditure:0 Release:96500000 Obligation:91675078.98 |
5.1912568306011 |
1696319863 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Flood Mitigation Structures protecting Public Infrastructures/ Facilities, Construction of Naguilian Flood Control, Sallapadan, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 21.9 Actual: 18.26 Expenditure:0 Release:49000000 Obligation:46622110.75 |
-16.62100456621 |
1697556897 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities, Construction of Dolores Bridge Phase 2, Cardona & Poblacion, Dolores, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 10.59 Actual: 8.51 Expenditure:0 Release:96500000 Obligation:91722391.02 |
-19.641170915958 |
1698876232 | ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System, Asset Preservation Program, Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads, Abra-Ilocos Norte Rd - K0444 + 200 - K0444 + 350 Abra | DPWH Abra DEO | (Cumulative) |
Target: 83.3 Actual: 100 Expenditure:86848061.09 Release:96500000 Obligation:96497845.65 |
46.33854567205 |
1711669269 | ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System, Asset Preservation Program, Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads, Abra-Ilocos Norte Rd - K0444 + 650 - K0444 + 700 Abra | DPWH Abra DEO | (Cumulative) |
Target: 99.43 Actual: 100 Expenditure:52107994.39 Release:57900000 Obligation:57897771.54 |
14.089800224171 |
1730572312 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Flood Mitigation Structures protecting Public Infrastructures/ Facilities, Construction of Angad Flood Control, Bangued, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:49000000 Obligation:0 |
0 |
1737931159 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Construction/ Improvement of Access Roads leading to Trades, Industries and Economic Zones (Roads Leveraging Linkages for Industry and Trade Infrastructure Program - ROLL-IT), Junction Silet San Juan to Tineg Boundary Leading to the Coffee Plantations in support to the Coffee Industry, Tineg, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:0 Release:3724837.2 Obligation:3724837.2 |
-34.306666666667 |
1739579254 | ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System, Network Development Program, Construction of Missing Links/ New Roads, Besao-Tubo (via Tamboan) Road, Package A, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 0 Actual: 96.23 Expenditure:0 Release:12603780 Obligation:11970477.89 |
0 |
1745456574 | ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System, Asset Preservation Program, Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads, Abra-Ilocos Norte Rd - K0433 + 524 - K0433 + 663 Abra | DPWH Abra DEO | (Cumulative) |
Target: 0 Actual: 100 Expenditure:63285539.34 Release:96500000 Obligation:93600022 |
0 |
1746751433 | ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System, Asset Preservation Program, Preventive Maintenance - Tertiary Roads,Abra-Ilocos Norte Rd - K0432 + 100 - K0442 + 000 Abra | DPWH Abra DEO | (Cumulative) |
Target: 10.98 Actual: 22.9 Expenditure:0 Release:96500000 Obligation:91679765.35 |
108.56102003643 |
1763578877 | ORGANIZATIONAL OUTCOME 2 : Protect Lives and Properties Against Major Floods, Flood Management Program, Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers, Construction of Flood Control Structure along Abra River, Sta. 25+800 -Sta. 26+300, Cabaruyan, Daguioman, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:21229127.41 Release:49000000 Obligation:47038679.34 |
-45.860351470726 |
1769630916 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities, Construction of Quirsodan Bridge, San Isidro, Lagangilang, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
1777293580 | ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System, Asset Preservation Program, Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads, Abra-Kalinga Rd - K0451 + 450 - K0451 + 600 Abra | DPWH Abra DEO | (Cumulative) |
Target: 32.03 Actual: 80 Expenditure:0 Release:96500000 Obligation:91680130.68 |
146.60912453761 |
1789729206 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Basic Infrastructure Program (BIP), Flood Mitigation Structures protecting Public Infrastructures/ Facilities, Construction of Bagalay Flood Control Structure, Barangay Bagalay, Tayum, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:49500000 Release:49500000 Obligation:49500000 |
-5.4760484993043 |
1791196383 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities, Construction of Bucao-Tagayon Road, La Paz Section, Barangay Liguis, La Paz, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 28.57 Actual: 25.64 Expenditure:0 Release:96500000 Obligation:91633013.83 |
-10.255512775639 |
1800423230 | ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System, Asset Preservation Program, Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads, Abra-Kalinga Rd - K0476 + 250 - K0476 + 800 Abra | DPWH Abra DEO | (Cumulative) |
Target: 83.3 Actual: 84.99 Expenditure:71931996 Release:96500000 Obligation:94034313.84 |
33.222250704947 |
1801159485 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Flood Mitigation Structures protecting Public Infrastructures/ Facilities, Construction of Canan Flood Control Structure, La Paz, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 39.86 Actual: 45.64 Expenditure:57762809.89 Release:96500000 Obligation:91686999.82 |
7.3629734180193 |
1807417346 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities, Construction of Langiden Bridge Phase 3, Nalnas-Dalayap & Suyo, Langiden& Pidigan, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 10.59 Actual: 8.07 Expenditure:0 Release:96500000 Obligation:91681599.36 |
-23.796033994334 |
1810885789 | ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System, Asset Preservation Program, Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads, Abra-Kalinga Rd - K0457 + 000 - K0457 + 100 Abra | DPWH Abra DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:96500000 Obligation:0 |
0 |
1812095742 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Basic Infrastructure Program (BIP), Multi-Purpose Buildings/ Facilities to support Social Services, Construction (Completion) of Multi-Purpose Building, Barangay Supo, Tubo, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 92.96 Actual: 90.26 Expenditure:0 Release:2970000 Obligation:2824716.43 |
-8.7545491306106 |
1827931159 | ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System, Asset Preservation Program, Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads,Abra-Ilocos Norte Rd - K0446 + 515 - K0446 + 700 Abra | DPWH Abra DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:96500000 Obligation:93629616.71 |
0 |
1830919027 | "CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Basic Infrastructure Program (BIP), Multi-Purpose Buildings/ Facilities to support Social Services, Construction (Completion) of Multi-Purpose Building, Barangay Cayapa, Lagangilang, Abra" Abra | DPWH Abra DEO | (Cumulative) |
Target: 50 Actual: 47.6 Expenditure:0 Release:2970000 Obligation:2794657.31 |
-10.154775386938 |
1847695575 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Flood Mitigation Structures protecting Public Infrastructures/ Facilities, Construction of Mapisla-Madao Flood Control, Licauan-Baay, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
1851802499 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Basic Infrastructure Program (BIP), Flood Mitigation Structures protecting Public Infrastructures/ Facilities, Construction of Poblacion Flood Control Structure (Phase 3), Barangay Poblacion, La Paz, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 81.14 Actual: 78.33 Expenditure:0 Release:49500000 Obligation:46545226.77 |
-25.043062200957 |
1856195627 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Flood Mitigation Structures protecting Public Infrastructures/ Facilities, Construction of Flood Control Structure, Barangay Abang, Bucay, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 57.82 Actual: 80 Expenditure:13374790.61 Release:19600000 Obligation:18620392.65 |
35.616206136633 |
1866434819 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities, Construction of North and South Poblacion Road (Phase II), Sta. 0 + 000 - Sta. 3 + 000, Bucay, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 48.74 Actual: 45 Expenditure:0 Release:49000000 Obligation:45831778.67 |
-7.6733688961838 |
1866864847 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Basic Infrastructure Program (BIP), Multi-Purpose Buildings/ Facilities to support Social Services, Construction of Abra Slaughterhouse, Barangay Mudeng, La Paz, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 22.81 Actual: 20.08 Expenditure:0 Release:9900000 Obligation:9420691.94 |
-11.968434896975 |
1870628777 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities, Construction of Taripan-Bayabas Road, Barangay Taripan, Malibcong, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 14.09 Actual: 12.03 Expenditure:0 Release:96500000 Obligation:94110592.2 |
-14.620298083747 |
1870994541 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities, Rehabilitation of Poblacion - Danac Road, Poblacion, Dao-angan, Amti, Kilong-Olao & Danac, Boliney, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 39.86 Actual: 36.82 Expenditure:0 Release:49000000 Obligation:47524342.16 |
-7.6266934269945 |
1879458396 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Basic Infrastructure Program (BIP), Flood Mitigation Structures protecting Public Infrastructures/ Facilities, Construction of Bua Flood Control Structure, Barangay Poblacion, Lacub, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 100 Actual: 95.84 Expenditure:46607719 Release:49500000 Obligation:46607719.18 |
-7.3874074486444 |
1899561452 | ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System, Asset Preservation Program, Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads,Abra-Kalinga Rd - K0437 + 400 - K0437 + 460 Abra | DPWH Abra DEO | (Cumulative) |
Target: 99.98 Actual: 100 Expenditure:33107119.11 Release:49000000 Obligation:46877812.59 |
6.4528231101107 |
1902710438 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Multi-Purpose Buildings/ Facilities to support Social Services, Construction of Multi-Purpose Building, La Paz Municipal Hospital (Phase 2), La Paz, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 21.12 Actual: 20.16 Expenditure:0 Release:49000000 Obligation:46919702.45 |
-4.5454545454545 |
1903803597 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Flood Mitigation Structures protecting Public Infrastructures/ Facilities, Construction of Cardona Flood Control Structure, Barangay Cardona, Dolores, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 10.4 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
1914926107 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities, Construction of Road, Kirsodan - Baay Road, Baay-Licuan, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 26.05 Actual: 22.57 Expenditure:0 Release:49000000 Obligation:47469615.8 |
-13.358925143954 |
1915252389 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Basic Infrastructure Program (BIP), Flood Mitigation Structures protecting Public Infrastructures/ Facilities, Construction of Abang Flood Control, Barangay Abang, Bucay, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 57.98 Actual: 80.53 Expenditure:33735691.31 Release:49500000 Obligation:47026861.1 |
35.049471742412 |
1922286082 | ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System, Asset Preservation Program, Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads, Abra-Kalinga Rd - K0439 + 700 - K0439 + 760 Abra | DPWH Abra DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:31862911.1 Release:49000000 Obligation:48997160.26 |
2.6791089704997 |
1925860370 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Basic Infrastructure Program (BIP), Multi-Purpose Buildings/ Facilities to support Social Services, Construction (Completion) of Multi-Purpose Building, Barangay Nagbukel-Tuquipa, Luba, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 92.96 Actual: 90.65 Expenditure:0 Release:2970000 Obligation:2817710 |
-8.3602911443591 |
1932071532 | ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System, Asset Preservation Program, Preventive Maintenance - Tertiary Roads,Abra-Cervantes Rd - K0468 + 000 - K0475 + 703, K0477 + 187 - K0478 + 732 Abra | DPWH Abra DEO | (Cumulative) |
Target: 30.43 Actual: 27.44 Expenditure:0 Release:96500000 Obligation:92583458.3 |
-9.8258297732501 |
1946031281 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities, Construction of Poblacion-Mabongtot Road, Langiden, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 19.35 Actual: 17.26 Expenditure:0 Release:96500000 Obligation:92371795.74 |
-10.801033591731 |
1959413661 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Basic Infrastructure Program (BIP), Flood Mitigation Structures protecting Public Infrastructures/ Facilities, Construction of Quidaoen - Cabcaburao Flood Control Structure (Phase 2), Barangay Quidaoen to Barangay Cabcaborao, San Juan, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 100 Actual: 95.83 Expenditure:17063382.64 Release:49500000 Obligation:46554369.44 |
-43.860824742268 |
1959795527 | "CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239, Preventive Maintenance along Abra-Cervantes Rd - K0438 + 182 - K0439 + 119, K0439 + 1000 - K0440 + 000, K0439 + 119 - K0439 + 1000, K0440 + 000 - K0440 + 161" Abra | DPWH Abra DEO | (Cumulative) |
Target: 0 Actual: 70.01 Expenditure:0 Release:49000000 Obligation:47041314.67 |
0 |
1967836107 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities, Construction of Salnec-Madalipay-Dugong Bridge Phase 3, Salnec & Dugong, Bucay, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 10.59 Actual: 7.67 Expenditure:0 Release:96500000 Obligation:91716233.56 |
-27.573182247403 |
1972849468 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Basic Infrastructure Program (BIP), Flood Mitigation Structures protecting Public Infrastructures/ Facilities, Construction of Bugbog-Santa Rosa Flood Control Structure (Phase 2), Barangay Bugbog to Barangay Santa Rosa, Bucay, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 4.63 Actual: 5 Expenditure:0 Release:29700000 Obligation:28214930.03 |
7.9913606911447 |
1975439520 | "Preventive Maintenance along Abra-Cervantes Rd - K0463 + 000 - K0475 + 703" Abra | DPWH Abra DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:144750000 Obligation:138650319.6 |
0 |
1991467341 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Basic Infrastructure Program (BIP), Multi-Purpose Buildings/ Facilities to support Social Services, Construction (Completion) of Multi-Purpose Building, Barangay Caganayan, Tineg, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 37.87 Actual: 35 Expenditure:0 Release:2970000 Obligation:2821125.32 |
-10.348360655738 |
1991823182 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Basic Infrastructure Program (BIP), Multi-Purpose Buildings/ Facilities to support Social Services, Construction (Completion) of Multi-Purpose Building, Barangay Abang, Bucay, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 92.96 Actual: 90.12 Expenditure:0 Release:2970000 Obligation:2793320.99 |
-8.8960776384957 |
2018200666 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Basic Infrastructure Program (BIP), Flood Mitigation Structures protecting Public Infrastructures/ Facilities, Construction of Patagui Flood Control, Poblacion, La Paz, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 90.54 Actual: 80 Expenditure:17317730.9 Release:49500000 Obligation:46548995.04 |
-30.711934869219 |
2018571419 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities, Construction of Road, Danglas, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 26.05 Actual: 23.51 Expenditure:0 Release:49000000 Obligation:46793841.67 |
-9.7504798464491 |
2033699491 | ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System, Asset Preservation Program, Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads, Abra-Ilocos Norte Rd - K0445 + 950 - K0446 + 020 Abra | DPWH Abra DEO | (Cumulative) |
Target: 99.98 Actual: 100 Expenditure:33786263.02 Release:49000000 Obligation:46765308.04 |
6.4403176389671 |
2048007527 | ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System, Asset Preservation Program, Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads, Abra-Kalinga Rd - K0443 + 300 - K0443 + 400 Abra | DPWH Abra DEO | (Cumulative) |
Target: 47.33 Actual: 85.64 Expenditure:70252060.56 Release:96500000 Obligation:91739219.19 |
64.187116564417 |
2048928241 | ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System, Asset Preservation Program, Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads, Abra-Ilocos Norte Rd - K0431 + 600 - K0431 + 700 Abra | DPWH Abra DEO | (Cumulative) |
Target: 43.27 Actual: 100 Expenditure:63197045.13 Release:96500000 Obligation:93599961.7 |
115.05376344086 |
2049525718 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Construction/ Improvement of Access Roads leading to Declared Tourism Destinations (Tourism Road Infrastructure Program - TRIP), Alimusgan-Bai-Caganayan Road leading to Kaparkan Falls, Brgy. Caganayan, Tineg, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 100 Actual: 95.83 Expenditure:0 Release:2940000 Obligation:2789713.97 |
-7.4732065269866 |
2055092502 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Basic Infrastructure Program (BIP), Flood Mitigation Structures protecting Public Infrastructures/ Facilities, Construction of Malanas Flood Control, Malanas, San Juan, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 73.81 Actual: 80.55 Expenditure:24986208.77 Release:49500000 Obligation:46519951.13 |
0.11185682326621 |
2057030041 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Basic Infrastructure Program (BIP), Public Water Supply System (Level II or III), Construction of Water Supply (Level II), Barangay Tabiog, Bucay, Abra Abra | DPWH Abra DEO | (default) |
Target: 100 Actual: 96.38 Expenditure:0 Release:9900000 Obligation:9314834.93 |
-3.62 |
2059558695 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Basic Infrastructure Program (BIP), Flood Mitigation Structures protecting Public Infrastructures/ Facilities, Construction of Soot Flood Control, Barangay Mudeng, La Paz, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 82.35 Actual: 80.06 Expenditure:33502855.75 Release:49500000 Obligation:46531744.09 |
-25.365899133029 |
2061164494 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities, Rehabilitation of Langaosian - Sto Tomas Road, Villaviciosa & Manabo, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 26.88 Actual: 24.11 Expenditure:0 Release:49000000 Obligation:47511547.15 |
-10.30505952381 |
2068675571 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Flood Mitigation Structures protecting Public Infrastructures/ Facilities, Construction of Patagui Flood Control Structure, La Paz, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
2075899115 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities, Construction of Road, La Paz, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 0 Actual: 22.06 Expenditure:0 Release:96500000 Obligation:91588993.22 |
0 |
2084527690 | ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System, Asset Preservation Program, Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads,Abra-Ilocos Norte Rd - K0447 + 614 - K0447 + 700 Abra | DPWH Abra DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:96500000 Obligation:93560438.97 |
0 |
2101993324 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities, Construction of Soot-San Gregorio-Toon-Bulbulala Bypass Road, La Paz, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 25.23 Actual: 22.62 Expenditure:0 Release:96500000 Obligation:93624070.91 |
-10.344827586207 |
2105291255 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Flood Mitigation Structures protecting Public Infrastructures/ Facilities, Construction of Pang-ot Flood Control, Lagayan Abra | DPWH Abra DEO | (Cumulative) |
Target: 77.32 Actual: 80.06 Expenditure:25356836.29 Release:49000000 Obligation:46546937.15 |
-7.155282384321 |
2122189435 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities, Rehabilitation of Malibcong Road, Malibcong, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 30 Actual: 28.06 Expenditure:0 Release:49000000 Obligation:46516313.22 |
-6.4666666666667 |
2135743763 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities, Construction of Alaoa-Upper Tineg Road, Alaoa, Tineg, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:49000000 Obligation:46544785.43 |
0 |
2147070377 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities, Rehabilitation of Upper Tineg Road, Tineg, Abra Abra | DPWH Abra DEO | (Cumulative) |
Target: 43.11 Actual: 40.16 Expenditure:0 Release:0 Obligation:0 |
-6.8429598700998 |
5892195 | Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Flood Mitigation Structures Protecting Public Infrastructure Construction of Madduang River Flood Control, Sta. 84+680 - Sta. 84+835 (B/S), Kabugao, Apayao Apayao | DPWH Apayao 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
73079866 | Construction of Missing Links/ New Roads Abra-Kalinga-Apayao Road (Buluan-Banban-Puguin-Sacpil-Pinukpuk), Package 1, Apayao Apayao | DPWH Apayao 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
103860152 | National Building Program-Multipurpose/Facilities-Structural Improvement of Public Buildings and Construction of Evacuation Centers/Quarantine Facilities- CAR, Construction of Evacuation Center at Poblacion, Kabugao, Apayao Apayao | DPWH Apayao 1st DEO | (Cumulative) |
Target: 100 Actual: 78.12 Expenditure: Release:0 Obligation:34608021.6 |
-36.6 |
125373070 | Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse and Landslide - Secondary Roads, Conner-Kabugao Rd K0570+360 - K0570+372 Apayao | DPWH Apayao 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
133232378 | Construction of Multi Purpose Building - Construction of Multi-Purpose Building, Brgy. Badduat, Kabugao, Apayao Apayao | DPWH Apayao 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
179333717 | Asset Preservation Program - Rehabilitation / Reconstruction of Roads with Slips, Slope Collapse and Landslide - Tertiary Roads Apayao-Ilocos Norte Rd - K0614+325-K0614+354 Apayao | DPWH Apayao 1st DEO | (Cumulative) |
Target: 80 Actual: 68.98 Expenditure: Release:0 Obligation:24555860 |
-46.938461538462 |
185801160 | Flood Management Program - Construction/Maintenance of Flood Mitigation Structures and Drainage System Construction of Barren River (Downstream) Flood Control Structure, Sta. 39+033 - Sta.39+693 (L/S), Brgy. Malama, Conner, Apayao Apayao | DPWH Apayao 1st DEO | (Cumulative) |
Target: 55 Actual: 70.98 Expenditure: Release:0 Obligation:51762600 |
-29.02 |
224396254 | Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse and Landslide - Tertiary Roads, Apayao-Ilocos Norte Rd 621 + 290 - K0621 + 390 Apayao | DPWH Apayao 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
228602127 | Muti-Purpose Buidings/ Facilities to support Social Services Construction Multi-Purpose Building, Barangay Waga, Kabugao, Apayao Apayao | DPWH Apayao 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
247702593 | Construction of Nabuangan (Upstream) Flood Control, Sta. 38 + 997 - Sta. 39 + 837 (B/S), Brgy. Caglayan, Conner, Apayao Apayao | DPWH Apayao 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-67.401686820445 |
257998741 | Flood Management Program - Construction/Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers Construction of Apayao River Flood Control Structure, Sta. 82+292 - Sta. 82+592, Brgy. Nagbabalayan, Kabugao, Apayao Apayao | DPWH Apayao 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
259299252 | Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Multi-Purpose Buildings/ Facilities to support Social Services Construction (Completion) of Multi-Purpose Building, Badduat Livelihood Building, Kabugao, Apayao Apayao | DPWH Apayao 1st DEO | (Cumulative) |
Target: 70 Actual: 100 Expenditure: Release:0 Obligation:1470000 |
-16.666666666667 |
336867832 | Asset Preservation Program - Rehabilitation / Reconstruction of Roads with Slips, Slope Collapse and Landslide - Secondary Roads Kabugao-Pudtol-Luna-Cagayan Bdry. Rd - K0613+(010) - K0613+040 Apayao | DPWH Apayao 1st DEO | (Cumulative) |
Target: 90 Actual: 100 Expenditure: Release:0 Obligation:9800000 |
-28.571428571429 |
346308177 | Asset Preservation Program - Rehabilitation / Reconstruction of Roads with Slips, Slope Collapse and Landslide - Secondary Roads Conner-Kabugao Rd K0578 + 435 - K0579 + 357 Apayao | DPWH Apayao 1st DEO | (Cumulative) |
Target: 90 Actual: 90.31 Expenditure: Release:0 Obligation:9800000 |
-35.492857142857 |
363936322 | Muti-Purpose Buidings/ Facilities to support Social Services Construction (Completion) Multi-Purpose Building (KALIPI), Conner, Apayao Apayao | DPWH Apayao 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
445137885 | Construction/ Improvement of Access Roads leading to Declared Tourism Destinations, Caglayan-Paddig-Cupis Road leading to Nabuagan River, Banselan Cave, Cupis Loomweaving, Brgy. Caglayan (New Pob.), Conner, Apayao, Package II Apayao | DPWH Apayao 1st DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure: Release:0 Obligation:49000000 |
-31.453571428571 |
588530789 | Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones (Roads Leveraging Linkages for Industry and Trade Infrastructure Program - ROLL-IT), Manag-Talifugo-Paddaoan Road in support of Banana, Coffee, Cacao, Rice and Corn Industries, Conner, Apayao Apayao | DPWH Apayao 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
593240753 | Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones (Roads Leveraging Linkages for Industry and Trade Infrastructure Program - ROLL-IT), Maduang-Dagara-Maragat-Abra Boundary in support to Blacksmithing, Handicraft, Furniture, High Value Crops and Coffee Industries, Kabugao, Apayao Apayao | DPWH Apayao 1st DEO | (Cumulative) |
Target: 80 Actual: 88.34 Expenditure: Release:0 Obligation:67550000 |
-11.858333333333 |
630486812 | Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse and Landslide - Tertiary Roads, Apayao-Ilocos Norte Rd K0616 + 280 - K0616 + 380 Apayao | DPWH Apayao 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
632648347 | Construction of Missing Links/ New Roads Abra-Kalinga-Apayao Road (Buluan-Banban-Puguin-Sacpil-Pinukpuk), Package 1, Apayao Apayao | DPWH Apayao 1st DEO | (Cumulative) |
Target: 80 Actual: 89.29 Expenditure: Release:0 Obligation:39200000 |
-11.066666666667 |
640490278 | Paving of Unpaved Roads - Tertiary Roads Apayao-Ilocos Norte Road - K0631+851 - K0632+063 Apayao | DPWH Apayao 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
662551140 | Construction/ Maintenance of Flood Mitigation Structures and Drainage Systemns Construction of Barren River (Upstream) Flood Control Structure, Sta. 39+693 - Sta. 39+893 (R/S), Brgy. Ili, Conner, Apayao Apayao | DPWH Apayao 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
696546151 | Flood Management Program - Construction/Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers Construction of Apayao River Flood Control Structure, Sta. 82+292 - Sta. 82+592, Brgy. Nagbabalayan, Kabugao, Apayao Apayao | DPWH Apayao 1st DEO | (Cumulative) |
Target: 55 Actual: 90.78 Expenditure: Release:0 Obligation:23154236.27 |
-9.22 |
707190082 | Construction/ Improvement of Access Roads leading to Declared Tourism Destinations, Caglayan-Paddig-Cupis Road leading to Nabuagan River, Banselan Cave, Cupis Loomweaving, Brgy. Caglayan (New Pob.), Conner, Apayao, Package II Apayao | DPWH Apayao 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
741560563 | Construction/ Maintenance of Flood Mitigation Structures and Drainage Systemns Construction of Barren River (Upstream) Flood Control Structure, Sta. 39+693 - Sta. 39+993 (L/S), Brgy. Ili , Conner, Apayao Apayao | DPWH Apayao 1st DEO | (Cumulative) |
Target: 80 Actual: 92.89 Expenditure: Release:0 Obligation:23520000 |
-23.964285714286 |
787006886 | Network Development Program - Off-Carriageway Improvement - Tertiary Roads Apayao-Ilocos Norte Rd - K0615 - 485 + K0615 + 980 Apayao | DPWH Apayao 1st DEO | (Cumulative) |
Target: 60 Actual: 90.23 Expenditure: Release:0 Obligation:12504800 |
0.25555555555556 |
804363461 | Construction of Missing Links/ New Roads Abra-Kalinga-Apayao Road (Buluan-Banban-Puguin-Sacpil-Pinukpuk), Package 2, Apayao Apayao | DPWH Apayao 1st DEO | (default) |
Target: 80 Actual: 95.65 Expenditure: Release:0 Obligation:19600000 |
19.5625 |
814724898 | Asset Preservation Program - Rehabilitation / Reconstruction of Roads with Slips, Slope Collapse and Landslide - Secondary Roads Kabugao-Pudtol-Luna-Cagayan Bdry. Rd - K0595+320 - K0595+345 Apayao | DPWH Apayao 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
858993357 | Construction/ Maintenance of Flood Mitigation Structures and Drainage Systemns Construction of Barren River (Upstream) Flood Control Structure, Sta. 39+693 - Sta. 39+893 (R/S), Brgy. Ili, Conner, Apayao Apayao | DPWH Apayao 1st DEO | (Cumulative) |
Target: 80 Actual: 87.56 Expenditure: Release:0 Obligation:15680000 |
-28.735714285714 |
924438100 | Asset Preservation Program - Rehabilitation / Reconstruction of Roads with Slips, Slope Collapse and Landslide - Secondary Roads Kabugao-Pudtol-Luna-Cagayan Bdry Rd - K0591 + 692 - K0591 + 740 Apayao | DPWH Apayao 1st DEO | (Cumulative) |
Target: 90 Actual: 90.12 Expenditure: Release:0 Obligation:9800000 |
-35.628571428571 |
977538901 | Flood Management Program - Construction/Maintenance of Flood Mitigation Structures and Drainage System Construction of Barren River (Downstream) Flood Control Structure, Sta. 39+033 - Sta.39+693 (L/S), Brgy. Malama, Conner, Apayao Apayao | DPWH Apayao 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-67.537945579643 |
1000108409 | Construction/ Improvement of Access Roads leading to Declared Tourism Destinations (Tourism Road Infrastrcture Program) Manag-Liwan Road leading to Purag River, Purag Cave and Bellang Cave, Conner, Apayao Apayao | DPWH Apayao 1st DEO | (Cumulative) |
Target: 80 Actual: 100 Expenditure: Release:0 Obligation:9800000 |
-10.471428571429 |
1021061823 | Muti-Purpose Buidings/ Facilities to support Social Services Construction Multi-Purpose Building, Barangay Guinamgamman, Conner, Apayao Apayao | DPWH Apayao 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
1049836523 | Paving of Unpaved Roads - Tertiary Roads Apayao-Ilocos Norte Road - K0631+851 - K0632+063 Apayao | DPWH Apayao 1st DEO | (Cumulative) |
Target: 80 Actual: 100 Expenditure: Release:0 Obligation:9141440 |
-8.8833333333333 |
1069626786 | Construction of Multi Purpose Building - Construction of Multi-Purpose Building, Brgy. Badduat, Kabugao, Apayao Apayao | DPWH Apayao 1st DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure: Release:0 Obligation:4797017.19 |
-29.139130434783 |
1107852154 | Construction of Missing Links/ New Roads Abra-Kalinga-Apayao Road (Buluan-Banban-Puguin-Sacpil-Pinukpuk), Package 2, Apayao Apayao | DPWH Apayao 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
1122654021 | Muti-Purpose Buidings/ Facilities to support Social Services Construction Multi-Purpose Building, Barangay Waga, Kabugao, Apayao Apayao | DPWH Apayao 1st DEO | (Cumulative) |
Target: 80 Actual: 92.54 Expenditure: Release:0 Obligation:4950000 |
-22.883333333333 |
1136103373 | Construction/ Maintenance of Flood Mitigation Structures and Drainage Systemns Construction of Barren River (Upstream) Flood Control Structure, Sta. 39+693 - Sta. 39+993 (L/S), Brgy. Ili , Conner, Apayao Apayao | DPWH Apayao 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
1162595632 | Construction of Nabuangan (Upstream) Flood Control, Sta. 38 + 997 - Sta. 39 + 837 (B/S), Brgy. Caglayan, Conner, Apayao Apayao | DPWH Apayao 1st DEO | (Cumulative) |
Target: 80 Actual: 85.26 Expenditure: Release:0 Obligation:80309010.27 |
-22.06 |
1179584139 | Asset Preservation Program - Rehabilitation / Reconstruction of Roads with Slips, Slope Collapse and Landslide - Secondary Roads Abbut-Conner Rd - K0553+041-K0553+366 Apayao | DPWH Apayao 1st DEO | (Cumulative) |
Target: 90 Actual: 86.78 Expenditure: Release:0 Obligation:9800000 |
-38.014285714286 |
1249527003 | Construction/ Improvement of Access Roads leading to Declared Tourism Destinations (Tourism Road Infrastrcture Program) Manag-Liwan Road leading to Purag River, Purag Cave and Bellang Cave, Conner, Apayao Apayao | DPWH Apayao 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
1288546559 | Construction of Nabuangan River (Upstream) Flood Control, Sta. 37 + 807 - Sta. 38 + 267 (L/S), Sitio Paddig, Brgy. Caglayan, Conner, Apayao Apayao | DPWH Apayao 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
1289237579 | Muti-Purpose Buidings/ Facilities to support Social Services Construction Multi-Purpose Building, Barangay Bulu, Kabugao, Apayao Apayao | DPWH Apayao 1st DEO | (Cumulative) |
Target: 80 Actual: 95.46 Expenditure: Release:0 Obligation:4950000 |
-20.45 |
1303320772 | Paving of Unpaved Roads - Tertiary Roads Apayao-Ilocos Norte Road - K0635+714 - K0635+1000 Apayao | DPWH Apayao 1st DEO | (Cumulative) |
Target: 80 Actual: 96.75 Expenditure: Release:0 Obligation:20740720 |
-5.8 |
1405667974 | Network Development Program - Off-Carriageway Improvement - Tertiary Roads Apayao-Ilocos Norte Rd - K0615 - 485 + K0615 + 980 Apayao | DPWH Apayao 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
1412666054 | Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones (Roads Leveraging Linkages for Industry and Trade Infrastructure Program - ROLL-IT), Manag-Talifugo-Paddaoan Road in support of Banana, Coffee, Cacao, Rice and Corn Industries, Conner, Apayao Apayao | DPWH Apayao 1st DEO | (Cumulative) |
Target: 80 Actual: 91.67 Expenditure: Release:0 Obligation:48229720 |
-12.6 |
1420525369 | Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse and Landslide - Secondary Roads, Abbut-Conner Rd K0558 + 002 - K0558 + 156 Apayao | DPWH Apayao 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
1519906135 | Construction of Road Slope Protection Structure Apayao-Ilocos Norte Rd - K0623 + 020 - K0623 + 735 Apayao | DPWH Apayao 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
1553554216 | Asset Preservation Program - Rehabilitation / Reconstruction of Roads with Slips, Slope Collapse and Landslide - Secondary Roads Conner-Kabugao Rd K0578 + 435 - K0579 + 357 Apayao | DPWH Apayao 1st DEO | (default) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
1635514904 | Construction of Concrete Road Maduang-Dagara-Maragat-Abra Boundary in support to Blacksmithing, Handicraft, Furniture, High Value Crops and Coffee Industries, Kabugao, Apayao Apayao | DPWH Apayao 1st DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure: Release:0 Obligation:86848777.68 |
-34.64 |
1638547321 | Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse and Landslide - Tertiary Roads, Apayao-Ilocos Norte Rd 621 + 290 - K0621 + 390 Apayao | DPWH Apayao 1st DEO | (Cumulative) |
Target: 80 Actual: 82.14 Expenditure: Release:0 Obligation:77200000 |
-28.523076923077 |
1660017111 | National Building Program-Multipurpose/Facilities-Structural Improvement of Public Buildings and Construction of Evacuation Centers/Quarantine Facilities- CAR, Construction of Evacuation Center at Poblacion, Kabugao, Apayao Apayao | DPWH Apayao 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-67.753333333333 |
1668838794 | Asset Preservation Program - Rehabilitation / Reconstruction of Roads with Slips, Slope Collapse and Landslide - Tertiary Roads Apayao-Ilocos Norte Rd - K0614+325-K0614+354 Apayao | DPWH Apayao 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
1676773298 | Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Flood Mitigation Structures Protecting Public Infrastructure Construction of Sicapo River Flood Control, Sta. 88+632 - Sta. 88+932(L/S), Kabugao, Apayao Apayao | DPWH Apayao 1st DEO | (Cumulative) |
Target: 55 Actual: 77.99 Expenditure: Release:0 Obligation:24500000 |
-22.01 |
1690877527 | Construction of Concrete Road Maduang-Dagara-Maragat-Abra Boundary in support to Blacksmithing, Handicraft, Furniture, High Value Crops and Coffee Industries, Kabugao, Apayao Apayao | DPWH Apayao 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
1705168237 | Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse and Landslide - Tertiary Roads, Apayao-Ilocos Norte Rd K0616 + 280 - K0616 + 380 Apayao | DPWH Apayao 1st DEO | (Cumulative) |
Target: 80 Actual: 98.43 Expenditure: Release:0 Obligation:2940000 |
-17.975 |
1705189525 | Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Multi-Purpose Buildings/ Facilities to support Social Services Construction (Completion) of Multi-Purpose Building, Badduat Livelihood Building, Kabugao, Apayao Apayao | DPWH Apayao 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
1713580030 | Asset Preservation Program - Rehabilitation / Reconstruction of Roads with Slips, Slope Collapse and Landslide - Secondary Roads Kabugao-Pudtol-Luna-Cagayan Bdry. Rd - K0595+320 - K0595+345 Apayao | DPWH Apayao 1st DEO | (Cumulative) |
Target: 90 Actual: 93.38 Expenditure: Release:0 Obligation:5880000 |
-33.3 |
1716031820 | Construction of Road Slope Protection Structure Apayao-Ilocos Norte Rd - K0623 + 020 - K0623 + 735 Apayao | DPWH Apayao 1st DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure: Release:0 Obligation:28714000 |
-34.523333333333 |
1717629526 | Muti-Purpose Buidings/ Facilities to support Social Services Construction Multi-Purpose Building, Barangay Guinamgamman, Conner, Apayao Apayao | DPWH Apayao 1st DEO | (Cumulative) |
Target: 80 Actual: 100 Expenditure: Release:0 Obligation:4950000 |
2.3 |
1762764370 | Asset Preservation Program - Rehabilitation / Reconstruction of Roads with Slips, Slope Collapse and Landslide - Secondary Roads Kabugao-Pudtol-Luna-Cagayan Bdry. Rd - K0608+580-K0608+610 Apayao | DPWH Apayao 1st DEO | (Cumulative) |
Target: 90 Actual: 100 Expenditure: Release:0 Obligation:3920000 |
-28.571428571429 |
1827839355 | Asset Preservation Program - Rehabilitation / Reconstruction of Roads with Slips, Slope Collapse and Landslide - Secondary Roads Conner-Kabugao Rd K0593 + 235 - K0593 + 375 Apayao | DPWH Apayao 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
1842317262 | Asset Preservation Program - Rehabilitation / Reconstruction of Roads with Slips, Slope Collapse and Landslide - Secondary Roads Conner-Kabugao Rd K0593 + 235 - K0593 + 375 Apayao | DPWH Apayao 1st DEO | (Cumulative) |
Target: 90 Actual: 79.45 Expenditure: Release:0 Obligation:9800000 |
-43.25 |
1856375612 | Muti-Purpose Buidings/ Facilities to support Social Services Construction Multi-Purpose Building, Barangay Bulu, Kabugao, Apayao Apayao | DPWH Apayao 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
1872900982 | Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones (Roads Leveraging Linkages for Industry and Trade Infrastructure Program - ROLL-IT), Maduang-Dagara-Maragat-Abra Boundary in support to Blacksmithing, Handicraft, Furniture, High Value Crops and Coffee Industries, Kabugao, Apayao Apayao | DPWH Apayao 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
1874829856 | Asset Preservation Program - Rehabilitation / Reconstruction of Roads with Slips, Slope Collapse and Landslide - Secondary Roads Abbut-Conner Rd - K0553+041-K0553+366 Apayao | DPWH Apayao 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
1906725626 | Paving of Unpaved Roads - Tertiary Roads Apayao-Ilocos Norte Road - K0635+714 - K0635+1000 Apayao | DPWH Apayao 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
1906743164 | CSSP - Construction/ Improvement of Access Roads leading to Declared Tourism Destinations (Tourism Road Infrastructure Program - TRIP) Caglayan-Paddig-Cupis Road leading to Nabuangan River, Banselan Cave, Cupis Loomweaving, Brgy. Caglayan (New Pob.), Conner, Apayao Apayao | DPWH Apayao 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-67.863333333333 |
1940661591 | Asset Preservation Program - Rehabilitation / Reconstruction of Roads with Slips, Slope Collapse and Landslide - Secondary Roads Kabugao-Pudtol-Luna-Cagayan Bdry. Rd - K0613+(010) - K0613+040 Apayao | DPWH Apayao 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
1951919927 | Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Flood Mitigation Structures Protecting Public Infrastructure Construction of Madduang River Flood Control, Sta. 84+680 - Sta. 84+835 (B/S), Kabugao, Apayao Apayao | DPWH Apayao 1st DEO | (Cumulative) |
Target: 55 Actual: 90.12 Expenditure: Release:0 Obligation:24500000 |
-9.88 |
1985720959 | Construction of Nabuangan River (Upstream) Flood Control, Sta. 37 + 807 - Sta. 38 + 267 (L/S), Sitio Paddig, Brgy. Caglayan, Conner, Apayao Apayao | DPWH Apayao 1st DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure: Release:0 Obligation:39200000 |
-13.425 |
2006409392 | Asset Preservation Program - Rehabilitation / Reconstruction of Roads with Slips, Slope Collapse and Landslide - Secondary Roads Kabugao-Pudtol-Luna-Cagayan Bdry. Rd - K0608+580-K0608+610 Apayao | DPWH Apayao 1st DEO | (default) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
2024303803 | Asset Preservation Program - Rehabilitation / Reconstruction of Roads with Slips, Slope Collapse and Landslide - Secondary Roads Kabugao-Pudtol-Luna-Cagayan Bdry Rd - K0591 + 692 - K0591 + 740 Apayao | DPWH Apayao 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
2056763097 | CSSP - Construction/ Improvement of Access Roads leading to Declared Tourism Destinations (Tourism Road Infrastructure Program - TRIP) Caglayan-Paddig-Cupis Road leading to Nabuangan River, Banselan Cave, Cupis Loomweaving, Brgy. Caglayan (New Pob.), Conner, Apayao Apayao | DPWH Apayao 1st DEO | (Cumulative) |
Target: 60 Actual: 84.95 Expenditure: Release:0 Obligation:39200000 |
-22.772727272727 |
2086133726 | Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Flood Mitigation Structures Protecting Public Infrastructure Construction of Sicapo River Flood Control, Sta. 88+632 - Sta. 88+932(L/S), Kabugao, Apayao Apayao | DPWH Apayao 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
2087602339 | Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse and Landslide - Secondary Roads, Conner-Kabugao Rd K0570+360 - K0570+372 Apayao | DPWH Apayao 1st DEO | (default) |
Target: 80 Actual: 100 Expenditure: Release:0 Obligation:4410000 |
25 |
2117554546 | Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse and Landslide - Secondary Roads, Abbut-Conner Rd K0558 + 002 - K0558 + 156 Apayao | DPWH Apayao 1st DEO | (Cumulative) |
Target: 80 Actual: 94.78 Expenditure: Release:0 Obligation:10290000 |
-28.485714285714 |
2132349651 | Muti-Purpose Buidings/ Facilities to support Social Services Construction (Completion) Multi-Purpose Building (KALIPI), Conner, Apayao Apayao | DPWH Apayao 1st DEO | (Cumulative) |
Target: 80 Actual: 100 Expenditure: Release:0 Obligation:2354940 |
14.15 |
21306557 | Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Roads connecting to Indigenous People (IP) Communities - Improvement of Local Road, Barangay Bananao, Paracelis, Mountain Province Mountain Province | DPWH MP 2nd DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:4455000 Release:4950000 Obligation:4950000 |
21.817872340426 |
36382009 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP) -Construction/ Improvement of Access Roads leading to Trades, Industries and Economic Zones (Roads Leveraging Linkages for Industry and Trade Infrastructure Program - ROLL-IT) - Poblacion Natonin-Maducayan-Saliok Road connecting Maducayan to the National Road in support of Abaca, Banana, Cacao, Corn and Tourism Industries, Natonin, Mountain Province Coffee, Cacao, Rice, Bamboo, Corn, and Food Processing Industries, Natonin, Mountain Province Mountain Province | DPWH MP 2nd DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
56290728 | ORGANIZATIONAL OUTCOME 2: Protect Lives and Properties Against Major Floods - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Dannal Flood Control Structure, Sta. 076+960 - Sta. 077+660 (R.S.), Anonat, Paracelis, Mountain Province Mountain Province | DPWH MP 2nd DEO | (Cumulative) |
Target: 80 Actual: 67.67 Expenditure:32705661 Release:69960570 Obligation:69960570 |
-35.137931034483 |
63448860 | Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads - Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - K0472 + 350 - K0472 + 495 Mountain Province | DPWH MP 2nd DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
75051840 | ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System-Rehabilitation/Reconstruction of roads with Slips, Slope Collapse, and Landslide-Jct. Talubin-Barlig-Natonin-Paracelis-Calaccad Rd K0442+058-K0442+072, K0443+190-K0443+207, K0443+425-K0443+451,K0445+105-K0445+135, K0446+055-K0446+090, K0446+307-K0446+335, K0446+390-K0446+415, K0446+438-K0446+450, K0446+490-K0446+528, K0446+545-K0446+560, K0447+040-K0447+057, K0447+382-K0447+417, K0453+883-K0454+000 Mountain Province | DPWH MP 2nd DEO | (Cumulative) |
Target: 60 Actual: 54.41 Expenditure:15971771.6 Release:25576040 Obligation:25576040 |
-13.71709483032 |
86360259 | Rehabilitation/Reconstruction of roads with Slips, Slope Collapse, and Landslide-Jct. Talubin-Barlig-Natonin-Paracelis-Calaccad Rd K0442+058-K0442+072, K0443+190-K0443+207, K0443+425-K0443+451,K0445+105-K0445+135, K0446+055-K0446+090, K0446+307-K0446+335, K0446+390-K0446+415, K0446+438-K0446+450, K0446+490-K0446+528, K0446+545-K0446+560, K0447+040-K0447+057, K0447+382-K0447+417, K0453+883-K0454+000 Mountain Province | DPWH MP 2nd DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
86926222 | Local Program (LP) - Buildings And Other Structures - Multipurpose/ Facilities - National Building Program - Construction (Completion) of DPWH Mountain Province 2nd DEO Support Facilities, Saliok, Natonin, Mountain Province Mountain Province | DPWH MP 2nd DEO | (Cumulative) |
Target: 40.85 Actual: 51.28 Expenditure:23520000 Release:23520000 Obligation:23520000 |
-17.925736235595 |
190101519 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP) -Construction/ Improvement of Access Roads leading to Trades, Industries and Economic Zones (Roads Leveraging Linkages for Industry and Trade Infrastructure Program - ROLL-IT) - Poblacion, Natonin-Toboy Road in support of Abaca, Banana, Cacao, Corn and Tourism Industries, Natonin, Mountain Province Mountain Province | DPWH MP 2nd DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:6424110 Release:7137900 Obligation:7802760 |
8.3953488372093 |
212290810 | Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Dannal Flood Control Structure, Sta. 076+960 - Sta. 077+660 (R.S.), Anonat, Paracelis, Mountain Province Mountain Province | DPWH MP 2nd DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
253947813 | Construction/Rehabilitation of Water Supply/Septage and Sewerage/ Rainwater Collector System - Water Supply - Construction of Level III Water Supply System, Barlig, Mountain Province Mountain Province | DPWH MP 2nd DEO | (default) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
296556725 | ORGANIZATIONAL OUTCOME 2: Protect Lives and Properties Against Major Floods-Flood Management Program - Construction/Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Katao Flood Control Structure, Sta. 083+030-083+130 (R.S.), Brgy. Buringal, Paracelis, Mountain Province Mountain Province | DPWH MP 2nd DEO | (Cumulative) |
Target: 75.06 Actual: 85.29 Expenditure:7705577.03 Release:9800000 Obligation:9800000 |
7.2560362173038 |
310456037 | Construction/Rehabilitation/Improvement of Catao-Bangad-Bulo Local Road, Buringal, Paracelis, Mountain Province Mountain Province | DPWH MP 2nd DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:9850500 Release:9850500 Obligation:9900000 |
0.46779661016949 |
409833469 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP) - Construction/ Improvement of Access Roads leading to Declared Tourism Destinations (Tourism Road Infrastructure Program - TRIP) - Cassag-Bacarri-Camparadi-Cawayan-Buringal Proper-Sinamar Road leading to Smokey, Makilo Sphinx, Mabarutbot Mud Pool, Little Chocolate Hills, Buringal Waterfalls, Paracelis, Mt. Province Mountain Province | DPWH MP 2nd DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
417780578 | ORGANIZATIONAL OUTCOME 2: Protect Lives and Properties Against Major Floods - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Lower Sakakang Flood Control Structure, Sta. 117+620 - Sta. 118+070 (R.S.), Sta. 117+830 - Sta. 118+180 (L.S.), Bacarri, Paracelis, Mountain Province Mountain Province | DPWH MP 2nd DEO | (Cumulative) |
Target: 70 Actual: 65.02 Expenditure:45073220.91 Release:81060000 Obligation:81060000 |
-20.991869918699 |
471771032 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP) - Construction/ Improvement of Access Roads leading to Declared Tourism Destinations (Tourism Road Infrastructure Program - TRIP) - Cassag-Bacarri-Camparadi-Cawayan-Buringal Proper-Sinamar Road leading to Smokey, Makilo Sphinx, Mabarutbot Mud Pool, Little Chocolate Hills, Buringal Waterfalls, Paracelis, Mt. Province Mountain Province | DPWH MP 2nd DEO | (Cumulative) |
Target: 90 Actual: 82.08 Expenditure:63908666 Release:96500000 Obligation:96500000 |
16.79020979021 |
490989883 | ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System-Rehabilitation/Reconstruction of roads with Slips, Slope Collapse, and Landslide-Jct. Talubin-Barlig-Natonin-Paracelis-Calaccad Rd K0469+420-K0469+520, K0470+000-K0470+040, K0471+000-K0471+070, K0478+390-K0478+440, K0479+540-K0479+580, K0479+620-K0479+665 Mountain Province | DPWH MP 2nd DEO | (Cumulative) |
Target: 46.78 Actual: 45.52 Expenditure:15845008.72 Release:33629680 Obligation:33629680 |
-4.7300125575555 |
499360443 | ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System - Network Development - Paving of Unpaved Roads - Tertiary Roads - Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - (S04030LZ) Chainage 3415 - Chainage 4015 Mountain Province | DPWH MP 2nd DEO | (Cumulative) |
Target: 59.15 Actual: 55.14 Expenditure:10121079.73 Release:21560000 Obligation:21560000 |
-28.630597980844 |
553220712 | ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System-Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads - Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - K0396 + 223 - K0396 + 800 Mountain Province | DPWH MP 2nd DEO | (Cumulative) |
Target: 42.63 Actual: 32.76 Expenditure:3254476.03 Release:21809900 Obligation:21809900 |
-41.5 |
621934834 | Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads - Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - K0396 + 223 - K0396 + 800 Mountain Province | DPWH MP 2nd DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-73.506666666667 |
627642398 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP) -Construction/ Improvement of Access Roads leading to Trades, Industries and Economic Zones (Roads Leveraging Linkages for Industry and Trade Infrastructure Program - ROLL-IT) - Jct. Nansuso-Bacarri-BANTAHS-MPSPC-Tawang Road in support of Banana, Coffee, Cacao, Corn and Food Processing Industries, Paracelis, Mountain Province Mountain Province | DPWH MP 2nd DEO | (Cumulative) |
Target: 61.23 Actual: 56.35 Expenditure:18650652.6 Release:18650652.6 Obligation:18650652.6 |
-17.193240264511 |
689154339 | Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Roads connecting to Indigenous People (IP) Communities - Improvement of Local Road, Barangay Anonat Proper, Paracelis, Mountain Province Mountain Province | DPWH MP 2nd DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:4443519.58 Release:4950000 Obligation:4950000 |
-5.3930131004367 |
717479068 | ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads - Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - K0426 + 190 - K0426 + 647, K0426 + 722 - K0426 + 782 Mountain Province | DPWH MP 2nd DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:26514684 Release:29460760 Obligation:29460760 |
5.1368421052632 |
724129135 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP) -Construction/ Improvement of Access Roads leading to Trades, Industries and Economic Zones (Roads Leveraging Linkages for Industry and Trade Infrastructure Program - ROLL-IT) - Paracelis-Cassag-Makilo-Camparadi-Bantay Road connecting Bantay, Paracelis and National Road in support of Banana, Corn and Food Processing Industries, Paracelis, Mountain Province Mountain Province | DPWH MP 2nd DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:4900000 Release:4900000 Obligation:4900000 |
-2.1787234042553 |
771208335 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP) -Construction/ Improvement of Access Roads leading to Trades, Industries and Economic Zones (Roads Leveraging Linkages for Industry and Trade Infrastructure Program - ROLL-IT) - Fina-ig-Banawel Proper Road connecting Banawel Proper, Natonin and National Road in support of Coffee, Rice, Banana, Bambo, Corn, and Food Processing Industries, Natonin, Mountain Province Mountain Province | DPWH MP 2nd DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
773856401 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP) -Construction/ Improvement of Access Roads leading to Trades, Industries and Economic Zones (Roads Leveraging Linkages for Industry and Trade Infrastructure Program - ROLL-IT) - Fina-ig-Banawel Proper Road connecting Banawel Proper, Natonin and National Road in support of Coffee, Rice, Banana, Bambo, Corn, and Food Processing Industries, Natonin, Mountain Province Mountain Province | DPWH MP 2nd DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:0 Release:4900000 Obligation:4900000 |
-1.304347826087 |
804335466 | ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads - Mt. Province-Ifugao Rd (Kiling-Paracelis Sect) - K0460 + 124 - K0460 + 194, K0473+ 650 - K0473 + 710 Mountain Province | DPWH MP 2nd DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:6974681 Release:7761600 Obligation:7761600 |
-1.2977777777778 |
834277096 | Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads - Mt. Province-Ifugao Rd (Kiling-Paracelis Sect) - K0477 + 000 - K0477 + 312 Mountain Province | DPWH MP 2nd DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
855306661 | Flood Management Program - Construction/Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Katao Flood Control Structure, Sta. 083+030-083+130 (R.S.), Brgy. Buringal, Paracelis, Mountain Province Mountain Province | DPWH MP 2nd DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
892183834 | Network Development - Paving of Unpaved Roads - Tertiary Roads - Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - (S04030LZ) Chainage 830 - Chainage 1340 Mountain Province | DPWH MP 2nd DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
1002602484 | ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Network Development - Construction of Missing Links/ New Roads -Tanudan-Barlig - Ifugao Road (Tanudan-Barlig Section), Mountain Province Mountain Province | DPWH MP 2nd DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:4357188.13 Release:4900000 Obligation:4900000 |
-3.1245283018868 |
1032556956 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP) -Construction/ Improvement of Access Roads leading to Trades, Industries and Economic Zones (Roads Leveraging Linkages for Industry and Trade Infrastructure Program - ROLL-IT) - Poblacion, Natonin-Toboy Road in support of Abaca, Banana, Cacao, Corn and Tourism Industries, Natonin, Mountain Province Mountain Province | DPWH MP 2nd DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
1038104745 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP) -Construction/ Improvement of Access Roads leading to Trades, Industries and Economic Zones (Roads Leveraging Linkages for Industry and Trade Infrastructure Program - ROLL-IT) - Poblacion Natonin-Maducayan-Saliok Road connecting Maducayan to the National Road in support of Abaca, Banana, Cacao, Corn and Tourism Industries, Natonin, Mountain Province Coffee, Cacao, Rice, Bamboo, Corn, and Food Processing Industries, Natonin, Mountain Province Mountain Province | DPWH MP 2nd DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:4410000 Release:4900000 Obligation:4900000 |
-32.885906040268 |
1050124477 | ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System - Network Development - Paving of Unpaved Roads - Tertiary Roads - Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - (S04030LZ) Chainage 830 - Chainage 1340 Mountain Province | DPWH MP 2nd DEO | (Cumulative) |
Target: 77.14 Actual: 73.74 Expenditure:13398037.01 Release:21560000 Obligation:21560000 |
-18.672107643101 |
1077473416 | Construction/Rehabilitation/Improvement of Catao-Bangad-Bulo Local Road, Buringal, Paracelis, Mountain Province Mountain Province | DPWH MP 2nd DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
1095091436 | ORGANIZATIONAL OUTCOME 2: Protect Lives and Properties Against Major Floods - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Drainage System, Sta. 134+009 - Sta. 134+607, Butac, Natonin, Mountain Province Mountain Province | DPWH MP 2nd DEO | (Cumulative) |
Target: 50 Actual: 48.65 Expenditure:5115789.04 Release:34300000 Obligation:34300000 |
-13.511111111111 |
1104409800 | Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads - Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - K0426 + 190 - K0426 + 647, K0426 + 722 - K0426 + 782 Mountain Province | DPWH MP 2nd DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
1166907854 | ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads - Mt. Province-Ifugao Rd (Kiling-Paracelis Sect) - K0457 + 000 - K0457 + 107 Mountain Province | DPWH MP 2nd DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:0 Release:3525060 Obligation:3525060 |
-27.536231884058 |
1170654851 | ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads - Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - K0472 + 350 - K0472 + 495 Mountain Province | DPWH MP 2nd DEO | (Cumulative) |
Target: 62.74 Actual: 75.8 Expenditure:6957222.08 Release:9692200 Obligation:9692200 |
-4.196157735086 |
1238168030 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP) -Construction/ Improvement of Access Roads leading to Trades, Industries and Economic Zones (Roads Leveraging Linkages for Industry and Trade Infrastructure Program - ROLL-IT) - Paracelis-Cassag-Makilo-Camparadi-Bantay Road connecting Bantay, Paracelis and National Road in support of Banana, Corn and Food Processing Industries, Paracelis, Mountain Province Mountain Province | DPWH MP 2nd DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
1264614216 | Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Roads connecting to Indigenous People (IP) Communities - Improvement of Local Road, Barangay Anonat Proper, Paracelis, Mountain Province Mountain Province | DPWH MP 2nd DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
1270243538 | ORGANIZATIONAL OUTCOME 2: Protect Lives and Properties Against Major Floods - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Flood Control Structure, Bagwang Proper, Sta. 088+900 - Sta. 089+500 (R.S.), Palitod, Paracelis, Mountain Province Mountain Province | DPWH MP 2nd DEO | (Cumulative) |
Target: 75 Actual: 70.71 Expenditure:43649918 Release:57900000 Obligation:57900000 |
-45.361538461538 |
1306011984 | ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads - Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - K0463 + 1490 - K0463 + 1562 Mountain Province | DPWH MP 2nd DEO | (Cumulative) |
Target: 100 Actual: 70.3 Expenditure:13434175.8 Release:29400000 Obligation:29400000 |
-20.263440860215 |
1334535290 | Network Development Program - Paving of Unpaved Roads - Tertiary Roads - Mt. Province-Isabela Rd - (S00535LZ) Chainage 19133 - Chainage 19243 Mountain Province | DPWH MP 2nd DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
1397347196 | ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System - Network Development Program - Paving of Unpaved Roads - Tertiary Roads - Mt. Province-Isabela Rd - (S00535LZ) Chainage 19133 - Chainage 19243 Mountain Province | DPWH MP 2nd DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:3880800 Release:4312000 Obligation:4312000 |
-42.4 |
1445146888 | Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Flood Control Structure, Bagwang Proper, Sta. 088+900 - Sta. 089+500 (R.S.), Palitod, Paracelis, Mountain Province Mountain Province | DPWH MP 2nd DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
1464777074 | Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads - Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - K0463 + 1490 - K0463 + 1562 Mountain Province | DPWH MP 2nd DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
1464990796 | Local Program (LP) - Buildings And Other Structures - Multipurpose/ Facilities - National Building Program - Construction (Completion) of DPWH Mountain Province 2nd DEO Support Facilities, Saliok, Natonin, Mountain Province Mountain Province | DPWH MP 2nd DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-72.453097345133 |
1509785682 | Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Lower Sakakang Flood Control Structure, Sta. 117+620 - Sta. 118+070 (R.S.), Sta. 117+830 - Sta. 118+180 (L.S.), Bacarri, Paracelis, Mountain Province Mountain Province | DPWH MP 2nd DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-69.50690869683 |
1570579513 | Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads - Mt. Province-Ifugao Rd (Kiling-Paracelis Sect) - K0460 + 124 - K0460 + 194, K0473+ 650 - K0473 + 710 Mountain Province | DPWH MP 2nd DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
1581325737 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP) -Construction/ Improvement of Access Roads leading to Trades, Industries and Economic Zones (Roads Leveraging Linkages for Industry and Trade Infrastructure Program - ROLL-IT) - Poblacion, Paracelis-Bantay-Buringal Road in support of Banana, Cacao, Corn and Tourism Industries, Paracelis, Mountain Province Mountain Province | DPWH MP 2nd DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:4410000 Release:4900000 Obligation:4900000 |
-13.646153846154 |
1646555624 | Retrofitting/ Strengthening of Permanent Bridges - Bananao Br. (B00993LZ) along Mt. Province-Ifugao Rd (Kiling-Paracelis Sect) Mountain Province | DPWH MP 2nd DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
1663570026 | Network Development - Paving of Unpaved Roads - Tertiary Roads - Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - (S04030LZ) Chainage 3415 - Chainage 4015 Mountain Province | DPWH MP 2nd DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
1718024755 | ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System - Bridge - Retrofitting/ Strengthening of Permanent Bridges - Bananao Br. (B00993LZ) along Mt. Province-Ifugao Rd (Kiling-Paracelis Sect) Mountain Province | DPWH MP 2nd DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:13230000 Release:14700000 Obligation:14700000 |
-5.2304347826087 |
1731131252 | Network Development - Paving of Unpaved Roads - Tertiary Roads - Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - (S04030LZ) Chainage 1340 - Chainage 1640 Mountain Province | DPWH MP 2nd DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
1746043413 | Rehabilitation/Reconstruction of roads with Slips, Slope Collapse, and Landslide-Jct. Talubin-Barlig-Natonin-Paracelis-Calaccad Rd K0469+420-K0469+520, K0470+000-K0470+040, K0471+000-K0471+070, K0478+390-K0478+440, K0479+540-K0479+580, K0479+620-K0479+665 Mountain Province | DPWH MP 2nd DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
1750797513 | Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Drainage System, Sta. 134+009 - Sta. 134+607, Butac, Natonin, Mountain Province Mountain Province | DPWH MP 2nd DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-67.573333333333 |
1756422539 | Network Development - Construction of Missing Links/ New Roads -Tanudan-Barlig - Ifugao Road (Tanudan-Barlig Section), Mountain Province Mountain Province | DPWH MP 2nd DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
1774043720 | ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System - Network Development - Paving of Unpaved Roads - Tertiary Roads - Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - (S04030LZ) Chainage 1340 - Chainage 1640 Mountain Province | DPWH MP 2nd DEO | (Cumulative) |
Target: 60 Actual: 53.17 Expenditure:3576941.17 Release:9378600 Obligation:9378600 |
-24.613639585992 |
1796339967 | Construction/ Improvement of Access Roads leading to Trades, Industries and Economic Zones (Roads Leveraging Linkages for Industry and Trade Infrastructure Program - ROLL-IT) - Jct. Nansuso-Bacarri-BANTAHS-MPSPC-Tawang Road in support of Banana, Coffee, Cacao, Corn and Food Processing Industries, Paracelis, Mountain Province Mountain Province | DPWH MP 2nd DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
1824284260 | Network Development - Construction of Missing Links/ New Roads - Tanudan-Barlig - Ifugao Road (Barlig - Banaue Section), Mountain Province Mountain Province | DPWH MP 2nd DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
1855344231 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP) - Construction/Rehabilitation of Water Supply/Septage and Sewerage/ Rainwater Collector System - Water Supply - Construction of Level III Water Supply System, Barlig, Mountain Province Mountain Province | DPWH MP 2nd DEO | (Cumulative) |
Target: 100 Actual: 92.37 Expenditure:10423114.12 Release:19600000 Obligation:19600000 |
-22.355555555556 |
1958964766 | Network Development Program-Paving of Unpaved Roads - Tertiary Roads, Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - (S03997LZ) Chainage 409+040 - 409+090,K0427+535-K0427+693,K0428+538-K0428+735,K0429+741-K0429+798,K0429+869-K0430+137,K0435+435-K0435+526 Mountain Province | DPWH MP 2nd DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
1970304198 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP) -Construction/ Improvement of Access Roads leading to Trades, Industries and Economic Zones (Roads Leveraging Linkages for Industry and Trade Infrastructure Program - ROLL-IT) - Poblacion, Paracelis-Bantay-Buringal Road in support of Banana, Cacao, Corn and Tourism Industries, Paracelis, Mountain Province Mountain Province | DPWH MP 2nd DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
2024224049 | ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads - Mt. Province-Ifugao Rd (Kiling-Paracelis Sect) - K0477 + 000 - K0477 + 312 Mountain Province | DPWH MP 2nd DEO | (Cumulative) |
Target: 100 Actual: 98.73 Expenditure:5986247 Release:10279220 Obligation:10279220 |
-5.4755555555556 |
2044582745 | Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Roads connecting to Indigenous People (IP) Communities - Improvement of Local Road, Barangay Bananao, Paracelis, Mountain Province Mountain Province | DPWH MP 2nd DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
2085603178 | ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System - Network Development - Construction of Missing Links/ New Roads - Tanudan-Barlig - Ifugao Road (Barlig - Banaue Section), Mountain Province Mountain Province | DPWH MP 2nd DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:12498163.37 Release:29400000 Obligation:29400000 |
31.181286549708 |
2093788276 | Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads - Mt. Province-Ifugao Rd (Kiling-Paracelis Sect) - K0457 + 000 - K0457 + 107 Mountain Province | DPWH MP 2nd DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
2129573126 | ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System-Network Development Program-Paving of Unpaved Roads - Tertiary Roads, Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - (S03997LZ) Chainage 409+040 - 409+090,K0427+535-K0427+693,K0428+538-K0428+735,K0429+741-K0429+798,K0429+869-K0430+137,K0435+435-K0435+526 Mountain Province | DPWH MP 2nd DEO | (Cumulative) |
Target: 83.21 Actual: 89.07 Expenditure:27358528.98 Release:34300000 Obligation:34300000 |
-21.510398308072 |
4572032 | Construction of Pantar Elementary School/ Bravo/ Masablang Access Road, Barangay Laya West/ Masablang, Tabuk City, Kalinga Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
88132656 | Tabuk-Banawe via Tanudan-Barlig Rd - (S005083LZ) - K0513 + 188 – K0513 + 797, K0513 + 816 – K0514 + 088, K0514 + 525 – K0514 + 677, K0516 + 689 – K0516 + 723, K0533 + 720 – K0533 + 780, K0537 + 480 – K0537 + 540, K0542 + 620, K0542 + 660 Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:25000000 Release:24384428.55 Obligation:25000000 |
-0.29875633988745 |
144925131 | Bulanao-Paracelis Rd - K0500 + 453 - K0500 + 548 Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 80 Expenditure:2549000 Release:2462400.84 Obligation:2549000 |
-52.133823751701 |
145021435 | Installation of Safety Devices and Solar LED Street Light along Mt Province Bdry-Calanan-Pinukpuk-Abbut - K0470 + (-103) - K479 + 421 Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 83 Expenditure:96737000 Release:92415306.09 Obligation:96737000 |
10.97089225696 |
170533826 | Construction of Kinama/ San Quintin/ Mapitpitak, Callagdao/ Purok 1-Bitanga Access Road with Box Culvert, Barangay Kinama/ San Quintin/ Bulanao/ Laya West, Rizal/ Tabuk City, Kalinga Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
178019105 | Tabuk-Banawe via Tanudan-Barlig Rd - K0512 + 461 - K0512 + 472, K0514 + 169 - K0514 + 207, K0518 + 645 - K0518 + 695, K0536 + 808 - K0536 + 833, K0542 + 621 - K0542 + 658 Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 72.06 Expenditure:16500000 Release:16054506.46 Obligation:16500000 |
-29.663140311804 |
183177316 | Construction of Level III Water Supply System, Rizal, Kalinga Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-91.666666666667 |
185151183 | Balbalan-Pinukpuk Rd - K0499+3215-K0499+3294, K0509+051-K0509+496, K0515+270-K0515+400 Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 93.2 Expenditure:14011000 Release:13032436.47 Obligation:14011000 |
-9.9088102247433 |
186768551 | Construction (Completion) of Sitio Pakak Multi-Purpose Building in Agbannawag, Tabuk City, Kalinga Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:800000 Release:762400.9 Obligation:800000 |
0.45598432318359 |
214146559 | Construction of Multi-Purpose Building, Pinagan Elementary School/Lacnog West,Barangay Lucog/Lacnog West, Tabuk City, Kalinga Kalinga | DPWH Lower Kalinga DEO | (default) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
216160308 | Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd (Cagaluan-Calanan Sect) - K0481 + 905 - K0481 + 949 Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:100000000 Release:96362598.43 Obligation:100000000 |
-0.58333333333333 |
232704703 | Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd (Pinukpuk-Abbut Sect) - K0531 + 013 - K0531 + 801 Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
240537628 | Construction of Central School/ Sunrise/ Pinuk-Balan, Purok 7/ Hilltop (Cliff) Flood Control, Barangay Dagupan/ Bulanao, Tabuk City, Kalinga Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:5000000 Release:4916940.37 Obligation:5000000 |
-1.925820256776 |
242960234 | Construction of Flood Control Structure along Saltan River, Sta. 15 + 700 - Sta. 16 + 650, Apatan, Pinukpuk, Kalinga Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
257309826 | Installation of Safety Devices and Solar LED Street Light along Mt Province Bdry-Calanan-Pinukpuk-Abbut - K0479 + 421 - K0488 + 945 Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 81 Expenditure:97884000 Release:93511062.34 Obligation:97884000 |
9.8457436678728 |
278297966 | Macutay-Greenhills-San Pedro and San Vicente Access Road leading to Elephant Hill, Archeological Tourism Site, Brgy. San Pedro, Rizal (Liwan), Kalinga Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
279119736 | Mt. Province Bdry.-Calanan-Pinukpuk-Abbut Road (Pinukpuk-Abbut Section) - K0528+1048-K0528+1064, K0531+474-K0531+515, K0532+691-K0532+714 Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
316830053 | Construction of Bono-Bongat Road, Rizal, Kalinga Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-69.833333333333 |
318021086 | Improvement of Purok 5-Purok 1 Drainage Canal System in Bulanao, Tabuk City, Kalinga Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
336708529 | Installation of Safety Devices and Solar LED Street Light along Mt Province Bdry-Calanan-Pinukpuk-Abbut - K0488 + 945 - K0495 + 358 (Cagaluan-Calanan Section), K0496 + (-700) - K0498 + 469 (Calanan-Pinukpuk Section) Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 76.81 Actual: 70 Expenditure:97503000 Release:93146757.09 Obligation:97503000 |
29.755028878709 |
347903212 | Balbalan-Pinukpuk Rd - (S00537LZ) Chainage 1023 - Chainage 1062, Chainage 2366 - Chainage 2383, Chainage 18742 - Chainage 18814, Chainage 24711 - Chainage 24738, Chainage 25580 - Chainage 25652, Chainage 25722 - Chainage 25882 Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
357493249 | Installation and Furnishing of Safety Devices Solar Studs and Solar LED Street Light along Kalinga-Cagayan Rd (Calanan-Enrile Section) - K0516 + 705 - K0526 + 229 Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-67.9 |
357586045 | Tabuk-Banawe via Tanudan-Barlig Rd - K0513 + 427 - K0513 + 443, K0520 + 863 - K0520 + 893, K0523 + 032 - K0523 + 121, K0523 + 604 - K0523 + 608, K0523 + 611 - K0523 + 620, K0523 + 958 - K0523 + 1008, K0524 + 846 - K0524 + 899, K0525 + 151 - K0525 + 234, K0525 + 658 - K0525 + 998, K0533 + 720 - K0533 + 765 Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
363033234 | Installation and Furnishing of Safety Devices Solar Studs and Solar LED Street Light along Kalinga-Cagayan Rd (Calanan-Enrile Section) - K0516 + 705 - K0526 + 229 Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 81.11 Expenditure:97699000 Release:93334334.39 Obligation:97699000 |
9.3352821555669 |
364287607 | Tabuk-Banawe via Tanudan-Barlig Rd, Kalinga Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 40 Expenditure:100000000 Release:96171116.07 Obligation:100000000 |
-22.869500574441 |
365280322 | Construction of A. Canao Bridge Towards Camalog (Channeling, Embankment Dike, Revetment), along Chico River, Sta. 92+700 - Sta. 93+500 (Right Bank), Tabuk City, Kalinga Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
372830750 | Mt. Province Bdry-Calanan-Pinukpuk-Abbut Rd (Calanan-Pinukpuk Sect) - K0496 + (-700) - K0496 + 475, K0508 + 189 - K0508 + 654 Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:24840000 Release:21894135.68 Obligation:24840000 |
-0.66666666666667 |
390900474 | Installation and Furnishing of Safety Devices Solar Studs and Solar LED Street Light along Nambaran-Isabela Rd - K0509 + (-903) - K0520 + 865 Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 80.22 Expenditure:95777000 Release:91498186.85 Obligation:95777000 |
7.8819903126376 |
418487195 | Nambaran-Isabela Rd - K0512 + 877 - K0513 + 502 Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
423912132 | Construction of Mega Dike Project along Chico River, Sta. 84 + 000 - Sta. 85 + 000 (Left Bank), Tabuk City, Kalinga Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-69.833333333333 |
443961147 | Nambaran-Isabela Rd - K0512 + 877 - K0513 + 502 Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:7375000 Release:7195807.36 Obligation:7375000 |
-0.2745618450556 |
449600773 | Installation and Furnishing of Safety Devices Solar Studs and Solar LED Street Light along Bulanao-Paracelis Rd - K0500 + (-569) - K0508 + 955 Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 83 Expenditure:94084000 Release:89881129.22 Obligation:94084000 |
9.9412590984549 |
467255459 | Construction of Level III Water Supply System, Tabuk City, Kalinga Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-69 |
477233190 | Installation of Safety Devices and Solar LED Street Light along Mt Province Bdry-Calanan-Pinukpuk-Abbut - K0525 + 616 - K0535 + 140 Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.81 |
489581942 | Tabuk-Banawe via Tanudan-Barlig Rd - K0512 + 461 - K0512 + 472, K0514 + 169 - K0514 + 207, K0518 + 645 - K0518 + 695, K0536 + 808 - K0536 + 833, K0542 + 621 - K0542 + 658 Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
492885291 | Improvement of Road at R. Baduyen Street from Balacang Street to Sitio San Felipe, Magsaysay, Tabuk City, Kalinga Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
493928284 | Construction of Multi-Purpose Building, Cawagayan/Allaguia/Malagnat, Barangay Cawagayan/Allaguia/Malagnat, Pinukpuk, Kalinga Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:5000000 Release:4944593.12 Obligation:5000000 |
-6.3981772276618 |
497324749 | Construction of Casabsaba-an/ Balawag/Amlao Proper/Bliss Flood Control, Brgy. Bulanao/Balawag/Amlao/ Nambaran, Tabuk City, Kalinga Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:5000001 Release:4811362.67 Obligation:5000001 |
-3.1327398085548 |
500616452 | Construction of Callagdao, Bulanao to Makilo, Calacaad Road leading to Saudi Bulo Lake Toursim Site, Barangay Bulanao-Calacaad, Tabuk City, Kalinga Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 91 Expenditure:10000000 Release:9890302.65 Obligation:10000000 |
-11.364169992956 |
524165902 | Kalinga-Cagayan Rd (Calanan-Enrile Section) - K0520 + 026 - K0521 + 000, K0524+ 128 - K0525 + 096 Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
529259636 | Construction of Amlao Flood Control Structure along Chico River, Sta. 110+100 - Sta. 111+000, Brgy. Amlao, Tabuk City, Kalinga Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:41306000 Release:40254513.26 Obligation:41306000 |
0.13796909492274 |
537605672 | Installation of Safety Devices and Solar LED Street Light along Mt Province Bdry-Calanan-Pinukpuk-Abbut - K0488 + 945 - K0495 + 358 (Cagaluan-Calanan Section), K0496 + (-700) - K0498 + 469 (Calanan-Pinukpuk Section) Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
538956722 | Access Road leading to Banga-Banga Falls, Tabuk City, Kalinga Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
540104575 | Construction of Pantar Elementary School/ Bravo/ Masablang Access Road, Barangay Laya West/ Masablang, Tabuk City, Kalinga Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 91 Expenditure:5000000 Release:4895118.81 Obligation:5000000 |
-12.310060914385 |
554486408 | Tabuk-Banawe via Tanudan-Barlig Rd - K0510 + 095 - K0510 + 159, K0511 + 381 - K0511 + 402, K0511 + 605 - K0511 + 632, K0511 + 758 - K0511 + 772, K0523 + 000 - K0524 + 000, K0525 + 907 - K0525 + 960 Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
556214940 | Babalag West-Liwan West-Alibangbang Access Road connecting Enrile-Tabuk National Road and Alibangbang Access Road in support to Veggie Noddles/Chips Processing and Sugarcane Processing, Rizal, Kalinga Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
573564754 | Construction of Masabalang-Ragas-Callugayan Road, Barangay Masablang, Tabuk City, Kalinga Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
574953443 | Construction of Tuliao/ New Tanglag/ Appas EJB/ Dutol, Matambong Falls/Avocado Access Road, Barangay Calanan/New Tanglag/ Appas/ Amlao/ Bulanao, Tabuk City, Kalinga Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:8000000 Release:7778549.84 Obligation:8000000 |
-4.7067494998421 |
602760055 | Construction (Completion) of Sitio Pakak Multi-Purpose Building in Agbannawag, Tabuk City, Kalinga Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
604605799 | Construction (Completion) of Multi-Purpose Building, Pagugu/Appas, Barangay Pagugu/Appas, Tanudan/Tabuk City, Kalinga Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
606520901 | Construction of Purok 4/Tuga/ Greenhills Access Road, Brgy. Calanan/Tuga/Bulanao, Tabuk City, Kalinga Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
607653856 | Balbalan-Pinukpuk Rd - K0499+3215-K0499+3294, K0509+051-K0509+496, K0515+270-K0515+400 Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
643904133 | Kalinga-Cagayan Rd (Calanan-Enrile Section) - K0497 + 510 - K0498 + 344, K0499 + 915 - K0503 + 000, K0505 + 000 - K0506 + 494, K0510 + 780 - K0511 + 939 Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
659974256 | Construction of Flood Control Structure along Cal-owan River, Sta. 2 + 430 - Sta. 3 + 380 (Left Bank), Brgy. Ammacian to Brgy. Malagnat, Pinukpuk, Kalinga Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
670789764 | Construction of Mega Dike Project along Chico River (Left Bank), Tabuk City, Kalinga Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 76.82 Actual: 35.07 Expenditure:60000000 Release:57568444.07 Obligation:60000000 |
-49.734530360073 |
673925773 | Lucog-Magnao Road connecting Mt. Province Boundary-Calanan-Abbut National Road and Magnao Road in Support to the Coffee and Tiger Grass Processing, Tabuk City, Kalinga Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:4000000 Release:3907848.63 Obligation:4000000 |
-6.4187657171126 |
679872163 | Tabuk-Banawe via Tanudan-Barlig Rd, Kalinga Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 81.99 Actual: 0 Expenditure: Release:100000000 Obligation:0 |
-74.034966245456 |
689032232 | Improvement of Calaccad / Makilo / San Sebastian Local Road in Tabuk City, Kalinga Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:3000000 Release:2941526.68 Obligation:3000000 |
-16.166666666667 |
698958151 | Tabuk-Banawe via Tanudan-Barlig Rd - K0543 + 394 - K0543 + 474 Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
699608499 | Construction of Multi-Purpose Building, Pinagan Elementary School/Lacnog West,Barangay Lucog/Lacnog West, Tabuk City, Kalinga Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:6000000 Release:5924933.66 Obligation:6000000 |
-16.542724849165 |
699954742 | Construction of Drainage System (Canal Lining) in Karitanan, Katabbogan, Pinukpuk, Kalinga Kalinga | DPWH Lower Kalinga DEO | (default) |
Target: 100 Actual: 100 Expenditure:1000000 Release:974051.61 Obligation:1000000 |
0 |
702749865 | Mt. Province Bdry.-Calanan-Pinukpuk-Abbut Rd (Cagaluan-Calanan Section) - K0472+262-K0472+307, K0472+364-K0472+401, K0472+431-K0472+473, K0472+726-K0472+752, K0472+860-K0472+907, K0476+1114-K0476+1145, K0477+297-K0477+329, K0480+839-K0480+874, K0481+183-K0481+220, K0484+885-K0484+913, K0484+927-K0484+940, K0484+958-K0484+981, K0486+794-K0486+815, K0487+501-K0487+547, K0487+608-K0487+641, K0492+276-K0492+306, K0493+741-K0493+830 Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure: Release:44500000 Obligation:0 |
-90.789635269557 |
730035307 | Improvement of Road at R. Baduyen Street from Balacang Street to Sitio San Felipe, Magsaysay, Tabuk City, Kalinga Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:10000000 Release:9782966.89 Obligation:10000000 |
8.7191926192229 |
742643154 | Construction of Masabalang-Ragas-Callugayan Road, Barangay Masablang, Tabuk City, Kalinga Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 60.65 Expenditure:25000000 Release:24474158.18 Obligation:25000000 |
-24.265597314184 |
759620262 | Tabuk-Banawe via Tanudan-Barlig Rd - K0510 + 095 - K0510 + 159, K0511 + 381 - K0511 + 402, K0511 + 605 - K0511 + 632, K0511 + 758 - K0511 + 772, K0523 + 000 - K0524 + 000, K0525 + 907 - K0525 + 960 Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:25000000 Release:24442908.73 Obligation:25000000 |
11.045260654562 |
760625249 | Bulanao-Paracelis Road-K0504+236-K0504+540, K0513+230-K0513+321 Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
767320143 | Construction of Casabsaba-an/ Balawag/Amlao Proper/Bliss Flood Control, Brgy. Bulanao/Balawag/Amlao/ Nambaran, Tabuk City, Kalinga Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
783526307 | Bangaan-Bakir Access Road connecting Liwan West National Road and Bangaan-Bakir Access Road in support to Veggie Noodle Processing Industry, Rizal, Kalinga Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:4000000 Release:3880436.36 Obligation:4000000 |
-0.9001569080849 |
797620526 | Construction of Level III Water Supply Project, Tanudan, Kalinga Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
836035175 | Construction (Completion) of Multi-Purpose Building, Calaocan/Casabaan, Barangay Calaocan/Bulanao, Rizal/Tabuk City, Kalinga Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-81.073333333333 |
850297638 | Cagayan-Kalinga Road Junction-Mapaoay (Ipil)-Nasgueban Bypass Road in support of Processed Food Industry and Feedmill Industry, Tabuk City, Kalinga Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:3523000 Release:3441589.88 Obligation:3523000 |
6.4178127046496 |
862714159 | Construction of Mega Dike Project along Chico River, Sta. 84 + 000 - Sta. 85 + 000 (Left Bank), Tabuk City, Kalinga Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 95.13 Actual: 52 Expenditure:60000000 Release:57568444.07 Obligation:60000000 |
-49.308422043595 |
865144955 | Installation and Furnishing of Safety Devices Solar Studs and Solar LED Street Light along Nambaran-Isabela Rd - K0509 + (-903) - K0520 + 865 Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-67.97 |
932424971 | Rehabilitation of Liwan West Water Works in Rizal, Kalinga Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 93 Expenditure:1000000 Release:940502.91 Obligation:1000000 |
-15.80386308763 |
934031981 | Construction of Level III Water Supply System, Tabuk City, Kalinga Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 67.26 Actual: 62.78 Expenditure:71706000 Release:69190699.49 Obligation:71706000 |
-8.9667584162608 |
943100479 | Balbalan-Pinukpuk Rd - K0517 + 274 - K0517 + 308, K0522 + 830 - K0522 + 862 Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
949653344 | Bangaan-Bakir Access Road connecting Liwan West National Road and Bangaan-Bakir Access Road in support to Veggie Noodle Processing Industry, Rizal, Kalinga Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
953653664 | Construction of Bantor-Balong Circumferential Road in Barangay Balong, Tabuk City, Kalinga Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
967880404 | Macutay-Greenhills-San Pedro and San Vicente Access Road leading to Elephant Hill, Archeological Tourism Site, Brgy. San Pedro Rizal (Liwan), Kalinga Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
969538415 | Kalinga-Cagayan Rd (Calanan-Enrile Section) - K0506 + 905 - K0507 + 000, K0512 + 469 - K0512 + 931 Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
970172281 | Construction of Pantal, Brookside/New Balbalan Public Cemetery Access Road, Barangay Bulanao/Lacnog, Tabuk City, Kalinga Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 98.1 Expenditure:5000000 Release:4800018.76 Obligation:5000000 |
-5.4935132823267 |
990540633 | Construction of Bantor-Balong Circumferential Road in Barangay Balong, Tabuk City, Kalinga Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:30000000 Release:29670348.06 Obligation:30000000 |
2.2669166524629 |
1021565632 | Construction of Tuliao/ New Tanglag/ Appas EJB/ Dutol, Matambong Falls/Avocado Access Road, Barangay Calanan/New Tanglag/ Appas/ Amlao/ Bulanao, Tabuk City, Kalinga Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
1034760049 | Tabuk-Banawe via Tanudan-Barlig Rd - (S005083LZ) - K0524 + 050.5 - K0525 + 110, K0525 + 144 - K0525 + 228.5, K0539 + 750 - K0539 + 790, K0538 + 640 - K0538 + 706, K0544 + 347 + K0544 + 600 Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:25000000 Release:24377389.91 Obligation:25000000 |
18.733839689722 |
1050774779 | Construction (Completion) of Mapaoay Multi-Purpose Building with MPP in Ipil, Tabuk City, Kalinga Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
1070232168 | Construction of Level III Water Supply System, Rizal, Kalinga Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 80.09 Actual: 75.12 Expenditure:43000000 Release:42129972.38 Obligation:43000000 |
24.107541276216 |
1089075116 | Tallac/Tangbay Road-Guilayon-Pinukpuk in support of Coffee Processing Industry and Processed Fruit Industry, Tabuk City, Kalinga Kalinga | DPWH Lower Kalinga DEO | (default) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
1091137750 | Construction of Multi-Purpose Building in Barangay Agbannawag, Tabuk City, Kalinga Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 70.3 Expenditure:5000000 Release:4948325.41 Obligation:5000000 |
-55.676765281319 |
1100949899 | Construction of Rizal Municipal Police Station Building, Rizal, Kalinga Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-69.666666666667 |
1107595641 | Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd (Pinukpuk-Abbut Sect) - K0531 + 013 - K0531 + 801 Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:9298000 Release:9066425.63 Obligation:9298000 |
-4.6620268853084 |
1152692277 | Tabuk-Banawe via Tanudan-Barlig Rd - (S005083LZ) - K0513 + 188 – K0513 + 797, K0513 + 816 – K0514 + 088, K0514 + 525 – K0514 + 677, K0516 + 689 – K0516 + 723, K0533 + 720 – K0533 + 780, K0537 + 480 – K0537 + 540, K0542 + 620, K0542 + 660 Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
1153184774 | Construction of Flood Control Structure along Saltan River, Sta. 15 + 700 - Sta. 16 + 650, Apatan, Pinukpuk, Kalinga Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 58.18 Expenditure:80000000 Release:75561744.01 Obligation:80000000 |
-45.054214062396 |
1181302707 | Macutay-Greenhills-San Pedro and San Vicente Access Road leading to Elephant Hill, Archeological Tourism Site, Brgy. San Pedro, Rizal (Liwan), Kalinga Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:4000000 Release:3851015.36 Obligation:4000000 |
-62.159912210996 |
1204218859 | Construction of Mangapawon/ Pinococ Access Road, Barangay Catabbogan/Pinococ, Pinukpuk, Kalinga Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
1254353983 | Construction (Completion) of Isla/ Mallong, /Duenak/Lay-asan/ Employees Village Footbridge w/ Slope Protection, Tabuk City/Tanudan. Kalinga Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
1258230824 | Construction of Camlogan/ Aciga/ Taggay Footbridge, Barangay Allaguia/ Aciga/ Taggay, Pinukpuk, Kalinga Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 88.75 Actual: 65.95 Expenditure:5000000 Release:4850168.71 Obligation:5000000 |
-25.985187894304 |
1261275384 | Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd (Cagaluan-Calanan Sect) - K0473 + 163 - K0473 + 353 Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:3310000 Release:2995547.84 Obligation:3310000 |
-4.1058685696027 |
1305863069 | Construction (Completion) of Isla/ Mallong, /Duenak/Lay-asan/ Employees Village Footbridge w/ Slope Protection, Tabuk City/Tanudan. Kalinga Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 70.87 Actual: 0 Expenditure:3000000 Release:2641755.56 Obligation:3000000 |
17.761873780091 |
1306090763 | Bulanao-Paracelis Rd - K0500 + 453 - K0500 + 548 Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
1337154000 | Construction of Road in Barangay Pakawit, Pinukpuk, Kalinga Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
1342882994 | Tabuk-Banawe via Tanudan-Barlig Rd - (S005083LZ) - K0516 + 723 - K0517 + 704, K0524 + 000 - K0524 + 050.5, K0537 + 200 - K0537 + 260, K0543 + 267.7 - K0543 + 297.7 Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
1355473592 | Kalinga-Cagayan Road (Calanan-Enrile Section) - K0496+591-K0496+668, K0502+752-K0502+763, K0513+172-K0513+211 Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure: Release:5500000 Obligation:0 |
-77.966420248089 |
1366596154 | Construction of Callagdao, Bulanao to Makilo, Calacaad Road leading to Saudi Bulo Lake Toursim Site, Barangay Bulanao-Calacaad, Tabuk City, Kalinga Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
1372074978 | Tabuk-Banawe via Tanudan-Barlig Rd - K0543 + 394 - K0543 + 474 Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 91 Expenditure:44786000 Release:43890280 Obligation:44786000 |
-15.790061834165 |
1387634184 | Tabuk-Banawe via Tanudan-Barlig Rd - (S005083LZ) - K0524 + 050.5 - K0525 + 110, K0525 + 144 - K0525 + 228.5, K0539 + 750 - K0539 + 790, K0538 + 640 - K0538 + 706, K0544 + 347 + K0544 + 600 Kalinga | DPWH Lower Kalinga DEO | (default) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
1439201246 | Improvement of Road from S. Tamayao Street going to Sitio Ubbog to Chico River, Magsaysay, Tabuk City, Kalinga Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:15000000 Release:14545514.2 Obligation:15000000 |
-5.8818507768482 |
1445799364 | Construction (Completion) of Mapaoay Multi-Purpose Building with MPP in Ipil, Tabuk City, Kalinga Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:1200000 Release:1164231.14 Obligation:1200000 |
-3.4289713086074 |
1446245881 | Tabuk-Banawe via Tanudan-Barlig Rd - K0510 + 685 - K0510 + 745, K0512 + 458 - K0512 + 473, K0514 + 120 - K0514 + 160, K0514 + 930 - K0514 + 940, K0518 + 650 - K0518 + 680, K0524 + 489 - K0524 + 514, K0541 + 700 - K0541 + 748, K0509 + (-157) - K0509 + 193, K0509 + 564 - K0509 + 900, K0510 + 909 -K0511 + 191, K0513 + 054 - K0513 + 188 Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
1457374477 | Mt. Province Bdry.-Calanan-Pinukpuk-Abbut Road (Pinukpuk-Abbut Section) - K0528+1048-K0528+1064, K0531+474-K0531+515, K0532+691-K0532+714 Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 33.51 Expenditure:6500000 Release:5848044.66 Obligation:6500000 |
-66.127564944911 |
1524723332 | Construction of Casigayan-Dilag/KNHS Employees Village Access Road, Barangay Casigayan/Dilag/Bulanao, Tabuk City, Kalinga Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:5000000 Release:4875673.89 Obligation:5000000 |
-1.726635605497 |
1526119930 | Bawac Banneng Access Road connecting Tabuk Banaue via Tanudan Barlig National Road Bawac Section and Banneng Tabuk Pangol Provincial Road in support to Coffee, Fruit, and Root Crops Processing Industry, Tanudan, Kalinga Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
1527286253 | Installation of Safety Devices and Solar LED Street Light along Mt Province Bdry-Calanan-Pinukpuk-Abbut - K0525 + 616 - K0535 + 140 Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 81 Expenditure:96737000 Release:92443970.58 Obligation:96737000 |
8.5250681371617 |
1564830089 | Construction of Level III Water Supply Project, Tanudan, Kalinga Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 96 Expenditure:25000000 Release:24364116.45 Obligation:25000000 |
-5.3333333333333 |
1565560663 | Installation and Furnishing of Safety Devices Solar Studs and Solar LED Street Light along Bulanao-Paracelis Rd - K0500 + (-569) - K0508 + 955 Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-67.686666666667 |
1587544993 | Construction (Completion) of Multi-Purpose Building, Calaocan/Casabaan, Barangay Calaocan/Bulanao, Rizal/Tabuk City, Kalinga Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 56.78 Expenditure:3000000 Release:2909317.99 Obligation:3000000 |
-61.982945818548 |
1589427343 | Construction (Completion) of Aciga Footbridge (Phase 2) in Pinkpuk, Kalinga Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:1000000 Release:979633.61 Obligation:1000000 |
-1.3089549137752 |
1590568458 | Construction of Dilag (Basao)/ Kinawayanan Access Road, Barangay Dilag/ Cudal, Tabuk City, Kalinga Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
1593130733 | Construction of Casigayan-Dilag/KNHS Employees Village Access Road, Barangay Casigayan/Dilag/Bulanao, Tabuk City, Kalinga Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
1601548370 | Construction of Rizal Municipal Police Station Building, Rizal, Kalinga Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 71.39 Actual: 15 Expenditure:7362000 Release:7095540.25 Obligation:7362000 |
-85.608924126487 |
1606586190 | Installation of Safety Devices and Solar LED Street Light along Mt Province Bdry-Calanan-Pinukpuk-Abbut - K0479 + 421 - K0488 + 945 Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-68.536666666667 |
1611612112 | Construction of Multi-Purpose Building, Cawagayan/Allaguia/Malagnat, Barangay Cawagayan/Allaguia/Malagnat, Pinukpuk, Kalinga Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
1621315823 | Balbalan-Pinukpuk Rd - K0517 + 274 - K0517 + 308, K0522 + 830 - K0522 + 862 Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 74.52 Expenditure:9500000 Release:9170150.04 Obligation:9500000 |
-19.123173277662 |
1627675654 | Construction of Taga Multi-Purpose Building in Pinukpuk, Kalinga Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:2000000 Release:1950153.97 Obligation:2000000 |
-3.0625067317704 |
1650787288 | Macutay-Greenhills-San Pedro and San Vicente Access Road leading to Elephant Hill, Archeological Tourism Site, Brgy. San Pedro Rizal (Liwan), Kalinga Kalinga | DPWH Lower Kalinga DEO | (default) |
Target: 100 Actual: 0 Expenditure:20038000 Release:10019000 Obligation:20038000 |
-100 |
1652176864 | Construction (Completion) of Multi-Purpose Building, Pagugu/Appas, Barangay Pagugu/Appas, Tanudan/Tabuk City, Kalinga Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 97.19 Expenditure:3000000 Release:2960647.91 Obligation:3000000 |
-4.9114140502541 |
1653524325 | Kalinga-Cagayan Rd (Calanan-Enrile Section) - K0510 + 438 - K0510 + 538, K0510 + 644 - K0510 + 768, K0512 + 000 - K0512 + 294, K0513 + 414 - K0513 + 465, K0518 + 840 - K0518 + 880 Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
1655603955 | Tabuk-Banawe via Tanudan-Barlig Rd, Kalinga Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
1657211963 | Construction of Mega Dike Project along Chico River (Left Bank), Tabuk City, Kalinga Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-69.533333333333 |
1664221874 | Construction of Gobgob (Coshie)/ Burubur/ Lourdes Access Road, Barangay Gobgob/ Bulo/ Casigayan, Tabuk City, Kalinga Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
1668889473 | Construction of Amlao Flood Control Structure along Chico River, Sta. 110+100 - Sta. 111+000, Brgy. Amlao, Tabuk City, Kalinga Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
1686174059 | Construction of Kinama/ San Quintin/ Mapitpitak, Callagdao/ Purok 1-Bitanga Access Road with Box Culvert, Barangay Kinama/ San Quintin/ Bulanao/ Laya West, Rizal/ Tabuk City, Kalinga Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:5000000 Release:4088912.75 Obligation:5000000 |
2.645316440847 |
1693262809 | Improvement of Calaccad / Makilo / San Sebastian Local Road in Tabuk City, Kalinga Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
1705501358 | Construction of Mangapawon/ Pinococ Access Road, Barangay Catabbogan/Pinococ, Pinukpuk, Kalinga Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:5000000 Release:4878254.52 Obligation:5000000 |
-1.6030274683221 |
1715211441 | Construction of Balong Hortellano Padayao Road at Barangay Balong, Tabuk City, Kalinga Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
1723464838 | Construction of Bono-Bongat Road, Rizal, Kalinga Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 71.01 Expenditure:30000000 Release:29071589.61 Obligation:30000000 |
-17.074069524628 |
1728155121 | Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd (Cagaluan Calanan Sect) - K0472 + 364 - K0472 + 401, K0472 + 431 - K0472 + 473, K0472 + 865 - K0472 + 907, K0473 + 999 - K0474 + 066, K0476 + 1120 - K0476 + 1145, K0480 + 840 - K0480 + 874, K0481 + 183 - K0481 + 220, K0484 + 885 - K0484 + 913, K0484 + 927 - K0484 + 940, K0484 + 958 - K0484 + 981, K0486 + 794 - K0486 + 815, K0487 + 608 - K0487 + 641 Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 75 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
1741665899 | Tabuk-Banawe via Tanudan-Barlig Rd - K0513 + 427 - K0513 + 443, K0520 + 863 - K0520 + 893, K0523 + 032 - K0523 + 121, K0523 + 604 - K0523 + 608, K0523 + 611 - K0523 + 620, K0523 + 958 - K0523 + 1008, K0524 + 846 - K0524 + 899, K0525 + 151 - K0525 + 234, K0525 + 658 - K0525 + 998, K0533 + 720 - K0533 + 765 Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:28542000 Release:27621554.19 Obligation:28542000 |
-6 |
1753189688 | Kalinga-Cagayan Rd (Calanan-Enrile Section) - K0506 + 905 - K0507 + 000, K0512 + 469 - K0512 + 931 Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:11388000 Release:11104337.09 Obligation:11388000 |
-6.061355764473 |
1776027062 | Kalinga-Cagayan Rd (Calanan-Enrile Section) - K0497 + 510 - K0498 + 344, K0499 + 915 - K0503 + 000, K0505 + 000 - K0506 + 494, K0510 + 780 - K0511 + 939 Kalinga | DPWH Lower Kalinga DEO | (default) |
Target: 100 Actual: 100 Expenditure:42279000 Release:40580222.02 Obligation:42279000 |
0 |
1785437475 | Construction of Purok 4/Tuga/ Greenhills Access Road, Brgy. Calanan/Tuga/Bulanao, Tabuk City, Kalinga Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:5000000 Release:4795403.74 Obligation:5000000 |
-19.673338242185 |
1790193396 | Construction of Kaus/ Mapaco Flood Control, Barangay Pinukpuk Jct./Mapaco, Pinukpuk, Kalinga Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 91 Expenditure:5000000 Release:4839345.59 Obligation:5000000 |
-19.278252611586 |
1792817956 | Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd (Cagaluan Calanan Sect) - K0472 + 364 - K0472 + 401, K0472 + 431 - K0472 + 473, K0472 + 865 - K0472 + 907, K0473 + 999 - K0474 + 066, K0476 + 1120 - K0476 + 1145, K0480 + 840 - K0480 + 874, K0481 + 183 - K0481 + 220, K0484 + 885 - K0484 + 913, K0484 + 927 - K0484 + 940, K0484 + 958 - K0484 + 981, K0486 + 794 - K0486 + 815, K0487 + 608 - K0487 + 641 Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-67.333333333333 |
1799146175 | Construction (Completion) of Aciga Footbridge (Phase 2) in Pinkpuk, Kalinga Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
1807837142 | Construction of Multi-Purpose Building in Barangay Agbannawag, Tabuk City, Kalinga Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
1823836513 | Tabuk-Banawe via Tanudan-Barlig Rd - (S005083LZ) - K0513 + 188 – K0513 + 797, K0513 + 816 – K0514 + 088, K0514 + 525 – K0514 + 677, K0516 + 689 – K0516 + 723, K0533 + 720 – K0533 + 780, K0537 + 480 – K0537 + 540, K0542 + 620, K0542 + 660 Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 75 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
1844086035 | Construction of Central School/ Sunrise/ Pinuk-Balan, Purok 7/ Hilltop (Cliff) Flood Control, Barangay Dagupan/ Bulanao, Tabuk City, Kalinga Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
1851308748 | Construction of Flood Control Structure along Cal-owan River, Sta. 2 + 430 - Sta. 3 + 380 (Left Bank), Brgy. Ammacian to Brgy. Malagnat, Pinukpuk, Kalinga Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 76 Expenditure:50000000 Release:48449186.44 Obligation:50000000 |
-44.179748232108 |
1852662016 | Tabuk-Banawe via Tanudan-Barlig Rd - (S005083LZ) - K0516 + 723 - K0517 + 704, K0524 + 000 - K0524 + 050.5, K0537 + 200 - K0537 + 260, K0543 + 267.7 - K0543 + 297.7 Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:25000000 Release:24301305.88 Obligation:25000000 |
14.582603619381 |
1861962917 | Kalinga-Cagayan Rd (Calanan-Enrile Section) - K0496 + 591 - K0496 + 668, K0515 + 233 - K0515 + 280 Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 75 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
1865946878 | Construction of Pantal, Brookside/New Balbalan Public Cemetery Access Road, Barangay Bulanao/Lacnog, Tabuk City, Kalinga Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-67.3 |
1876180918 | Bawac Banneng Access Road connecting Tabuk Banaue via Tanudan Barlig National Road Bawac Section and Banneng Tabuk Pangol Provincial Road in support to Coffee, Fruit, and Root Crops Processing Industry, Tanudan, Kalinga Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 91 Expenditure:4000000 Release:3871214.95 Obligation:4000000 |
-33.924012614507 |
1882660460 | Installation of Safety Devices and Solar LED Street Light along Mt Province Bdry-Calanan-Pinukpuk-Abbut - K0470 + (-103) - K479 + 421 Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-68.426666666667 |
1905834191 | Improvement of Road from S. Tamayao Street going to Sitio Ubbog to Chico River, Magsaysay, Tabuk City, Kalinga Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
1910709782 | Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd (Cagaluan-Calanan Sect) - K0473 + 163 - K0473 + 353 Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
1926076754 | Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd (Cagaluan-Calanan Sect) - K0481 + 905 - K0481 + 949 Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
1926459600 | Babalag West-Liwan West-Alibangbang Access Road connecting Enrile-Tabuk National Road and Alibangbang Access Road in support to Veggie Noddles/Chips Processing and Sugarcane Processing, Rizal, Kalinga Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:4000000 Release:3894680.07 Obligation:4000000 |
30.553727554762 |
1965367430 | Kalinga-Cagayan Rd (Calanan-Enrile Section) - K0520 + 026 - K0521 + 000, K0524+ 128 - K0525 + 096 Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 87.75 Expenditure:47975000 Release:46711429.28 Obligation:47975000 |
13.308556764888 |
1975855813 | Kalinga-Cagayan Rd (Calanan-Enrile Section) - K0496 + 591 - K0496 + 668, K0515 + 233 - K0515 + 280 Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
1989013208 | Rehabilitation of Liwan West Water Works in Rizal, Kalinga Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
1993291028 | Construction of Balong Hortellano Padayao Road at Barangay Balong, Tabuk City, Kalinga Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 63.92 Expenditure:25000000 Release:24580103.61 Obligation:25000000 |
-37.223569696105 |
2002001281 | Tabuk-Banawe via Tanudan-Barlig Rd, Kalinga Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-69.666666666667 |
2027063742 | Construction of Dilag (Basao)/ Kinawayanan Access Road, Barangay Dilag/ Cudal, Tabuk City, Kalinga Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:5000000 Release:4888303.34 Obligation:5000000 |
-2.6606099935107 |
2036506666 | Construction of Bridge and approaches in Luyucan to Katao Road, Lacnog, Tabuk City, Kalinga Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 90.86 Expenditure:20000000 Release:19580886 Obligation:20000000 |
-9.14 |
2043726824 | Construction of Gobgob (Coshie)/ Burubur/ Lourdes Access Road, Barangay Gobgob/ Bulo/ Casigayan, Tabuk City, Kalinga Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:5000000 Release:4947502.75 Obligation:5000000 |
0.85553314321485 |
2049237106 | Bulanao-Paracelis Road-K0504+236-K0504+540, K0513+230-K0513+321 Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 90 Expenditure:5660000 Release:5471991.15 Obligation:5660000 |
-34.715195038355 |
2058019167 | Construction of Camlogan/ Aciga/ Taggay Footbridge, Barangay Allaguia/ Aciga/ Taggay, Pinukpuk, Kalinga Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
2060724489 | Construction of Taga Multi-Purpose Building in Pinukpuk, Kalinga Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
2068339844 | Construction of Road in Barangay Pakawit, Pinukpuk, Kalinga Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:8000000 Release:7777558.79 Obligation:8000000 |
0.53309640159931 |
2073292003 | Construction of A. Canao Bridge Towards Camalog (Channeling, Embankment Dike, Revetment), along Chico River, Sta. 92+700 - Sta. 93+500 (Right Bank), Tabuk City, Kalinga Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 74.06 Actual: 72.61 Expenditure:80000000 Release:76424709.06 Obligation:80000000 |
37.267472411981 |
2075043452 | Improvement of Purok 5-Purok 1 Drainage Canal System in Bulanao, Tabuk City, Kalinga Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:2000000 Release:1710042.25 Obligation:2000000 |
-12.21 |
2087089920 | Balbalan-Pinukpuk Rd - (S00537LZ) Chainage 1023 - Chainage 1062, Chainage 2366 - Chainage 2383, Chainage 18742 - Chainage 18814, Chainage 24711 - Chainage 24738, Chainage 25580 - Chainage 25652, Chainage 25722 - Chainage 25882 Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 97.09 Expenditure:35521000 Release:34810580 Obligation:35521000 |
-6.85 |
2096055893 | Cagayan-Kalinga Road Junction-Mapaoay (Ipil)-Nasgueban Bypass Road in support of Processed Food Industry and Feedmill Industry, Tabuk City, Kalinga Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
2103044811 | Construction of Bridge and approaches in Luyucan to Katao Road, Lacnog, Tabuk City, Kalinga Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
2104707770 | Construction of Kaus/ Mapaco Flood Control, Barangay Pinukpuk Jct./Mapaco, Pinukpuk, Kalinga Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
2107752295 | Access Road leading to Banga-Banga Falls, Tabuk City, Kalinga Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 92.5 Expenditure:4000000 Release:3811557.95 Obligation:4000000 |
-51.721796488505 |
2108558011 | Tabuk-Banawe via Tanudan-Barlig Rd - K0510 + 685 - K0510 + 745, K0512 + 458 - K0512 + 473, K0514 + 120 - K0514 + 160, K0514 + 930 - K0514 + 940, K0518 + 650 - K0518 + 680, K0524 + 489 - K0524 + 514, K0541 + 700 - K0541 + 748, K0509 + (-157) - K0509 + 193, K0509 + 564 - K0509 + 900, K0510 + 909 -K0511 + 191, K0513 + 054 - K0513 + 188 Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:25000000 Release:24371516.35 Obligation:25000000 |
16.720041118096 |
2111519847 | Tallac/Tangbay Road-Guilayon-Pinukpuk in support of Coffee Processing Industry and Processed Fruit Industry, Tabuk City, Kalinga Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:4000000 Release:3913397.44 Obligation:4000000 |
-16.483333333333 |
2123398341 | Kalinga-Cagayan Rd (Calanan-Enrile Section) - K0510 + 438 - K0510 + 538, K0510 + 644 - K0510 + 768, K0512 + 000 - K0512 + 294, K0513 + 414 - K0513 + 465, K0518 + 840 - K0518 + 880 Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:16530000 Release:16199400 Obligation:16530000 |
-3 |
2129541193 | Lucog-Magnao Road connecting Mt. Province Boundary-Calanan-Abbut National Road and Magnao Road in Support to the Coffee and Tiger Grass Processing, Tabuk City, Kalinga Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
2136529010 | Mt. Province Bdry-Calanan-Pinukpuk-Abbut Rd (Calanan-Pinukpuk Sect) - K0496 + (-700) - K0496 + 475, K0508 + 189 - K0508 + 654 Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
2141178712 | Construction of Drainage System (Canal Lining) in Karitanan, Katabbogan, Pinukpuk, Kalinga Kalinga | DPWH Lower Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
3258836 | Concreting of Sitio Washington to Sitio Ampaloc Brgy. Cattubo FMR, Brgy. Cattubo, Atok, Benguet Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 87 Expenditure:1862162.04 Release:12450000 Obligation:12414413.59 |
-9.1743119266055 |
8468064 | Construction of 2-Storey, 4-Classroom School Building, Abra High School, Bangued, Abra Abra | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 100 Expenditure:8493210 Release:9438975 Obligation:9436900 |
-33.333333333333 |
12600708 | Mt Prov-Cagayan via Tabuk-Enrile Rd - K0418 + 580 - K0418 + 623, K0418 + 780 - K0418 + 898 Mountain Province | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 20 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
20390419 | Baguio-La Trinidad-Itogon-Sablan-Tuba and Tublay, Kamog Jct.-Calot-Pappa-Bagong-Balluay-Tuel Jct. (Section 2 of BLISTT Outer Ring Circumferential Road), Package 5, Benguet Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 22.42 Actual: 54.35 Expenditure:153975894.4 Release:289500000 Obligation:289400000 |
141.42127993718 |
21255777 | Concreting of Brgy. Ba-ay FMR, Brgy. Ba-ay, Pinukpuk, Kalinga Kalinga | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 92 Expenditure:0 Release:11754150.2 Obligation:11754150.2 |
-39.166666666667 |
27076716 | Baguio-La Trinidad-Itogon-Sablan-Tuba and Tublay, Tuel Jct. - Ambongdolan Jct. (Section 3 of BLISTT Outer Ring Circumferential Road), Benguet Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 87.79 Actual: 0 Expenditure:0 Release:25090000 Obligation:23870820.15 |
-100 |
40013807 | Basic Educational Facilities Fund (BEFF): Construction of Various Classrooms under the DepEd’s Basic Educational Facilities Fund: Baguio City National Science High School (Construction/ Completion of 4 STY, 4 Regular Workshop, 2 Sci Lab & 2 ICT School Building, Baguio City National Science High School) Baguio City | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
46476984 | Construction of DPWH Regional Office CAR Office Building, Engineer's Hill, Baguio City Baguio City | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 3.45 Actual: 0 Expenditure:0 Release:115800000 Obligation:0 |
-100 |
56324800 | Construction of Guimma-Poray Pangol FMR. Brgy. Pangol, Tanudan, Kalinga Kalinga | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 100 Expenditure:11774196.28 Release:11774196.28 Obligation:11774196.28 |
-33.333333333333 |
70896734 | a) Gov. Bado Dangwa National Rd - K0348 + 520 - K0348 + 672 b) Gov. Bado Dangwa National Rd - K0348 + 760 - K0348 + 908 Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 100 Expenditure:212300000 Release:212300000 Obligation:212300000 |
-12.778020061055 |
74164983 | Baguio - Bontoc Rd - K0375 + 100 - K0375 + 130, K0375 + 935 - K0376 + 042 Mountain Province | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 20 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
85615645 | Improvement and concreting of Brgy. Bulalacao to Brgy, Palasaan FMR, Brgy. Bulalacao and Brgy. Palasaan, Mankayan, Benguet Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 100 Expenditure:11193750 Release:12437500 Obligation:12437500 |
-33.333333333333 |
87521145 | Mt Prov-Cagayan via Tabuk-Enrile Rd - K0415 + 481 - K0415 + 608 Mountain Province | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 20 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
101678375 | Concreting of Brgy. Adaoay to Brgy. Anchukey FMR, Brgy. Adaoay and Brgy. Anchukey, Kabayan, Benguet Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 100 Expenditure:10418077.26 Release:11568974.73 Obligation:11568974.73 |
-33.333333333333 |
117225484 | Baguio-La Trinidad-Itogon-Sablan-Tuba and Tublay, Labey-Lacamen Provincial Road (Section 4A of BLISTT Outer Ring Circumferential Road), Package 2, Benguet Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 81.89 Actual: 74.76 Expenditure:96422061.37 Release:144750000 Obligation:144731522.6 |
-7.9996649355001 |
125124097 | Shilan-Beckel Rd - K0262 + 870 - K0263 + 000, K0263 + 345 - K0263 + 410 Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 93.94 Expenditure:88321756.3 Release:106150000 Obligation:106000000 |
-21.752278913034 |
125211365 | Concreting of Nalusbo-Tonguey FMR, Brgy. Madaymen, Kibungan, Benguet Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 100 Expenditure:7833620.01 Release:12287541.23 Obligation:12287541.23 |
-33.333333333333 |
147719860 | Construction of Road, Camp 1 - Tabaan Sur - Tabaan Norte - Taloy Sur Road to Marcos Highway, Tuba Benguet Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 0 Actual: 0.67 Expenditure:31827775.84 Release:212800000 Obligation:0 |
0 |
161955786 | a) Mt Prov-Cagayan via Tabuk-Enrile Rd - K0416+110 - K0416+190 b) Mt Prov-Cagayan via Tabuk-Enrile Rd - K0418+230 - K0418+380 c) Mt Prov-Cagayan via Tabuk-Enrile Rd - K0418+460 - K0418+580 Mountain Province | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 94 Expenditure:255028164.7 Release:289500000 Obligation:289500000 |
-7.3805932629462 |
165123797 | Repair/Rehabilitation and Construction/ Concreting of Baguio Animal Breeding and Research Center, Brgy. Dontogan FMR, Brgy. Dontogan, Baguio City Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 0 Actual: 38.76 Expenditure:0 Release:14796777.73 Obligation:14796777.73 |
0 |
167891284 | Banaue-Hungduan-Benguet Bdry Rd - K0407 + 480 - K0407 + 850 Ifugao | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 56.97 Expenditure:57245500.05 Release:114050455 Obligation:114050455 |
-54.592232613223 |
169681466 | Concreting of Sitio Lam-ayan, Brgy. Bangao FMR, Brgy. Bangao, Buguias, Benguet Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 100 Expenditure:11193752.99 Release:12437500 Obligation:12437500 |
-33.333333333333 |
171797263 | Construction of Poblacion Luba Bridge, Luba,Abra Abra | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 51.45 Expenditure:39174659.06 Release:96500000 Obligation:96500000 |
-67.42 |
172313904 | A.) Banaue-Mayoyao-A Lista-Isabela Bdry Rd - K0350 + 650 - K0350 + 760; B) Banaue-Mayoyao-A Lista-Isabela Bdry Rd - K0353 + 710 - K0353 + 804 Ifugao | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 49.24 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
180835223 | Kiangan-Tinoc-Buguias Rd - K0355 + 520 - K0355 + 668 Ifugao | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 20 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
184647461 | Abatan-Mankayan-Cervantes Rd - K0335 + 350 - K0335 + 545, K0346 + 075 - K0346 + 271 Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 100 Expenditure:95550958.25 Release:106150000 Obligation:106081707.1 |
-8.2371410102502 |
201476112 | Concreting of Sitio Dinamili to Sitio Taaw, Brgy. Ballay FMR, Brgy. Ballay, Kabayan, Benguet Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 0 Actual: 100 Expenditure:0 Release:12427441.44 Obligation:12427441.44 |
0 |
204809585 | Concreting of Sitio Lay-odan to Sitio Baney, Brgy. Sebang FMR, Brgy. Sebang, Buguias, Benguet Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 53.5 Expenditure:1857997.91 Release:12450000 Obligation:12386652.73 |
-41.891891891892 |
215534481 | Concreting of Km. 24-to-Sitio Adala, Caliking FMR, Caliking, Atok, Benguet Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 100 Expenditure:11193750 Release:12437500 Obligation:12437500 |
-33.333333333333 |
224495343 | Basic Educational Facilities Fund (BEFF) - Constuction of Slope Protection, Patilong ES, Banaue, Ifugao Ifugao | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 84.5 Expenditure:2359513.32 Release:5416455.19 Obligation:5416455.19 |
-38.759720679257 |
230651003 | City Limit-Sto Tomas Rd - K0255+1085 - K0255+1098.5, K0255+1806.5 - K0255+1857, K0258+454 - K0258+478.5, K0258+801 + K258+847, K0259+065.5 - K0259+097.5, K029+277 - K0259+292, K0259+336.5 - K0259+492, K0259+606 - K0259+612.5, K0259+684.5 - K0259+785, K0259+813 - K0259+840, K0259+927 - K0259+1093, K0260+000 - K0260+077, K0261+064 - K0261+088, K0261+693 - K0261+715.5, K0262+000 - K0262+180, K0262+522 - K0262+636, K0263+416 - K0263+478 Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 97.61 Actual: 84.56 Expenditure:133254288.9 Release:193000000 Obligation:192850000 |
-21.087488602006 |
236613452 | Opening and Concreting of Sitio Jappa, Brgy. Ekip FMR, Bokod, Benguet Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 100 Expenditure:5478592.59 Release:12184689.51 Obligation:12184689.51 |
-33.333333333333 |
243822802 | Construction of DPWH Regional Office CAR Office Building, Engineer's Hill, Baguio City Baguio City | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
263340934 | Construction/ Completion of Tanudan Vocational School Kalinga | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 100 Expenditure:0 Release:248433.8 Obligation:248433.8 |
-19.935948759007 |
264220233 | Concreting of Brgy. Kili FMR, Brgy. Kili, Tubo, Abra Abra | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 95.43 Expenditure:0 Release:12933000 Obligation:12933000 |
-36.38 |
265574673 | Basic Educational Facilities Fund (BEFF) - Constuction of Slope Protection, Kinakin ES, Banaue, Ifugao Ifugao | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 100 Expenditure:16632839.83 Release:18480933.15 Obligation:18480933.15 |
-25.50378068313 |
273944595 | Construction of Road, Anovang DOMOLPOS Itogon - Kayapa Nueva Vizcaya, Itogon, Benguet Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 20 Actual: 47.89 Expenditure:136203775.7 Release:297000000 Obligation:296830000 |
127.65957446809 |
277125844 | Cong. Andres Acop Cosalan Rd - K0314+719 - K0314 + 760, K0314 + 793 - K0314 + 845 Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 22.15 Actual: 86.16 Expenditure:0 Release:125450000 Obligation:125350000 |
203.69718309859 |
280765669 | Improvement of Mabaca to Taloctoc Road in Tanudan, Kalinga Kalinga | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 39.52 Actual: 51.26 Expenditure:29914903.14 Release:130275000 Obligation:128970222 |
30.28770242915 |
282891057 | Construction of Naguey Flood Control, Atok, Benguet Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 100 Expenditure:74205955.1 Release:96500000 Obligation:96393468.53 |
-1.6349908877896 |
291964608 | Baguio-Itogon Rd - K0260 + 800 - K0260 + 954 Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 50 Actual: 54.87 Expenditure:28942272.58 Release:193000000 Obligation:192948483.9 |
8.3833151581243 |
293177959 | Improvement of Baguingey-Central, Brgy. Pongayan and Brgy. Poblacion Central FMR, Kapangan, Benguet Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 100 Expenditure:11193750 Release:12437500 Obligation:12437500 |
-33.333333333333 |
307742629 | Cong. Andres Acop Cosalan Rd- K0301 + (-905) - K0304 + 024, K0313 + 175 - K0317 + 533, K0319 + 000 - K0322 + 600, K0324 + 000 - K0327 + 000, K0328 + 700 - K0330 + 500, K0331 + 751 - K0333 + 381 Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 22.42 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
121.12712975098 |
309505844 | Gov. Bado Dangwa National Rd - K0345 + 520 - K0345 + 650 Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 70 Actual: 52.96 Expenditure:53632395.4 Release:101267959.4 Obligation:101267959.4 |
-0.31996988518727 |
315582039 | Construction of Flood Control along Ibulao River Sta 323+800.00 - 324+400.00, 325+680.00 - 326+060.00 (Hapid), Lamut, Ifugao Ifugao | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 100 Expenditure:60301684.39 Release:67550000 Obligation:67550000 |
-33.333333333333 |
320754232 | Kennon Rd - K0223 + 749 - K0223 + 890 Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 89.25 Actual: 100 Expenditure:193000000 Release:193000000 Obligation:193000000 |
17.987139401805 |
321133220 | Construction of Flood Control along Lagawe River, Sta 0+000-Sta 0+680 Ifugao | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 0 Actual: 92.06 Expenditure:45613191.25 Release:61570860 Obligation:60951052.5 |
0 |
321338394 | Concreting of Brgy. Lower Taloctoc FMR, Brgy. Lower Taloctoc, Tanudan, Kalinga Kalinga | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 100 Expenditure:9410757 Release:11882023.17 Obligation:11882023.17 |
-34 |
325471915 | Concreting of Brgy. Guinguinabang FMR, Brgy.Guinguinabang, Lacub, Abra Abra | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 97.42 Expenditure:0 Release:11938000 Obligation:11938000 |
-35.053333333333 |
347547257 | Concreting of Sowe-Cabayo FMR, Brgy. Poblacion, Atok, Benguet Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 100 Expenditure:10188416.01 Release:12337597.18 Obligation:12337597.18 |
-33.333333333333 |
354698694 | Repair Rehabilitation and Construction of Farm-to-Market Roads in Designated Key Production Areas - Concreting of Sitio Palaad, Barangay Kiling, Alfonso Lista, Ifugao Ifugao | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
357141106 | Opening and Concreting of Sitio Marooc to Sitio Camiding, Brgy. Loacan FMR, Brgy. Loacan, Itogon, Benguet Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 100 Expenditure:12469973.09 Release:12469973.09 Obligation:12469973.09 |
-33.333333333333 |
360109119 | Construction of Road Slope Protection along Governor Dangwa National Road at Ambalideng, Poblacion, Kibungan, Benguet, K0315+120 - K0315+175, K0315+650 - K0315+695 Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 67.9 Expenditure:22422714.4 Release:59400000 Obligation:59400001 |
-53.7607681569 |
373288650 | Concreting of Natta'longan-Gasilang FMR, Brgy. Bantay, Paracelis, Mountain Province Mountain Province | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 100 Expenditure:0 Release:11940000 Obligation:11940000 |
-33.333333333333 |
381611877 | Concreting of Brgy. Suyang FMR Phase II, Brgy. Suyang Tabuk City, Kalinga Kalinga | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
388336194 | a) Nueva Vizcaya-Ifugao-Mt. Province Rd - K0312+060 - K0313 + 677 b) Preventive Maintenance - Secondary Roads - Nueva Viscaya - Ifugao - Mt. Province Bdry. Road K0323 + 770 - K0324 + 015, K0324 + 738 - K0326 + 200 Ifugao | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 100 Expenditure:38175822.79 Release:39000000 Obligation:38175822.79 |
-33.333333333333 |
394730612 | along Claveria - Calanasan Kabugao Rd - K0646 + 472 - K0646 + 507 Apayao | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
394745827 | Marat Br. along Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd Mountain Province | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 100 Expenditure:88162308.66 Release:111336875 Obligation:111336875 |
-31.459904043866 |
404182953 | Concreting of Sitio Sapid, Brgy. Pacso FMR, Brgy. Pacso, Kabayan, Benguet Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 100 Expenditure:11256250 Release:12500000 Obligation:12500000 |
-33.333333333333 |
405687897 | Concreting of Cabanawan-Balok, Brgy. Datakan FMR, Brgy. Datakan, Kapangan, Benguet Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 100 Expenditure:9349185.01 Release:12437500 Obligation:12437500 |
-33.333333333333 |
415760944 | Baguio-La Trinidad-Itogon-Sablan-Tuba and Tublay, Asin-Nangalisan Jct.-Bayabas-Monglo Jct. (Section 1 of BLISTT Outer Ring Circumferential Road), Package 1, Benguet Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 65.45 Expenditure:69873670.15 Release:173700000 Obligation:173610748.5 |
-53.835832675612 |
423343734 | Rehabilitation/Improvement of Mangga-Obellan-Catampan FMR, Brgy. Balakbak, Kapangan, Benguet Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 100 Expenditure:9333026.3 Release:12437500 Obligation:12437500 |
-33.333333333333 |
424298283 | Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - K0380 + 320 - K0380 + 486 Mountain Province | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 20 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
425750714 | Concreting of Caupasan to Karkariskis , Brgy. Benben FMR, Brgy. Benben, La Paz, Abra Abra | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 95.02 Expenditure:0 Release:12435090.58 Obligation:12435090.58 |
-36.653333333333 |
427286729 | Improvement/Rehabilitation of Brgy. Palaquio Road, Brgy. Palaquio, Bucay, Abra Abra | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 100 Expenditure:6029827.66 Release:13928000 Obligation:13928000 |
-33.333333333333 |
428587834 | Concreting of Brgy. Alangtin FMR, Brgy. Alangtin, Tubo, Abra Abra | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 100 Expenditure:0 Release:11938000 Obligation:11938000 |
-33.333333333333 |
437258704 | Construction/ Rehabilitation of Multi-Purpose Building (Benguet Sports Complex and Facilities) at Barangay Wangal, La Trinidad, Benguet Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 100 Expenditure:134880763.3 Release:163350000 Obligation:163350000 |
-35.58 |
437509954 | Concreting and Opening of Sitio Bengaongao to Sitio Bagto, Brgy. Ambongdolan FMR, Brgy. Ambongdolan, Tublay, Benguet (Phase II) Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 96 Actual: 77 Expenditure:1860000 Release:12450000 Obligation:12400000 |
-18.095238095238 |
438201978 | Opening and Concreting of Sitio Goldfield to Sitio Liang, Brgy. Poblacion FMR, Poblacion, Itogon, Benguet Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
446650371 | Construction of Rain Harvesting and Treatment Facility (Phase II), Busol Watershed, Ambiong, Baguio City Baguio City | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 100 Expenditure:80301891.28 Release:97299020 Obligation:97299020 |
-58.333333333333 |
452671386 | Cong. Andres Acop Cosalan Rd - K0356 + 680 - K0356 + 830 Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 83.7 Actual: 100 Expenditure:214230000 Release:214230000 Obligation:214230000 |
74.901617839965 |
454851919 | Baguio-La Trinidad-Itogon-Sablan-Tuba and Tublay, Kamog Jct.-Calot-Pappa-Bagong-Balluay-Tuel Jct. (Section 2 of BLISTT Outer Ring Circumferential Road), Package 4, Benguet Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 22.42 Actual: 1.84 Expenditure:43401718.22 Release:289500000 Obligation:289344788.1 |
-89.393063583815 |
455979231 | Preventive Maintenance along Itogon-Dalupirip-San Manuel Bdry Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 20 Actual: 56.49 Expenditure:0 Release:86850000 Obligation:86744118.42 |
140.30482641829 |
458017690 | Construction of Road, Liwang - Akmet - Dek-dek, Mankayan, Benguet Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 20 Actual: 0.38 Expenditure:0 Release:96500000 Obligation:96391145.6 |
-98.1 |
459041224 | Baguio-La Trinidad-Itogon-Sablan-Tuba and Tublay, Kamog Jct.-Calot-Pappa-Bagong-Balluay-Tuel Jct. (Section 2 of BLISTT Outer Ring Circumferential Road), Package 2, Benguet Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 32.23 Actual: 0 Expenditure:0 Release:170805000 Obligation:0 |
-100 |
465560083 | Concreting of Junction Taba-ao - Sitio Nagotikan, Brgy. Loo FMR, Buguias, Benguet Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 100 Expenditure:6511880.05 Release:12064375 Obligation:12064375 |
-32.659932659933 |
468765864 | Construction of Quartering Facility Building, Kalinga Police Provincial Office, Tabuk City, Kalinga Kalinga | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 100 Expenditure:14844271.13 Release:19300000 Obligation:19300000 |
-33.333333333333 |
471867904 | Construction of Sagpat Kibungan Benguet - Santol La Union Road Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 32.23 Actual: 1.24 Expenditure:29679000 Release:198000000 Obligation:197860000 |
-95.068602107775 |
471952568 | Concreting of Brgy. Suyang FMR, Brgy. Suyang, Tabuk City, Kalinga Kalinga | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 100 Expenditure:5461400.3 Release:11780979.22 Obligation:11780979.22 |
-33.333333333333 |
478438795 | Concreting/Improvement of Sitio San Pablo - Sitio Madopdop, Brgy. Lacnog West FMR Kalinga | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 100 Expenditure:10630288.15 Release:11811431.29 Obligation:11811431.29 |
-33.333333333333 |
480177096 | Baguio-La Trinidad-Itogon-Sablan-Tuba and Tublay, Guisset-Binga-Baloy-Tinongdan (Section 5 of BLISTT Outer Ring Circumferential Road), Package 1, Benguet Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 20 Actual: 76.23 Expenditure:162294161.2 Release:231600000 Obligation:231480000 |
232.21153846154 |
492615799 | Concreting of Palidan - Banggelao - Bagtang - Longboy, Brgy. Dalipey FMR, Brgy. Dalipey, Bakun, Benguet Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 100 Expenditure:11940000 Release:11940000 Obligation:11940000 |
-33.333333333333 |
504580263 | Construction/Improvement of Dada - Beyeng - Kayapa Road, Dada, Beyeng and Kayapa, Bakun, Benguet Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 79.82 Expenditure:64929732.2 Release:96500000 Obligation:96456206.19 |
-28.084103156274 |
508719415 | Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - K0406 + 226 - K0406 + 401, K0406 + 431 - K0406 + 490 Mountain Province | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 20 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
529231316 | Banaue-Mayoyao-A Lista-Isabela Bdry Rd - K0362 + 560 - K0362 + 675, K0372 + 210 - K0372 + 310 Ifugao | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 100 Expenditure:99165330 Release:99165330 Obligation:99165330 |
-33.333333333333 |
533284806 | Concreting of Sitio Tappo, Brgy. Banawel FMR, Natonin, Mountain Province Mountain Province | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 100 Expenditure:0 Release:11940000 Obligation:11940000 |
-33.333333333333 |
537966290 | Opening and Concreting of Sitio Lit-angan - Beneng Baay - Todey, Brgy. Colalo and Brgy. Bedbed FMR, Mankayan, Benguet Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 100 Expenditure:9490478.76 Release:12139703.02 Obligation:12139703.02 |
-33.333333333333 |
545644733 | Concreting and Improvement of Aguyad-Lebbeng FMR, Brgy. Tadiangan, Tuba, Benguet Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 100 Expenditure:5531762.83 Release:11847238.85 Obligation:11847238.85 |
-33.333333333333 |
546573643 | Concreting of Brgy. Tubtuba FMR, Brgy. Tubtuba, Tubo, Abra Abra | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 100 Expenditure:6173736.56 Release:11937900 Obligation:11937900 |
-33.333333333333 |
547054063 | Concreting of Brgy. Sapid to Sitio Guiweng Brgy. Cabiten FMR, Brgy. Sapid and Brgy. Cabiten, Mankayan, Benguet Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 59.5 Expenditure:0 Release:12450000 Obligation:12431968.39 |
-48.706896551724 |
550598247 | Marcos Hi-way - K0272 + 800 - K0272 + 909 Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 100 Expenditure:120625000 Release:168875000 Obligation:120625000 |
-61.243314471746 |
551633313 | Concreting of Brgy. Sto. Tomas Strawberry Area FMR, Brgy. Sto. Tomas, Baguio City Baguio City | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 100 Expenditure:8272866.44 Release:11118135.71 Obligation:11118135.71 |
-33.333333333333 |
553871996 | Opening and Concreting of Sitio Labilab, Brgy. Loacan FMR, Brgy. Loacan, Itogon, Benguet Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 0 Actual: 62.1 Expenditure:0 Release:0 Obligation:0 |
0 |
560464648 | Itogon-Dalupirip-Sn Manuel Bdry Rd - K0271 + 875 - K0272 + 045, K0272 + 400 - K0272 + 455 Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 32.23 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
18.081550802139 |
560731616 | Baguio-La Trinidad-Itogon-Sablan-Tuba and Tublay, Kamog Jct.-Calot-Pappa-Bagong-Balluay-Tuel Jct. (Section 2 of BLISTT Outer Ring Circumferential Road), Package 4, Benguet Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
568373395 | Construction (Completion) of Bridge along Tumbal River connecting Luba to Manabo, Abra Abra | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 31.21 Expenditure:44897672.93 Release:144750000 Obligation:146888718.8 |
-89.596666666667 |
579808787 | Concreting of Brgy. Gacab FMR, Brgy. Gacab, Malibcong, Abra Abra | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 100 Expenditure:0 Release:11938000 Obligation:11938000 |
-34.853333333333 |
583040315 | Construction of Road, Lab-Ang - Ampucao to Bitnong-Ansagan Road, Itogon & Tuba, Benguet Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 0 Actual: 3.65 Expenditure:14463567.76 Release:96500000 Obligation:96423785.07 |
0 |
584550973 | Baguio-Bontoc Rd - K0374+120 - K0374+285, Sabangan, Mt. Province Mountain Province | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 20 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
605005244 | Construction of Amburayan Flood Control, Kapangan, Benguet Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 95.19 Expenditure:56961951.62 Release:96500000 Obligation:96372298.9 |
-18.583435834358 |
614712274 | Concreting of Brgy. Bayabas FMR, Brgy. Bayabas, Malibcong, Abra Abra | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 100 Expenditure:0 Release:11938000 Obligation:11938000 |
-33.333333333333 |
623546095 | Kennon Rd - K0222 + 112 - K0222 + 260 Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 98.84 Actual: 99.32 Expenditure:183347166.1 Release:191070000 Obligation:193000000 |
10.062468343745 |
630376898 | Installation of Road Safety Devices along Asin (Km 8)-Nangalisan-Sn Pascual, Tuba Rd - K0258 + 100 - K0268 + 000, K0269 + 000 - K0277 + 780 Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 62.23 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-86.115231032516 |
633173476 | Construction of Luba-Sabnangan Flood Control, Luba, Abra Abra | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 33.73 Expenditure:28898954.48 Release:96500000 Obligation:96149183.32 |
-77.396548835651 |
636980914 | Asset Preservation - Preventive Maintenance - Asphalt Ovelay (Instapave) along Asin (KM 8) - Nangalisan-Sn Pascual, Tuba, Benguet-La Union Bdry Road - K0258+(-351) - K0282+540 Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 98.42 Expenditure:195895049.2 Release:241250000 Obligation:241250000 |
4.4725495832136 |
639865740 | Construction of Road, Tinongdan Proper - Cayuco - Cawayan Road, Itogon, Benguet Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 0 Actual: 0.89 Expenditure:14465990.24 Release:96500000 Obligation:96439934.9 |
0 |
646275406 | Concreting of Baac-Poblacion FMR, Baac and Poblacion, Langiden, Abra Abra | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 100 Expenditure:11937997 Release:11937997 Obligation:11937997 |
-33.333333333333 |
649227555 | Construction of DPWH Benguet 1st District Engineering Office Main Building, Benguet Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:115800000 Obligation:0 |
0 |
653094149 | Construction of Ampusongan Flood Control, Bakun, Benguet Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 70.41 Expenditure:30770498.74 Release:96500000 Obligation:96445799.79 |
-56.371251465907 |
674772674 | Construction of Spiritual Enhancement Center Building, Philippine Military Academy, Fort General Gregorio H. del Pilar, Baguio City Baguio City | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 95.04 Expenditure:27822787.99 Release:48250000 Obligation:47691205.61 |
-33.376313094922 |
685503634 | Concreting of Sitio Balangabang, Brgy. Ballay FMR, Brgy. Ballay, Kabayan, Benguet Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
695508912 | Basic Educational Facilities Fund (BEFF): Construction of Various Classrooms under the DepEd’s Basic Educational Facilities Fund: Construction/ Completion of (4STY8CL)- Manuel L. Quezon Elementary School, Baguio City Baguio City | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
712711647 | Concreting of Sitio Cagam-is to Sitio Mabuhay, Brgy. Gambang FMR, Brgy. Gambang, Bakun, Benguet Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 77 Expenditure:1849500.12 Release:12450000 Obligation:12330000.81 |
-20.183486238532 |
722468771 | Preventive Maintenance (Asphalt Overlay) along Gov. Bado Dangwa National Rd - K0308 + 500 - K0318 + 167, K0319 + (-840) - K0320 + 100 Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 32.23 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-99.703703703704 |
731052350 | Concreting of Sitio Tonguey to Sitio Pokles, Brgy. Madaymen FMR, Brgy. Madaymen, Kibungan, Benguet (Phase II) Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 54 Expenditure:1862810.63 Release:12450000 Obligation:12418737.5 |
-52.592592592593 |
736658888 | a) Mt Prov-Cagayan via Tabuk-Enrile Rd - K0404 + 800 - K0404 + 935 b) Mt Prov-Cagayan via Tabuk-Enrile Rd - K0404 + 955 - K0405 + 060 c) Mt Prov-Cagayan via Tabuk-Enrile Rd - K0416 + 005 - K0416 + 090 Mountain Province | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 93.52 Expenditure:234246432.9 Release:289500000 Obligation:289500000 |
-25.794680506001 |
736753801 | Baguio-Bontoc Rd - K0302 + 180 - K0302 + 300, K0314 + 104 - K0314 + 170 Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 70 Actual: 77.8 Expenditure:149573209.4 Release:193000000 Obligation:192942846 |
50.97639172253 |
755931494 | Gov. Bado Dangwa National Rd - K0339 + 323 - K0339 + 548 Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 32.23 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
76.706926300222 |
757621381 | Concreteing og Brgy. Buneg FMR, Brgy. Buneg, Lacub, Abra Abra | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 96.42 Expenditure:0 Release:11580000 Obligation:11938000 |
-35.72 |
773484262 | Construction of Bridge across Tumbal River connecting Luba to Manabo, Abra Abra | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 89.96 Expenditure:11842230.63 Release:29700000 Obligation:29700000 |
-48.71 |
778940932 | Baguio-Bontoc Rd - K0347 + 520 - K0347 + 577 Mountain Province | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 20 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
782288333 | Construction of Piminggan - Saguitlang - Lubas - Dungon Road in support to Coffee, Cacao, Bamboo, Gold, Livestock, High Value Vegetables and Food Processing, Tuba, Benguet Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 32.23 Actual: 35.13 Expenditure:63068200.66 Release:198000000 Obligation:197860000.3 |
-29.825683671838 |
783477831 | Rehabilitation of Tangbao-Kimmallugong FMR, Tangbao and Olo, San Isidro, Abra Abra | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 96.44 Expenditure:6959099.15 Release:15917000 Obligation:15917000 |
-35.706666666667 |
794421262 | Concreting of Sitio Shekdan to Sitio Benmetao, Brgy. Camp 4 FMR, Brgy. Camp 4, Tuba, Benguet Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 0 Actual: 31.06 Expenditure:0 Release:12436035.7 Obligation:12436035.7 |
0 |
795537583 | Gov. Bado Dangwa National Rd - K0339 + 548 - K0339 + 706 Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 20 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
810854740 | Rehabilitation of Wayaway-Magmaguey-Pataqui FMR, Poblacion, La Paz, Abra Abra | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 100 Expenditure:47757894.95 Release:47757894.95 Obligation:47757894.95 |
-33.333333333333 |
816387853 | Concreting and Opening of Sitio Mangitit to Sitio Depnak, Brgy. Bagong FMR, Brgy. Bagong, Sablan, Benguet Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 0 Actual: 79.1 Expenditure:0 Release:12433880 Obligation:12433880 |
0 |
826433029 | Concreting and Opening of Sitio Pital to Sitio Takkey, Brgy. Karao FMR, Brgy. Karao, Bokod, Benguet Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 0 Actual: 90.05 Expenditure:0 Release:12425526.43 Obligation:12425526.43 |
0 |
837300520 | along Claveria - Calanasan Kabugao Rd - K0646 + 450 - K0646 + 472 Apayao | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
856520610 | Cong. Andres Acop Cosalan Rd - K0316 + 549 - K0316 + 725 Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 45.68 Actual: 42.38 Expenditure:0 Release:144750000 Obligation:144622778.4 |
-39.615931721195 |
858058358 | Baguio-La Trinidad-Itogon-Sablan-Tuba and Tublay, Poblacion Jct.-Batuang-Carantes Jct-Balatoc Jct. (Section 6 of BLISTT Outer Ring Circumferential Road), Benguet Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 32.23 Actual: 25.62 Expenditure:22708499.75 Release:151505000 Obligation:151389998.3 |
-44.949494949495 |
863144699 | Concreting of Brgy. Bagalay - Brgy. Budac Farm to Market Road, Brgy. Bagalay and Budac, Tayum, Abra Abra | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 0 Actual: 100 Expenditure:0 Release:37814034.85 Obligation:37814034.85 |
0 |
872136722 | Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - K0438 + 000 - K0444 + 150, K0444 + 220 - K0453 + 800 Mountain Province | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 20 Actual: 0.23 Expenditure:0 Release:241250000 Obligation:241140860.7 |
-98.85 |
882463458 | Construction of Carumsing Bridge, Carumsing, Dangtalan, Pasil, Kalinga Kalinga | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:98430000 Obligation:97350926.56 |
0 |
883453877 | Concreting of Sagpat-Manawal, Brgy. Sagpat FMR, Brgy. Sagpat, Kibungan, Benguet Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 100 Expenditure:9674753.19 Release:12357489.77 Obligation:12357489.77 |
-33.333333333333 |
897083626 | Concreting of Brgy. Magnao FMR, Brgy. Magnao, Tabuk City, Kalinga Kalinga | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 95 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
904121829 | Baguio-La Trinidad-Itogon-Sablan-Tuba and Tublay, Kamog Jct.-Calot-Pappa-Bagong-Balluay-Tuel Jct. (Section 2 of BLISTT Outer Ring Circumferential Road), Package 3, Benguet Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 0.04 Expenditure:43407000 Release:289500000 Obligation:289380000 |
-99.964620555457 |
906844090 | Construction/Improvement of Beyeng - Tacadang Road, Tacadang, Kibungan, Benguet Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 70.81 Expenditure:53580349.98 Release:96500000 Obligation:96448111.1 |
-35.761589403974 |
908565624 | Gov. Bado Dangwa National Rd - K0338 + 320 - K0338 + 473 Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 20 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
910422007 | Baguio-La Trinidad-Itogon-Sablan-Tuba and Tublay, Labey-Lacamen Provincial Road (Section 4B of BLISTT Outer Ring Circumferential Road), Package 6, Benguet Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 91.3 Expenditure:208480184.2 Release:246075000 Obligation:246075000 |
-28.741895708206 |
920080064 | Concreting of Sitio Peril, Brgy. Alapang FMR, Brgy. Alapang, La Trinidad, Benguet Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 0 Actual: 19.38 Expenditure:0 Release:12432493 Obligation:12432493 |
0 |
925262066 | Cong. Andres Acop Cosalan Rd - K0316 + 240 - K0316 + 365 Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 45.68 Actual: 79.71 Expenditure:0 Release:130275000 Obligation:130173582.4 |
-10.258099945085 |
936423676 | Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - K0380 + 1912 - K0380 + 2104 Mountain Province | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 20 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
936697555 | A.) Banaue-Mayoyao-A Lista-Isabela Bdry Rd - K0358 + 842 - K0359 + 047; B.) Banaue-Mayoyao-A Lista-Isabela Bdry Rd - K0362 + 080 - K0362 + 140 Ifugao | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 49.24 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
940387913 | Concreting of Brgy. Caliking (along damsite) FMR, Brgy. Caliking, Atok, Benguet Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 84 Expenditure:1864526.59 Release:12450000 Obligation:12430177.24 |
-9.1743119266055 |
940547225 | a) Construction of Calimag Flood Control, Sta. 5 + 823 - Sta. 6 + 132 (LS), Alfonso Lista, Ifugao b) Construction of Calupaan Flood Control, Sta. 40 + 975 - Sta. 668 (LS), Alfonso Lista, Ifugao c) Construction of San Juan Flood Control, Sta. 38 + 023 - Sta. 38 + 792 (LS), Alfonso Lista, Ifugao Ifugao | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 100 Expenditure:123477540 Release:123477540 Obligation:123477540 |
-33.333333333333 |
944143093 | Concreting of Sitio Tin-apan to Sitio Amdodon, Brgy. Bangao FMR, Brgy. Bangao, Buguias, Benguet Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 53.5 Expenditure:1864752.23 Release:12450000 Obligation:12431681.51 |
-41.891891891892 |
950118998 | Asphalt Overlay (Instapave) along Gov Bado Dangwa National Road- K0264+050 - K0275 + 299 Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 83.05 Expenditure:72799702.14 Release:120625000 Obligation:120523971.7 |
5.035446895912 |
955580084 | Concreting of Cardona Farm to Market Road, Brgy. Cardona, Dolores, Abra Abra | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 0 Actual: 55.26 Expenditure:0 Release:28330365.79 Obligation:28330365.79 |
0 |
955807309 | Concreting of Sitio Upper Patkiaw to Sitio Nan-agto, Brgy. Natubleng FMR, Brgy. Natubleng, Buguias, Benguet Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 56 Expenditure:1864717.27 Release:12450000 Obligation:12431448.47 |
-40.540540540541 |
959086687 | Construction of Baguyos Flood Control at Barangay Colalo, Mankayan, Benguet Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 100 Expenditure:86738478.17 Release:96500000 Obligation:96380643.4 |
-7.0130987666125 |
959446509 | Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - K0380 + 173 - K0380 + 320 Mountain Province | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 20 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
970201464 | Opening and Concreting of Sitio Owak to Sitio Pigingan, Brgy. Karao, Bokod, Benguet Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 100 Expenditure:5654412.66 Release:12479887.86 Obligation:12479887.86 |
-30.451716103905 |
976434417 | Concreting and Opening of Sitio Lipit to Sitio Lubas, Brgy. Ansagan FMR, Brgy. Ansagan, Tuba, Benguet Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 0 Actual: 38.09 Expenditure:0 Release:12427522 Obligation:12427522 |
0 |
990277578 | Preventive Maintenance (Asphalt Overlay) along Baguio-Bontoc Rd - K0254 + (-586) - K0260 + 000 Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 32.23 Actual: 54.49 Expenditure:67676184.77 Release:125450000 Obligation:125344467.2 |
229.42605526875 |
995691089 | Preventive Maintenance (Asphalt Overlay) along Baguio-Itogon Rd - K0254 + (-651) - K0258 + 595, K0261 + 000 - K0268 + 055 Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 32.23 Actual: 10.31 Expenditure:0 Release:202650000 Obligation:202539962 |
-59.057971014493 |
1001698962 | Baguio-La Trinidad-Itogon-Sablan-Tuba and Tublay, Labey-Lacamen Provincial Road (Section 4B of BLISTT Outer Ring Circumferential Road), Package 1, Benguet Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 100 Expenditure:193000000 Release:193000000 Obligation:193000000 |
-33.333333333333 |
1006776008 | Baguio-Bontoc Rd - K0369 + 640 - K0369 + 910 Mountain Province | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 20 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
1010810240 | Cong. Andres Acop Cosalan Rd - K0314 + 845 - K0315 + 000 Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 22.15 Actual: 40.42 Expenditure:0 Release:144750000 Obligation:144647629.5 |
37.173839376483 |
1018657094 | Opening and Concreting of Ungbul-Labanun, Barangay Pindongan Fmr, Barangay Pindongan, Kiangan, Ifugao Ifugao | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 95.03 Expenditure:0 Release:11940000 Obligation:11940000 |
-35.166484716157 |
1021296340 | Mt Prov-Ilocos Sur via Tue Rd - K0389 + 876 - K0390 + 000 Mountain Province | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 100 Expenditure:67381674.09 Release:96500000 Obligation:96500000 |
-19.653368214519 |
1024338695 | Baguio-La Trinidad-Itogon-Sablan-Tuba and Tublay, Taloy Norte Jct. - San Pascual Brgy. Hall Jct. (Section 7 of BLISTT Outer Ring Circumferential Road), Package 1, Benguet Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 100 Expenditure:97300471.63 Release:115800000 Obligation:111245660 |
-32.132070989854 |
1036531869 | a) Gov. Bado Dangwa National Rd - K0342 + 770 - K0342 + 857, K0343 + 107 - K0343 + 215, K0347 + 055 - K0347 + 150 b) Gov. Bado Dangwa National Rd - K0341 + 104 - K0341 + 314, K0341 + 798 - K0341 + 910 c) Gov. Bado Dangwa National Rd - K0337 + 621 - K0337+706, K0337 + 909 - K0337 + 995 Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 97.63 Actual: 100 Expenditure:492150000 Release:492150000 Obligation:492150000 |
-0.8231677080234 |
1041609380 | Mt Prov-Cagayan via Tabuk-Enrile Rd - K0404 + 660 - K0404 + 770 Mountain Province | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 20 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
1043965901 | Concreting of Sitio Tacarang to Sitio Ponopon, Brgy. Ba-ayan FMR, Ba-ayan, Tublay, Benguet Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 86 Expenditure:1864327.11 Release:12450000 Obligation:12428847.4 |
-12.612612612613 |
1049514565 | Cong. Andres Acop Cosalan Rd - K0315 + 115 - K0315 + 240 Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 100 Expenditure:86728801.91 Release:96500000 Obligation:96500000 |
-33.063355533987 |
1053263027 | Concreting of Brgy. Dintan FMR, Brgy. Dintan, Pilar, Abra Abra | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 100 Expenditure:10493626.65 Release:11940000 Obligation:11940000 |
-33.333333333333 |
1060486812 | Baguio-La Trinidad-Itogon-Sablan-Tuba and Tublay, Labey-Lacamen Provincial Road (Section 4B of BLISTT Outer Ring Circumferential Road), Package 4, Benguet Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 100 Expenditure:270426695 Release:284675000 Obligation:284675000 |
-23.366321383188 |
1065400654 | Guinzadan-Cagubatan-Balili (Mankayan) Road leading to Mogao Mountain and Gawaan Lake, Phase I, Tubo, Mankayan, Benguet Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 20 Actual: 7.77 Expenditure:14468988.24 Release:96500000 Obligation:96459921.62 |
-61.15 |
1065625811 | Soot Br. (B00989LZ) along Abra-Ilocos Norte Rd Abra | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 74.18 Actual: 39.28 Expenditure:159495368 Release:530823340 Obligation:530757818.4 |
-53.800288297733 |
1084545805 | Cong. Andres Acop Cosalan Rd - K0318 + 220 - K0318 + 410 Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 100 Expenditure:106150000 Release:106150000 Obligation:106150000 |
-13.078489448352 |
1090080345 | Mt Prov-Cagayan via Tabuk-Enrile Rd -K0406 + 746 - K0406 + 941 Mountain Province | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 20 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
1096442807 | Gov. Bado Dangwa National Rd - K0308 + 979 - K0309 + 085, K0309 + 510 - K0309 + 616, K0313 + 900 - K0314 + 000 Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 98.53 Actual: 93.96 Expenditure:173612112.1 Release:193000000 Obligation:193000000 |
-22.916928227663 |
1102056396 | Concreting of Brgy. Dilong FMR, Brgy. Dilong, Tubo, Abra Abra | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 96.07 Expenditure:0 Release:12933000 Obligation:12933000 |
-35.953333333333 |
1103194696 | Baguio-La Trinidad-Itogon-Sablan-Tuba and Tublay, Labey-Lacamen Provincial Road (Section 4A of BLISTT Outer Ring Circumferential Road), Package 3, Benguet Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 32.23 Actual: 66.17 Expenditure:82906528.19 Release:193000000 Obligation:192944655.8 |
192.65568277018 |
1105405179 | Construction of Flood Control Structure along Lamut River, Sta. 18+300 - Sta. 18+800 and Sta. 18+985 - Sta. 19+111 (Pieza Side), Lamut, Ifugao Ifugao | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
1116766023 | Concreting of Sitio Pagalan to Sitio Bulala, Brgy. Bayabas FMR, Brgy. Bayabas, Sablan, Benguet Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 100 Expenditure:12498904.38 Release:12498904.38 Obligation:12498904.38 |
-33.333333333333 |
1136617098 | Gov. Bado Dangwa National Rd - K0319 + 560 - K0319 + 736 Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 20 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
1137864887 | Mt Prov-Ilocos Sur via Tue Rd - K0389 + 380 - K0389 + 736 Mountain Province | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 100 Expenditure:60546001.49 Release:96500000 Obligation:96500000 |
-17.995298140628 |
1153220328 | Local Infrastructure Program - Concreting of Sitio Angar to Sitio Ujud, Brgy. Balangbang FMR, Brgy. Balangbang, Mayoyao, Ifugao Ifugao | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 100 Expenditure:7711329.6 Release:11715013.07 Obligation:11715013.07 |
-33.333333333333 |
1160473118 | Concreting of Brgy. Pacoc FMR, Brgy. Pacoc, Lacub, Abra Abra | Department of Public Works and Highways - CAR | (default) |
Target: 100 Actual: 95.26 Expenditure:0 Release:13430000 Obligation:13430000 |
-4.74 |
1170231285 | Rehabilitation/Concreting of Tuday-Tayawa FMR, Cabaroan, Danglas, Abra Abra | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 100 Expenditure:10743991.52 Release:11937768.35 Obligation:11937768.35 |
-33.333333333333 |
1172577182 | Baguio-La Trinidad-Itogon-Sablan-Tuba and Tublay, Labey-Lacamen Provincial Road (Section 4B of BLISTT Outer Ring Circumferential Road), Package 7, Benguet Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 92.02 Expenditure:163825164.9 Release:193000000 Obligation:193000000 |
-29.076436848882 |
1177570840 | Baguio-La Trinidad-Itogon-Sablan-Tuba and Tublay, Kamog Jct.-Calot-Pappa-Bagong-Balluay-Tuel Jct. (Section 2 of BLISTT Outer Ring Circumferential Road), Package 3, Benguet Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 22.42 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
1178615866 | Concreting of Payen, Brgy. Palasa-an FMR, Brgy. Palasa-an, Mankayan, Benguet Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 100 Expenditure:11148750 Release:12387500 Obligation:12387500 |
-33.333333333333 |
1179197447 | Baguio-La Trinidad-Itogon-Sablan-Tuba and Tublay, Labey-Lacamen Provincial Road (Section 4A of BLISTT Outer Ring Circumferential Road), Package 2, Benguet Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
1187944378 | Gov. Bado Dangwa National Rd - K0338 + 753 - K0338 + 914 Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 32.23 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
70.868040333187 |
1195210627 | Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - K0418 + 000 - K0427 + 535, K0427 + 693 - K0428 + 538, K0428 + 735 - K0429 + 741, K0429 + 798 - K0429 + 855, K0431 + 200 - K0433 + 550, K0436 + 316 - K0438 + 000 Mountain Province | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 20 Actual: 15.02 Expenditure:0 Release:241250000 Obligation:241140759.6 |
-24.9 |
1198230993 | Concreting of Sitio Toking, Brgy. Bulalacao to Sitio Pacda, Brgy. Suyoc FMR, Brgy. Bulalacao and Brgy. Suyoc, Mankayan, Benguet Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 95 Actual: 77 Expenditure:0 Release:12450000 Obligation:12415013.4 |
-25.961538461538 |
1211362403 | Cong. Andres Acop Cosalan Rd - K0315 + 693 - K0315 + 930 Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 32.23 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
94.582504970179 |
1221212388 | Kennon Rd - K0239 + 297 - K0239 + 380 Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 100 Expenditure:87576566.06 Release:91096000 Obligation:91096000 |
-8.3912519692336 |
1221840782 | Construction of 4-Storey, 8-Classroom School Building, Abra High School, Bangued, Abra Abra | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 98.52 Expenditure:8871373.39 Release:17939746.17 Obligation:17939746.17 |
-31.285729503249 |
1224384377 | Concreting of Brgy. Patagui - Brgy. Bagatoy Farm to Market Road, Brgy. Patagui and Brgy. Bagatoy, La Paz, Abra Abra | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 0 Actual: 56.47 Expenditure:0 Release:28677554.85 Obligation:28677554.85 |
0 |
1228605375 | Asphalt Overlay (Instapave) along Baguio - Bontoc Road K0284+969 - K0294+969 Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 38.94 Expenditure:0 Release:120625000 Obligation:120523717.1 |
-62.311293153891 |
1235130165 | Gov. Bado Dangwa National Rd - K0288 + 382 - K0288 + 535, K0298 + 130 - K0298 + 200 Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 99.95 Actual: 94.92 Expenditure:139543790.6 Release:154400000 Obligation:154400000 |
-16.669647648006 |
1237307592 | Baguio - Bontoc Rd - K0379 + 880 - K0380 + 020, K0380 + 917 - K0380 + 986 Mountain Province | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 20 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
1241324234 | Cong. Andres Acop Cosalan Rd - K0355 + 100 - K0355 + 250 Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 100 Expenditure:120625000 Release:120625000 Obligation:120625000 |
-10.080028774391 |
1246729767 | Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - K0380 + 1112 - K0380 + 1295 Mountain Province | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 20 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
1259861692 | Baguio-La Trinidad-Itogon-Sablan-Tuba and Tublay, Labey-Lacamen Provincial Road (Section 4A of BLISTT Outer Ring Circumferential Road), Package 1, Benguet Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 74.27 Expenditure:87408820.12 Release:164050000 Obligation:163992142.5 |
-60.443333333333 |
1262898684 | Concreting and Opening of Sitio Wakal, Brgy. Nawal FMR, Brgy. Nawal, Bokod, Benguet Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
1263609224 | Concreting of Sitio Bokes to Sitio Ewa, Brgy. Sagpat FMR, Brgy. Sagpat, Kibungan, Benguet Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 100 Expenditure:12425802.15 Release:12425802.15 Obligation:12425802.15 |
-33.333333333333 |
1273659010 | Construction of Road, Kapangan, Benguet - San Gabriel, La Union Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 32.23 Actual: 19.15 Expenditure:29691502.24 Release:198000000 Obligation:197943348.3 |
-54.978902953586 |
1300290695 | Kennon Rd - K0241 + 650 - K0241 + 790 Baguio City | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 53.46 Actual: 36.47 Expenditure:0 Release:118559900 Obligation:118458183.8 |
-12.466087900163 |
1303363022 | Construction of Road, Guioeng - Lawad - Selac Road, Amlimay, Buguias, Benguet Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 20 Actual: 1.46 Expenditure:14467868.96 Release:96500000 Obligation:96452459.74 |
-92.7 |
1326894017 | Preventive Maintenance along Baguio-Bontoc Rd - K0273 + 500 - K0281 + 438 Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 32.23 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-70.146883684002 |
1334176509 | Local Infrastructure Program - Concreting of Sitio Malalupa to Sitio Caragasan Proper, Brgy. Caragasan FMR, Brgy. Caragasan, Alfonso Lista, Ifugao Ifugao | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 100 Expenditure:11940000 Release:11940000 Obligation:11940000 |
-33.333333333333 |
1336561085 | Construction/Concreting of the Tabuk City, Kalinga - Tuao, Cagayan Road via Burayugan-San Francisco-Naruangan Section, Kalinga Kalinga | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 97.07 Expenditure:75154433.8 Release:109688794.5 Obligation:109688794.5 |
-36.636666666667 |
1337494025 | Construction of Road, Solnob/Belao - Cemento Road, Bokod, Benguet Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 0 Actual: 4.88 Expenditure:14467170.16 Release:96500000 Obligation:96447801.06 |
0 |
1344668042 | Aguinaldo-Toboy-Natonin Road, Aguinaldo, Ifugao Ifugao | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 39.52 Actual: 41.4 Expenditure:38156000.17 Release:118212500 Obligation:118183084.7 |
42.560728744939 |
1346725891 | Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - K0388 + (-1036) - K0399 + 280, K0399 + 362 - K0399 + 504, K0399 + 546 - K0402 + 323 Mountain Province | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 20 Actual: 30.36 Expenditure:65831925.04 Release:241250000 Obligation:241142620.8 |
51.8 |
1349261280 | Construction of Purok 3 to Purok 4, Brgy. Happy Hallow FMR, Baguio City Baguio City | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 0 Actual: 5.18 Expenditure:0 Release:12005812.07 Obligation:12005812.07 |
0 |
1354484677 | Concreting of Brgy. Dulao FMR, Brgy. Dulao, Malibcong, Abra Abra | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 100 Expenditure:10744200.01 Release:11938000 Obligation:11938000 |
-33.333333333333 |
1356507746 | Concreting of Malapaao Farm to Market Road, Brgy. Malapaao, Langiden, Abra Abra | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 73.81 Actual: 100 Expenditure:0 Release:46544980.79 Obligation:46544980.79 |
116.58031088083 |
1366980702 | Cong. Andres Acop Cosalan Rd - K0343 + (-746) - K0353 + 173, K0353 + 227 - K0355 + 100 Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 32.23 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-99.784083898828 |
1367530551 | Cong. Andres Acop Cosalan Rd - K0318 + 570 - K0318 + 690 Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 22.15 Actual: 82.3 Expenditure:119521270.8 Release:164050000 Obligation:163948452.4 |
563.06588973554 |
1379124114 | Concreting of Sitio Ambatutong-Sitio Bila-Sitio Addang FMR Phase IV, Brgy. Bunot, Paracelis, Mountain Province Mountain Province | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 100 Expenditure:0 Release:11940000 Obligation:11940000 |
-33.333333333333 |
1380402615 | Concreting of Pinanday - Babattan, Brgy. Ambassador FMR, Brgy. Ambassador, Tublay, Benguet Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 100 Expenditure:11193749.99 Release:12350340.87 Obligation:12350340.87 |
-33.333333333333 |
1381331356 | Cong. Andres Acop Cosalan Rd - K0341 + 115 - K0341 + 255 Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 22.15 Actual: 25.48 Expenditure:0 Release:144750000 Obligation:144623471.2 |
-29.824079164376 |
1384414332 | Concreting of Sitio Lubo, Brgy. Poblacion FMR, Brgy. Poblacion, Bakun, Benguet Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 62 Expenditure:1850625.05 Release:12450000 Obligation:12337500.33 |
-35.135135135135 |
1391582951 | Concreting of Brgy. Duldulao FMR, Brgy. Duldulao, Malibcong, Abra Abra | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 97.33 Expenditure:4935066.74 Release:11938000 Obligation:11938000 |
-35.113333333333 |
1393442698 | Gakian Br. Along Gov. Bado Dangwa National Road Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 100 Expenditure:87653153.25 Release:106150000 Obligation:106150000 |
-33.108130706713 |
1396944689 | Concreting of Sitio Cocoy to Sitio Ababba, Brgy. Tukucan FMR, Brgy. Tukucan, Tinoc, Ifugao Ifugao | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 100 Expenditure:5305883.36 Release:11940000 Obligation:11940000 |
-33.333333333333 |
1401247198 | Baguio-La Trinidad-Itogon-Sablan-Tuba and Tublay, Asin-Nangalisan Jct.-Bayabas-Monglo Jct. (Section 1 of BLISTT Outer Ring Circumferential Road), Package 1, Benguet Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 63.71 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
1407470289 | Concreting of Brgy. Lusuac FMR, Lusuac, Peñarrubia, Abra Abra | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-67.926666666667 |
1411626177 | Construction of Beyeng - Tacadang Road, Bakun and Kibungan, Benguet Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 32.23 Actual: 6.7 Expenditure:0 Release:198000000 Obligation:197909259.1 |
-79.306184012066 |
1416601818 | Concreting of Sitio Taba-ao (Inarado to Killet Section) to Sitio Mainit, Brgy. San Pascual FMR, Brgy. San Pascual, Tuba, Benguet Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 0 Actual: 54.14 Expenditure:0 Release:12434760 Obligation:12434760 |
0 |
1420691562 | Concreting of Brgy. Mamuyod FMR, Brgy. Mamuyod, Tublay, Benguet Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 100 Expenditure:11175750.62 Release:12417500.68 Obligation:12417500.68 |
-33.333333333333 |
1421113894 | Benguet - Nueva Vizcaya Road KO254+(-372) - KO281+800 Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 100 Expenditure:273494461.2 Release:289500000 Obligation:289500000 |
-28.711459632864 |
1425381696 | Construction of Road, Poblacion - Dalingaoan - Sinacbat, Bakun, Benguet Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 20 Actual: 1.96 Expenditure:14468170.54 Release:96800000 Obligation:96454470.24 |
-90.2 |
1442026147 | Concreting of Brgy. Nagcanasan FMR, Brgy. Nagcanasan, Pilar, Abra Abra | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 100 Expenditure:11895627.07 Release:11940000 Obligation:11940000 |
-33.333333333333 |
1446000594 | Construction of Fort del Pilar Perimeter Fence, Philippine Military Academy, Fort General Gregorio H. del Pilar, Baguio City Baguio City | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 100 Expenditure:35178488.7 Release:96500000 Obligation:93609577.67 |
-33.333333333333 |
1448024320 | Concreting of Brgy. Quimloong to Brgy. Abang to Brgy. Dugong FMR, Brgy. Quimloong, Brgy. Abang and Brgy. Dugong, Bucay, Abra Abra | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 96.23 Expenditure:0 Release:24872291.49 Obligation:24872291.49 |
-35.846666666667 |
1476554715 | Baguio-La Trinidad-Itogon-Sablan-Tuba and Tublay, Kamog Jct.-Calot-Pappa-Bagong-Balluay-Tuel Jct. (Section 2 of BLISTT Outer Ring Circumferential Road), Package 6, Benguet Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 22.42 Actual: 54.3 Expenditure:65145644.42 Release:289500000 Obligation:289474959 |
184.41011235955 |
1478081084 | Construction of a 2-Storey, 4-Classroom, Cabunagan Primary School, Tadian, Mt. Province Mountain Province | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 100 Expenditure:0 Release:1324384 Obligation:1324384 |
-33.333333333333 |
1479895007 | Cong. Andres Acop Cosalan Rd - K0319 + 190 - K0319 + 320 Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 22.15 Actual: 0 Expenditure:0 Release:106150000 Obligation:106048817.8 |
-100 |
1483214725 | Mt Prov-Cagayan via Tabuk-Enrile Rd - K0404 + 660 - K0404 + 770 Mountain Province | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 20 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
1487372426 | Cong. Andres Acop Cosalan Rd - K0333 + 1188 - K0333 + 1448 Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 100 Expenditure:135332005.3 Release:142820000 Obligation:142820000 |
-28.091462290245 |
1491170163 | Benguet-Nueva Vizcaya Rd - K0281 + (-050) - K0281 + 155 Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 45.68 Actual: 90.3 Expenditure:109026891.9 Release:135100000 Obligation:135048553.2 |
87.769696969697 |
1496732258 | A.) Construction of Flood Control Structure along Lagawe River, Sta. 0+000- Sta. 1+219, (Tungngod Side) Lagawe, Ifugao B.) Construction of Boliwong Flood Control Structure, Sta. 3+858-Sta. 3+900 and Sta. 4+869-Sta. 5+182, Lagawe, Ifugao Ifugao | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 87.79 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
1532942251 | Benguet-Nueva Vizcaya Rd - K0293 + 020 - K0293 + 300 Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 22.15 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-23.521972810623 |
1536271252 | Local Infrastructure Program - Improvement/ Concreting of Brgy. Bunhian-Brgy. Majlong FMR, Brgy. Bunhian & Brgy. Majlong, Aguinaldo, Ifugao Ifugao | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 100 Expenditure:10746000 Release:11940000 Obligation:11940000 |
-33.333333333333 |
1537229724 | Asphalt Overlay along Marcos Highway (S00395LZ), K0270 + 500 - K0273 + 218, K0277 + 402 - K0279 + 149, Tuba, Benguet Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 100 Expenditure:96500000 Release:96500000 Obligation:96500000 |
-32.849852269675 |
1549418936 | Concreting of Sitio Toybongan to Sitio Shennet, Brgy. Tabaan Norte FMR, Brgy. Tabaan Norte, Tuba, Benguet Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 100 Expenditure:1797327.41 Release:12499566.64 Obligation:12499566.64 |
-35.003333333333 |
1553610878 | Improvement of Am-am Tourism Road, Junction to Salin, Pangga - Balicano, Brgy. Balili FMR, Mankayan, Benguet Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 100 Expenditure:10746000 Release:11806984.33 Obligation:11806984.33 |
-33.333333333333 |
1562312168 | Concreting of Sitio Pasnaan to Sitio Salin, Brgy. Balili FMR, Brgy. Balili, Mankayan, Benguet Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 94 Expenditure:4073921.02 Release:12450000 Obligation:12386347.41 |
16.216216216216 |
1563136743 | Baguio-La Trinidad-Itogon-Sablan-Tuba and Tublay, Labey-Lacamen Provincial Road (Section 4B of BLISTT Outer Ring Circumferential Road), Package 5, Benguet Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 89.84 Expenditure:205695563.6 Release:241250000 Obligation:241250000 |
-28.608934325152 |
1563850752 | Concreting of Sitio Tano to Sitio Alayo, Brgy. Gangal Farm to Market Road, Brgy. Gangal, Sallapadan, Abra Abra | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 0 Actual: 65.44 Expenditure:0 Release:11343758.66 Obligation:11343758.66 |
0 |
1565800967 | Rehabilitation of Calambat to Collago, Lagayan, Abra Abra | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 100 Expenditure:12571768.51 Release:23878000 Obligation:23878000 |
-34.926666666667 |
1573126458 | Concreting of Sitio Sinigpit, Brgy. Sta. Filomena FMR, Brgy. Sta. Filomena, Calanasan, Apayao Apayao | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 100 Expenditure:0 Release:12029021.12 Obligation:12029021.12 |
-33.333333333333 |
1579440426 | Construction/ Completion of 4STY8CL – Bakakeng National High School, Baguio City Baguio City | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
1581080918 | Preventive Maintenance along Baguio-Bontoc Rd - K0294 + 969 - K0299 + 760, K0299 + 820 - K0307 + 205 Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 32.23 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-97.651493186431 |
1582358977 | Asphalt Overlay along Pico - Lamtang Road (S00401LZ), K0255 + (-555) - K0260 + 750, La Trinidad, Benguet Benguet | Department of Public Works and Highways - CAR | (default) |
Target: 100 Actual: 100 Expenditure:96500000 Release:96500000 Obligation:96500000 |
0 |
1583645841 | Mt Prov-Cagayan via Tabuk-Enrile Rd - K0406 + 453 - K0406 + 692 Mountain Province | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 20 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
1598240245 | Gov. Bado Dangwa National Rd - K0319 + 310 - K0319 + 460 Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 20 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
1599858039 | Concreting of Brgy. Tabacda FMR, Brgy. Tabacda, Tubo, Abra Abra | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 100 Expenditure:7292326.05 Release:11937900 Obligation:11937900 |
-33.333333333333 |
1601418075 | Construction of Road, Bayating - Makidot - Dacaan Saddle, Atok, Benguet Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 20 Actual: 0.13 Expenditure:14472023.39 Release:96500000 Obligation:96480155.93 |
-99.35 |
1604603310 | Concreting of Sitio Asibanglan, Brgy. Bagumbayan FMR, Brgy. Bagumbayan, Tabuk City, Kalinga Kalinga | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
1616943368 | Baguio-La Trinidad-Itogon-Sablan-Tuba and Tublay, Labey-Lacamen Provincial Road (Section 4B of BLISTT Outer Ring Circumferential Road), Package 3, Benguet Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 32.23 Actual: 31.3 Expenditure:28938694.73 Release:193000000 Obligation:192924631.6 |
30.347555806725 |
1618639255 | Improvement of Poblacion-Quiliat FMR, Quiliat-Poblacion, Langiden, Abra Abra | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 100 Expenditure:27858000 Release:27858000 Obligation:27858000 |
-33.333333333333 |
1619052992 | Road Opening of Bolok - Adaoay - Bajen - Batan Access Road, Batan and Achokey, Kabayan, Benguet Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 64.94 Expenditure:47363553.73 Release:96500000 Obligation:95510807.78 |
-37.703522400766 |
1620923074 | Construction of Office's 5-Storey Condominium, Philippine Military Academy (PMA), Baguio City Baguio City | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 63.71 Actual: 26.74 Expenditure:35170055.84 Release:106150000 Obligation:104039881.1 |
-70.46609233488 |
1632118270 | Concreting of Brgy. Pacqued FMR, Brgy. Pacqued, Malibcong, Abra Abra | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 100 Expenditure:10658732.81 Release:11938000 Obligation:11938000 |
-33.333333333333 |
1638428036 | Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - K0402 + 323 - K0408 + 741, K0408 + 939 - K0409 + 040, K0409 + 090, - K0410 + 816, K0410 + 942 - K0416 + 126, K0416 + 301 - K0418 + 000 Mountain Province | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 20 Actual: 30.66 Expenditure:66494750.82 Release:241250000 Obligation:241143558.9 |
53.3 |
1638464029 | Mt Prov-Cagayan via Tabuk-Enrile Rd - K0405 + 150 - K0405 + 345 Mountain Province | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 20 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
1643436706 | Mt Prov-Ilocos Sur via Tue Rd - K0387 + (-061) - K0387 + 010 Mountain Province | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 100 Expenditure:86458916.87 Release:96500000 Obligation:96500000 |
-22.923522958784 |
1645532004 | Banaue-Hungduan-Benguet Bdry Rd - K0366 + 000 - K0366 + 070 Ifugao | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 87.79 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
1649632548 | Concreting of Sitio Tagpaya, Brgy. Madaymen FMR, Brgy. Madaymen, Kibungan, Benguet Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 56 Expenditure:1863342.92 Release:12450000 Obligation:12422286.1 |
-43.243243243243 |
1654821204 | Kennon Rd - K0228 + 886 - K0228 + 970, K0237 + 529 - K0237 + 777, K0239 + 000 - K0239 + 100 Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:460440100 Obligation:0 |
0 |
1663214605 | Gov. Bado Dangwa National Rd - K0315 + 721 - K0315 + 826, K0316 + 045 - K0316 + 082 Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 100 Expenditure:104172593.4 Release:115800000 Obligation:115800000 |
-3.982214404378 |
1664182729 | Construction of Baney Flood Control at Barangay Baculongan Sur, Buguias, Benguet (b) January 7, 2022 Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 95.85 Expenditure:86849711.22 Release:96500000 Obligation:95444444.44 |
-15.799028244968 |
1669919443 | Construction of Road, Ubanga - Cayapas - Balintag - Decan Road, Baculongan Sur, Buguias, Benguet Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 20 Actual: 1.12 Expenditure:14468988.24 Release:96500000 Obligation:96459921.62 |
-94.422310756972 |
1682584171 | Improvement of Quiliat-Baac FMR, Quiliat-Baac, Langiden, Abra Abra | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 100 Expenditure:25867999.16 Release:25867999.16 Obligation:25867999.16 |
-33.333333333333 |
1687969359 | Kennon Rd - K0234 + 910 - K0235 + 020, K0238 + 870 - K0238 + 920 Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 98.44 Actual: 100 Expenditure:173700000 Release:173700000 Obligation:173700000 |
1.1020119300374 |
1688785915 | Concreting of Junction Tuquid via Palayan-Tamac FMR, Tamac, Villaviciosa, Abra Abra | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 100 Expenditure:36705995.33 Release:40793000 Obligation:40793000 |
-33.333333333333 |
1697737648 | Concreting of Otso-Ambakian, Brgy. Batan FMR, Brgy. Batan, Kabayan, Benguet Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 100 Expenditure:12448966.58 Release:12448966.58 Obligation:12448966.58 |
-33.333333333333 |
1709540484 | Construction of Flood Control Structure, Mariis Main Canal (San Jose Section), Sta. 3+616 - Sta. 5+000, San Jose, Alfonso Lista, Ifugao Ifugao | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 6.03 Expenditure:0 Release:65780190 Obligation:65772968.34 |
-93.97 |
1709570033 | Concreting and Opening of Sitio Baguengey, Barangay Pongayan to Brgy. Poblacion Central, Brgy. Pongayan and Brgy. Poblacion Central FMR, Brgy. Pongayan and Brgy. Poblacion Central, Kapangan, Benguet (Phase II) Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 26 Expenditure:1850624.99 Release:12450000 Obligation:12337449.91 |
-67.43119266055 |
1710768716 | Concreting of Sitio Bansa to Sitio Mosgo, Brgy. Monamon Norte FMR, Brgy. Monamon Norte, Bauko, Mountain Province Mountain Province | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
1719658989 | Concreting of Brgy. Tikitik FMR, Brgy. Tikitik, Pilar, Abra Abra | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 100 Expenditure:10715204.56 Release:11940000 Obligation:11940000 |
-33.333333333333 |
1731041693 | Preventive Maintenance along Gov. Bado Dangwa National Rd - K0328 + (-085) - K0329 + 420, K0320 + 100 - K0331 + 000 Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 32.23 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-99.801762114537 |
1747573194 | Concreting Sitio Tuel Proper to Sitio Asin, Brgy Tuel FMR, Tuel, Tublay, Benguet Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 56 Expenditure:1858111.9 Release:12450000 Obligation:12387412.67 |
-39.908256880734 |
1762206027 | Banaue-Mayoyao-A Lista-Isabela Bdry Rd - K0347 + 940 - K0348 + 000, K0361 + 715 - K0351 + 850 Ifugao | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 100 Expenditure:105263165 Release:105263165 Obligation:105263165 |
-33.333333333333 |
1779496193 | Concreting of Sitio Bucarot, Brgy. Tanglagan FMR, Brgy. Tanglagan, Calanasan, Apayao Apayao | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 100 Expenditure:0 Release:12022722.52 Obligation:12022722.52 |
-33.333333333333 |
1781164914 | Kennon Rd - K0224 + 985 - K0225 + 090, K0232 + 535 - K0232 + 616, K0233 + 190 - K0233 + 254 Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 90.1 Actual: 98.54 Expenditure:180969806.4 Release:193000000 Obligation:192893370.4 |
14.693295292439 |
1792892742 | Baguio-La Trinidad-Itogon-Sablan-Tuba and Tublay, Labey-Lacamen Provincial Road (Section 4A of BLISTT Outer Ring Circumferential Road), Package 1, Benguet Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 32.23 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
1795411590 | Construction/ Completion of Tanudan Vocational School Kalinga | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
1796925952 | Construction of Quartering Facility Building, PRO COR Headquarters, Camp Bado Dangwa, La Trinidad, Benguet Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 60.72 Expenditure:9209345.38 Release:19300000 Obligation:17382235.86 |
-51.228915662651 |
1805738208 | Concreting of Sitio Gulon, Brgy. Ambiong FMR, Brgy. Ambiong, La Trinidad, Benguet Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 100 Expenditure:8288817.75 Release:12491255.12 Obligation:12491255.12 |
-33.333333333333 |
1806760946 | Benguet-Nueva Vizcaya Rd - K0293+ 245 - K0293 + 308 Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 45.68 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-40.302461640358 |
1815428375 | Rehabilitation of Kiwas to Baybayatin FMR, Collago, Lagayan, Abra Abra | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 100 Expenditure:7858043.91 Release:14923000 Obligation:14923000 |
-33.333333333333 |
1823989414 | Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse and Landslide along Abatan - Mankayan - Cervantes Road K0347 + 000 - K0348+100 Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 100 Expenditure:77136885.43 Release:96800000 Obligation:96381938.48 |
-22.620898453482 |
1826635640 | Rehabilitation/Concreting of Brgy. Nagaparan to Brgy. Abaquid FMR, Brgy. Nagaparan and Brgy. Abaquid, Danglas, Abra Abra | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 95.46 Expenditure:0 Release:35817914.76 Obligation:35817914.76 |
-36.36 |
1832383385 | Itogon-Dalupirip-San Nicolas Road, Itogon, Benguet Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 32.23 Actual: 43.7 Expenditure:68125525.74 Release:193000000 Obligation:192926551.4 |
79.765576804442 |
1833170695 | Construction of Enlisted Personnel 5-Storey Condominium, Philippine Military Academy (PMA), Baguio City Baguio City | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 76.82 Actual: 9.56 Expenditure:18377550.22 Release:125450000 Obligation:122517001.5 |
-90.67594797582 |
1834064816 | Concreting of Sitio Aduyon to Sitio Talingguroy, Brgy. Wangal FMR, La Trinidad, Benguet Benguet | Department of Public Works and Highways - CAR | (default) |
Target: 0 Actual: 82.25 Expenditure:0 Release:12430620 Obligation:12430620 |
0 |
1847599231 | Itogon-Dalupirip-Sn Manuel Bdry Rd - K0271 + 286 - K0271 + 413 Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 81.89 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-91.719057598273 |
1855218464 | a) Itogon-Dalupirip-sn Manuel Bdry Rd - K0276 + 015 - K0276 + 067, K0276 + 077 - K0276 + 213 b) Baguio-Itogon Rd - K0261 + 370 - K0261 + 445 Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 96.92 Expenditure:177283473 Release:212300000 Obligation:208676593.5 |
-59.772757174574 |
1858493486 | Concreting of Brgy. Paco to Brgy. Cabiten FMR, Brgy. Paco and Brgy. Cabiten, Mankayan, Benguet Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 89 Expenditure:1864797.25 Release:12450000 Obligation:12431981.64 |
-8.5585585585586 |
1867227473 | Cong. Andres Acop Cosalan Rd - K0314 + 430 - K0314 + 563 Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 22.15 Actual: 84.06 Expenditure:0 Release:106150000 Obligation:106049649.7 |
94.88307478583 |
1872150803 | Construction of Multi-Purpose Building Phase II, La Trinidad, Benguet Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 20 Actual: 0 Expenditure:0 Release:289500000 Obligation:0 |
-100 |
1878389344 | Concreting of Sitio Bakong to Sitio Sapsing, Brgy. Beckel FMR, Brgy. Beckel, La Trinidad, Benguet Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 0 Actual: 47.31 Expenditure:0 Release:12313679.93 Obligation:12313679.93 |
0 |
1883665137 | Construction of Flood Control Structure along Nayon River, Sta. 13+904- Sta. 13+960 and Sta. 13+970- Sta. 14+114, (Bimpal side) Lamut, Ifugao Ifugao | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 87.79 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
1887709673 | Benguet-Nueva Vizcaya Rd - K0254 + 270 - K0254 + 380 Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 91.57 Expenditure:96606857.09 Release:106150000 Obligation:106096400.5 |
-24.351546483644 |
1890371590 | Concreting of Central Bayabas-Amocao Junction FMR, Brgy. Bayabas, Sablan, Benguet Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 0 Actual: 86.94 Expenditure:0 Release:12434545.8 Obligation:12434545.8 |
0 |
1912199774 | Construction of Sinacbat - Alilem Road, Bakun, Benguet Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 39.52 Actual: 42.42 Expenditure:39408828.88 Release:198000000 Obligation:197895483.9 |
8.7133041848844 |
1912753853 | Construction of Road Slope Protection Structure along Governor Dangwa National Road at Ampusongan, Bakun, Benguet, K0338+970 - K0339+050 Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 100 Expenditure:59400000 Release:59400000 Obligation:59400000 |
-33.333333333333 |
1921097451 | Cong. Andres Acop Cosalan Rd - K0316 + 100 - K0316 + 240 Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 45.68 Actual: 58.55 Expenditure:75504628.07 Release:144750000 Obligation:144699097.4 |
19.245591498307 |
1939998307 | Concreting of Malanac - Shekdan, Brgy. Daclan FMR, Brgy. Daclan, Tublay, Benguet Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 100 Expenditure:11940000 Release:11940000 Obligation:11940000 |
-33.333333333333 |
1946140793 | Concreting of Brgy. Umnap FMR, Brgy. Umnap, Malibcong, Abra Abra | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 95.81 Expenditure:5411109.42 Release:12933000 Obligation:12933000 |
-36.126666666667 |
1966467841 | Gov. Bado Dangwa National Rd - K0275 + 229 - K0276 + 636, K0277 + (-367) - K0288 + 980 Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 81.89 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-39.105651894669 |
1992119834 | Cong. Andres Acop Cosalan Rd - K0315 + 940 - K0316 + 090 Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 45.68 Actual: 4.46 Expenditure:0 Release:144780000 Obligation:144622768.1 |
-93.261266320371 |
1992952031 | Concreting of Sitio Giligil - Lepsik - Mabilig - Bulisay, Brgy. Kayapa FMR, Brgy. Kayapa, Bakun, Benguet Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 100 Expenditure:11193749.99 Release:12287469.02 Obligation:12287469.02 |
-33.333333333333 |
1994505820 | Completion of Police Regional Office Cordillera One Stop-Shop National Support Unit Building, Camp Bado Dangwa, La Trinidad, Benguet Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 41.87 Expenditure:6635495.61 Release:19300000 Obligation:17101525.02 |
-60.60035757975 |
2006599808 | Gov. Bado Dangwa National Rd - K0338 + 038 - K0338 + 151, K0338 + 220 - K0338 + 250 Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 32.23 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
92.218949435444 |
2008487755 | Concreting and Improvement of Indaoac-Gusaran, Brgy. Tabaan Sur FMR, Brgy. Tabaan Sur, Tuba, Benguet Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 100 Expenditure:11999972.55 Release:11999972.55 Obligation:11999972.55 |
-33.333333333333 |
2014319193 | Benguet-Nueva Vizcaya Rd - K0283 + 280 - K0283 + 380, K0284 + 000 - K0284 + 100 Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 91.05 Actual: 86.8 Expenditure:148389372.1 Release:214230000 Obligation:214230000 |
0.12230634828189 |
2016341468 | Marcos Hi-way - K0260 + (-686) - K0264 + 000, K0264 + 460 - K0266 + 000, K0266 + 709 - K0267 + 165, K0267 + 325 - K0270 + 500 Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 63.71 Actual: 87.16 Expenditure:85015631.03 Release:193000000 Obligation:193000000 |
57.836157625589 |
2039785292 | Benguet-Nueva Vizcaya Rd - K0276 + 040 - K0276 + 135, K0276 + 286 - K0276 + 386 Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 97.14 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-48.44156533744 |
2042185825 | Baguio-Bontoc Rd - K0347 + 710 - K0347 + 1014 Mountain Province | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 20 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
2042257986 | Opening and Concreting of Talite-Pangalasay, Brgy. Bayabas FMR, Brgy. Bayabas, Sablan, Benguet Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 100 Expenditure:4518275.11 Release:12499363.21 Obligation:12499363.21 |
-31.034482758621 |
2060937591 | Preventive Maintenance of Road: Asphalt Overlay/Item 304-A (Slurry Surface Treatment 12mm) with Correction - Benguet-Nueva Vizcaya Road, K0288 + 000 - K0319 + 726 Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 0 Actual: 89 Expenditure:246619679.6 Release:289500000 Obligation:289392456.9 |
0 |
2067909780 | Construction of Road, Poblacion - Sagpat - Lubo - Madaymen, Kibungan, Benguet Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 20 Actual: 1.82 Expenditure:0 Release:96500000 Obligation:96391659.81 |
-90.9 |
2071924732 | Concreting and Opening of Sitio Ubod, Brgy. Labueg to Sitio Abiang, Brgy. Taba-ao FMR, Brgy. Labueg and Brgy. Taba-ao, Kapangan, Benguet Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 35 Expenditure:1858099.23 Release:12450000 Obligation:12387328.25 |
-68.468468468468 |
2087193612 | Concreting of Sitio Toking, Brgy. Bulalacao to Sitio Pacda, Brgy. Suyoc FMR, Brgy. Bulalacao and Brgy. Suyoc, Mankayan, Benguet Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 95 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
2090532814 | Construction of Road, Gadang - Lanas - Amponget - Bagulin, Gadang & Sagubo, Kapangan, Benguet Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 20 Actual: 0 Expenditure:0 Release:144750000 Obligation:144698856.5 |
-100 |
2101421911 | Concreting of Brgy. Nueva to Brgy. Panay FMR,Sta. Marcela, Apayao Apayao | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
2102741252 | Baguio-La Trinidad-Itogon-Sablan-Tuba and Tublay, Kamog Jct.-Calot-Pappa-Bagong-Balluay-Tuel Jct. (Section 2 of BLISTT Outer Ring Circumferential Road), Package 1 Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 22.42 Actual: 4.3 Expenditure:43109617.95 Release:289500000 Obligation:287397453 |
-83.553113553114 |
2109225749 | Benguet-Nueva Vizcaya Rd - K0284 + 450 - K0284 + 590 Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 45.68 Actual: 51.98 Expenditure:62869086.63 Release:144750000 Obligation:144697970.2 |
9.1183940016931 |
2119401917 | Preventive Maintenance (Asphalt Overlay) along Baguio-Bontoc Rd - K0312 + 600 - K0320 + 600 Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 39.52 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
2125493605 | Installation of Road Safety Devices along Cong. Andres Acop Cosalan Road K0301+(-905) - K0304+024 (S00386LZ) K0312+000 - K0317+533 (S00386LZ) K0318+(-466) - K0342+000 (S00379LZ) Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 99.93 Expenditure:126288012.4 Release:144750000 Obligation:144646889.6 |
-5.7602773650322 |
2135826808 | Baguio-La Trinidad-Itogon-Sablan-Tuba and Tublay, Labey-Lacamen Provincial Road (Section 4B of BLISTT Outer Ring Circumferential Road), Package 8, Benguet Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 100 Actual: 100 Expenditure:144750000 Release:144750000 Obligation:144750000 |
-26.261844191277 |
2142277750 | Itogon-Dalupirip-Sn Manuel Bdry Rd - K0275 + 510 - K0275 + 635, K0275 + 690 - K0275 + 810 Benguet | Department of Public Works and Highways - CAR | (Cumulative) |
Target: 95.08 Actual: 95.64 Expenditure:251273022.9 Release:279850000 Obligation:279850000 |
-46.305416527639 |
31381407 | Nueva Vizcaya-Ifugao-Mt Province Rd - K0334 + 500 - K0334 + 580 (001 - Assest Preservation Program) Ifugao | DPWH Ifugao 1st DEO | (Cumulative) |
Target: 75 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
72522525 | Completion of Multipurpose Building in Brgy. Ubuag, Hingyon, Ifugao Ifugao | DPWH Ifugao 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
84221478 | Cudog-Mungayang-Kiangan Road leading to Ambuaya Lake, Yamashita Shrine and Kiyangan Settlement, Kiangan and Lagawe , Ifugao (CSSP-TRIP) Ifugao | DPWH Ifugao 1st DEO | (Cumulative) |
Target: 75 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
113688555 | Construction/Improvement of Access Roads leading to Declared Tourism Destinations (Tourism Road Infrastructure Program-TRIP)-Lagawe-Boliwong-Abinuan Road leading to Inchang Falls, Lagawe, Ifugao Ifugao | DPWH Ifugao 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
138722689 | Construction of Multipurpose Building in Brgy. Pula, Asipulo, Ifugao Ifugao | DPWH Ifugao 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
148375889 | Lubuong-Bokiawan-Nungulunan Road leading to Bakung Spider Web and other tourism destinations, Hungduan, Ifugao (CSSP-TRIP) Ifugao | DPWH Ifugao 1st DEO | (Cumulative) |
Target: 75 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
188751957 | onstruction of Multipurpose Building in Brgy. Poblacion, Kiangan, Ifugao (CSSP-BIP) Ifugao | DPWH Ifugao 1st DEO | (Cumulative) |
Target: 30 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
192190523 | Construction of Missing Links/ New Roads -Kiangan-Asipulo-Ambaguio-Bayombong Road, Package 1, Ifugao Ifugao | DPWH Ifugao 1st DEO | (Cumulative) |
Target: 50 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-97.295905227917 |
219071739 | Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads along Nueva Vizcaya-Ifugao-Mt Province Rd - K0334 + 500 - K0334 + 580 Ifugao | DPWH Ifugao 1st DEO | (default) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
233502981 | Construction of Sitio Nunhabatan Access Road in Brgy. Hapid, Lamut, Ifugao Ifugao | DPWH Ifugao 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
301442203 | Construction of Sitio Nunhabatan Access Road in Brgy. Hapid, Lamut, Ifugao (CSSP-BIP) Ifugao | DPWH Ifugao 1st DEO | (Cumulative) |
Target: 75 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
340120514 | Construction of Multipurpose Building, Brgy. Panubtuban, Asipulo, Ifugao (CSSP-BIP) Ifugao | DPWH Ifugao 1st DEO | (Cumulative) |
Target: 75 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
376389564 | Construction of Multipurpose Building in Brgy. Poblacion, Kiangan, Ifugao Ifugao | DPWH Ifugao 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
389168784 | Construction of Multipurpose Building in Brgy. Magulon, Lamut, Ifugao Ifugao | DPWH Ifugao 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
392565870 | Lagawe-Hingyon Road via Burnay leading to Mt. Atugo and other tourism destinations, Lagawe and Hingyon, Ifugao (CSSP-TRIP) Ifugao | DPWH Ifugao 1st DEO | (Cumulative) |
Target: 75 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
393417955 | Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse and Landslide along Banaue-Hungduan-Benguet Bdry Rd - K0387 + 650 - K0387 + 680, K0389 + 170 - K0389 + 182, K0369 + 790 - K0369 + 819, K0377 + 081 - K0377 + 150 Ifugao | DPWH Ifugao 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
431527789 | a) Construction of Access Road In Brgy. Maggok, Hungduan, Ifugao (CSSP-BIP) Ifugao | DPWH Ifugao 1st DEO | (Cumulative) |
Target: 75 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
505914706 | Nueva Vizcaya-Ifugao-Mt Province Rd - K0298 + 450 - K0298 + 884, K0323 + 300 - K0323 + 357, K0325 + 769 - K0325 + 919, K0326 + 000 - K0326 + 104, K0326 + 169 - K0326 + 419, K0326 + 552 - K0326 + 765, K0326 + 812 - K0326 + 930, K0326 + 970 - K0327 + 092, K0327 + 167 - K0327 + 178, K0327 + 306 - K0327 + 428, K0327 + 465 - K0327 + 720, K0327 + 764 - K0327 + 835, K0327 + 927 - K0328 + 100, K0328 + 385 - K0328 + 963, K0330 + 963 - K0331 + 490 Ifugao | DPWH Ifugao 1st DEO | (Cumulative) |
Target: 70 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
508239872 | Nueva Vizcaya-Ifugao-Mt Province Rd - K0328 + 1026, K0328 + 594, K0329 + 921, K0330 + 102 - K0330 + 171, K0330 + 381, K0330 + 776, K0330 + 868, K0330 + 890, K0330 + 913 - K0330 + 987 Ifugao | DPWH Ifugao 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-64.252010723861 |
560391157 | Cudog-Mungayang-Kiangan Road leading to Ambuaya Lake, Yamashita Shrine and Kiyangan Settlement, Kiangan and Lagawe , Ifugao Ifugao | DPWH Ifugao 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-44.617231407213 |
610904174 | Kiangan-Asipulo-Ambaguio-Bayombong Road, Package 1, Ifugao (Network Development Program) Ifugao | DPWH Ifugao 1st DEO | (Cumulative) |
Target: 75 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
622317376 | Construction of Road, Barangay Sanafe, Lamut, Ifugao Ifugao | DPWH Ifugao 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
637790708 | Banaue-Hungduan-Benguet Bdry Rd - K0384+(-717) - K0384+(-607), K03567+808 - K0367+816, K0369+815 - K0369+827, K0372+300 - K0372+340, K0379+445 - K0379+638, K0380+290 - K0380+310 Ifugao | DPWH Ifugao 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-67.209775967413 |
719931912 | Construction of Sitio Humalophop Access Road in Brgy. Mompolia, Hingyon, Ifugao Ifugao | DPWH Ifugao 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
755939613 | Lagawe-Boliwong-Abinuan Road leading to Inchang Falls, Lagawe, Ifugao (Network Development Program) Ifugao | DPWH Ifugao 1st DEO | (Cumulative) |
Target: 45 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
782012845 | Construction of Multipurpose Building in Brgy. Tukucan, Tinoc, Ifugao (CSSP-BIP) Ifugao | DPWH Ifugao 1st DEO | (Cumulative) |
Target: 75 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
795530351 | Construction of Flood Control Structure along Lamut River, Sta. 18+300 - Sta. 18+850 (Pieza Side), Lamut, Ifugao Ifugao | DPWH Ifugao 1st DEO | (Cumulative) |
Target: 70 Actual: 0.12 Expenditure:0 Release:0 Obligation:38105039.76 |
-99.88 |
895943621 | Preventive Maintenance-Kiangan-Tinoc-Buguias Rd - (S00634LZ) Chainage 5394 - Chainage 7347 Ifugao | DPWH Ifugao 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
930348751 | Construction of Multipurpose Building in Brgy. Pula, Asipulo, Ifugao (CSSP-BIP) Ifugao | DPWH Ifugao 1st DEO | (Cumulative) |
Target: 75 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
933001412 | Construction of Sitio Humalophop Access Road in Brgy. Mompolia, Hingyon, Ifugao (CSSP-BIP) Ifugao | DPWH Ifugao 1st DEO | (Cumulative) |
Target: 75 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
989145893 | Construction of Sitio Humalophop Access Road in Brgy. Mompolia, Hingyon, Ifugao (CSSP-BIP) Ifugao | DPWH Ifugao 1st DEO | (Cumulative) |
Target: 75 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
1019348980 | Construction of Multipurpose Building, Brgy. Panubtuban, Asipulo, Ifugao Ifugao | DPWH Ifugao 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
1037768479 | Construction of 14 Special Action Batallion (SAB) Headquarters, Lamut, Ifugao (CSSP-TIKAS) Ifugao | DPWH Ifugao 1st DEO | (Cumulative) |
Target: 30 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
1081069271 | Construction of Public Water Supply (Level II) in Brgys. Cudog & Poblacion West, Lagawe, Ifugao Ifugao | DPWH Ifugao 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
1110100820 | Completion of Multipurpose Building in Brgy. Cawayan, Asipulo, Ifugao (CSSP-BIP) Ifugao | DPWH Ifugao 1st DEO | (Cumulative) |
Target: 75 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
1130792440 | Lagawe - Hingyon Road via Burnay leading to Mt. Atugo and other tourism destinations, Lagawe and Hingyon, Ifugao Ifugao | DPWH Ifugao 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.25 |
1163906107 | Nueva Vizcaya-Ifugao-Mt Province Rd - K0328 + 1026, K0328 + 594, K0329 + 921, K0330 + 102 - K0330 + 171, K0330 + 381, K0330 + 776, K0330 + 868, K0330 + 890, K0330 + 913 - K0330 + 987 (001 - Assest Preservation Program) Ifugao | DPWH Ifugao 1st DEO | (Cumulative) |
Target: 75 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
1165797038 | Kiangan-Tinoc-Buguias Rd - (S00634LZ) Chainage 5394 - Chainage 7347 (001 - Assest Preservation Program) Ifugao | DPWH Ifugao 1st DEO | (default) |
Target: 75 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
1170232251 | Banaue-Hungduan-Benguet Bdry Rd - K0391 + 125 - K0391 + 249, K0383 + 010 - K0383 + 080, K0392 +(-047) - K0392 + (-017), K0392 + 950 - K0392+974, K0393 + 000 - K0393 + 030 (001 - Assest Preservation Program) Ifugao | DPWH Ifugao 1st DEO | (Cumulative) |
Target: 65 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
1252835756 | Construction Of Access Road In Brgy. Maggok, Hungduan, Ifugao Ifugao | DPWH Ifugao 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
1285855945 | Completion of Multipurpose Building in Brgy. Bimpal, Lamut, Ifugao (CSSP-BIP) Ifugao | DPWH Ifugao 1st DEO | (Cumulative) |
Target: 75 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
1369382048 | Construction of Road, Barangay Sanafe, Lamut, Ifugao (CSSP-BIP) Ifugao | DPWH Ifugao 1st DEO | (Cumulative) |
Target: 75 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
1378639302 | Completion of Multipurpose Building in Brgy. Ubuag, Hingyon, Ifugao Ifugao | DPWH Ifugao 1st DEO | (default) |
Target: 75 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
1431613109 | Construction of Boliwong Flood Control Structure, Sta. 3+750-Sta. 3+900 and Sta. 4+782-Sta. 5+182, Lagawe, Ifugao Ifugao | DPWH Ifugao 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:73726000 Obligation:0 |
0 |
1492035180 | Construction of 14 Special Action Batallion (SAB) Headquarters, Lamut, Ifugao Ifugao | DPWH Ifugao 1st DEO | (Cumulative) |
Target: 50 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
1578529972 | Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse and Landslide along Kiangan-Tinoc-Buguias Rd - K0341 + 093 - K0341 + 114, K0341 + 133 - K0341 + 163, K0341 + 427 - K0341 + 445, K0341+488 - K0341 + 507, K0342 + 583 - K0342 + 621, K0342+736 - K0342 + 760, K0344+724 - K0344 + 776, K0348 + 122 - K0348 + 163, K0348 + 313 - K0348 + 335, K0348 + 618 - K0348 + 638, K0350 + 888 - K0350 + 919, K0351 + 860 - K0351 + 894, K0352 + 333 - K0352 + 414, K0355 + 703 - K0355 +733, K0358 + 460 - K0358+520 Ifugao | DPWH Ifugao 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
1613988659 | Completion of Multipurpose Building in Brgy. Abinuan, Lagawe, Ifugao Ifugao | DPWH Ifugao 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
1668229533 | Cudog-Mungayang-Kiangan Road leading to Ambuaya Lake, Yamashita Shrine and Kiyangan Settlement, Kiangan and Lagawe , Ifugao (CSSP-TRIP) Ifugao | DPWH Ifugao 1st DEO | (Cumulative) |
Target: 75 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
1709967267 | Nueva Vizcaya-Ifugao-Mt Province Rd - K0320 + 750, K0321 + 368 - K0321 + 373, K0321 + 595 - K0321 + 713, K0321 + 736, K0322 + 1003, K0322 + 143, K0322 + 252 - K0322 + 321, K0322 + 700 - K0322 + 851, K0323 + 297, K0324 + 000 - K0324 + 300, K0324 + 616, K0324 + 960, K0325 + 302, K0325 + 650 - K0325 + 880, K0325 + 976 - K0326 + 108 Ifugao | DPWH Ifugao 1st DEO | (Cumulative) |
Target: 70 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
1710882083 | Nueva Vizcaya-Ifugao-Mt Province Rd - K0305 + 000 - K0307 + 000 Ifugao | DPWH Ifugao 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-44.430268367796 |
1735119156 | Completion of Multipurpose Building in Brgy. Cawayan, Asipulo, Ifugao Ifugao | DPWH Ifugao 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
1744941678 | Nueva Vizcaya-Ifugao-Mt Province Rd - K0320 + 750, K0321 + 368 - K0321 + 373, K0321 + 595 - K0321 + 713, K0321 + 736, K0322 + 1003, K0322 + 143, K0322 + 252 - K0322 + 321, K0322 + 700 - K0322 + 851, K0323 + 297, K0324 + 000 - K0324 + 300, K0324 + 616, K0324 + 960, K0325 + 302, K0325 + 650 - K0325 + 880, K0325 + 976 - K0326 + 108 Ifugao | DPWH Ifugao 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
1771734249 | Completion of Multipurpose Building in Brgy. Abinuan, Lagawe, Ifugao (CSSP-BIP) Ifugao | DPWH Ifugao 1st DEO | (Cumulative) |
Target: 75 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
1799196777 | Construction of Banaue-Hingyon-Lagawe Waterworks (Hingyon Section), O-ong-Namulditan-Piwong, Banaue-Hingyon-Lagawe, Ifugao Ifugao | DPWH Ifugao 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-32.375737751547 |
1841990326 | Nueva Vizcaya-Ifugao-Mt Province Rd - K0305 + 000 - K0307 + 000 (001 - Assest Preservation Program) Ifugao | DPWH Ifugao 1st DEO | (Cumulative) |
Target: 75 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
1858782415 | Banaue-Hungduan-Benguet Bdry Rd - K0357+262 - K0357+309, K0358+485 - K0358+571, K0363+116 - K0363+141, K0364+578 - K0364+629, K0365+678 - K0365+861 Ifugao | DPWH Ifugao 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-69.345196719032 |
1904626013 | Construction of Flood Control Structure along Nayon River, Sta. 13+916- Sta. 14+140, (Bimpal side) Lamut, Ifugao Ifugao | DPWH Ifugao 1st DEO | (Cumulative) |
Target: 0 Actual: 1.67 Expenditure:0 Release:0 Obligation:12494941.19 |
0 |
2019310098 | Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse and Landslide along Nueva Vizcaya-Ifugao-Mt Province Rd - K0304 + 477 - K0304 + 498, K0305 + 800 - K0305 + 900, K0322 + 687 - K0322 + 707, K0332 + 199 - K0332 + 221 , K0332 + 305 - K0332 + 328 Ifugao | DPWH Ifugao 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
2030812446 | Nueva Vizcaya-Ifugao-Mt Province Rd - K0293 + 837, K0294 + 060, K0295 + 223, K0313 + 837, K0314 + 261, K0318 + 068, K0318 + 737, K0318 + 943, K0318 + 995, K0319 + 740, K0319 + 844 - K0320 + 130, K0320 + 290 Ifugao | DPWH Ifugao 1st DEO | (Cumulative) |
Target: 50 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-72.250825082508 |
2031102776 | Lubuong - Bokiawan - Nungulunan Road leading to Bakung Spider Web and other tourism destinations, Hungduan, Ifugao Ifugao | DPWH Ifugao 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-47.763724681514 |
2052345776 | Construction of Multipurpose Building in Brgy. Magulon, Lamut, Ifugao (CSSP-BIP) Ifugao | DPWH Ifugao 1st DEO | (Cumulative) |
Target: 30 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
2083485096 | Construction/Improvement of Access Roads leading to Declared Tourism Destinations (Tourism Road Infrastructure Program-TRIP)-Lagawe-Boliwong-Abinuan Road leading to Inchang Falls, Lagawe, Ifugao Ifugao | DPWH Ifugao 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
2087237187 | Construction/Upgrading/Rehabilitation of Drainage along National Roads along Kiangan-Tinoc-Buguias Rd - K0320 +639, K0331+403, K0330 + 988 - K0331 + 045, K0321 + 832 - K0322 + 056 Ifugao | DPWH Ifugao 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
2089781510 | Completion of Multipurpose Building in Brgy. Bimpal, Lamut, Ifugao Ifugao | DPWH Ifugao 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
2129100324 | Construction of Multipurpose Building in Brgy. Tukucan, Tinoc, Ifugao Ifugao | DPWH Ifugao 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
2134993482 | Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads along Jct Natl Rd-ICAT - (S00492LZ) Chainage 140 - Chainage 497 Ifugao | DPWH Ifugao 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
2140876906 | Kiangan-Tinoc-Buguias Rd - K0315 + (-147) - K0315 + 647, K0315 + 717 - K0316 + 433, K0316 + 495 - K0316 + 679, K0316 + 722 - K0317 + 426, K0317 + 455 - K0317 + 566, K0317 + 617 - K0318 + 191, K0320 + 027 - K0320 + 520, K0320 + 537 - K0321 + 265, K0321 + 292 - K0321 + 310, K0321 + 311 - K0321 + 343 Ifugao | DPWH Ifugao 1st DEO | (Cumulative) |
Target: 70 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
49059443 | Construction of Multi-Purpose Building, Barangay San Gregorio, Luna, Apayao Apayao | DPWH Apayao 2nd DEO | (Cumulative) |
Target: 94.15 Actual: 92.22 Expenditure: Release:4950000 Obligation:4920346.29 |
-0.5806163465833 |
50289068 | Construction of Multi-Purpose Building, Provincial Veterinary Office, Barangay San Gregorio, Luna, Apayao Apayao | DPWH Apayao 2nd DEO | (Cumulative) |
Target: 94.15 Actual: 89.73 Expenditure: Release:4950000 Obligation:4875142.54 |
-2.5383355664731 |
50543672 | Claveria-Calanasan Road - K0663 + 275 - K0663 + 376 Apayao | DPWH Apayao 2nd DEO | (Cumulative) |
Target: 37.67 Actual: 28.5 Expenditure: Release:67443036.32 Obligation:69300000 |
-29.262844378258 |
91116454 | Construction (Completion) of Area Shop Building, DPWH Apayao 2nd DEO, Luna, Apayao Apayao | DPWH Apayao 2nd DEO | (Cumulative) |
Target: 0.3 Actual: 0.5 Expenditure: Release:9690128.14 Obligation:10000000 |
66.666666666667 |
92762399 | Construction of Multi-Purpose Building (Crop Warehouse), Barangay Eva Puzon, Calanasan, Apayao Apayao | DPWH Apayao 2nd DEO | (Cumulative) |
Target: 94.15 Actual: 89.32 Expenditure: Release:4950000 Obligation:4803974.1 |
-5.4488610987048 |
261645307 | Construction of Materials Testing Laboratory Building of DPWH Apayao 2nd DEO, Luna, Apayao Apayao | DPWH Apayao 2nd DEO | (Cumulative) |
Target: 3.26 Actual: 3.28 Expenditure: Release:4802051.83 Obligation:5000000 |
0.61349693251534 |
263930526 | Claveria-Calanasan-Kabugao Rd - K0672 + 193 - K0672 + 300 Apayao | DPWH Apayao 2nd DEO | (Cumulative) |
Target: 60.32 Actual: 92.15 Expenditure: Release:94788090 Obligation:91940169.56 |
43.226788432268 |
270094028 | San Isidro Sur-Poblacion-Lappa-Marag-Cadaclan-Salagunting Tourism Road leading to Manacota Underground River and other tourism Areas, Brgy. Cadaclan, Calanasan (Bayag), Apayao, Package II Apayao | DPWH Apayao 2nd DEO | (Cumulative) |
Target: 74.83 Actual: 71.48 Expenditure: Release:49000000 Obligation:47524118.24 |
4.1139240506329 |
311555949 | San Sebastian-San Jose-San Francisco Road in support of Handicraft, Furniture, Processed High Value Crops, Vegetable Rice and Corn Industries, Luna, Apayao, San Sebastian Bridge Apayao | DPWH Apayao 2nd DEO | (Cumulative) |
Target: 50.92 Actual: 46.1 Expenditure: Release:24157000 Obligation:23431417.32 |
-8.3066524368552 |
376839123 | PENRO Apayao (Burot) - San Isidro - Quirino Road, Apayao Apayao | DPWH Apayao 2nd DEO | (Cumulative) |
Target: 98.61 Actual: 98.92 Expenditure: Release:9800000 Obligation:9503306.95 |
-1.2484685840966 |
387254897 | Apayao (Calanasan)-Ilocos Norte Rd - (S00644LZ) Chainage 2298 - Chainage 3324 Apayao | DPWH Apayao 2nd DEO | (Cumulative) |
Target: 58.42 Actual: 82.65 Expenditure: Release:44225440 Obligation:43183094.77 |
44.229592461143 |
387650225 | Claveria-Calanasan Kabugao Road - K0632 + 194 - K0632 + 310 Apayao | DPWH Apayao 2nd DEO | (Cumulative) |
Target: 60.32 Actual: 91.27 Expenditure: Release:90613500 Obligation:87890038.87 |
42.953190409742 |
415254481 | Claveria-Calanasan-Kabugao Rd - K0625 + 720 - K0625 + 869 Apayao | DPWH Apayao 2nd DEO | (Cumulative) |
Target: 73.69 Actual: 92.1 Expenditure: Release:63552970 Obligation:62919699.2 |
73.651473437341 |
453960679 | Dagupan-Salvacion Road in support of Handicrafts, Furniture, Pineapple, Banana, Vegetables, Rice and Corn Industries, Luna, Apayao Apayao | DPWH Apayao 2nd DEO | (Cumulative) |
Target: 100 Actual: 95.11 Expenditure: Release:9800000 Obligation:9496197.71 |
-7.0363391655451 |
465093398 | Claveria-Calanasan-Kabugao Rd - K0712 + 000 - K0712 + 144, K0712 +228 - K0713 + 383 Apayao | DPWH Apayao 2nd DEO | (Cumulative) |
Target: 77.61 Actual: 80.64 Expenditure: Release:67646500 Obligation:65525711.79 |
8.8680471724394 |
466141425 | Construction of Flood Control Structure in Brgy. Cadaclan, Calanasan, Apayao Apayao | DPWH Apayao 2nd DEO | (Cumulative) |
Target: 95.24 Actual: 90.5 Expenditure: Release:6930000 Obligation:6827260.01 |
-5.6181398035817 |
555253007 | Ayaga-Sta. Marcela-Flora-Lasam Rd - K0697 + 507 - K0699 + 082 Apayao | DPWH Apayao 2nd DEO | (Cumulative) |
Target: 80.73 Actual: 83.11 Expenditure: Release:60293200 Obligation:58070396.63 |
0.82863187588152 |
601743752 | Panay-Bato, Sabel Road in support of Cassava, Corn, Rice, Mandarin, Tourism, Handicraft, Furniture, Fruit Wines and Coconut, Santa Marcela, Apayao Apayao | DPWH Apayao 2nd DEO | (Cumulative) |
Target: 97.87 Actual: 94.75 Expenditure: Release:9800000 Obligation:9518847.03 |
-3.08 |
629942146 | Rehabilitation of Panay Evacuation Center, Barangay Panay, Sta Marcela, Apayao Apayao | DPWH Apayao 2nd DEO | (Cumulative) |
Target: 84.81 Actual: 80.56 Expenditure: Release:4950000 Obligation:4885577.34 |
6.807131280389 |
699454308 | Claveria-Calanasan-Kabugao Rd - K0710 + 539 - K0711 + 061, K0711 + 126 - K0711 + 868 Apayao | DPWH Apayao 2nd DEO | (Cumulative) |
Target: 80.73 Actual: 82.6 Expenditure: Release:62001250 Obligation:59542910.21 |
19.657968970381 |
703042892 | Apayao-Ilocos Norte Rd - K0640 + 727 - K0642 + 000 Apayao | DPWH Apayao 2nd DEO | (Cumulative) |
Target: 79.84 Actual: 82.36 Expenditure: Release:54051580 Obligation:52427182.88 |
6.7277463397108 |
706400534 | Lydia-Lalanggan Road leading to Pudtol Tourism Sites, Pudtol, Apayao Apayao | DPWH Apayao 2nd DEO | (Cumulative) |
Target: 100 Actual: 99.3 Expenditure: Release:4900000 Obligation:4753071.75 |
-2.4511129134 |
750867198 | Piddig-Carasi-Calanasan Road (Calanasan Side), Malungog Bridge, Apayao Apayao | DPWH Apayao 2nd DEO | (Cumulative) |
Target: 79.84 Actual: 76.3 Expenditure: Release:57900000 Obligation:56114330.36 |
-7.1588969729633 |
756045522 | Adams(Ilocos Norte)-Calanasan(Apayao) Road, Pagga Bridge, Apayao Apayao | DPWH Apayao 2nd DEO | (Cumulative) |
Target: 89.51 Actual: 84.6 Expenditure: Release:19600000 Obligation:18957734.48 |
-8.3143586559029 |
768038941 | Malubibit Br. (B04307LZ) along Ayaga-Sta. Marcela-Flora-Lasam Rd Apayao | DPWH Apayao 2nd DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure: Release:4410000 Obligation:4233600 |
21.377986348123 |
811624188 | Construction of Sta. Filomena Flood Control Structure, Sta. 0+440 - Sta. 1+400, Calanasan, Apayao Apayao | DPWH Apayao 2nd DEO | (Cumulative) |
Target: 9.91 Actual: 8.75 Expenditure: Release:47169843.01 Obligation:50000000 |
-11.705348133199 |
842252955 | Construction of Apayao-Abulug River Basin Flood Control Structure, San Mariano Section, Sta. 24+884-Sta. 25+380 (LS), Sta. Marcela, Apayao Apayao | DPWH Apayao 2nd DEO | (Cumulative) |
Target: 67.43 Actual: 80.48 Expenditure: Release:77200000 Obligation:74877305.9 |
13.700787401575 |
850250292 | Tumog Br. (B02257LZ) along Kabugao-Pudtol-Luna-Cagayan Bdry Rd Apayao | DPWH Apayao 2nd DEO | (Cumulative) |
Target: 99.85 Actual: 95.1 Expenditure: Release:38220000 Obligation:36691200 |
-5.6642636457261 |
852520857 | Claveria-Calanasan Road - K0662 + 423 - K0662 + 667 Apayao | DPWH Apayao 2nd DEO | (Cumulative) |
Target: 29.75 Actual: 25.34 Expenditure: Release:57900000 Obligation:59400000 |
-19.860847564832 |
864392470 | Claveria-Calanasan-Kabugao Rd - K0702 + 689 - K0703 + 100 Apayao | DPWH Apayao 2nd DEO | (Cumulative) |
Target: 100 Actual: 98.5 Expenditure: Release:14962640 Obligation:14513753.06 |
9.3119530472148 |
867837361 | Construction of Cabicungan River Basin Flood Control Structure, Dappay Section, Sta. 11 + 470 - Sta. 12 + 090 (R/S), Calanasan, Apayao Apayao | DPWH Apayao 2nd DEO | (Cumulative) |
Target: 97.55 Actual: 93.1 Expenditure: Release:49000000 Obligation:47293849.15 |
-1.9027870952003 |
888062332 | Salagunting Br. 1 (B01049LZ) along Claveria-Calanasan-Kabugao Rd Apayao | DPWH Apayao 2nd DEO | (Cumulative) |
Target: 4.66 Actual: 3.81 Expenditure: Release:48363078.14 Obligation:50000000 |
-18.240343347639 |
946157209 | Claveria-Calanasan-Kabugao Rd - K0627 + 400 - K0627 + 403, K0627 + 796 - K0627 + 799, K0632 + 120 - K0632 + 123 Apayao | DPWH Apayao 2nd DEO | (Cumulative) |
Target: 97.69 Actual: 92.9 Expenditure: Release:14700000 Obligation:14218483.37 |
-7.1815229159148 |
968395052 | Apayao (Calanasan)-Ilocos Norte Rd - (S00644LZ) Chainage 4298 - Chainage 4571 Apayao | DPWH Apayao 2nd DEO | (Cumulative) |
Target: 99.97 Actual: 95 Expenditure: Release:11760000 Obligation:11473398 |
3.3859216940091 |
1140743650 | Pudtol-Bagutong Road in support of Furniture Handicrafts, Loom Weaving, Banana, Pineapple, Vegetables, and root crops, Corn and Rice, Pudtol, Apayao Apayao | DPWH Apayao 2nd DEO | (Cumulative) |
Target: 99.48 Actual: 97.53 Expenditure: Release:9800000 Obligation:9509586.81 |
0.45368402917362 |
1159190477 | Construction of Multi-Purpose Building, Apayao Sports Complex, Luna, Apayao Apayao | DPWH Apayao 2nd DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
1201909187 | Improvement of Butao-Pulot Road, Barangay Butao, Calanasan, Apayao Apayao | DPWH Apayao 2nd DEO | (Cumulative) |
Target: 100 Actual: 95.85 Expenditure: Release:6930000 Obligation:6796790.07 |
-0.17939814814815 |
1207896913 | Piddig-Carasi-Calanasan Road (Calanasan Side), Gusi Bridge, Apayao Apayao | DPWH Apayao 2nd DEO | (Cumulative) |
Target: 97.12 Actual: 96.54 Expenditure: Release:11760000 Obligation:11397811.4 |
7.4697173620457 |
1213007441 | Kabangwelan Road leading to Villamor Falls, Luna, Apayao Apayao | DPWH Apayao 2nd DEO | (Cumulative) |
Target: 100 Actual: 98.66 Expenditure: Release:4900000 Obligation:4732200.02 |
15.330176406307 |
1320549435 | Construction of Multi-Purpose Building, Barangay Tubongan, Calanasan, Apayao Apayao | DPWH Apayao 2nd DEO | (Cumulative) |
Target: 100 Actual: 95.8 Expenditure: Release:4950000 Obligation:4777884.95 |
-3.7876708568919 |
1361084652 | Turod-Bayugao Road leading to Bayugao Waterfalls, Luna, Apayao Apayao | DPWH Apayao 2nd DEO | (Cumulative) |
Target: 100 Actual: 99.25 Expenditure: Release:5880000 Obligation:5701481.46 |
24.013143288486 |
1384914151 | Sta. Filomena Road in support of Multi-crop Processing Center (Coffee, Cacao, Pineapple, Coconut) Furniture Processing Center, Calanasan, Apayao Apayao | DPWH Apayao 2nd DEO | (Cumulative) |
Target: 88.24 Actual: 84.5 Expenditure: Release:14700000 Obligation:14431336.82 |
-5.4165371464097 |
1407892107 | Construction of Pamplona River Basin Flood Control Structure, Marag Section, Sta 27+562-Sta 27+762 (LS), Sta. 27+960-Sta. 28+460 (LS), Luna, Apayao Apayao | DPWH Apayao 2nd DEO | (Cumulative) |
Target: 67.43 Actual: 65.49 Expenditure: Release:82025000 Obligation:79564241.95 |
-2.992125984252 |
1449444310 | Construction of Apayao-Abulug River Basin Flood Control Structure, Swan Section, Sta. 37 + 121 - Sta. 37 + 682 (R/S), Pudtol, Apayao Apayao | DPWH Apayao 2nd DEO | (Cumulative) |
Target: 67.43 Actual: 67.18 Expenditure: Release:82025000 Obligation:79576285.45 |
7.2778402699663 |
1512476408 | Apayao-Ilocos Norte Rd - K0651 + 740 - K0651 + 812 Apayao | DPWH Apayao 2nd DEO | (Cumulative) |
Target: 100 Actual: 95.65 Expenditure: Release:3411380 Obligation:3362966.25 |
-4.738278342843 |
1529606341 | Adams(Ilocos Norte)-Calanasan(Apayao) Road, Bucarot Bridge, Apayao Apayao | DPWH Apayao 2nd DEO | (Cumulative) |
Target: 48.88 Actual: 43.9 Expenditure: Release:57900000 Obligation:56432363.15 |
-13.777711650052 |
1593062195 | Piddig-Carasi-Calanasan Road (Calanasan Side), Package 2, Apayao Apayao | DPWH Apayao 2nd DEO | (Cumulative) |
Target: 100 Actual: 96.3 Expenditure: Release:19600000 Obligation:19009260.93 |
-4.4317243007199 |
1618858322 | Santa Maria-Mallig Road in support of Furniture, Handicrafts, Banana, Rice, Corn, and Tourism Industries, Flora, Apayao, Mallig Bridge Apayao | DPWH Apayao 2nd DEO | (Cumulative) |
Target: 95.24 Actual: 91.45 Expenditure: Release:9800000 Obligation:9505881.75 |
-4.7660311958406 |
1625581712 | San Isidro Sur-Poblacion-Lappa-Marag-Cadaclan-Salagunting Tourism Road leading to Manacota Underground River and other tourism Areas, Brgy. Cadaclan, Calanasan (Bayag), Apayao, Package I (4 Bridges) Apayao | DPWH Apayao 2nd DEO | (Cumulative) |
Target: 6.96 Actual: 5.97 Expenditure: Release:80028635.73 Obligation:83160000 |
-14.224137931034 |
1628609481 | Claveria-Calanasan Kabugao Road - K0632 + 007 - K0632 + 194 Apayao | DPWH Apayao 2nd DEO | (Cumulative) |
Target: 60.32 Actual: 91.33 Expenditure: Release:91453050 Obligation:88700353.43 |
90.257516174045 |
1672437478 | San Carlos-Palali-Malekkeg Road in support of Cassava, Corn, Rice, Mandarin, Tourism, Handicraft, Furniture and Coconut, Santa Marcela, Apayao Apayao | DPWH Apayao 2nd DEO | (Cumulative) |
Target: 88.02 Actual: 94.89 Expenditure: Release:4752880.74 Obligation:5000000 |
7.780554293503 |
1721742542 | Claveria-Calanasan-Kabugao Rd - K0630 + 516 - K0630 + 662 Apayao | DPWH Apayao 2nd DEO | (Cumulative) |
Target: 83.77 Actual: 92.03 Expenditure: Release:57900000 Obligation:57320073.8 |
51.117564237944 |
1819676823 | Improvement of Poblacion-Langnao-Baliwanan Road, Barangay Poblacion and Barangay Langnao, Calanasan, Apayao Apayao | DPWH Apayao 2nd DEO | (Cumulative) |
Target: 86.2 Actual: 87.45 Expenditure: Release:49500000 Obligation:48010358.79 |
5.301974924199 |
1919980858 | San Carlos-San Antonio-Nueva-Marcela Road leading to Bacut Lake, Sta Marcela, Apayao, Panay Bridge Apayao | DPWH Apayao 2nd DEO | (Cumulative) |
Target: 65.45 Actual: 61.48 Expenditure: Release:20090000 Obligation:19649231.87 |
-6.4570846997625 |
1920792033 | Apayao-Ilocos Norte Rd - K0642 + 000 - K0642 + 978 Apayao | DPWH Apayao 2nd DEO | (Cumulative) |
Target: 73.69 Actual: 75.38 Expenditure: Release:49932960 Obligation:48434944.37 |
7.2907107168349 |
1940561251 | Construction of Multi-Purpose Building, Highway Patrol Group and Crime Laboratory, Apayao Police Provincial Office, Barangay San Gregorio, Luna, Apayao Apayao | DPWH Apayao 2nd DEO | (Cumulative) |
Target: 10.69 Actual: 3.02 Expenditure: Release:9702336.88 Obligation:10000000 |
-71.749298409729 |
1966518043 | Malubibit Sur-Balasi-Atok Road in support to Handicraft, Furniture, High Value Crops Processing and Support to Tourism Industries, Flora, Apayao Apayao | DPWH Apayao 2nd DEO | (Cumulative) |
Target: 100 Actual: 99.2 Expenditure: Release:9800000 Obligation:9508377.45 |
-2.2622131754256 |
1971995162 | San Isidro Sur-Poblacion-Lappa-Marag-Cadaclan-Salagunting Tourism Road leading to Manacota Underground River and other tourism Areas, Brgy. Cadaclan, Calanasan (Bayag), Apayao, Package III Apayao | DPWH Apayao 2nd DEO | (Cumulative) |
Target: 48.88 Actual: 52.17 Expenditure: Release:56935000 Obligation:54904111.66 |
6.0705252194614 |
2045446150 | Construction of Multi-Purpose Building, Barangay Cadaclan, Calanasan, Apayao Apayao | DPWH Apayao 2nd DEO | (Cumulative) |
Target: 90.5 Actual: 94.98 Expenditure: Release:4950000 Obligation:4800222.89 |
15.048674959438 |
2064053884 | Piddig-Carasi-Calanasan Road (Calanasan Side), Package 1, Apayao Apayao | DPWH Apayao 2nd DEO | (Cumulative) |
Target: 91.19 Actual: 87.2 Expenditure: Release:49000000 Obligation:49000000 |
0.59952038369304 |
2081416858 | Doña Loreta-Lydia Road in support of Furniture, Handicraft, Loomweaving, Blacksmithing, Pineapple, Banana, Vegetables, Rootcrops, Rice, and Corn Industries, Pudtol, Apayao Apayao | DPWH Apayao 2nd DEO | (Cumulative) |
Target: 100 Actual: 99.18 Expenditure: Release:6732600 Obligation:6594581.81 |
-5.0123330385815 |
2093977066 | Claveria-Calanasan-Kabugao Rd - K0666 + 475 - K0666 + 606 Apayao | DPWH Apayao 2nd DEO | (Cumulative) |
Target: 67.43 Actual: 91.33 Expenditure: Release:85962200 Obligation:83381601.2 |
29.243054774491 |
2094574254 | Sugoc Br. (B04217LZ) along Claveria-Calanasan-Kabugao Rd Apayao | DPWH Apayao 2nd DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure: Release:12054000 Obligation:11571840 |
0.83397485245061 |
2104133715 | Sta. Maria Br. (B04308LZ) along Ayaga-Sta. Marcela-Flora-Lasam Rd Apayao | DPWH Apayao 2nd DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure: Release:4410000 Obligation:4233600 |
21.710750853242 |
3463304 | Rehabilitation (Completion) of Manaba-Bulalacao Road Bulalacao, Mankayan, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 100 Expenditure:2637808.6 Release:2940000 Obligation:2930898.45 |
0 |
10141601 | NRJ Natubleng-Nabalicong-Cabuguiasan-Pacso-Tonglo-Saclalan Road leading to various tourist attractions, Buguias, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:2204848.21 Release:2450000 Obligation:2449831.36 |
-17.647058823529 |
12424052 | Construction (Completion) of Multi-Purpose Building at Barangay Balakbak, Kapangan, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 20 Expenditure:0 Release:2940000 Obligation:2936811.47 |
0 |
22098869 | onstruction/Rehabilitation of Caliking Water Supply at Barangay Caliking, Atok, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:1551434.14 Release:4950000 Obligation:4925049.97 |
-24 |
31811919 | Gov. Bado Dangwa National Rd - K0263+910 - K0263+935, K0264+011 - K0264+021, K0265+658 - K0265+683, K0269+770 - K0269+825 Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 48 Expenditure:3968011.53 Release:26460000 Obligation:26453410.19 |
0 |
49642820 | Rehabilitation (Completion) of Peled-Panad Road, Tabio, Mankayan, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 100 Expenditure:0 Release:2940000 Obligation:2930371.02 |
0 |
59858277 | Guinzadan-Cagubatan-Balili (Mankayan) Road leading to Mogao Mountain and Gawaan Lake, Mankayan, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:6969707.94 Release:9800000 Obligation:9780039.4 |
3.7852718513421 |
67510044 | Construction of Solar Water System, Kibungan, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
71214652 | Construction (Completion) of Gambang Water Supply at Barangay Gambang, Bakun, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:3920000 Obligation:3915000.17 |
0 |
101184981 | NRJ Bulalacao-Cabacab-Sinto Road leading to Agri-Tourism Farms in Brgy. Bulalacao, Mankayan, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
103417447 | Baguio-Bontoc Rd - K0284 + 000 - K0284 + 128, K0284 + 164 - K0284 + 452, K0284 + 492 - K0285 + 565 Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
112812579 | Construction (Completion) of Poblacion Water Supply at Barangay Poblacion, Kibungan, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 1 Expenditure:0 Release:3920000 Obligation:3915027.34 |
0 |
129383297 | Construction of Bulalacao Flood Control Sta. 1+149 - Sta. 1+511 (B.S.), Mankayan, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 100 Actual: 94 Expenditure:6476906.55 Release:9800000 Obligation:9505756.45 |
-7.2463768115942 |
130329076 | Gov. Bado Dangwa National Rd - K0338+600 - K0338+731 Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:4543168.65 Release:4555040 Obligation:4543168.65 |
0 |
130924071 | Construction of Multi Purpose Building (Covered Court) at Barangay Bangao, Buguias, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
133145833 | Improvement of Belantian Lengyatan Tabio Barangay Road, Barangay Tabio, Mankayan, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
134649069 | Construction of Road, Sitio Camanpaguey, Barangay Cabiten, Mankayan, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 15 Expenditure:4402045.58 Release:29400000 Obligation:29346970.53 |
0 |
141856579 | Construction of Multi-Purpose Building (TESDA Provincial Training Center), Lomon, Barangay Paykek, Kapangan, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:8891846.53 Release:9900000 Obligation:9887109.53 |
-35.869565217391 |
165421640 | Construction (Completion) of Bodehow Road, Daclan, Tublay, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 62 Expenditure:0 Release:2940000 Obligation:2936996.5 |
0 |
169069269 | Construction of Road along Lusong via Macutang-Dagdag-Cabacab Access Road, Brgy. Balili, Mankayan, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
170373247 | Construction/Rehabilitation of Cattubo Water Supply at Barangay Cattubo, Atok, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:4447700.59 Release:4950000 Obligation:4941889.55 |
-15.510948905109 |
172419101 | Construction (Completion) of Poblacion Water Supply at Barangay Poblacion, Bakun, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 100 Expenditure:3523277.1 Release:3920000 Obligation:3914752.33 |
0 |
177229777 | Construction (Completion) of Multi-Purpose Building at Barangay Baculongan Norte, Buguias, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:2940000 Obligation:0 |
0 |
197958299 | CONSTRUCTION OF MULTI-PURPOSE BUILDING AT RUFINO ALAWAS ELEMENTARY SCHOOL, BARANGAY CATTUBO, ATOK, BENGUET Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 75 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
221494832 | Baguio-Bontoc Rd - K0299+730 - K0299+790 Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:1713208.73 Release:1757140 Obligation:1713208.73 |
0 |
223097370 | Concreting of Bot-oan-Lebeng-Nakidol Road, Barangay Catlubong, Buguias, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:4263680.82 Release:9900000 Obligation:9887168 |
-20.034246575342 |
242274384 | Construction of Multi-Purpose Building Phase I, Barangay Sapid, Mankayan, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 47 Expenditure:12201567.25 Release:29400000 Obligation:29400000 |
0 |
248301935 | Construction of Road Slope Protection Project along Governor Bado Dangwa National Road at Ambalideng, Poblacion, Kibungan, Benguet, K0317+483 - K0317+670 Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:31094859.39 Release:39600000 Obligation:39485322.37 |
-0.68493150684932 |
253634228 | Gov. Bado Dangwa National Rd - K0263 + (-182) - K0263 + (-082) Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
260594229 | Construction of Solar Water System, Tublay, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
263507870 | Construction of Ambongdolan Water System at Barangay Ambongdolan, Ambongdolan, Tublay, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:1776158.91 Release:1980000 Obligation:1973509.9 |
-22.5 |
270925237 | Construction (Completion) of Multi-Purpose Building at Barangay Cuba, Kapangan, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 11 Expenditure:0 Release:2940000 Obligation:2933922.6 |
0 |
273262940 | Construction of Solar Water System, Bakun, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
286988671 | Construction of Pegdeyto-Baguingey-Pinalyok Road, Barangay Topdac, Atok, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
296953119 | Construction of Sapid Flood Control Sta. 5+779 - 6+019 (R.S.), Mankayan, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:7312628.99 Release:9800000 Obligation:9750603.31 |
-3.2727272727273 |
309118690 | Madaymen-Masala-Sagpat Road in support of Coffee, Bamboo, Food and Feed Crops, Cutflowers and Fruit Trees Industry, Kibungan, Benguet Benguet | DPWH Benguet 2nd DEO | (default) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
322009253 | Repair/ Rehabilitation of Sagpat Water System at Barangay Sagpat, Kibungan, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:2670111.25 Release:2970000 Obligation:2966790.28 |
0 |
332524098 | Construction (Completion) of Water Works System at Barangay Poblacion Central Kapangan, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 82 Expenditure:2079376.65 Release:2970000 Obligation:2934231 |
0 |
348274187 | Construction of Solar Water System, Mankayan, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
349053864 | Construction of Multi-Purpose Building, Barangay Balili, Mankayan, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
350738214 | Improvement of Road, Sipitan to Sicgatan, Dalipey, Bakun, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 67.12 Expenditure:4432698.86 Release:9800000 Obligation:9698669.23 |
0 |
352400181 | Rehabilitation (Completion) of Landing-Bilong Road Sagubo, Kapangan, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 71.2 Expenditure:440731.54 Release:2940000 Obligation:2938210.29 |
0 |
358841099 | Gov. Bado Dangwa National Rd - K0279+659 - K0279+674, K0280+275 - K0280+310, K0292+141 - K0292+156, K0292+466 - K0292+511, K0293+074 - K0293+109, K0299+454 - K0299+489, K0300+824 - K0300+859, K0304+027 - K0304+067 Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 41.2 Expenditure:2790013.74 Release:18620000 Obligation:18600091.6 |
0 |
367406449 | Construction (Completion) of Multi-Purpose Building at Sinacbat, Bakun, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 3 Expenditure:0 Release:2940000 Obligation:2935003.82 |
0 |
379673524 | Constuction of Nakidol Amlimay Potable Water Supply at Barangay Amlimay, Buguias, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:1772995.97 Release:1980000 Obligation:1969995.52 |
0 |
380111123 | Construction of Lam-Ayan - Dengao - Dekkan - Balintag Road, Baculongan Sur, Buguias, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
386883952 | Baguio-Bontoc Rd - K0313+625 - K0313+649, K0315+605 - K0315+710, K0315+900 - K0315+927, K0320+780 - K0320+815, K0322+285 - K0322+300, K0328+900 - K0328+915 Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 71 Expenditure:7371501.25 Release:15680000 Obligation:15659546.47 |
0 |
392761835 | Cong. Andres Acop Cosalan Rd - K0354+580 - K0354+581, K0355+400 - K0355+401,K0362+230 - K0362+233 Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 37 Expenditure:1174475.1 Release:7840000 Obligation:7829834 |
0 |
397673118 | Construction (Completion) of Gongol-Caang Road, Bagu, Bakun, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 100 Expenditure:2623896.06 Release:2940000 Obligation:2915440.06 |
0 |
400517247 | Construction (Completion) of Multi-Purpose Building at Lower Sipitan, Dalipey, Bakun, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:2940000 Obligation:2936937.57 |
0 |
405113785 | Construction (Completion) of Kayapa Water Supply at Barangay Kayapa, Bakun, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 30 Expenditure:587125.52 Release:3920000 Obligation:3914170.15 |
0 |
410497213 | Betwag-Pongayan Road in support to Coffee, Cacao, Bamboo, Cut Flower, Banana, Heirloom rice, Livestock and other High Value Vegetables, Kapangan, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
412188668 | Kapangan Central Gaswiling-Catiaoan Road-Bagulin Road in support of Coffee, Bamboo, Food and Feed Crops, Cutflowers and Fruit Trees Industry, Kapangan, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:2027884.61 Release:2836120 Obligation:2826119.69 |
0.054180964421158 |
415887556 | Construction of Cotcot - Bolinaca - Walengweng Road, Bangao, Buguias, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 82 Expenditure:5385072.08 Release:9800000 Obligation:9674540 |
0 |
419732972 | Construction of Flood Control Structure along Ambalideng River (Wanga Ricefield Area) at Poblacion, Kibungan, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 74 Expenditure:22582052.18 Release:29400000 Obligation:29230659.18 |
0 |
423133600 | Gov. Bado Dangwa National Rd - K0276+016 - K0278+820, K0287+000 - K0288+353, K0288+363 - K0288+945, K0288+1033 - K0290+558, K0291+000 - K0292+250 Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 57 Expenditure:13243946.79 Release:32830000 Obligation:32830000 |
0 |
425663191 | Construction (Completion) of Multi-Purpose Building at Caponga, Tublay, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 0.5 Expenditure:0 Release:2940000 Obligation:2934900.28 |
0 |
427277890 | Rehabilitation (Completion) of Obanga Paing Beleng Section Kebasen Road, Buguias, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 100 Expenditure:2640531.05 Release:2940000 Obligation:2933923.39 |
0 |
437836835 | Construction of Solar Water System, Kapangan, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
460737535 | Construction of Governor Bado Dangwa National Road to Ili, Poblacion Access Road Located at Barangay Poblacion, Kibungan, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:4403479.86 Release:4950000 Obligation:4892755.4 |
-3.6497028231798 |
471990158 | Construction of Multi-Purpose Building (Kapangan Public Market), Paykek, Kapangan, Benguet (Cluster I-2021) Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:15028174.84 Release:19800000 Obligation:19760911.96 |
-5.6521739130435 |
487956299 | Construction of Ampusongan Flood Control Phase 2, Barangay Ampusongan, Bakun, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:8773307.95 Release:9900000 Obligation:9860424 |
0.70921985815603 |
490909966 | Baguio-Bontoc Rd - K0304 + 000 - K0305 + 491 Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
506295151 | Baguio-Bontoc Rd - K0281 + 438 - K0282 + 000, K0283 + 554 - K0284 + 000, K0284 + 969 - K0287 + 755 Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
523889744 | Construction (Completion) of Gabion type Riprap at KM 288 Betak, Brgy. Road Section Aduyonan Phase 2, Abiang, Atok, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 87 Expenditure:1310000.05 Release:2940000 Obligation:2934995.04 |
0 |
541577781 | Construction of Multi-Purpose Building at Municipality of Kapangan, Province of Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:445049.81 Release:2970000 Obligation:2966998.74 |
0 |
543015118 | Construction of Multi-Purpose Building at Toludan Elementary School, Barangay Cattubo, Atok, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
544850548 | Construction (Completion) of Multi-Purpose Building at Barangay Abatan, Buguias, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 2 Expenditure:0 Release:2940000 Obligation:2934048.34 |
0 |
554181221 | NRJ Bulalacao-Cabacab-Sinto Road leading to Agri-Tourism Farms in Brgy. Bulalacao, Mankayan, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:366690.02 Release:2450000 Obligation:2444600.1 |
21.833333333333 |
571034091 | Construction/Rehabilitation of Sipitan Water Supply at Barangay Dalipey, Bakun, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:2967500.66 Release:2970000 Obligation:2967500.66 |
0 |
581958137 | Cong. Andres Acop Cosalan Rd - K0350+000 - K0356+000 Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
595539631 | Baguio - Bontoc Rd - K0336 + 400 - K0339+200 Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 86.36 Expenditure:0 Release:34300000 Obligation:34249864.97 |
0 |
607967644 | Cong. Andres Acop Cosalan Rd - K0351+353-K0351+760, K0352+249-K0352+509, K0355+197-K0355+239, K0355+395-K0356+000, BUGUIAS, BENGUET. Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 75 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
613868029 | Construction of Multi-Purpose Building in Alapang Elementary School, Barangay Sebang, Buguias, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 29 Expenditure:14401696.68 Release:39200000 Obligation:39185333.33 |
0 |
629481892 | Abatan-Mankayan-Cervantes Rd - K0334 + 360 - K0334 + 390, K0334 + 630 - K0334 + 670, K0342 + 955 - K0342 + 975 Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
634828379 | Construction (Completion) of Submersible Pump for Domestic Waterworks at Sinipsip, Amgaleyguey, Buguias, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:2940000 Obligation:2925946.5 |
0 |
635163175 | Madaymen-Masala-Sagpat Road in support of Coffee, Bamboo, Food and Feed Crops, Cutflowers and Fruit Trees Industry, Kibungan, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:2934939.5 Release:2940000 Obligation:2934939.5 |
0 |
635698023 | Cong. Andres Acop Cosalan Rd - K0365+000 - K0365+679, Buguias, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 75 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
640122580 | Construction of Galgalong Suspension Bridge Tower Cuba, Kapangan, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:14850000 Obligation:0 |
0 |
642141259 | Gov. Bado Dangwa National Rd - K0328+236 - K0328+246, K0328+352 - K0328+371, K0332+188 - K0332+198, K0339+305 - K0339+334, K0340+800 - K0341+000, K0341+900 - K0342+000, K0344+870 - K0344+885, K0345+205 - K0345+230, K0345+937 - K0345+964, K0345+976 - K0345+987, K0345+1026 - K0345+1036, K0346+432 - K0346+451, K0346+495 - K0346+504, K0346+671 - K0346+747K0349+497 - K0349+504,K0349+541 - K0349+551 Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 65 Expenditure:24644270.1 Release:64655000 Obligation:64425305 |
0 |
654723320 | Baguio-Bontoc Rd - K0309+800 - K0313+000 Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
658026231 | Construction (Completion) of Ambassador Water Supply at Barangay Ambassador, Tublay, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:3920000 Obligation:3914471.09 |
0 |
663933662 | Construction (Completion) of Multi-Purpose Building at Barangay Sapid, Mankayan, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:2940000 Obligation:0 |
0 |
675210765 | Construction (Completion) of Buyacaoan Water Supply at Barangay Buyacaoan, Buguias, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 6 Expenditure:0 Release:3920000 Obligation:3909571.76 |
0 |
679089148 | Baguio-Bontoc Rd - K0317 + 820 - K0317 + 837, K0318 + 012 - K0318 + 049, K0318 + 052 - K0318 + 070, K0318 + 320 - K0318 + 350, K0320 + 345 - K0320 + 410 Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
688114354 | Rehabilitation (Completion) of Nantoon-Bas-Angan Access Road, Kayapa, Bakun, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 100 Expenditure:0 Release:2940000 Obligation:2930216.54 |
0 |
692106662 | Construction (Completion) of Paco Water Supply at Barangay Paco, Mankayan, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 2 Expenditure:0 Release:3920000 Obligation:3913244.69 |
0 |
704992666 | Construction (Completion) of Multi-Purpose Building at Barangay Poblacion, Atok, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 2 Expenditure:0 Release:2940000 Obligation:2934751.68 |
0 |
725458063 | Improvement of J207-Loo-Lanas-Panayaoan - Balaan - Bangsalan JBPLS Road, Barangay Loo, Buguias, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
728258689 | Construction (Completion) of Multi-Purpose Building at Barangay Boklaoan, Kapangan, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 49 Expenditure:798959.72 Release:2940000 Obligation:2929301.89 |
0 |
730525316 | Repair/ Rehabilitation of Bulalacao Water System at Barangay Bulalacao, Mankayan, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:4758354.97 Release:5940000 Obligation:5916071.74 |
-11.861313868613 |
747112515 | Construction of Tabeyo Water System at Barangay Ambassador, Tublay, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:1605571.35 Release:2970000 Obligation:2965936.9 |
-13.928571428571 |
751658750 | Construction of Ampusongan Flood Control, Sitio Gayabasan, Ampusongan, Bakun Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 99.08 Expenditure:18589305.66 Release:24500000 Obligation:24500000 |
0 |
751713919 | Construction (Completion) of Multi-Purpose Building, Multi-Purpose Gym at Barangay Tuel, Tublay, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 9 Expenditure:440455.76 Release:2940000 Obligation:2936371.75 |
0 |
757797187 | Tabio-Bedbed-Baguingey-Sayapot Road in support of Coffee, Bamboo, Food and Feed Crops, Plantation Crops, Cutflowers and Fruit Trees Industries, Mankayan, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
774350538 | Construction of Palina Flood Control Sta. 3+322 - Sta. 3+437 (L.S.), Sta. 3+322 - Sta. 3+400 (R.S.), Sta. 4+126 - Sta. 4+166 (L.S.), Sta. 4+125 - Sta. 4+150 (R.S.) Kibungan, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:8802207.55 Release:9800000 Obligation:9780230.61 |
0.36630036630037 |
782832041 | Improvement of Local Road, Lutaan-Sapdaan Barangay Road Phase 2, Barangay Poblacion, Kibungan, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:7647209.51 Release:9900000 Obligation:9510025.43 |
-23.674911660777 |
785608161 | Construction (Completion) of Multi-Purpose Building at Barangay Palina, Kibungan, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:2940000 Obligation:2937075.7 |
0 |
806082594 | Kapangan Central Gaswiling-Catiaoan Road-Bagulin Road in support of Coffee, Bamboo, Food and Feed Crops, Cutflowers and Fruit Trees Industry, Kapangan, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
812320561 | Construction/Rehabilitation of Cabutotan Water Supply at Barangay Ampusongan, Bakun, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:2668500.54 Release:2970000 Obligation:2965000.6 |
0 |
814690367 | Construction (Completion) of Slope Protection Structure (Retaining Wall) at Sagpat Brgy. Hall Ground, Sagpat, Kibungan, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 100 Expenditure:2644198.76 Release:2940000 Obligation:2937998.62 |
0 |
814798424 | Construction of Central Buguias Flood Control along Agno River, Poblacion, Buguias, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 57 Expenditure:8501487.77 Release:24500000 Obligation:24469548.92 |
0 |
828772289 | Improvement of Beling Belis - Tawang Barangay Road, Barangay Beling Belis, Kapangan, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
839797274 | Gov. Bado Dangwa National Rd - K0341 + 895 - K0341 + 947, K0346 + 934 - K0347 + 002 Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
850134788 | Construction of Slope Protection at Lower Cotcot, Barangay Bangao, Buguias, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 89.5 Expenditure:2952768.9 Release:4950000 Obligation:4950000 |
0 |
851514125 | Rehabilitation (Completion) of Bokig to Cuyabing Road, Pasdong, Atok, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 100 Expenditure:2644971.08 Release:2940000 Obligation:2938856.76 |
0 |
863017130 | Gov. Bado Dangwa National Rd - K0349 + 680 - K0349 + 741, K0349 + 757 - K0349 + 800, K0350 + 702 - K0350 + 744, K0350 + 814 - K0350 + 835 Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 91.2 Actual: 92 Expenditure:14773978.92 Release:28715960 Obligation:28715960 |
35.202804206309 |
873404816 | Rehabilitation (Completion) of Multi-Purpose Building at Barangay Naguey, Naguey, Atok, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:2940000 Obligation:0 |
0 |
875083647 | Construction (Completion) of Nan-Agto Water Supply at Barangay Natubleng, Buguias, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 16 Expenditure:440209.878 Release:2940000 Obligation:2934732.52 |
0 |
880307434 | Construction (Completion) of Gaswiling Water Supply at Barangay Gaswiling, Kapangan, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 6 Expenditure:0 Release:3920000 Obligation:0 |
0 |
885635889 | Construction (Completion) of Dalipey Water Supply at Barangay Dalipey, Bakun, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 45 Expenditure:584961.17 Release:3920000 Obligation:3899741.13 |
0 |
893943446 | Construction of Guinaoang Flood Control Sta. 21+404 - Sta. 21+527 (R.S.), Sta. 21+441- Sta. 21+561 (L.S.), Mankayan, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:8390970.97 Release:9800000 Obligation:9323301.08 |
7.2727272727273 |
910802568 | Construction (Completion) of Access Road Opening from Mogao-Badeo Proper-Tableo (Continuation Phase II), Barangay Badeo, Kibungan, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 20 Expenditure:0 Release:2940000 Obligation:2934049.5 |
0 |
913231983 | Gov. Bado Dangwa National Rd - K0342 + 490 - K0342 + 505, K0350 + 840 - K0350 + 910 Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
923238191 | Construction of Flood Mitigation Structure along Agno River, Baoknit Section, Sta. 9 + 846 - Sta. 10 + 306 (R.S), Sta. 10 + 076 - Sta. 10 + 480 (L.S), Sta. 10 + 360 - Sta. 11 + 088 (R.S), Sta. 10 + 491 - Sta. 10 + 556 (L.S), Sta. 0 + 540 - Sta. 0 + 671 (L.S), Sta. 0 + 556 - Sta. 0 + 688 (R.S), Buguias, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
936781503 | Rehabilitation (Completion) of Lepaak-Bedbed Road located at Bedbed, Mankayan, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 100 Expenditure:2627773.57 Release:2940000 Obligation:2919748.41 |
0 |
944668817 | Construction (Completion) of Sapid Water Supply at Barangay Sapid, Mankayan, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:3920000 Obligation:0 |
0 |
945327200 | Construction of Flood Control Structure at Besil, Tublay Central, Tublay, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 81 Expenditure:7396314.49 Release:9800000 Obligation:9789992.93 |
0 |
950322418 | Cong. Andres Acop Cosalan Rd - K0363 + 540 - K0363 + 603 Benguet | DPWH Benguet 2nd DEO | (default) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
955330880 | Improvement of Road along Proper Paoay to Bosleng, Brgy. Paoay, Atok, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 50 Expenditure:5187023.95 Release:9800000 Obligation:9779994.1 |
0 |
961093003 | Rehabilitation (Completion) of Multi-Purpose Building (Mankayan National High School), Barangay Poblacion, Mankayan, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:2940000 Obligation:2934528 |
0 |
961557686 | Construction of Taneg Flood Control Sta. 13+995 - Sta. 14+319 (R.S.), Sta. 14+010 - Sta. 14+358 (L.S.), Mankayan, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 100 Actual: 96 Expenditure:21280183.87 Release:29400000 Obligation:23831587.47 |
-11.936936936937 |
989221533 | Construction/Opening of Community Access Road from Pidpid, Alilem, Ilocos Sur, Sinacbat, Bakun, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
992823551 | Construction of Copias Flood Control Sta. 5+264 - Sta. 5+434 (R.S.), Kapangan, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:9800000 Release:9800000 Obligation:9800000 |
-16.725978647687 |
1004418293 | Cong. Andres Acop Cosalan Rd - K0343+400 - K0343+430, K0345+200 - K0345+230,K0348+100 - K0348+150, K0348+740 - K0348+769, K0348+769 - K0348+880, K0349+960 - K0350+000, K0351+300 - K0351+400, K0351+870 - K0351+900, K0352+400 - K0352+500, K0356+396 - K0356+513, K0356+456 - K0356+496 Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 67 Expenditure:22845592.24 Release:63805800 Obligation:63705474.57 |
0 |
1008334201 | Construction (Completion) of Central Tublay Multi-Purpose Hall, Tublay, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 0.5 Expenditure:0 Release:2940000 Obligation:2935859.68 |
0 |
1041923974 | Construction of Gambang Flood Control, Gambang, Bakun, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 100 Actual: 86 Expenditure:17210871.86 Release:24500000 Obligation:24500000 |
-24.118013477547 |
1047894394 | Baguio-Bontoc Rd - K0266 + 600 - K0266 + 700, K0267 + 150 - K0267 + 180, K0268 + 850 - K0268 + 920, K0270 + 015 - K0270 + 045, K0272 + 720 - K0272 + 750 Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
1050414275 | Repair/ Rehabilitation of Boklaoan Water System at Barangay Boklaoan, Kapangan, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:3560400 Release:3960000 Obligation:3956000 |
6.0070671378092 |
1074553447 | Construction of Magmagaling Flood Control Sta. 4+572 - Sta. 4+800 (L.S.), Sta. 4+406 - Sta. 4+800 (R.S.),Buguias, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:29377392.06 Release:29400000 Obligation:29377392.06 |
11.08545034642 |
1089597792 | Construction (Completion) of Pukitan Road, Paco, Mankayan, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 100 Expenditure:2640449.43 Release:2940000 Obligation:2933832.7 |
0 |
1094348894 | Bangho-Daclan-Basil-Tublay Central Road in support of Coffee, Bamboo, Cutflowers and Fruit Tree Industries, Tublay, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
1096874196 | Kiangan-Tinoc-Buguias Rd - K0354 + 636 - K0354 + 730, K0359 + 180 - K0359 + 586 Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 98 Actual: 81.1 Expenditure:26736947.45 Release:39200000 Obligation:39200000 |
-21.851851851852 |
1106551832 | Construction of Alakan Flood Control Sta. 0+155 - Sta. 0+386 (L.S.), Sta. 0+261 - Sta. 0+323 (R.S.), Sta. 0+356 - Sta. 0+443 (R.S.), Sta. 0+692 - Sta. 0+745 (L.S.), Sta. 0+958 - Sta. 1+000 (B.S.) Buguias, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:14584710.36 Release:19600000 Obligation:19600000 |
12.903225806452 |
1130998935 | Construction (Completion) of Road at J204 Cotcot Labyan Buas J204 (Catholic Church To Balanban Section) Bangao, Buguias Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 100 Expenditure:2642039.86 Release:2940000 Obligation:2935599.85 |
0 |
1136830610 | Construction (Completion) of Basil Water Supply at Barangay Basil, Tublay, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:3920000 Obligation:3914930.48 |
0 |
1138843751 | Construction of Road, Sitio Camanpaguey, Barangay Cabiten, Mankayan, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
1144914216 | Construction (Completion) of Multi-Purpose Building at Barangay Sebang, Buguias, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 3 Expenditure:440172.63 Release:2940000 Obligation:2934484.17 |
0 |
1151818246 | Construction (Completion) of Poblacion Water Supply at Barangay Poblacion, Atok, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:2940000 Obligation:0 |
0 |
1152530437 | Construction (Completion) of Slope Protection Structure along Brgy. Portion to Tanod Outpost, Poblacion, Bakun, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 100 Expenditure:2909674.08 Release:2940000 Obligation:2909674.08 |
0 |
1155506646 | Construction (Completion) of Ambalideng Flood Control, Ambalideng, Poblacion, Kibungan, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 100 Expenditure:2909182.19 Release:2940000 Obligation:2909182.19 |
0 |
1174095012 | Baguio-Bontoc Rd - K0294 + 000 - K0295 + 803 Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
1185486597 | Construction (Completion) of Water Supply at Barangay Lubo, Kibungan, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:3920000 Obligation:3914694.38 |
0 |
1195724040 | Rehabilitation (Completion) of Ambabag-Lip-Atan-Poy-Oc Road, Guinaoang, Mankayan, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 100 Expenditure:2640854 Release:2940000 Obligation:2934282.22 |
0 |
1197720164 | Construction (Completion) of Multi-Purpose Building At Barangay Calamagan, Buguias, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 2.5 Expenditure:0 Release:2940000 Obligation:2938206.12 |
0 |
1211530490 | Rehabilitation (Completion) of J204-Lamut-Colliding Road, Natubleng, Buguias, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 80 Expenditure:1343651.09 Release:2940000 Obligation:2927008.18 |
0 |
1226295088 | Construction (Completion) of Multi-Purpose Building at Barangay Paykek, Kapangan, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:2940000 Obligation:0 |
0 |
1238182024 | (a) BAGUIO-BONTOC RD - K0309+088 - K0309+500, K0309+800 - K0311+350, K0312+040 - K0312+855, K0313+015 - K0313+780, K0314+180 - K0315+030, K0315+146 - K0315+958, K0316+292 - K0316+661 , K0317+560 - K0317+609, BUGUIAS, BENGUET Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 75 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
1247317122 | King Solomon Sto. Nino-Coroz-Tabeyo Road in support to Coffee, Cacao, Bamboo Cut Flower Heirloom Rice, Livestock, and other High Value Vegetables, Tublay, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:1212442.68 Release:2450000 Obligation:2441970.44 |
-16.016796640672 |
1250413641 | Gov. Bado Dangwa National Rd - K0277 + 000 - K0277 + 032, K0278 + 250 - K0278 + 370, K0279 + 912 - K0279 + 942 Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
1259292885 | Gov. Bado Dangwa National Rd - K0306+590 - K0306+700, K0315+445 - K0315+520 Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 75 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
1266148058 | King Solomon Sto. Nino-Coroz-Tabeyo Road in support to Coffee, Cacao, Bamboo Cut Flower Heirloom Rice, Livestock, and other High Value Vegetables, Tublay, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
1287902825 | Construction (Completion) of Pongayan Water Supply at Barangay Pongayan, Kapangan, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 25 Expenditure:587131.38 Release:3920000 Obligation:3914209.18 |
0 |
1298173722 | Construction (Completion) of Multi Purpose Building at Abatan, Buguias, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:29400000 Obligation:29380089.51 |
0 |
1306293154 | Construction of Multi-Purpose Building (Socio Cultural and Evacuation Center) at Barangay Loo, Buguias, Benguet (Cluster II) Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 100 Actual: 75.1 Expenditure:3993477.52 Release:12870000 Obligation:12740516.59 |
-46.980198019802 |
1334646839 | Construction (Completion) of Ewa Water Supply Kibungan, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:3920000 Obligation:0 |
0 |
1340397886 | Rehabilitation (Completion) of Multi-Purpose Building at Barangay Loo, Buguias, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:2940000 Obligation:2936837.58 |
0 |
1356021475 | Construction of Ba-ayan to Gasal Barangay Road Upper Taneg, Mankayan, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:4627338.55 Release:6930000 Obligation:6851406.2 |
-11.287212528806 |
1358490967 | Construction of Municipal Rural Health Unit at Brgy. Caponga,Tublay, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 42 Expenditure:7963337.59 Release:19800000 Obligation:19790103.69 |
0 |
1360294115 | Repair/ Rehabilitation of Taba - ao Water System at Barangay Taba-ao, Kapangan, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:2430272.15 Release:2970000 Obligation:2950524.74 |
1.7241379310345 |
1382597579 | Construction (Completion) of DPWH Benguet 2nd DEO Building, Natubleng, Buguias, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 100 Actual: 86.5 Expenditure:4089559.58 Release:7840000 Obligation:7769995.18 |
-22.427440633245 |
1386300009 | Road Slope Protection along Governor Bado Dangwa National Road, Mayus, Poblacion, Kibungan, Benguet, K0320+442 - KO320+592 Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 75 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
1407206825 | Bangho-Daclan-Basil-Tublay Central Road in support of Coffee, Bamboo, Cutflowers and Fruit Tree Industries, Tublay, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:2194885.54 Release:2450000 Obligation:2438761.71 |
0 |
1420979090 | Construction of Ampusongan Flood Control, Phase II, Ampusongan, Bakun, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 100 Expenditure:16128653.24 Release:19600000 Obligation:19404037.22 |
0 |
1422383943 | Baguio-Bontoc Rd - K0340 + 330 - K0340 + 415 Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
1438640781 | Rehabilitation (Completion) of Longboy-Tacal Road, Labueg, Kapangan, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 77 Expenditure:1219624.27 Release:2940000 Obligation:2920002.96 |
0 |
1440838180 | Guinzadan-Cagubatan-Balili (Mankayan) Road leading to Mogao Mountain and Gawaan Lake, Mankayan, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
1443693461 | Construction of Multi Purpose Building Phase 2 at Acop, Caponga, Tublay, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:39200000 Obligation:39077788.38 |
0 |
1448377060 | Construction of Naguey Flood Control Structure, Sta. 5+875 - Sta. 6+475 (L.S), Sta. 4+725 - 5+725 (B.S) along Amburayan River, Atok, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 91.4 Actual: 99.9 Expenditure:42553255.74 Release:51920860 Obligation:51920860 |
52.350427350427 |
1476765058 | Baguio-Bontoc Rd - K0320+810 Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
1494992508 | Repair/ Rehabilitation of Palina Water System at Barangay Palina, Kibungan, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:2668618.74 Release:2970000 Obligation:2965131.93 |
0.68965517241379 |
1508794444 | Construction (Completion) of Multi-Purpose Building at Taba-Ao, Kapangan, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 21 Expenditure:440436.6 Release:2940000 Obligation:2936243.98 |
0 |
1510481618 | Gov. Bado Dangwa National Rd - K0324 + 445 - K0324 + 470, K0331 + 540 - K0331 + 575, K0338 + 060 - K0338 + 086, K0338 + 515 - K0338 + 560, K0338 + 875 - K0338 + 890, K0339 + 360 - K0339 + 440 Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
1518467439 | Improvement of Nilawitan-Dontog, Barangay Poblacion Central, Buguias, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:4455000 Release:4950000 Obligation:4950000 |
-15.437561455261 |
1520801657 | Construction of Baney Flood Control Sta. 1+445 - Sta. 2+777 (R.S.), Buguias, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:23747048.82 Release:29400000 Obligation:29400000 |
23.076923076923 |
1521362801 | Repair/ Rehabilitation of Water System of Demeg-Nadontog at Barangay Baculongan Norte, Buguias, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:1781569.43 Release:1980000 Obligation:1979521.59 |
-4.3333333333333 |
1565289283 | Construction of Multi Purpose Building at Barangay Tacadang, Kibungan, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 100 Actual: 90 Expenditure:881466.8 Release:5940000 Obligation:5876445.34 |
-28.780487804878 |
1565422317 | Construction (Completion) of Multi-Purpose Building At Barangay Buyacaoan, Buguias, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:2940000 Obligation:2934767.86 |
0 |
1573969230 | Construction (Completion) of Alumit-Obellan Water Works at Balakbak, Kapangan, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 20 Expenditure:0 Release:3920000 Obligation:3914544.23 |
0 |
1574510505 | Improvement of Aurora Street to Gate 1 Lepanto Municipal Road, Barangay Poblacion, Mankayan, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:4127821.26 Release:9900000 Obligation:9900000 |
-0.35335689045936 |
1575161450 | Concreting of Barangay Road along Bosleng Barangay Road, Barangay Paoay, Atok, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:5980012.57 Release:9900000 Obligation:9850054.45 |
0.71174377224199 |
1580932483 | Improvement of Road along Sitio Pual To Sitio Nalseb, Topdac, Atok, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 75 Expenditure:3808738.4 Release:9800000 Obligation:9776543.96 |
0 |
1601492419 | Construction of Multi-purpose Building at Tublay Municipal Ground, Acop, Barangay Caponga, Tublay, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 100 Actual: 52 Expenditure:6303776.45 Release:9900000 Obligation:9900000 |
-54.788418708241 |
1607047100 | Construction of Pongo Barangay Road, Gambang, Bakun, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:4850086.37 Release:4950000 Obligation:4850086.37 |
-2.0176297747307 |
1614710032 | Poblacion-Naguey-Pasdong-Lubo Road in support to Coffee, Cacao, Bamboo, Cutflower, Banana, Livestock, and Other High Value Vegetables, Atok, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
1632207246 | Rehabilitation (Completion) of Bana-Ao-Payew Emusto Road, Amlimay, Buguias, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 100 Expenditure:2605683.44 Release:2940000 Obligation:2895203.82 |
0 |
1633971906 | Construction of Papasok-Sibugan Flood Control Sta.5+360 - Sta. 5+863 (L.S.), Buguias, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:17640000 Release:19600000 Obligation:19106138.97 |
0 |
1634721608 | Rehabilitation (Completion) of Multi-Purpose Building (Cattubo Barangay Hall), Cattubo, Atok, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:2940000 Obligation:0 |
0 |
1636968845 | Construction (Completion) of Sagpat Water Supply at Barangay Sagpat, Kibungan, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:3920000 Obligation:0 |
0 |
1637693555 | Construction of Road, Tonguey - Pocles - Nan-agto, Barangay Madaymen, Kibungan, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
1641872779 | Construction of Pasdong Flood Control along Amburayan River, Pasdong, Atok, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:19225046.46 Release:24500000 Obligation:24500000 |
26.71271656664 |
1642326718 | Improvement (Completion) of Cantaw to Laglagan FMR, Tadayan, Pudong, Kapangan, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 69 Expenditure:440762.76 Release:2940000 Obligation:2938418.39 |
0 |
1672939817 | Construction (Completion) of Water Supply at Loo National High School and Elementary School, Barangay Loo, Buguias, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:3920000 Obligation:0 |
0 |
1673827488 | Cong. Andres Acop Cosalan Rd - K0360+000 - K0360+250 Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
1677651877 | Gov. Bado Dangwa National Rd - K0311+130 - K0311+150, K0313+750 - K0313+770,K0314+670 - K0314+695,K0315+143 - K0315+158,K0315+618 - K0315+668,K0316+503 - K0316+528 Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 72 Expenditure:14227584.76 Release:34300000 Obligation:34269987.35 |
0 |
1681187146 | Gov. Bado Dangwa National Rd - K0347+144 - K0347+279, K0347+327 - K0347+376 Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 68 Expenditure:29542008.91 Release:79130000 Obligation:78529990.73 |
0 |
1685155963 | Tabio-Bedbed-Baguingey-Sayapot Road in support of Coffee, Bamboo, Food and Feed Crops, Plantation Crops, Cutflowers and Fruit Trees Industries, Mankayan, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:2195762.44 Release:2450000 Obligation:2439736.04 |
-1.5166436872169 |
1692899520 | Guiswak-Lokot-Ambalideng Access Road in support to Coffee, Cacao, Bamboo, Cutflower, Banana, Livestock, Heirloom Rice, and other High Value Vegetables, Kibungan, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
1712269251 | Betwag-Pongayan Road in support to Coffee, Cacao, Bamboo, Cut Flower, Banana, Heirloom rice, Livestock and other High Value Vegetables, Kapangan, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:1325038.76 Release:2450000 Obligation:2437532.22 |
0 |
1760141012 | Construction of Lam-ayan-Dengao-Dekkan-Balintag Road, Baculungan Norte, Buguias, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
1780613528 | Construction of Solar Water System, Atok, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
1788950210 | Improvement of Road, Papayew, Caliking, Atok, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 73 Expenditure:6445116.46 Release:9800000 Obligation:9793493.33 |
0 |
1790634975 | Construction (Completion) of Water System at Ketmegan-Lengaoan and Guiweng- Junction-Lengaoan Waking Elementary School, Buguias, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:3920000 Obligation:0 |
0 |
1804484488 | Construction (Completion) of Taneg Water Supply at Barangay Taneg, Mankayan, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 5 Expenditure:0 Release:3920000 Obligation:3897722.83 |
0 |
1821551607 | Repair/ Rehabilitation of Sapid Water System at Barangay Sapid, Mankayan, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:2670223.31 Release:2970000 Obligation:2966914.79 |
-30.344827586207 |
1823842607 | Construction (Completion) of Barangay Health Station at Basil, Tublay, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 49 Expenditure:0 Release:2970000 Obligation:2964643.44 |
0 |
1826654228 | Construction (Completion) of J204 Cts 73 Dangpa Pal-Dal Akipan Lengaoan Road 1B Road Improvement Junction Tabak Akipan Section, Lengaoan, Buguias, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 100 Expenditure:2640836.77 Release:2940000 Obligation:2934263.08 |
0 |
1852541088 | Construction of Road to Sitio Patapat, Topdac, Atok, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 20 Expenditure:440275.88 Release:2940000 Obligation:2935172.5 |
0 |
1862261854 | Mangkingao - Am-am via Masca-Sayapot Road leading to Am-am Observatory Rock, Burial Cave, Cada Farm and Kenny Farm, Mankayan, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
1863249193 | Cong. Andres Acop Cosalan Rd - K0352 + 100 - K0352 + 160 Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 91.4 Actual: 69 Expenditure:18574951.66 Release:29400000 Obligation:29400000 |
-21.652421652422 |
1863485587 | Construction of Climate Change Resilient Multi- Purpose Building (2nd Floor of the Model Senior Citizens Center), Acop, Caponga, Tublay, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
1869414582 | Baguio-Bontoc Rd - K0297+144 - K0297+163, K0298+902 - K0298+908, K0298+924 - K0298+952 Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 98 Expenditure:0 Release:2646000 Obligation:2637571.01 |
0 |
1870972641 | Poblacion-Naguey-Pasdong-Lubo Road in support to Coffee, Cacao, Bamboo, Cutflower, Banana, Livestock, and Other High Value Vegetables, Atok, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:2439975.75 Release:2450000 Obligation:2439975.75 |
-13.809256136406 |
1879489542 | Construction of Sitio Ekip to Sitio Seb-itan Flood Control Sta. 3+991 - Sta. 4+382 (L.S.), Sta. 3+950 - Sta. 4+208 (R.S.), Buguias, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:29400000 Release:29400000 Obligation:29400000 |
28.444444444444 |
1879936580 | Construction of Kapangan Flood Control Sta. 8+241 - Sta. 8+374 (R.S.), Sta. 8+243 - 8+374 (L.S.),Kapangan, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 100 Actual: 64 Expenditure:2170929.64 Release:11649260 Obligation:11489414.45 |
-67.615658362989 |
1880406157 | Gov. Bado Dangwa National Rd - K0293 + 930 - K0293 + 990, K0297 + 840 - K0297 + 890 Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
1884733309 | Construction of Solar Water System, Buguias, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
1891076539 | Baguio-Bontoc Rd - K0262+420 - K0262+960 Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
1891504365 | Construction of Lam-Ayan - Dengao - Dekkan - Balintag Road, Baculongan Norte, Buguias, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 75 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
1921742125 | Rehabilitation (Completion) of Multi-Purpose Building, Taneg, Mankayan, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:2940000 Obligation:2937876.59 |
0 |
1926165489 | Construction (Completion) of Water Supply at Barangay Loo, Buguias, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 11.25 Expenditure:586302.05 Release:3920000 Obligation:3908680.3 |
0 |
1927511159 | Construction of Mayus Flood Control Sta. 0+158 - Sta. 0+278 (R.S.), Sta. 0+187 - Sta. 0+292 (L.S.), Kibungan, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:7833760.63 Release:9800000 Obligation:8704178.48 |
-34.798534798535 |
1938286422 | Kiangan-Tinoc-Buguias Rd - K0355 + 860 - K0359 + 590 Benguet | DPWH Benguet 2nd DEO | (default) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
1939793700 | Construction (Completion) of Water Supply at Camp 30, Barangay Caliking, Atok, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:2940000 Obligation:0 |
0 |
1947480489 | Construction of Balili Flood Control Sta. 1+429 - Sta. 1+698 (L.S.), Sta. 1+445 - Sta. 1+698 (R.S.), Sta. 1+711 - Sta. 1+849 (L.S.), Sta. 1+727 - Sta. 1+803 (R.S.), Mankayan, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 100 Actual: 89.5 Expenditure:14608116.3 Release:29400000 Obligation:29400000 |
-5.026455026455 |
1950359893 | Construction (Completion) of Aduyonan Water Supply at Barangay Abiang, Atok, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:2940000 Obligation:2934820.57 |
0 |
1957609230 | Improvement/Concreting of Beyeng-Tacadang Road, Brgy. Bakun and Brgy. Kibungan Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
1957796889 | Construction (Completion) of Ba-ayan Water Supply at Barangay Ba-ayan, Tublay, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:3920000 Obligation:3915001.14 |
0 |
1972117245 | Rehabilitation (Completion) of Keyang to Proper Gadang Road, Gadang, Kapangan, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 83.2 Expenditure:440881.85 Release:2940000 Obligation:2939212.36 |
0 |
1988620813 | Rehabilitation (Completion) of Road from Crossing to Lokot, Cayapes, Kapangan, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 74 Expenditure:0 Release:2940000 Obligation:2920000.3 |
0 |
1989841934 | Construction of Ibisan - Kamanbagang Road, Sebang, Buguias, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 100 Expenditure:7157598.76 Release:9800000 Obligation:9779054.97 |
0 |
1999661081 | Improvement of Pulag Barangay Road, Barangay Baayan, Tublay, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
2049056696 | Construction of Flood Mitigation Structure along Agno River, Poblacion Buguias Section, Sta. 7 + 724 - Sta. 8 + 724 (B.S), Buguias, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
2054028267 | Construction (Completion) of DPWH Benguet 2nd DEO Buidling, Natubleng, Buguias, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:30907740.51 Release:39200000 Obligation:39177070.87 |
-2.0408163265306 |
2059311034 | Construction of Flood Mitigation Structure along Agno River, Calamagan Section, Sta. 0 + 012 - Sta. 0 + 472 (L.S), Sta. 0 + 012 - Sta. 0 + 447 (R.S), Sta. 11 + 474 - Sta. 12 + 174 (L.S), Sta. 11 + 743 - Sta. 12 + 068 (R.S), Buguias, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
2065482202 | Gov Bado Dangwa National Road - K0286+740 - K0286+840, Kapangan, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
2071099986 | Baguio-Bontoc Rd - K0339+110 - K0339+132, K0339+500 - K0339+530 Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 75 Expenditure:1125890.94 Release:7526400 Obligation:7505939.58 |
0 |
2074394627 | Construction of Legwey-Taba-ao Road, Barangay Taba-ao, Kapangan, Bengue Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
2076250035 | Construction of Multi-Purpose Building with Parking (Beside Municipal Hall) at Barangay Paoay, Atok, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 100 Actual: 66 Expenditure:890162.9 Release:5940000 Obligation:5934419.36 |
-35.096153846154 |
2078428809 | Mangkingao - Am-am via Masca-Sayapot Road leading to Am-am Observatory Rock, Burial Cave, Cada Farm and Kenny Farm, Mankayan, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:2199537.13 Release:2450000 Obligation:2443930.14 |
-15.371759769584 |
2090420176 | Cong. Andres Acop Cosalan Rd - K0364+000 - K0365+865 Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
2099841844 | Construction (Completion) of Water Supply System at Ayosip-Buyot, Barangay Balakbak, Kapangan, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 32 Expenditure:0 Release:3920000 Obligation:3914494.38 |
0 |
2101550763 | NRJ Natubleng-Nabalicong-Cabuguiasan-Pacso-Tonglo-Saclalan Road leading to various tourist attractions, Buguias, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
2106371414 | Construction (Completion) of Multi-Purpose at Lomon, Paykek, Kapangan, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:29400000 Obligation:29281124.57 |
0 |
2116651117 | Road Slope Protection along Governor Bado Dangwa National Road, Mayus, Poblacion, Kibungan, Benguet, KO320+442 - KO320+592 Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-32.624113475177 |
2120381159 | Guiswak-Lokot-Ambalideng Access Road in support to Coffee, Cacao, Bamboo, Cutflower, Banana, Livestock, Heirloom Rice, and other High Value Vegetables, Kibungan, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure:2931247.17 Release:2940000 Obligation:2931247.17 |
2.269598395154 |
2125131404 | Cong. Andres Acop Cosalan Rd - K0358 + 800 - K0358 + 820 Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
2135199847 | Construction of Flood Control Structure at Nabalicong, Natubleng, Buguias, Benguet Benguet | DPWH Benguet 2nd DEO | (Cumulative) |
Target: 0 Actual: 47 Expenditure:19841383.42 Release:49000000 Obligation:48990442.38 |
0 |
8651908 | Abatan-Bagnen Road, in support of Agribusiness, Coffee, Food Processing and Tourism Industries, Bauko, Mountain Province Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure: Release:5000000 Obligation:4900000 |
-4.316907051282 |
14122614 | vConstruction of Wawang Flood Control Structure, Sta. 32 + 180 - Sta. 32 + 250 (L.S.), Sta. 32 + 184 - Sta. 32 + 264 (R.S.), Sta. 32 + 328 - Sta. 32 + 358 (L.S.), Sta. 32 + 335 - Sta. 32 + 375 (R.S.) along Talubin River, Bontoc, Mountain Province Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure: Release:25000000 Obligation:24500000 |
-24.785459454247 |
15642621 | Bontoc - Mainit - Sagada Road leading to Guina-ang Rice Terraces, Mainit Hotsprings, Bomod-ok Falls, Mountain Province Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure: Release:15000000 Obligation:14700000 |
-13.436199722607 |
41965333 | Lubon-Bilig Road connecting Lubon and Bilig to Tadian-Besao-Sagada Provincial Road in support of Heirloom Rice, Coffee, and Muscovado Processing and other Food Processing Industries, Lubon, Tadian, Mountain Province Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure: Release:5000000 Obligation:4900000 |
-3.5514294134984 |
42579706 | Mt Prov-Cagayan via Tabuk-Enrile Rd - K0392 + 310, K0392 + 634, K0396 + 513, K0397 + 427, K0398 + 400, K0399 + 080, K0400 + 162 - K0400 + 372 Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 98.73 Expenditure: Release:20000000 Obligation:19600000 |
-11.036271788104 |
48954188 | Improvement of Local Road, Barangay Masla, Tadian, Mountain Province Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure: Release:5000000 Obligation:4950000 |
-3.7110249142175 |
65992708 | Construction of Tamog-o - Chico River Flood Mitigation Structure, Sta. 67+476 - Sta. 67+512 (L.S.), Sitio Tamog-o in Barangay Monamon Norte, Bauko, Mountain Province Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
110061302 | Tadian-Sagada via Besao leading to Tirad Pass View, Fidelisan Falls, Sumaguing Cave, Balangagan Cave, Ayyuweng di Lambak ed Tadian Festival, Kiltepan Sunrise, Besao Sunset Hanging Coffins, Echo Valley, Tadian, Mountain Province Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure: Release:22571000 Obligation:22119580 |
-17.939278030122 |
111847167 | Construction of Flood Control, Barangay Mainit, Bontoc, Mountain Province Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure: Release:5000000 Obligation:4950000 |
-6.2224967189068 |
119030618 | Improvement of Local Road, Barangay Leseb, Bauko, Mountain Province Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
125512571 | Sagada-Besao-Quirino (via Laylaya) Road, Mountain Province Mountain Province | DPWH MP 1st DEO | (default) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
130710985 | Baguio-Bontoc Rd - K0344 + 450 - K0344 + 480, K0373 + 801 - K0373 + 903, K0374 + 024 - K0374 + 044, K0387 + 970 - K0388 + 000 Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure: Release:15000000 Obligation:14700000 |
-4.96346809547 |
132289153 | Construction (Completion) of Multi-Purpose Building, Barangay Demang, Sadanga, Mountain Province Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure: Release:2000000 Obligation:1980000 |
-20.409566370378 |
144582600 | Construction of Palinga-ao Flood Control Structure, Sta. 46 + 040 - Sta. 46 + 110 (LS) along Chico River, Sabangan, Mountain Province Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure: Release:5000000 Obligation:4900000 |
12.546680025503 |
154494447 | Improvement of Local Road, Barangay Tetep-an Norte, Sagada, Mountain Province Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
161533862 | Improvement of Local Road, Barangay Tetep-an Norte, Sagada, Mountain Province Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 0 Actual: 100 Expenditure: Release:5000000 Obligation:4950000 |
0 |
165040401 | Mt Prov-Cagayan via Tabuk-Enrile Rd - K0393 + 570 - K0393 + 587 Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
173870092 | Lubo Br. (B00941LZ) along Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
181526221 | Improvement of Local Road, Barangay Sinto, Bauko, Mountain Province Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure: Release:5000000 Obligation:4950000 |
-1.5433232894833 |
226024693 | Mt Prov-Cagayan via Tabuk-Enrile Rd - K0392 + 263 - K0392 + 309 Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 0 Actual: 100 Expenditure: Release:2000000 Obligation:1938044.65 |
0 |
256229753 | Baguio-Bontoc Rd - K0351 + 680 - K0351 + 800, K0360 + 908 - K0361 + 015, K0367 + 615 - K0367 + 780, K0367 + 850 - K0367 + 920, K0368 + 150 - K0368 + 250, K0368 + 904 - K0369 + 082 Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
264356469 | Poblacion, Sagada-Aguid Road in support of Coffee Weaving, Food Processing and Tourism Industries, Sagada, Mountain Province Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure: Release:5000000 Obligation:4900000 |
0.63381642512077 |
270737497 | Improvement of Sagada-Payeo Provincial Road, Sagada, Mountain Province Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
278657982 | Besao- Tubo (via Tamboan) Road, Mountain Province Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
280182835 | Sabangan Br. (B04953LZ) along Baguio-Bontoc Rd Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
305527063 | Baguio-Bontoc Rd - K0347 + 528 - K0347 + 589 Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-91.666666666667 |
315039083 | Mt Prov-Ilocos Sur via Tue Rd - K0416 + 212 Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
320106727 | Nacawang-Mabalite Road connecting Barangays Batayan and Mabalite in support of Sugarcane, Coffee, Corn, Mango and Furniture Industries, Tadian, Mountain Province Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
321857374 | Bauko Br. (B00935LZ) along Mt Prov-Ilocos Sur via Tue Rd Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
344774750 | Construction of Level III Water Supply System, Bauko, Mountain Province Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure: Release:37437000 Obligation:36321377.77 |
0 |
347990741 | Dantay-Sagada Rd - K0396 + 990 Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
365589030 | Improvement of Local Road, Barangay Bila - Barangay Otucan Norte Bauko, Mountain Province Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
373414851 | Chico Karayan Bridge- Lanao- Tikitik Bypass Road, Package D, Mountain Province Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
394246718 | Lubon-Bilig Road connecting Lubon and Bilig to Tadian-Besao-Sagada Provincial Road in support of Heirloom Rice, Coffee, and Muscovado Processing and other Food Processing Industries, Lubon, Tadian, Mountain Province Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
415628653 | Construction of Multi-Purpose Building at Barangay Tambingan, Sabangan, Mountain Province Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 0 Actual: 0.18 Expenditure: Release:5000000 Obligation:4826410.86 |
0 |
418419712 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Basic Infrastructure Program (BIP), Public Water Supply System (Level II or III) Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
440062316 | Baguio-Bontoc Rd - K0347 + 000 - K0347 + 079 Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
454247378 | Banaao-Lenga-Cadadanan-Am-am Road connecting Banaao, Lenga and Cadadanan, Tadian, Mountain Province Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
456931925 | Mt Prov-Ilocos Sur via Tue Rd - K0416 + 212 Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 0 Actual: 100 Expenditure: Release:2500000 Obligation:2450000 |
0 |
461941113 | Bato-Cuba-Balicanao-Pua-Mankingao Road connecting Bato and Mankingao in support of Food/Vegetable Processing and Coffee Industries, Brgy. Sadsadan and Brgy. Monamon Sur, Bauko, Mountain Province Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 0 Actual: 100 Expenditure: Release:5000000 Obligation:4900000 |
0 |
462801879 | Calacaban Br. (B04293LZ) along Mt Prov-Ilocos Sur via Tue Rd Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure: Release:15000000 Obligation:14760000 |
-5.1697151290193 |
492772306 | Baguio-Bontoc Rd - K0377 + 670 - K0377 +846 Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 0 Actual: 100 Expenditure: Release:3500000 Obligation:3430000 |
0 |
493737901 | Baguio-Bontoc Rd - K0371 + 037, K0371 + 841 Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure: Release:4000000 Obligation:3920000 |
-1.7852938868398 |
496807809 | Improvement of Local Road, Barangay Bun-ayan, Sabangan, Mountain Province Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
516354707 | Construction of Can-eo Road, Bontoc, Mountain Province Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
519575679 | Improvement of Local Road, Barangay Masla, Tadian, Mountain Province Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
551858392 | Balili-Suyo-Sagada Road leading to Sagada Caves, Rice Terraces, and Water Falls, Bontoc and Sagada, Mountain Province Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure: Release:10000000 Obligation:9800000 |
9.0940021386216 |
556229931 | Improvement of Local Road, Barangay Maligcong, Bontoc, Mountain Province Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 0 Actual: 100 Expenditure: Release:5000000 Obligation:4950000 |
0 |
557014557 | Improvement of Local Road, Sitio Asbiagan, Barangay Monamon Sur, Bauko, Mountain Province Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
557277649 | Construction of Multi-Purpose Building at Barangay Tambingan, Sabangan, Mountain Province Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
571143965 | Tapapan-Pagang Road connecting Pagang and the Provincial road in support of food/vegetable processing, dairy and coffee industries, Barangay Tapapan, Bauko, Mountain Province Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure: Release:5000000 Obligation:4900000 |
-3.729384573197 |
579782470 | Construction of Flood Control Structure along Bayudan River, Kabulawan-Busilac Bila-Otucan Sur, Sta. 55+800 - Sta. 56+480 (B.S.), Bauko, Mountain Province Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 97.69 Expenditure: Release:100000000 Obligation:96500000 |
44.955674865776 |
587733196 | Improvement of Local Road, Barangay Banguitan, Besao, Mountain Province Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
590329585 | Construction of Sadsadan-Balicanao-Salin Road, Bauko, Mountain Province Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
608440815 | Improvement of Local Road, Barangay Sinto, Bauko, Mountain Province Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
613288956 | Bila-Bagnen Oriente Road in support of Agribusiness, Coffee and Food Processing Industries, Bauko, Mountain Province Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure: Release:5000000 Obligation:4900000 |
-4.1222254251946 |
614594493 | Improvement of Local Road, Sitio Asbiagan, Barangay Monamon Sur, Bauko, Mountain Province Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 0 Actual: 100 Expenditure: Release:5000000 Obligation:4950000 |
0 |
625342021 | Construction of Tamog-o - Chico River Flood Mitigation Structure, Sta. 67+476 - Sta. 67+512 (L.S.), Sitio Tamog-o in Barangay Monamon Norte, Bauko, Mountain Province Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 0 Actual: 100 Expenditure: Release:50000000 Obligation:4900000 |
0 |
626336195 | Improvement of Local Road, Barangay Banguitan, Besao, Mountain Province Mountain Province | DPWH MP 1st DEO | (default) |
Target: 100 Actual: 100 Expenditure: Release:5000000 Obligation:4950000 |
0 |
647737639 | Lukib-Naigawa-Tamog-o-Suyo-Panas Road in support of Agribusiness Industry, Bauko, Mountain Province Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
653852725 | Dantay-Sagada Rd - K0396 + 990 Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 0 Actual: 100 Expenditure: Release:3000000 Obligation:2940000 |
0 |
660580324 | Beto Br. (B04612LZ) along Mt Prov-Ilocos Sur via Tue Rd Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure: Release:13000000 Obligation:12740000 |
-1.1272619400771 |
666525880 | Improvement of Local Road, Barangay Mabaay, Bauko, Mountain Province Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
677967020 | Mt Prov-Cagayan via Tabuk-Enrile Rd - K0400 + 640 - K0400 + 665 Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
686202601 | Improvement of Local Road, Barangay Leseb, Bauko, Mountain Province Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure: Release:5000000 Obligation:4950000 |
0.23448275862069 |
695994669 | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Basic Infrastructure Program (BIP), Public Water Supply System (Level II or III) Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure: Release:5000000 Obligation:4875000.06 |
1.747188570877 |
698320128 | Construction of Level III Water Supply System, Sabangan, Mountain Province Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
708739243 | Construction (Completion) of Multi-Purpose Building, Barangay Poblacion, Tadian, Mountain Province Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure: Release:3000000 Obligation:2970000 |
-22.768462986473 |
724092768 | Construction of Chico-Karayan-Tikitik Flood Control Structure, Sta. 29+000 - Sta. 29+760 (LS) along Chico River, Bontoc, Mountain Province Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure: Release:30000000 Obligation:29400000 |
47.318412162162 |
728254342 | Improvement of Local Road, Barangay Balili - Barangay Alab Proper, Bontoc, Mountain Province Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
735491083 | Abatan-Bagnen Road, in support of Agribusiness, Coffee, Food Processing and Tourism Industries, Bauko, Mountain Province Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
749909136 | Improvement of Local Road, Barangay Data, Sabangan, Mountain Province Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
756760725 | Mt Prov-Cagayan via Tabuk-Enrile Rd - K0419 + 087, K0420 + 388, K0420 + 628 Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
758660901 | Masla-Duagan Road in support of Sugarcane, Coffee, Food Processing and Furniture Industries, Tadian, Mountain Province Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
800106403 | Tadian-Sagada via Besao leading to Tirad Pass View, Fidelisan Falls, Sumaguing Cave, Balangagan Cave, Ayyuweng di Lambak ed Tadian Festival, Kiltepan Sunrise, Besao Sunset Hanging Coffins, Echo Valley, Tadian, Mountain Province Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
800284788 | Guinzadan-Cagubatan-Balili (Mankayan) Road leading to Mogao Mountain and Gawaan Lake, Bauko and Tadian, Mountain Province Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
812550381 | Construction of Multi-Purpose Building, Barangay Kayan East, Tadian, Mountain Province Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
815033859 | Mt Prov-Cagayan via Tabuk-Enrile Rd - K0400 + 640 - K0400 + 665 Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure: Release:10000000 Obligation:9800000 |
-18.242259536057 |
822951527 | Bauko Br. (B00935LZ) along Mt Prov-Ilocos Sur via Tue Rd Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure: Release:25000000 Obligation:24500000 |
-3.1865612278321 |
825567933 | Construction of ABIT Flood Control along Abit River, Tadian, Mountain Province Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
828273203 | Construction of Multi-Purpose Building, Barangay Suyo, Sagada, Mountain Province Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
837177558 | Mt Prov-Ilocos Sur via Tue Rd - K0388 + 930 - K0388 + 1050 Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure: Release:11520000 Obligation:11289600 |
-7.5961379765638 |
853842548 | Sagada-Besao-Quirino (via Laylaya) Road, Mountain Province Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 90.89 Expenditure: Release:50000000 Obligation:48260000.01 |
-4.3332025337743 |
874908933 | Construction (Completion) of Multi-Purpose Building, Barangay Poblacion, Tadian, Mountain Province Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
886941022 | Lukib-Naigawa-Tamog-o-Suyo-Panas Road in support of Agribusiness Industry, Bauko, Mountain Province Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure: Release:5000000 Obligation:4900000 |
-4.463031114085 |
892463832 | Calacaban Br. (B04293LZ) along Mt Prov-Ilocos Sur via Tue Rd Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
900744356 | Improvement of Local Road, Barangay Capinitan, Sabangan, Mountain Province Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure: Release:5000000 Obligation:4950000 |
-1.6729844000583 |
916834871 | Construction of Flood Control, Barangay Mainit, Bontoc, Mountain Province Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
919152652 | Improvement of Local Road, Barangay Talubin, Bontoc, Mountain Province Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 0 Actual: 100 Expenditure: Release:5000000 Obligation:4950000 |
0 |
919735557 | Improvement of Local Road, Barangay Mabaay, Bauko, Mountain Province Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure: Release:5000000 Obligation:4950000 |
-5.35933721806 |
949164638 | Lacbaben-Magiyad Road in support of Coffee, Food Processing, and Heirloom Rice Industries, Bauko, Mountain Province Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
957392435 | Latang Br. (B00926LZ) along Mt Prov-Cagayan via Tabuk-Enrile Rd Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure: Release:10000000 Obligation:9800000 |
-19.316630530796 |
968525896 | Maba-ay-Abatan Road leading to various tourism sites, Maba-ay-Abatan, Bauko , Mt. Province Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
969516568 | Improvement of Local Road, Barangay Data, Sabangan, Mountain Province Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure: Release:5000000 Obligation:4950000 |
-0.97180242568008 |
980125799 | Construction of Chico River Flood Control, Tamog-o Section at Sitio Tamog-o in Barangay Monamon Norte, Bauko, Mountain Province Mountain Province | DPWH MP 1st DEO | (default) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
999630936 | Construction of Multi-Purpose Building at Barangay Camatagan, Sabangan, Mountain Province Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure: Release:5000000 Obligation:4900000 |
0.18868792857471 |
1043678769 | Construction of Chico-Karayan-Tikitik Flood Control Structure, Sta. 29+000 - Sta. 29+760 (LS) along Chico River, Bontoc, Mountain Province Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
1052642139 | Balitian Br. (B02982LZ) along Baguio-Bontoc Rd Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 0 Actual: 100 Expenditure: Release:6000000 Obligation:5880000 |
0 |
1061393888 | Construction of Multi-Purpose Building at Barangay Balugan, Sagada, Mountain Province Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 1000 Actual: 100 Expenditure: Release:5000000 Obligation:4900000 |
-83.660394265233 |
1064828914 | Baguio-Bontoc Rd - K0374 + 100 - K0374 + 120 Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
1073431754 | Construction (Completion) of Multi-Purpose Building (Municipal Local Government Unit Building), Opukan, Sadanga, Mountain Province Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 0 Actual: 80.21 Expenditure: Release:5000000 Obligation:4859209.08 |
0 |
1076579297 | Baguio-Bontoc Rd - K0347 + 000 - K0347 + 079 Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure: Release:3500000 Obligation:3430000 |
0.52272727272728 |
1080782707 | Lubo Br. (B00941LZ) along Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure: Release:5000000 Obligation:4784437.28 |
-17.841638172807 |
1086055944 | Bunga-Gayang-Palina Road connecting Bunga and Gayang to Mountain Province-Ilocos Sur National Road supporting Heirloom Rice, Coffee, Banana Chips, and other Industries, Bunga, Tadian, Mountain Province Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure: Release:5000000 Obligation:4900000 |
-3.0871847208048 |
1118385460 | Baguio-Bontoc Rd - K0351 + 680 - K0351 + 800, K0360 + 908 - K0361 + 015, K0367 + 615 - K0367 + 780, K0367 + 850 - K0367 + 920, K0368 + 150 - K0368 + 250, K0368 + 904 - K0369 + 082 Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 92.75 Expenditure: Release:22253000 Obligation:21807940 |
-5.0567368073152 |
1125155589 | Malanas Br. (B00932LZ) along Mt Prov-Cagayan via Tabuk-Enrile Rd Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
1127702635 | Mt Prov-Cagayan via Tabuk-Enrile Rd - K0402 + 300 - K0402 + 333 Mountain Province | DPWH MP 1st DEO | (default) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
1129218093 | Chico Karayan Bridge- Lanao- Tikitik Bypass Road, Package D, Mountain Province Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 98.18 Actual: 90.82 Expenditure: Release:74439000 Obligation:69678013.06 |
3.794751056021 |
1135629371 | Mt Prov-Cagayan via Tabuk-Enrile Rd - K0392 + 263 - K0392 + 309 Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
1166293123 | Guinzadan-Cagubatan-Balili (Mankayan) Road leading to Mogao Mountain and Gawaan Lake, Bauko and Tadian, Mountain Province Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure: Release:10000000 Obligation:9800000 |
-8.3158319870759 |
1168972739 | Sabangan-Sagada Road leading to Poblacion Sagada, Sumaguing Cave, Hanging Coffins, Bomod-ok Falls, Bokong Falls, Marcos Cave, Mountain Province Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure: Release:10000000 Obligation:9800000 |
-15.426809918854 |
1187590249 | Ampawailen Br. (B04296LZ) along Mt Prov-Cagayan via Tabuk-Enrile Rd Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure: Release:3000000 Obligation:2940000 |
-16.918612206003 |
1212140041 | Improvement of Local Road, Barangay Bun-ayan, Sabangan, Mountain Province Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure: Release:5000000 Obligation:4950000 |
-1.6729844000583 |
1214570657 | Construction of Flood Control Structure along Bayudan River, Kabulawan-Busilac Bila-Otucan Sur, Sta. 55+800 - Sta. 56+480 (B.S.), Bauko, Mountain Province Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
1223118068 | Improvement of Local Road, Barangay Tapapan, Bauko, Mountain Province Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
1232789214 | Mt Prov-Cagayan via Tabuk-Enrile Rd - K0402 + 300 - K0402 + 333 Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 95.32 Expenditure: Release:15000000 Obligation:14700000 |
-27.393279797126 |
1251851275 | Dantay-Sagada Rd - K0393 + 033 - K0393 + 248 Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
1252777023 | Construction of Sadsadan-Balicanao-Salin Road, Bauko, Mountain Province Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 85.74 Expenditure: Release:40000000 Obligation:39200000 |
-11.02900322258 |
1267315855 | Improvement of Local Road, Barangay Bayyo, Bontoc, Mountain Province Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure: Release:5000000 Obligation:4950000 |
2.4082458337347 |
1280881628 | Baguio-Bontoc Rd - K0373 + 438 - K0373 + 456 Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
1281364628 | Construction of Bonon Flood Control Structure, Sta. 31+ 380 - Sta.31+460 (LS) along Talubin River, Bontoc, Mountain Province Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure: Release:16000000 Obligation:15680000 |
-25.010995455212 |
1283549568 | Baguio-Bontoc Rd - K0347 + 528 - K0347 + 589 Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure: Release:10000000 Obligation:9800000 |
61.459133296764 |
1295439950 | Improvement of Local Road, Barangay Bagnen Oriente, Bauko, Mountain Province Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 0 Actual: 91.5 Expenditure: Release:50000000 Obligation:4850999.12 |
0 |
1307350256 | Improvement of Local Road, Barangay Maligcong, Bontoc, Mountain Province Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
1307928220 | Construction of Wawang Flood Control Structure, Sta. 32 + 180 - Sta. 32 + 250 (L.S.), Sta. 32 + 184 - Sta. 32 + 264 (R.S.), Sta. 32 + 328 - Sta. 32 + 358 (L.S.), Sta. 32 + 335 - Sta. 32 + 375 (R.S.) along Talubin River, Bontoc, Mountain Province Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
1327340878 | Malanas Br. (B00932LZ) along Mt Prov-Cagayan via Tabuk-Enrile Rd Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure: Release:3000000 Obligation:2940000 |
-24.573140985435 |
1361866749 | Mt Prov-Cagayan via Tabuk-Enrile Rd - K0419 + 087, K0420 + 388, K0420 + 628 Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure: Release:7000000 Obligation:6860000 |
-6.4822780454233 |
1362715528 | Construction of Betwagan Bridge, Sadanga, Mountain Province Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-75.813969429022 |
1365384436 | Tapapan-Pagang Road connecting Pagang and the Provincial road in support of food/vegetable processing, dairy and coffee industries, Barangay Tapapan, Bauko, Mountain Province Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
1373448672 | Construction of Palinga-ao Flood Control Structure, Sta. 46 + 040 - Sta. 46 + 110 (LS) along Chico River, Sabangan, Mountain Province Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
1387245929 | Bontoc - Mainit - Sagada Road leading to Guina-ang Rice Terraces, Mainit Hotsprings, Bomod-ok Falls, Mountain Province Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
1387967886 | Chico Karayan Br. (B00924LZ) along Mt Province-N Vizcaya Rd Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 101 Expenditure: Release:13000000 Obligation:12740000 |
-5.4096271632343 |
1406570729 | Construction/ Rehabilitation of Water Supply/ Septage and Sewerage/ Rainwater Collector System Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-67.796610169492 |
1412235578 | Cabunagan Br. 2 (B04952LZ) along Mt Prov-Ilocos Sur via Kayan Rd Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
1443515221 | Improvement of Local Road, Barangay Balili - Barangay Alab Proper, Bontoc, Mountain Province Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure: Release:5000000 Obligation:4950000 |
-3.4626038781163 |
1445261619 | Poblacion, Sagada-Aguid Road in support of Coffee Weaving, Food Processing and Tourism Industries, Sagada, Mountain Province Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
1453872478 | Masla-Duagan Road in support of Sugarcane, Coffee, Food Processing and Furniture Industries, Tadian, Mountain Province Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure: Release:5000000 Obligation:4900000 |
-9.1655791816995 |
1464194361 | Mt Prov-Ilocos Sur via Tue Rd - K0388 + 930 - K0388 + 1050 Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
1468782202 | Sabangan Br. (B04953LZ) along Baguio-Bontoc Rd Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 99.71 Actual: 100 Expenditure: Release:2500000 Obligation:2450000 |
42.328420232452 |
1480459100 | Nacawang-Mabalite Road connecting Barangays Batayan and Mabalite in support of Sugarcane, Coffee, Corn, Mango and Furniture Industries, Tadian, Mountain Province Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure: Release:5000000 Obligation:4900000 |
-6.1410915790282 |
1481779818 | Construction of Multi-Purpose Building at Barangay Camatagan, Sabangan, Mountain Province Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
1506120769 | Construction of Multi-Purpose Building, Barangay Kayan East, Tadian, Mountain Province Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 0 Actual: 50.87 Expenditure: Release:5000000 Obligation:4847400.94 |
0 |
1506977140 | Mt Prov-Ilocos Sur via Tue Rd - K0418 + 360 Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure: Release:1500000 Obligation:1470000 |
-1.7460947364623 |
1536889353 | Baguio-Bontoc Rd - K0377 + 670 - K0377 +846 Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
1544479691 | Construction of Level III Water Supply System, Sabangan, Mountain Province Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 86.2 Expenditure: Release:30000000 Obligation:28665068.87 |
-45.962694428952 |
1553897358 | Improvement of Local Road, Barangay Bagnen Oriente, Bauko, Mountain Province Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
1557884546 | Magkang Br. (B00940LZ) along Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
1560925876 | Improvement of Local Road, Barangay Tapapan, Bauko, Mountain Province Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure: Release:5000000 Obligation:4950000 |
-4.5163754416118 |
1604992431 | Bila-Bagnen Oriente Road in support of Agribusiness, Coffee and Food Processing Industries, Bauko, Mountain Province Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
1606391038 | Banaao-Lenga-Cadadanan-Am-am Road connecting Banaao, Lenga and Cadadanan, Tadian, Mountain Province Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure: Release:5000000 Obligation:4900000 |
-1.8817619783617 |
1610475360 | Baguio-Bontoc Rd - K0371 + 037, K0371 + 841 Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
1624096731 | Latang Br. (B00926LZ) along Mt Prov-Cagayan via Tabuk-Enrile Rd Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
1630720531 | Baguio-Bontoc Rd - K0374 + 100 - K0374 + 120 Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure: Release:10000000 Obligation:9800000 |
37.348157298744 |
1651678596 | Improvement of Local Road, Barangay Bayyo, Bontoc, Mountain Province Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
1662241907 | Bato-Cuba-Balicanao-Pua-Mankingao Road connecting Bato and Mankingao in support of Food/Vegetable Processing and Coffee Industries, Brgy. Sadsadan and Brgy. Monamon Sur, Bauko, Mountain Province Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
1674573035 | Improvement of Sagada-Payeo Provincial Road, Sagada, Mountain Province Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure: Release:5000000 Obligation:4900000 |
-0.30225351034932 |
1716845455 | Asdan-Kadso-Masapa Road connecting Asdan and Kadso to the Mt. Province-Ilocos Sur National Road supporting Heirloom Rice, Banana Chips, Coffee and other Industries, Kayan West, Tadian, Mountain Province Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure: Release:5000000 Obligation:4900000 |
-9.2870680857268 |
1721382486 | Sabangan-Sagada Road leading to Poblacion Sagada, Sumaguing Cave, Hanging Coffins, Bomod-ok Falls, Bokong Falls, Marcos Cave, Mountain Province Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
1724119799 | Construction of Level III Water Supply System, Bauko, Mountain Province Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-70.998645903859 |
1750483119 | Mt Prov-Cagayan via Tabuk-Enrile Rd - K0393 + 570 - K0393 + 587 Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 0 Actual: 100 Expenditure: Release:15000000 Obligation:1470000 |
0 |
1765848657 | Construction of ABIT Flood Control along Abit River, Tadian, Mountain Province Mountain Province | DPWH MP 1st DEO | (default) |
Target: 100 Actual: 78.98 Expenditure: Release:100000000 Obligation:96500000 |
-21.02 |
1774493003 | Construction of Multi-Purpose Building, Barangay Suyo, Sagada, Mountain Province Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 0 Actual: 72.52 Expenditure: Release:5000000 Obligation:4950000 |
0 |
1782093447 | Maba-ay-Abatan Road leading to various tourism sites, Maba-ay-Abatan, Bauko , Mt. Province Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure: Release:10000000 Obligation:9800000 |
-9.1405292093502 |
1784023522 | Improvement of Local Road, Barangay Lagawa, Bauko, Mountain Province Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure: Release:5000000 Obligation:4950000 |
-4.6704583472733 |
1790117043 | Balitian Br. (B02982LZ) along Baguio-Bontoc Rd Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
1795161858 | Construction of Multi-Purpose Building at Barangay Balugan, Sagada, Mountain Province Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
1807695532 | Baguio-Bontoc Rd - K0344 + 450 - K0344 + 480, K0373 + 801 - K0373 + 903, K0374 + 024 - K0374 + 044, K0387 + 970 - K0388 + 000 Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
1811286041 | Improvement of Local Road, Barangay Bila - Barangay Otucan Norte Bauko, Mountain Province Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 0 Actual: 100 Expenditure: Release:5000000 Obligation:4950000 |
0 |
1815690295 | Chico Karayan Br. (B00924LZ) along Mt Province-N Vizcaya Rd Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
1825825415 | Construction of Chico River Flood Control, Tamog-o Section at Sitio Tamog-o in Barangay Monamon Norte, Bauko, Mountain Province Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure: Release:5000000 Obligation:4900000 |
-1.1639710360696 |
1835465573 | Construction/ Rehabilitation of Water Supply/ Septage and Sewerage/ Rainwater Collector System Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
1882614348 | Construction of Bonon Flood Control Structure, Sta. 31+ 380 - Sta.31+460 (LS) along Talubin River, Bontoc, Mountain Province Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
1907038954 | Bunga-Gayang-Palina Road connecting Bunga and Gayang to Mountain Province-Ilocos Sur National Road supporting Heirloom Rice, Coffee, Banana Chips, and other Industries, Bunga, Tadian, Mountain Province Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
1937595728 | Construction of Betwagam Bridge, Sadanga, Mountain Province Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 0 Actual: 0.7 Expenditure: Release:59400000 Obligation:57320000 |
0 |
1964235718 | Dantay-Sagada Rd - K0393 + 033 - K0393 + 248 Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure: Release:5056000 Obligation:4954880 |
-6.825503593302 |
1965552879 | Improvement of Local Road, Barangay Capinitan, Sabangan, Mountain Province Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
1978097838 | Ampawailen Br. (B04296LZ) along Mt Prov-Cagayan via Tabuk-Enrile Rd Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
1994300480 | Magkang Br. (B00940LZ) along Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure: Release:25000000 Obligation:24500000 |
0.76897517444344 |
2002336004 | Asdan-Kadso-Masapa Road connecting Asdan and Kadso to the Mt. Province-Ilocos Sur National Road supporting Heirloom Rice, Banana Chips, Coffee and other Industries, Kayan West, Tadian, Mountain Province Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
2017984153 | Construction (Completion) of Multi-Purpose Building, Barangay Demang, Sadanga, Mountain Province Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
2021164946 | Besao- Tubo (via Tamboan) Road, Mountain Province Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure: Release:25000000 Obligation:24500000 |
-2.7450203151323 |
2021855153 | Mt Prov-Cagayan via Tabuk-Enrile Rd - K0392 + 310, K0392 + 634, K0396 + 513, K0397 + 427, K0398 + 400, K0399 + 080, K0400 + 162 - K0400 + 372 Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
2023207342 | Cabunagan Br. 2 (B04952LZ) along Mt Prov-Ilocos Sur via Kayan Rd Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure: Release:1500000 Obligation:1470000 |
-9.2948158491883 |
2028598204 | Construction (Completion) of Multi-Purpose Building (Municipal Local Government Unit Building), Opukan, Sadanga, Mountain Province Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
2030332224 | Improvement of Local Road, Barangay Talubin, Bontoc, Mountain Province Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
2080940850 | Mt Prov-Ilocos Sur via Tue Rd - K0418 + 360 Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
2082080293 | Beto Br. (B04612LZ) along Mt Prov-Ilocos Sur via Tue Rd Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
2085506628 | Construction of Can-eo Road, Bontoc, Mountain Province Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 0 Actual: 100 Expenditure: Release:5000000 Obligation:4950000 |
0 |
2105710168 | Improvement of Local Road, Barangay Lagawa, Bauko, Mountain Province Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
2112928802 | Lacbaben-Magiyad Road in support of Coffee, Food Processing, and Heirloom Rice Industries, Bauko, Mountain Province Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 100 Expenditure: Release:5000000 Obligation:4900000 |
9.5535065233194 |
2129558504 | Baguio-Bontoc Rd - K0373 + 438 - K0373 + 456 Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 0 Actual: 100 Expenditure: Release:2000000 Obligation:1960000 |
0 |
2144661142 | Balili-Suyo-Sagada Road leading to Sagada Caves, Rice Terraces, and Water Falls, Bontoc and Sagada, Mountain Province Mountain Province | DPWH MP 1st DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-66.666666666667 |
6353793 | Mt. Province Bdry.-Calanan-Pinukpuk-Abbut Rd. K0423+382 - K0423+392, K0424+672 - K0424+690, K0426+875 - K0426+925, K0433+520 - K0433+570, K0435+007 - K0435+050, K0437+533 - K0437+594, K0437+785 - K0437+800, K0437+835 - K0437+850, K0437+875 - K0437+907, K0439+1434 - K0439+1449, K0449+668 - K0449+727, K0450+750 - K0450+810, K0450+880 - K0450+930, K0451+207 - K0451+323, K0451+694 - K0451+867, K0452+774 - K0452+804, K0453+414 - K0453+466, K0453+863 - K0453+889, K0454+924 - K0454+959, K0459+1930 - K0459+1942, K0462+826 - K0463+000 Kalinga | DPWH Upper Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-70.652562726762 |
10359484 | Mt. Province Bdry.-Calanan-Pinukpuk-Abbut Rd. K0446+684 - K0447+192 Kalinga | DPWH Upper Kalinga DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
47621056 | Construction of RHU Lower Uma Flood Control Sta. 180+050 - Sta. 180+110 (R.S.), Lower Uma, Lubuagan, Kalinga Kalinga | DPWH Upper Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-52.725 |
82153384 | Mountain Province Boundary Cagaluan Junction Sukiap, Tanglag-Mabongtot Road in support of Agribusiness Industry (Coffee, Heirloom Rice, and Other High Value Crops), Lubuagan, Kalinga Kalinga | DPWH Upper Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-49.299838750743 |
86539335 | Construction of Balngabang Drainage System, Sta.173+350 - Sta.173+450 (B.S.), Dangoy, Lubuagan, Kalinga Kalinga | DPWH Upper Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-43.317784520629 |
108860795 | Construction of Abra-Kalinga-Apayao Road along Aciga (Pinukpuk)-Tawang-Buaya-Mabaca (Balbalan Section), Kalinga Kalinga | DPWH Upper Kalinga DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
123440502 | Rehabilitation/Improvement of Road (Pulag Relocation Site), Barangay Pugong, Pasil, Kalinga Kalinga | DPWH Upper Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-33.996666666667 |
134117260 | Construction of Road, Sitio Tocpao, Poblacion, Lubuagan, Kalinga Kalinga | DPWH Upper Kalinga DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
187873793 | Construction of Balbalasang Bridge and Approaches, Balbalan, Kalinga Kalinga | DPWH Upper Kalinga DEO | (Cumulative) |
Target: 97.99 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-74.087718078821 |
211015396 | Construction (Completion) of Nawoy Multi-Purpose Building in Balbalan, Kalinga Kalinga | DPWH Upper Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-36.320232493772 |
248302223 | Construction of Dao-angan Flood Control Structure, Sta.141+960 - Sta.142+110 (B.S.), Dao-angan, Balbalan, Kalinga Kalinga | DPWH Upper Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-65.52038675545 |
327060012 | Pasil River Junction - Vaaw Galdang Road connecting Limood - Amdalao Provincial Road and Vaaw Galdang Road in support to the Heirloom Rice, Coffee and Banana Processing, Pasil, Kalinga, Package II Kalinga | DPWH Upper Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-33.993333333333 |
340245747 | Construction of Pantikian Drainage Systems Sta. 154+600 - Sta. 154+840 (B.S.), Pantikian, Balbalan, Kalinga Kalinga | DPWH Upper Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-55.918546733079 |
346807017 | Construction (Completion) of Dangoy Flood Control Structure, Sta.173+650 - Sta.173+690 (R.S.), Dangoy, Lubuagan, Kalinga Kalinga | DPWH Upper Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-50.7 |
346883745 | Construction (Completion) of Luplupa Flood Control Structure along Chico River Sta.189+100 - Sta.189+250 (R/S), Luplupa, Tinglayan, Kalinga Kalinga | DPWH Upper Kalinga DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
363801243 | Construction of Purag Chartoy Footbridge at Lower Bangad, Tinglayan, Kalinga Kalinga | DPWH Upper Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-33.956666666667 |
397460452 | Poblacion Tinglayan-Tulgao East-Tulgao West in support of Processed Food Industry, Blacksmith Industry and Rattan/Bamboo Weaving Industry, Tinglayan, Kalinga Kalinga | DPWH Upper Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-79.525273963703 |
433084216 | Bugnay (Mangape) - Buscalan-Loccong-Butbut Proper road leading to Buscalan Tattoo Village, Kalinga Kalinga | DPWH Upper Kalinga DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
470602156 | Pasil River Junction - Vaaw Galdang Road connecting Limood - Amdalao Provincial Road and Vaaw Galdang Road in support to the Heirloom Rice, Coffee and Banana Processing, Pasil, Kalinga Kalinga | DPWH Upper Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-83.822767317326 |
482520243 | Abra-Kalinga-Apayao Road along Aciga (Pinukpuk)-Tawang-Buaya-Mabaca (Balbalan Section, Kalinga), Kalinga Kalinga | DPWH Upper Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-50.256085630431 |
497961679 | Construction of Tapao Flood Control Structure, Sta.166+000 - Sta.166+200 (L.S.), Balbalasang, Balbalan, Kalinga Kalinga | DPWH Upper Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-51.080017024899 |
503701443 | Construction of Mong-ol Flood Control STA. 171+140 - STA. 171+240 (R.S.), Balinciagao Norte, Pasil, Kalinga Kalinga | DPWH Upper Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-78.893453848261 |
526964173 | Construction (Completion) of Kimatan Flood Control Structure, Sta.173+680 - Sta.173+780 (R.S.), Poblacion, Lubuagan, Kalinga Kalinga | DPWH Upper Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-47.146423722132 |
573579461 | Construction of DPWH Upper Kalinga District Engineering Office Building, Kalinga Kalinga | DPWH Upper Kalinga DEO | (Cumulative) |
Target: 65.45 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-88.054447312837 |
582394657 | Construction of Sukiap Flood Control Structure along Chico River Sta.170+350 - Sta.170+650 (R.S), Tanglag, Lubuagan, Kalinga Kalinga | DPWH Upper Kalinga DEO | (Cumulative) |
Target: 73.38 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-24.3399871217 |
609072033 | Construction of Dugnac/Lungog/Umisi-is Footbridge, Barangay Dugnac/Western Uma/Guina-ang, Lubuagan/Pasil, Kalinga Kalinga | DPWH Upper Kalinga DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
638509829 | Construction of Bulen Access Road, Barangay Magsilay, Pasil, Kalinga Kalinga | DPWH Upper Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-58.956699624957 |
672541021 | Construction of Level III Water Supply System, Lubuagan, Kalinga Benguet | DPWH Upper Kalinga DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
694188679 | Construction of Chachawis/Langso, Arngigan/Tulgao Footbridge, Barangay Bugnay/Belong Man-ubal/Tulgao, Tinglayan, Kalinga Kalinga | DPWH Upper Kalinga DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
723693966 | Construction of Yakyak Mabilong - Malusong Flood Control Structure, Sta.170+200 - Sta.170+275 (B.S.), Mabilong and Antonio Canao, Lubuagan, Kalinga Kalinga | DPWH Upper Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-72.981629769195 |
756269124 | Construction of Abra-Kalinga-Apayao Road along Salegseg-Gawa-an-Mabaca (Balbalan Section), Kalinga Kalinga | DPWH Upper Kalinga DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
756941990 | Construction of Latawan Drainage System, Sta.180+270 - Sta.180+390 (B.S.), Western Uma, Lubuagan, Kalinga Kalinga | DPWH Upper Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-44.542196155099 |
777249118 | Construction (Continuation) of Cagaluan Flood Control Structure, Sta.163+870 - Sta.164+070 (R.S.), Cagaluan, Pasil, Kalinga Kalinga | DPWH Upper Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-34.720731913932 |
782882258 | Kalinga-Abra Rd.- K0471+653 - K0471+703 Kalinga | DPWH Upper Kalinga DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
841122084 | Lubuagan-Batong Buhay-Abra Bdry Rd - K0464+520 - k0464+630, K0465+445 - K0465+470 Kalinga | DPWH Upper Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-50.273198304286 |
864113428 | Construction of Amdalao Drainage Systems Sta. 175+590 - Sta. 175+720 (B.S), Sitio Amdalao, Guina-ang, Pasil, Kalinga Kalinga | DPWH Upper Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-54.68 |
899112559 | Construction of Maatop Flood Control Structure, Sta.162+187 - Sta.162+415 (R.S), Maatop, Balbalan, Kalinga Kalinga | DPWH Upper Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
3.5257696497162 |
909504186 | Construction of Gallang Flood Control Structure, Sta.164+015 - Sta.165+765 (L.S.), Balbalasang, Balbalan, Kalinga Kalinga | DPWH Upper Kalinga DEO | (Cumulative) |
Target: 52.62 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-53.953895535454 |
927399369 | Construction of Sidil Flood Control Sta. 170+400 - Sta. 170+470 (L.S.), Pugong, Pasil, Kalinga Kalinga | DPWH Upper Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-60.191082802548 |
934214980 | Continuation of Cagaluan Flood Control Sta. 164+070 - Sta. 164+270 (L.S.), Cagaluan, Pasil, Kalinga Kalinga | DPWH Upper Kalinga DEO | (Cumulative) |
Target: 99 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-64.302712993812 |
959655430 | Lubuagan-Batong Buhay Junction Awichon-Upper Uma Road in support of Homestyles Industry (Softbroom Making and Blacksmith), Lubuagan, Kalinga, Package II Kalinga | DPWH Upper Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-34.3 |
973753190 | Installation/Construction of Road Safety Devices (Solar Studs and Solar LED Street Lights) along Kalinga-Abra Rd - K022+389 - K0526+511, Balbalan, Kalinga Kalinga | DPWH Upper Kalinga DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
982086788 | Construction of Mataliling Flood Control Structure, Sta.181+310 - Sta. 181+410 (L.S), Upper Uma, Lubuagan, Kalinga Kalinga | DPWH Upper Kalinga DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
1009300748 | Installation/Construction of Road Safety Devices (Solar Studs and Solar LED Street Lights) along Lubuagan-Batong Buhay-Abra Bdry Rd - K0459+(-610) - K0472+120, Lubuagan and Pasil, Kalinga Kalinga | DPWH Upper Kalinga DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
1020322885 | Bugnay (Mangape)-Buscalan-Loccong-Butbut Proper road leading to Buscalan Tattoo Village, Kalinga Kalinga | DPWH Upper Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-93.153333333333 |
1031209206 | Balantoy-Dao-angan-Poswoy-Ababa-an Road in support of Coffee Processing Industry, Homestyles Industry (Basketry and Softbroom Making) and Food Processing Industry, Balbalan, Kalinga Kalinga | DPWH Upper Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-48.786486050637 |
1090200507 | Construction of Manangol Flood Control Sta.179+350 - Sta.179+450 (R.S.), Mabilong, Lubuagan, Kalinga Kalinga | DPWH Upper Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-48.54715748203 |
1116943813 | Construction of Bonog-Chico Flood Control along Chico River Sta.182+000 - Sta. 182+070 (L.S), Poblacion, Tinglayan, Kalinga Kalinga | DPWH Upper Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-83.676153401021 |
1133665634 | Kalinga-Abra Rd.- K0477+202 - K0477+857 Kalinga | DPWH Upper Kalinga DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
1176801134 | Concreting/Improvement of the Balbalasang Local Road in Brgy. Balbalasang, Balbalan, Kalinga Kalinga | DPWH Upper Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-36.311923149369 |
1212668514 | Construction (Completion) of Cagaluan Multi-Purpose Building, Barangay Cagaluan, Pasil, Kalinga Kalinga | DPWH Upper Kalinga DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
1215183346 | Construction of Slope Protection along Kalinga-Abra Road (Balbalan Section), K0494+070-K0494+133.50, Balbalan, Kalinga Kalinga | DPWH Upper Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-21.118736823218 |
1262609111 | Kalinga-Abra Rd.- K0497+045 - K0497+278 Kalinga | DPWH Upper Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-54.476311202662 |
1296920410 | Uguid Subterranean Tourism Destination Access Road, Brgy. Maling (Kabugao), Balbalan, Kalinga Kalinga | DPWH Upper Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-64.985484426512 |
1300052993 | National Road System along Kalinga-Abra Road (Balbalan Section), K0487 + 1235-K0487+1260, K0487 + 1310-K0487+1381, K0489 + 081-K0489+211, K0489 + 286-K0489+500, K0489 + 1715-K0489+1755, K0494 + 055-K0494+201, K0497 + 440-K0497+618, Balbalan, Kalinga Kalinga | DPWH Upper Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-46.718595343633 |
1313069340 | Mt. Province Bdry.-Calanan-Pinukpuk-Abbut Rd. (Cagaluan - Calanan Sect) - K0465+280 - K0465+346, K0465+615 - K0465+704, K0465+743 - K0465+858, K0467+895 - K0467+985 Kalinga | DPWH Upper Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-70.615847747334 |
1344180350 | Construction of Access Road Leading to DPWH- Upper Kalinga DEO Building Cagaluan, Pasil, Kalinga Kalinga | DPWH Upper Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-82.565 |
1413761433 | Construction of Dalayap Flood Control Sta. 149+300 - Sta. 149+325 (B.S.), Salegseg, Balbalan, Kalinga Kalinga | DPWH Upper Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-71.405582097058 |
1481268063 | Construction of Multi-Purpose Building, Lubuagan/Buaya/Char-ig, Barangay Dangoy/Buaya/Mallango, Lubuagan/Balbalan/Tinglayan, Kalinga Kalinga | DPWH Upper Kalinga DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
1496087253 | Completion of Dao/Lutut/Maulay Footbridge in Pasil, Kalinga Kalinga | DPWH Upper Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-34.683333333333 |
1503367390 | Completion of Wangwang Flood Control Sta. 170+000 - Sta 170+060 (L.S.), Dangtalan, Pasil, Kalinga Kalinga | DPWH Upper Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-82.92 |
1516366410 | Mallango-Asafang-Tabtaban-Sumadel Road in support to sugarcane wine processing and softbroom making, Tinglayan, Kalinga Kalinga | DPWH Upper Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-55.629418098404 |
1522071816 | Construction of Balbalan Proper Flood Control Sta. 145+200 - Sta. 145+250 (B.S), Balbalan Proper, Balbalan, Kalinga Kalinga | DPWH Upper Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-58.225191893534 |
1522433177 | Lubuagan-Batong Buhay-Abra Bdry Rd - (S00563LZ) Chainage 075 - Chainage 120 Kalinga | DPWH Upper Kalinga DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
1545146839 | Lubuagan-Batong Buhay-Abra Bdry Road - K0476+426 - K0476+655, K0476+878 - K0476+1440, K0476+1675 - K0476+2879 Kalinga | DPWH Upper Kalinga DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
1569731616 | Wallis Bridge (B04610LZ) along Mt. Province Bdry- Calanan-Pinukpuk-Abbut Rd. Kalinga | DPWH Upper Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-36.62 |
1576888850 | Construction of Ta-ang Flood Control Sta. 175+230 - Sta. 175+280 (B.S.), Dangtalan, Pasil, Kalinga Kalinga | DPWH Upper Kalinga DEO | (Cumulative) |
Target: 96.26 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-70.875589201543 |
1576957243 | Uguid Subterranean Tourism Destination Access Road Brgy. Maling, Balbalan, Kalinga Kalinga | DPWH Upper Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-36.933333333333 |
1588409487 | Construction of Balinciagao Creek Flood Control Structure, Sta.171+170 - Sta.171+270 (B.S.), Balinciagao Sur, Pasil, Kalinga Kalinga | DPWH Upper Kalinga DEO | (Cumulative) |
Target: 89.51 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-35.509289380467 |
1597278701 | Construction of Banat, Magsilay Proper drainage Sytems Sta. 169+590 - Sta 169+740(R.S.), Magsilay, Pasil, Kalinga Kalinga | DPWH Upper Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-72.395 |
1597654400 | Butbut Proper-Tulgao-Dananao-Sumadel-Mallango Road leading to Tulgao & Sumadel Rice Terraces, Palang-ah Falls & Hotspring, Tinglayan, Kalinga Kalinga | DPWH Upper Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-80.562114057392 |
1631658579 | Kalinga-Abra Rd.- K0510+000 - K0510+087 Kalinga | DPWH Upper Kalinga DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
1656824262 | Construction of Tulgao East/Bugnay Access Road, Barangay Tulgao/Bugnay, Tinglayan, Kalinga Kalinga | DPWH Upper Kalinga DEO | (default) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
1700365273 | Construction of Ambalbalan Flood Control along Chico River STA. 175+350 - STA. 175+410 (R.S.), Mabongtot, Lubuagan, Kalinga Kalinga | DPWH Upper Kalinga DEO | (default) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-100 |
1729045662 | Lubuagan-Batongbuhay-Abra Bdry Road K0473+738 - K0475+823 Kalinga | DPWH Upper Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-36.66 |
1743643700 | Construction of Sitio Sabangan, Malusong Flood Control Sta. 170+200 - Sta. 170+270 (B.S.), Sitio Sabangan, Antonio Canao, Lubuagan, Kalinga Kalinga | DPWH Upper Kalinga DEO | (Cumulative) |
Target: 84.28 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-80.005384546352 |
1762277115 | Completion of Balbalan Central School Drainage Systems Sta. 147+900 - Sta. 148+100 (B.S.), Salegseg, Balbalan, Kalinga Kalinga | DPWH Upper Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-62.971745711403 |
1801846713 | Construction of Balbalasang Multi-Purpose Building in Balbalan, Kalinga Kalinga | DPWH Upper Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-38.152971112109 |
1828016937 | Construction of Basao Local Road, Basao, Tinglayan, Kalinga Kalinga | DPWH Upper Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-36.46 |
1834197444 | Lubuagan-Batong Buhay Junction Awichon-Upper Uma Road in support of Homestyles Industry (Softbroom Making and Blacksmith), Lubuagan, Kalinga Kalinga | DPWH Upper Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-65.712306626645 |
1844563148 | Kalinga-Abra Rd.- K0526+083 - K0526+102 Kalinga | DPWH Upper Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-59.373463165142 |
1845349967 | Balbalan-Pinukpuk Rd. K0491+478 - K0491+504, K0492+251 - K0492+301, K0492+697 - K0492+727, K0493+000 - K0493+028 Kalinga | DPWH Upper Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-45.908227708343 |
1854144243 | Kalinga-Abra Rd.- K0464+622 - K0464+677, K0465+124 - K0465+225, K0471+000 - K0471+120, K0471+152 - K0471+216, K0474+1000 - K0474+1043, K0479+508 - K0479+544, K0479+566 - K0479+588, K0480+786 - K0480+842, K0503+1198 - K0503+1266, K0503+1412 - K0503+1448, K0506+830 - K0506+850, K0509+420 - K0509+452, K0516+550 - K0516+570, K0517+295 - K0517+309, K0523+277 - K0523+322 Kalinga | DPWH Upper Kalinga DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
1865087974 | Construction (Completion) of Balbalan Multi-Purpose Building, Balbalan, Kalinga Kalinga | DPWH Upper Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-35.716666666667 |
1866900146 | Construction of Danglis Flood Control Structure along Chico River Sta.188+800 - Sta.188+950 (R/S), Poblacion, Tinglayan, Kalinga Kalinga | DPWH Upper Kalinga DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
1870627910 | Construction of Water System, Barangay Community Waterworks in Olata, Barangay Mabilong, Lubuagan, Kalinga Kalinga | DPWH Upper Kalinga DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
1896751098 | Construction of Dun-ol Sangab Flood Control along Pasil River Sta.175+270 - Sta 175+630 (L.S.), Amdalao, Guina-ang, Pasil, Kalinga Kalinga | DPWH Upper Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-77.738161559889 |
1901961700 | Installation/Construction of Road Safety Devices (Solar Studs and Solar LED Street Lights) along Mt. Province Bdry.-Calanan-Pinukpuk-Abbut- K0447+000 - K0469+916 Kalinga | DPWH Upper Kalinga DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
1921391705 | Construction of Dao-angan Bridge Flood Control Sta. 141+900 - Sta. 141+960 (B.S.), Dao-angan, Balbalan, Kalinga Kalinga | DPWH Upper Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-80.321510876286 |
1932441107 | Mountain Province Boundary Cagaluan Junction Sukiap, Tanglag-Mabongtot Road in support of Agribusiness Industry (Coffee, Heirloom Rice, and Other High Value Crops), Lubuagan, Kalinga, Package II Kalinga | DPWH Upper Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-33.826666666667 |
1967253249 | Installation/Construction of Road Safety Devices (Solar Studs and Solar LED Street Lights) along Balbalan-Pinukpuk Rd. K0480+(-376) - K0494+664 Kalinga | DPWH Upper Kalinga DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
2038656185 | Construction of Level III Water Supply Project, Pasil, Kalinga Kalinga | DPWH Upper Kalinga DEO | (Cumulative) |
Target: 100 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
-35.92 |
2066436417 | Construction of Basao/Sumadel-Asafang Access Road, Barangay Basao/Sumadel, Tinglayan, Kalinga Kalinga | DPWH Upper Kalinga DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |
2077851108 | Kalinga-Abra Rd.- K0500+133 - K0500+167 Kalinga | DPWH Upper Kalinga DEO | (Cumulative) |
Target: 0 Actual: 0 Expenditure:0 Release:0 Obligation:0 |
0 |